ARCHITECTS : J MAYER H. [BERLIN]
STRUCTURAL CONSULTANTS: ARUP & FFM
LEVEL: PRECINT LEVEL
AREA : 12000 SQM.
METROPOL PARASOL, SEVILLE (SPAIN)
Plaza de la Encarnación served as a
farmers’ market for till 1960s.
After the Market Place was
demolished, the public square fell into
despair and became an eyesore.
The plaza remained derelict for
nearly 30 years, only to be used
as a parking space before the
city officials decided that
something needed to be done
to rejuvenate the space.
BACKGROUND
Planning was done regarding
construction of a shopping
centre on the square, but
those plans were halted
when Roman ruins were
discovered at the site while
excavation.
The result, Metropol Parasol, is a contemporary timber structure that provides
a striking contrast to the city’s traditional architecture. #PLACEMAKING
#LARGESCALEARCHITECTURE
• After the demolition of Plaza de la Encarnación, the
neighbourhood became an area of dim streets, mostly
closed premises with very little business and many empty
houses.
• In 2004, city officials called for entries through an
international design competition to obtain proposals for
renovation the square and to activate the adjoining
commercial areas.
• Besides enabling a complex programme of uses, it was also
stipulated that the project had to constitute an architectural
landmark that would transform the square into an inviting
destination, even during the city’s scorching summers.
Mercado de Feria
Mercado de Entradores
CONCERNS
#FIGURE- GROUND RELATIONSHIP
DESCRIPTION:
• Metropol Parasol is the new icon project for Seville- a place
of identification and to articulate Seville’s role as one of
Spain’s most fascinating cultural destinations.
• Its role as a unique urban space within the dense fabric of
the medieval inner city of Seville allows for great variety of
activities like memory, leisure and commerce.
• A highly developed infra helps to activate the square,
making it an attractive destination for tourists and locals
alike.
• Its strong concern for specific ethical and social situation
moved the Plaza de la Encarnacion into the centre of urban
activity of Seville. Metropol Parasol is innovation at the
forefront of sustainable construction by
long-lasting adaptability of various
programmes, unique architecture design
of highest standards, efficient
construction and environmental
concerns.
QUANTITATIVE DESIGN PROGRAMME
• Responsible use and management use of natural resources
(eg. Timber from sustainable forests and certified sources)
• Reduced embodied energy due to the use of timber instead
of steel for parasols
• Use of growing material, local materials, recycled and
recyclable materials
• Long life cycle of construction due of long lasting low
maintenance materials
• Operation and maintenance: self cleaning skin polyurethane
coating as long lasting weather protection and solution
liquid free
• Low impact construction process
• Creation of an improved microclimate by shading of the
plaza and evaporative cooling over water features
• Adaptation of the scheme, keeping existing monumental
trees in the square
• Natural lighting, low energy public lighting
• Public furniture made of recycled materials
• Construction on columns provides additional usable space
without reducing the available space.
QUALITATIVE DESIGN PROGRAMME
DESIGN ELEMENTS
• Surface Water
The surfaces on the plaza are made of
permeable finishes to allow a direct
drainage of the locally intense rainfall to
the ground rather than public sewage.
• Green Power Generation
The Parasol integrates solar-thermal &
solar-electric panels for hot water
production for the restaurants and
bars and photovoltaic power generation for
fountains & public-lighting.
• Permeability
The structure was deliberately not made
continuous but left permeable, to let some
filtered light to the plaza & allow any warm
air generated on the plaza or the air-
conditioning equipment to escape.
• Shading
The Parasols provides shading from the intense
sun in the Southern Spain; on the plaza level this
leads to an extended usability & increase in
attractiveness of the public space, while for the
market this reduced the cooling load for the AC
equipment.
• Free Cooling
Water features distributed on the plaza provide a
source of cooling by evaporation; apart from an
eye catcher and focal point for social activities.
DESIGN PRINCIPLES• “…an urban democratic open cathedral without walls..”
The architect, Jürgen
Mayer H, was inspired
by the magnificent
fan tracery vaulting of
the cathedral when
he designed the
parasols.
Moreover, traces
of inspiration from
local vegetation
can also be
observed.
#SIGNIFICANCE
OF OBJECT
DESIGN IMPLEMENTATION
• The engineering strategy ensured that the loads of this enormous timber structure were brought to ground
among the precious ancient ruins with deftness and lightness of touch.
• The plinth is made up of huge Vierendeel trusses forming a box that sits atop five enormous steel trident
columns rising out of the museum level.
• The connecting steel platforms of the mushrooms, for the restaurant area and rooftop walkway, are
supported by a number of profiled hollow steel struts, which transfer their greater loads back to the
concrete core using a saw-tooth connector.
• The structural engineers developed the
innovative fork-headed connection detail
based on glued-in steel bars (FFM) — an
optimised bonding approach to aid with
rapid erection on site.
• Construction of the shading structure was
carefully considered. Connections between
the trunks of the mushrooms and the
canopy were site welded. To plan it,
Finnforest used a 3D contour of the
Parasol, allowing the scaffolding contractor
to work out the potential loads that it
would have to take to allow the canopy to
be constructed on it.
Construction of the timber structure began in
June 2008 and completed in March 2011.
How Did They Open Up “The Urban Umbrella” ?
