Hyderabad Metro Rail – For a Better Livable City
ITP, Conference
ITP, Conference
Hyderabad
Hyderabad
July 28, 2012
July 28, 2012
NVS Reddy,
IRAS
Managing Director,
Hyderabad Metro Rail Ltd.
1
India’s Urbanization
India’s urban population will increase from 30% (300 million) to 40% (600
million by 2030) i.e., will be doubled in number & twice the population of
US today
Scale & speed of urbanization in India – not happened anywhere in the
world except in China
Tremendous potential for Indian cities to be global hubs of economic
activity in the present post-industrial era
At just 30% urbanizn – Indian cities already bursting at seams &
infrastructure cracking
70% of new employment opportunities will be generated in cities
85% of total tax revenue comes from urban economy – will finance
development of the nation
www.hyderabadmetrorail.in
2
India’s Urbanization
McKinsey estimates $1.2 trillion (`60 lakh crore) investment to meet
projected infrastructure demand in Indian cities.
Intra-urban commute management – one of the key factors for success &
‘livability’ of the cities
Planning Commn estimates $1 trillion investment on infrastructure in 12 th
Plan – 50% to come from pvt. Sector thru’ PPP route
McKinsey estimates about 8,400 km of metro rail requirement in 35 top
Tier I & Tier II Indian cities
www.hyderabadmetrorail.in
3
The world of Urban Transport has changed drastically…
No. of Metro Systems
(Metro + LRT)
Source: http://mic-ro.com/metro/index.html
The first Oil shock of 1970 was the initial trigger
www.hyderabadmetrorail.in
4
Hyderabad Traffic Scenario
Rapid growth of HUA – 80 lakh people + considerable floating population
Lack of efficient, reliable & comfortable PTS → increase in personal
vehicles ( 28 lakh vehs + addition of 2 lakh pa)
Total passgr trips : 140 lakh per day
Total motorized trips : 92 lakh per day - Modal split : (Bus & MMTS: 44%;
Two wheelers: 30%; Autos: 16%; Cars: 10%)
Total vehicle trips (motorized) : 35 lakh per day - Model split: (Two
wheelers : 61%; Autos : 21%; Cars : 15%; Bus & MMTS : 3%)
www.hyderabadmetrorail.in
5
Hyderabad Traffic Scenario – Major Concerns
High emissions of CO, CO2, SO2, NOX, TSPM, RSPM, etc., &
deterioration of Air Quality Index.
Alarming projections of traffic snarls and air quality deterioration
in avg trip length from 7 km in 1980 to 18 km in 2010
Heavy traffic volumes in major corridors
Congestion level : avg journey speeds reduced from 30 kmph (1980) to
11 kmph now – 8 kmph in future
70% of the road network operates in highly congested condition
www.hyderabadmetrorail.in
6
Congestion Principle
Car with 1 or 2 persons occupies 5.3 sqm road space
(Rail carries 48 persons in 5.3sqm or 24 in 2.6sqm. Ratio 1:24)
www.hyderabadmetrorail.in
10
Solution
MRTS (Metro Rail) in core area
ORR; PVNR Expressway & MMTS phase II
BRTS on newly developed wide roads
Road widening, flyovers, link roads, jn. improvements & other T&T
works
www.hyderabadmetrorail.in
11
Metro Rail & Urban Redesign
• City for citizens not cars
• People friendly city
• City for children, old men & women
• Gender equality & women emancipation
• Democracy & public space
• Public space & poorer sections
• Reducing distances & improving accessibility
• Affordable transportation with comfort
• Improving productivity & enabling quality time
• Promoting family values
• BAQ & improving livability
• Improving competitiveness
• Brand equity of Hyderabad
www.hyderabadmetrorail.in
12
Hyderabad Metro Rail Project
3 high density traffic corridors (71 km) taken up in phase I
•
Miyapur – L.B.Nagar
: (28.87 kms; 27 Stns)
•
Jubilee Bus Station – Falaknuma
: (14.78 kms; 16 Stns)
•
Nagole – Shilparamam
: (27.51 kms; 23 Stns)
Integration/interchange planned with existing Rail terminals, MMTS stations &
Bus depots
Air conditioned “Merry go round” feeder buses between Metro rail stations &
catchment areas “seamless travel” facility – on same ticket
Not a simple Metro, but an urban redesign & rejuvenation effort to transform
Hyderabad into a people friendly green city.
‘Transit+’ concept: Last mile connectivity with NMT, pedestrian facilities &
street furniture.
Eco-friendly stns with natural ventilation, sky-walks, ramps, escalators, elevators
& a host of commuter-friendly facilities.
www.hyderabadmetrorail.in
13
Hyderabad Metro Rail Corridors
Miyapur
1
3 high density tfc. corridors (71 km) taken up in phase I. Cost ` 14, 132 Cr.
JNTU
KPHB Colony
1. Miyapur – L.B.Nagar
: 14.78 km; 16 stns
3. Nagole – Shilparamam
Balanagar
: 28.87 km; 27 stns
2. Jubilee Bus Station – Falaknuma
Kukatpally
: 27.51 km; 23 stns
Moosapet
Bharat Nagar
Jubilee Bus Station
Erragadda
ESI
Shilparamam
3
Madhura
Yusufguda Nagar
Durgam
Hitec City
Madhapur PS
S.R.Nagar
Cheruvu
Jubilee Hills
Peddamma Temple
Road No.5 Panjagutta
Jubilee Hills
Check Post
Prakash Nagar Paradise
Begumpet
2
Parade Grounds
Rasoolpura
Ameerpet
Mettuguda
Secunderabad R.S
Irrum Manzil
Secunderabad
Gandhi Hospital
Musheerabad
Khairatabad
Survey of India
RTC X Road
Assembly
Chikkadpally
Uppal
Narayanaguda
Namply
Gandhi Bhavan
M.G.Bus Station
Malakpet
New Market
Salarjung Museum
Musarambagh
Charminar
Integration with Rail Terminals
3
Sultan Bazaar
OMC
Metro Rail Interchange
Integration with Bus Stations
Habsiguda
NGRI
Lakdi-ka-pul
MMTS Integration
Tarnaka
Dilsukhnagar
Chaitanyapuri
Victoria Memorial
Shalibanda
1
Shamsheergunj
Falaknuma
www.hyderabadmetrorail.in
Nagole
L.B.Nagar
Jangammet
2
14
Current Status of Hyderabad Metro
Over 1000 expat & Indian engineers currently working on designs &
at various work spots
Depot works at Uppal & Miyapur and precast yard works at Uppal
and pier works in stage 1 (Nagole to Mettuguda) and stage 2
(Miyapur to SR Nagar) in full swing
50 piers and 100 foundations in stage 1 & 135 segments completed
(as on 27.07.2012)
First stretch (Nagole to Mettuguda) will be opened by end of 2014
July 05, 2012 declared as Appointed Date
Full project to be completed in 5 yrs
www.hyderabadmetrorail.in
34
HMR - Facilitation Works
Provision of additional lanes to existing road
Provision of additional lanes to existing road
www.hyderabadmetrorail.in
Extension of culvert
Widening of bridge 38
38
HMR - Facilitation Works
Shifting of electrical poles
www.hyderabadmetrorail.in
39