Phase 1: Concrete structure
The steel structure of the museum and marketplace and
the steel/concrete structure for the high-level cafe are
completed. Two of the concrete cores that house lifts and
four concrete plinths have been constructed.
Phase 2: Timber Trunks
Construction of the timber
trunks starts with the base
plates at the top of the
concrete plinths. The
timber panels, which are
up to 16m high, are then
set up according to a
sequence which ensures
temporary stability at all
times.
Phase 3: Main Structure
The individual elements immediately
above the trunks are prepared at the
plaza level before they are hoisted into
place at high level. The fire protection is
constructed at the lower half of the
trunks.
Phase 4: Scaffolding Up
Scaffolding is built to temporarily support the
main timber structure outside the area of the
trunks. Work started at the rear of the site and
two cranes were needed to attend to the
simultaneous erection of scaffolding and timber.
Phase 5: Scaffolding Down
Scaffolding is taken down zone by zone, from the outside of
the structure inward, with continuous control of the structure
ensuring safety. The overall plaza is repaved and all urban
infrastructures finished.
Phase 6: Finishing Touches
The entire scaffolding has been taken down, and
the high-level walkway constructed on top of the
timber structure. All services, such as lightning
protection, are installed within the timber
structure.
DEVELOPING A STRUCTURAL STRATEGY
• Optimising Jurgen Mayer H's design was one of the first things that needed to be
addressed. The scheme as proposed maintained a classic separation between the
outer visible cladding and the hidden structure required to make it stand up, making
use of steel structural tubes that would then be covered in metal cladding.
• The revised approach in the design development phase involved looking at dual-layer
steel shells and the use of steel foam. In the end, the design team chose to
concentrate on a supporting structure made out of curved lamina.
• There were two options feasible: a radial disc configuration directed outwards from
the supporting beams, or an orthogonal arrangement supported from the trunks.
Although the former would be statically more efficient and saves material, there
would be problems with the constantly changing geometry of the connecting
interfaces, so the latter was chosen.
• Given the enormous number of connections, it was
presumed that the structure should consist of welded steel
sheets, but analysis of the structure showed that these thin
steel sheets would buckle long before the required loading
capacity was reached. In the end team opted for Kerto-Q
LVL. Even though these would be thicker than the steel
sheets, they would weigh less and would also be more stable
and would not suffer from crumpling, due to their thickness.
• Because the roof is not closed, to give the form rigidity,
additional steel diagonals were needed to give the timber
structure the rigidity to carry the load. These are positioned
around the concrete cores and lend stiffness to the structure.
However, since the arrangement of the steels influences the
appearance of the Parasols, these are positioned as
inconspicuously as possible.
• The use of cross-laminated timber ensured that the
structure could work at optimum loading strengths, as well
as making it resistant to the harsh effects of moisture,
making it eminently suitable for use in outdoors.
LVL : Laminated Veneer Lumber
MANAGEMENT
STRATEGIES
PPP (PUBLIC PRIVATE PARTNERSHIP)
A partnership between a public sector entity (sponsoring
authority) and a private sector entity (a legal entity in
which 51% or more of equity is with the private partner/s)
for the creation and/or management of infrastructure for
public purpose for a specified period of time (concession
period) on commercial terms.
During the concession time, the private partner is
entitled to earn the amount that he invested along with
the profit, by charging the users – the amount being
monitored by the public sector entity.
After the concession time is over, the infrastructure is
handed over to the public in all its totality.
The design was procured
using a form of PPP
contract between the
Seville city government
and Sacyr.
It involved Sacyr putting up
half the construction cost,
the architect working
under the contractor, and
the other consultants
being appointed by the
architect.
Under the PPP, Sacyr
maintains ownership and
management of the site
for 40 years, before the
whole building is handed
back to the city in
perpetuity.
Construction began in 2005, with an estimated cost of
50 million euros and a projected completion date in
2007. However, unknown to the public, the project soon
faced difficulties.
By some estimates, due to delays, the total cost of the
structure approached 100 million euros.
OUTCOME
Local Effect:
Activation
Development in the
neighbouring areas
The Parasol have also become
A centre for public demonstrations
and protests where people gather
for common interests- a space par
excellence within which the political
exists as a public expression of the
plurality of the people within it.
#PROTECTION & ENHANCEMENT OF THE HUMAN NETWORK ; #PUBLICDOMAIN
The use of the plaza to for mass public
gatherings- for concerts, celebration, etc.. .
When viewed from different angles, Metropol
Parasol has a fantastic, daring, creative and
inventive sculpture-like repetitive geometric plan.
Residents of Seville have distinct feelings towards
Metropol Parasol.
Although there are many who admire, but it is
not uncommon to find a few disappointed by the
galactic waffle-like structure landing in such a
traditional city.
But so did most Parisians hated EIFFEL TOWER in its inception...!
And the rest is history !!!
THANK YOU !
MANSI RAWAT BA13ARC028
SAURABH DEOTALE BA13ARC043
PRASAD THANTHRATEY BA13ARC049

More Related Content

What's hot

Case study cummunity. center presentation
Case study cummunity. center presentationCase study cummunity. center presentation
Case study cummunity. center presentation
Sispap1
 

What's hot (20)

Case study cummunity. center presentation
Case study cummunity. center presentationCase study cummunity. center presentation
Case study cummunity. center presentation
 
Peter eisenman
Peter eisenmanPeter eisenman
Peter eisenman
 
the dancing house by Frank. O. Gehry
the dancing house by Frank. O. Gehry the dancing house by Frank. O. Gehry
the dancing house by Frank. O. Gehry
 
Rem koolhas
Rem koolhasRem koolhas
Rem koolhas
 
Hassan fathy
Hassan fathyHassan fathy
Hassan fathy
 
Guggenheim museum @ bilbao
Guggenheim museum @ bilbaoGuggenheim museum @ bilbao
Guggenheim museum @ bilbao
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Kenzo Tange - Architecture
Kenzo Tange - ArchitectureKenzo Tange - Architecture
Kenzo Tange - Architecture
 
Kimbell art museum
Kimbell art museumKimbell art museum
Kimbell art museum
 
LESS IS MORE(MIES VAN DER ROHE)
LESS IS MORE(MIES VAN DER ROHE)LESS IS MORE(MIES VAN DER ROHE)
LESS IS MORE(MIES VAN DER ROHE)
 
norman foster
norman fosternorman foster
norman foster
 
Zaha Hadid works
Zaha Hadid worksZaha Hadid works
Zaha Hadid works
 
Heydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materialsHeydar Aliyev Center Structural system and materials
Heydar Aliyev Center Structural system and materials
 
Richard meier
Richard meierRichard meier
Richard meier
 
The crystal palace
The crystal palaceThe crystal palace
The crystal palace
 
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
HEYDER ALIVEY CULTURE CENTER - STRUCTURE ANALYSIS
 
Hassan fathy
Hassan fathyHassan fathy
Hassan fathy
 
Guggenheim museum,newyork
Guggenheim museum,newyorkGuggenheim museum,newyork
Guggenheim museum,newyork
 
Blob architecture research paper
Blob architecture research paperBlob architecture research paper
Blob architecture research paper
 
I.M. Pei
I.M. PeiI.M. Pei
I.M. Pei
 

Similar to Case Study: Metropol Parasol, Seville (Spain)

Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
01 case study
01 case study01 case study
01 case study
Architect
 

Similar to Case Study: Metropol Parasol, Seville (Spain) (20)

Building Technology project 02
Building Technology project 02Building Technology project 02
Building Technology project 02
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
PROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONSPROJECT 2: CONSTRUCTION SOLUTIONS
PROJECT 2: CONSTRUCTION SOLUTIONS
 
AR Gunnar Birkerts
AR Gunnar BirkertsAR Gunnar Birkerts
AR Gunnar Birkerts
 
Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.Marquette Plaza, Minneapolis, Minnesota, United States.
Marquette Plaza, Minneapolis, Minnesota, United States.
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Norman foster
Norman fosterNorman foster
Norman foster
 
CASE STUDY
CASE STUDYCASE STUDY
CASE STUDY
 
Case study 2.pptx
Case study 2.pptxCase study 2.pptx
Case study 2.pptx
 
HOA ASSGINMENT.pptx
HOA ASSGINMENT.pptxHOA ASSGINMENT.pptx
HOA ASSGINMENT.pptx
 
case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.case study on National institute of design, Ahmedabad.
case study on National institute of design, Ahmedabad.
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Ar.Norman Foster by Shrikant
Ar.Norman Foster by ShrikantAr.Norman Foster by Shrikant
Ar.Norman Foster by Shrikant
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
Architecture as technology and case studies
Architecture as technology and case studiesArchitecture as technology and case studies
Architecture as technology and case studies
 
High tech architecture
High tech architectureHigh tech architecture
High tech architecture
 
01 case study
01 case study01 case study
01 case study
 
agoragarden-asim-190605231200 (1).pdf
agoragarden-asim-190605231200 (1).pdfagoragarden-asim-190605231200 (1).pdf
agoragarden-asim-190605231200 (1).pdf
 

More from Prasad Thanthratey

More from Prasad Thanthratey (20)

Madhya Pradesh Real Estate Policy 2019
Madhya Pradesh Real Estate Policy 2019Madhya Pradesh Real Estate Policy 2019
Madhya Pradesh Real Estate Policy 2019
 
Pooled Finance Development Fund
Pooled Finance Development FundPooled Finance Development Fund
Pooled Finance Development Fund
 
Risk Register for Bhausaheb Surve Nagar, Nagpur, Maharashtra
Risk Register for Bhausaheb Surve Nagar, Nagpur, MaharashtraRisk Register for Bhausaheb Surve Nagar, Nagpur, Maharashtra
Risk Register for Bhausaheb Surve Nagar, Nagpur, Maharashtra
 
Public Transport Systems, Intermediate Public Transport Systems and their Cha...
Public Transport Systems, Intermediate Public Transport Systems and their Cha...Public Transport Systems, Intermediate Public Transport Systems and their Cha...
Public Transport Systems, Intermediate Public Transport Systems and their Cha...
 
Sewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, MaharashtraSewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, Maharashtra
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Urban-Rural Ratio and Urban & Metropolitan Concentration
Urban-Rural Ratio and Urban & Metropolitan ConcentrationUrban-Rural Ratio and Urban & Metropolitan Concentration
Urban-Rural Ratio and Urban & Metropolitan Concentration
 
Consumer Market and Consumer Buying Behavior
Consumer Market and Consumer Buying BehaviorConsumer Market and Consumer Buying Behavior
Consumer Market and Consumer Buying Behavior
 
Docuseries Review- Chernobyl (HBO)
Docuseries Review- Chernobyl (HBO)Docuseries Review- Chernobyl (HBO)
Docuseries Review- Chernobyl (HBO)
 
Refugee Resettlement Housing In India and Abroad- A Brief Report
Refugee Resettlement Housing In India and Abroad- A Brief ReportRefugee Resettlement Housing In India and Abroad- A Brief Report
Refugee Resettlement Housing In India and Abroad- A Brief Report
 
Mumbai Floods (2005)- A brief report from Disaster Management Perspective
Mumbai Floods (2005)- A brief report from Disaster Management PerspectiveMumbai Floods (2005)- A brief report from Disaster Management Perspective
Mumbai Floods (2005)- A brief report from Disaster Management Perspective
 
Critical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/SlacksCritical Path Method: Activities And Events, Float/Slacks
Critical Path Method: Activities And Events, Float/Slacks
 
Specific Areas of Action: Housing Scenario in India
Specific Areas of Action: Housing Scenario in IndiaSpecific Areas of Action: Housing Scenario in India
Specific Areas of Action: Housing Scenario in India
 
Case Study: Suspension Structures
Case Study: Suspension StructuresCase Study: Suspension Structures
Case Study: Suspension Structures
 
Case Study: Membrane Structures
Case Study: Membrane StructuresCase Study: Membrane Structures
Case Study: Membrane Structures
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Case Study: Catenary Structures
Case Study: Catenary StructuresCase Study: Catenary Structures
Case Study: Catenary Structures
 
Book Review: "The New Landscape-Urbanization In The Third World" by Charles C...
Book Review: "The New Landscape-Urbanization In The Third World" by Charles C...Book Review: "The New Landscape-Urbanization In The Third World" by Charles C...
Book Review: "The New Landscape-Urbanization In The Third World" by Charles C...
 
A review of the House, Form and Culture by Amos Rapoport
A review of the House, Form and Culture by Amos Rapoport A review of the House, Form and Culture by Amos Rapoport
A review of the House, Form and Culture by Amos Rapoport
 
Building Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their LimitationsBuilding Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their Limitations
 

Recently uploaded

Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
nirzagarg
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
CristineGraceAcuyan
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
eqaqen
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
eeanqy
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
sriharipichandi
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 

Recently uploaded (20)

Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
How to Turn a Picture Into a Line Drawing in Photoshop
How to Turn a Picture Into a Line Drawing in PhotoshopHow to Turn a Picture Into a Line Drawing in Photoshop
How to Turn a Picture Into a Line Drawing in Photoshop
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Mysore [ 7014168258 ] Call Me For Genuine Models We...
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 

Case Study: Metropol Parasol, Seville (Spain)

  • 1. ARCHITECTS : J MAYER H. [BERLIN] STRUCTURAL CONSULTANTS: ARUP & FFM LEVEL: PRECINT LEVEL AREA : 12000 SQM. METROPOL PARASOL, SEVILLE (SPAIN)
  • 2. Plaza de la Encarnación served as a farmers’ market for till 1960s. After the Market Place was demolished, the public square fell into despair and became an eyesore. The plaza remained derelict for nearly 30 years, only to be used as a parking space before the city officials decided that something needed to be done to rejuvenate the space. BACKGROUND Planning was done regarding construction of a shopping centre on the square, but those plans were halted when Roman ruins were discovered at the site while excavation.
  • 3. The result, Metropol Parasol, is a contemporary timber structure that provides a striking contrast to the city’s traditional architecture. #PLACEMAKING #LARGESCALEARCHITECTURE
  • 4. • After the demolition of Plaza de la Encarnación, the neighbourhood became an area of dim streets, mostly closed premises with very little business and many empty houses. • In 2004, city officials called for entries through an international design competition to obtain proposals for renovation the square and to activate the adjoining commercial areas. • Besides enabling a complex programme of uses, it was also stipulated that the project had to constitute an architectural landmark that would transform the square into an inviting destination, even during the city’s scorching summers. Mercado de Feria Mercado de Entradores CONCERNS #FIGURE- GROUND RELATIONSHIP
  • 5. DESCRIPTION: • Metropol Parasol is the new icon project for Seville- a place of identification and to articulate Seville’s role as one of Spain’s most fascinating cultural destinations. • Its role as a unique urban space within the dense fabric of the medieval inner city of Seville allows for great variety of activities like memory, leisure and commerce. • A highly developed infra helps to activate the square, making it an attractive destination for tourists and locals alike. • Its strong concern for specific ethical and social situation moved the Plaza de la Encarnacion into the centre of urban activity of Seville. Metropol Parasol is innovation at the forefront of sustainable construction by long-lasting adaptability of various programmes, unique architecture design of highest standards, efficient construction and environmental concerns.
  • 6. QUANTITATIVE DESIGN PROGRAMME • Responsible use and management use of natural resources (eg. Timber from sustainable forests and certified sources) • Reduced embodied energy due to the use of timber instead of steel for parasols • Use of growing material, local materials, recycled and recyclable materials • Long life cycle of construction due of long lasting low maintenance materials • Operation and maintenance: self cleaning skin polyurethane coating as long lasting weather protection and solution liquid free • Low impact construction process • Creation of an improved microclimate by shading of the plaza and evaporative cooling over water features • Adaptation of the scheme, keeping existing monumental trees in the square • Natural lighting, low energy public lighting • Public furniture made of recycled materials • Construction on columns provides additional usable space without reducing the available space.
  • 8. DESIGN ELEMENTS • Surface Water The surfaces on the plaza are made of permeable finishes to allow a direct drainage of the locally intense rainfall to the ground rather than public sewage. • Green Power Generation The Parasol integrates solar-thermal & solar-electric panels for hot water production for the restaurants and bars and photovoltaic power generation for fountains & public-lighting. • Permeability The structure was deliberately not made continuous but left permeable, to let some filtered light to the plaza & allow any warm air generated on the plaza or the air- conditioning equipment to escape.
  • 9. • Shading The Parasols provides shading from the intense sun in the Southern Spain; on the plaza level this leads to an extended usability & increase in attractiveness of the public space, while for the market this reduced the cooling load for the AC equipment. • Free Cooling Water features distributed on the plaza provide a source of cooling by evaporation; apart from an eye catcher and focal point for social activities.
  • 10. DESIGN PRINCIPLES• “…an urban democratic open cathedral without walls..” The architect, Jürgen Mayer H, was inspired by the magnificent fan tracery vaulting of the cathedral when he designed the parasols. Moreover, traces of inspiration from local vegetation can also be observed. #SIGNIFICANCE OF OBJECT
  • 11. DESIGN IMPLEMENTATION • The engineering strategy ensured that the loads of this enormous timber structure were brought to ground among the precious ancient ruins with deftness and lightness of touch. • The plinth is made up of huge Vierendeel trusses forming a box that sits atop five enormous steel trident columns rising out of the museum level. • The connecting steel platforms of the mushrooms, for the restaurant area and rooftop walkway, are supported by a number of profiled hollow steel struts, which transfer their greater loads back to the concrete core using a saw-tooth connector.
  • 12. • The structural engineers developed the innovative fork-headed connection detail based on glued-in steel bars (FFM) — an optimised bonding approach to aid with rapid erection on site. • Construction of the shading structure was carefully considered. Connections between the trunks of the mushrooms and the canopy were site welded. To plan it, Finnforest used a 3D contour of the Parasol, allowing the scaffolding contractor to work out the potential loads that it would have to take to allow the canopy to be constructed on it. Construction of the timber structure began in June 2008 and completed in March 2011.
  • 13. How Did They Open Up “The Urban Umbrella” ? Phase 1: Concrete structure The steel structure of the museum and marketplace and the steel/concrete structure for the high-level cafe are completed. Two of the concrete cores that house lifts and four concrete plinths have been constructed. Phase 2: Timber Trunks Construction of the timber trunks starts with the base plates at the top of the concrete plinths. The timber panels, which are up to 16m high, are then set up according to a sequence which ensures temporary stability at all times.
  • 14. Phase 3: Main Structure The individual elements immediately above the trunks are prepared at the plaza level before they are hoisted into place at high level. The fire protection is constructed at the lower half of the trunks. Phase 4: Scaffolding Up Scaffolding is built to temporarily support the main timber structure outside the area of the trunks. Work started at the rear of the site and two cranes were needed to attend to the simultaneous erection of scaffolding and timber.
  • 15. Phase 5: Scaffolding Down Scaffolding is taken down zone by zone, from the outside of the structure inward, with continuous control of the structure ensuring safety. The overall plaza is repaved and all urban infrastructures finished. Phase 6: Finishing Touches The entire scaffolding has been taken down, and the high-level walkway constructed on top of the timber structure. All services, such as lightning protection, are installed within the timber structure.
  • 16. DEVELOPING A STRUCTURAL STRATEGY • Optimising Jurgen Mayer H's design was one of the first things that needed to be addressed. The scheme as proposed maintained a classic separation between the outer visible cladding and the hidden structure required to make it stand up, making use of steel structural tubes that would then be covered in metal cladding. • The revised approach in the design development phase involved looking at dual-layer steel shells and the use of steel foam. In the end, the design team chose to concentrate on a supporting structure made out of curved lamina. • There were two options feasible: a radial disc configuration directed outwards from the supporting beams, or an orthogonal arrangement supported from the trunks. Although the former would be statically more efficient and saves material, there would be problems with the constantly changing geometry of the connecting interfaces, so the latter was chosen.
  • 17. • Given the enormous number of connections, it was presumed that the structure should consist of welded steel sheets, but analysis of the structure showed that these thin steel sheets would buckle long before the required loading capacity was reached. In the end team opted for Kerto-Q LVL. Even though these would be thicker than the steel sheets, they would weigh less and would also be more stable and would not suffer from crumpling, due to their thickness. • Because the roof is not closed, to give the form rigidity, additional steel diagonals were needed to give the timber structure the rigidity to carry the load. These are positioned around the concrete cores and lend stiffness to the structure. However, since the arrangement of the steels influences the appearance of the Parasols, these are positioned as inconspicuously as possible. • The use of cross-laminated timber ensured that the structure could work at optimum loading strengths, as well as making it resistant to the harsh effects of moisture, making it eminently suitable for use in outdoors. LVL : Laminated Veneer Lumber
  • 18. MANAGEMENT STRATEGIES PPP (PUBLIC PRIVATE PARTNERSHIP) A partnership between a public sector entity (sponsoring authority) and a private sector entity (a legal entity in which 51% or more of equity is with the private partner/s) for the creation and/or management of infrastructure for public purpose for a specified period of time (concession period) on commercial terms. During the concession time, the private partner is entitled to earn the amount that he invested along with the profit, by charging the users – the amount being monitored by the public sector entity. After the concession time is over, the infrastructure is handed over to the public in all its totality.
  • 19. The design was procured using a form of PPP contract between the Seville city government and Sacyr. It involved Sacyr putting up half the construction cost, the architect working under the contractor, and the other consultants being appointed by the architect. Under the PPP, Sacyr maintains ownership and management of the site for 40 years, before the whole building is handed back to the city in perpetuity. Construction began in 2005, with an estimated cost of 50 million euros and a projected completion date in 2007. However, unknown to the public, the project soon faced difficulties. By some estimates, due to delays, the total cost of the structure approached 100 million euros.
  • 20. OUTCOME Local Effect: Activation Development in the neighbouring areas The Parasol have also become A centre for public demonstrations and protests where people gather for common interests- a space par excellence within which the political exists as a public expression of the plurality of the people within it. #PROTECTION & ENHANCEMENT OF THE HUMAN NETWORK ; #PUBLICDOMAIN
  • 21. The use of the plaza to for mass public gatherings- for concerts, celebration, etc.. . When viewed from different angles, Metropol Parasol has a fantastic, daring, creative and inventive sculpture-like repetitive geometric plan. Residents of Seville have distinct feelings towards Metropol Parasol. Although there are many who admire, but it is not uncommon to find a few disappointed by the galactic waffle-like structure landing in such a traditional city. But so did most Parisians hated EIFFEL TOWER in its inception...! And the rest is history !!!
  • 22. THANK YOU ! MANSI RAWAT BA13ARC028 SAURABH DEOTALE BA13ARC043 PRASAD THANTHRATEY BA13ARC049