How to do quick user assign in kanban in Odoo 17 ERP
Step By Step Guide To Create WBS
1. Work Break Down Structure
(WBS)
Step by Step Guide to Create WBS
5
Only
Steps
www.pmcmentor.com
PMBOK
2. Steps To Create WBS
1. Identify the deliverables by reviewing the scope statement
2. Decide the structure/layout the WBS i.e. Horizontal View, Outline View, Tree View,
etc.
3. Decide the organization of the WBS i.e. Organize by phase, organize by deliverables .
4. Decompose the upper level WBS into lower-level detailed
components
5. Assign unique identification codes to each WBS components
6. Verify the degree of decomposition is appropriate. Use 8/80 hours
rule i.e. if workpackage takes more than 80 hours to complete, decompose it further. If workpackage can be
completed within 8 hours, don’t decompose further.
3. 2-Structure WBS Using different
layouts
Outline ViewTree View
For more examples of layout, see Practice Standard of WBS on www.pmi.org
6. DOWNLOAD PMP PREP COACH APP ON YOUR SMART PHONE / TABLET FROM BELOW STORES,
THE WORLD’S FIRST APP , OFFERING 8 METHODS TO PREPARE FOR EXAM
FROM CONTRIBUTOR OF PMBOK.
GOOGLE PLAY STORE: HTTPS://GOO.GL/K9KU4T
APPLE STORE: HTTPS://GOO.GL/DTCR1D
FOLLOW ON SLIDESHARE
URL: HTTP://GOO.GL/HHGMKQ
SUBSCRIBE TO YOU TUBE CHANNEL:
URL: HTTPS://GOO.GL/WQYX9A
LISTEN TO AUDIO FLASHCARD, THE MOST COMPREHENSIVE AUDIO VOCABULARY ON PMBOK 5TH
EDITION INCLUDING ITTO
URL: HTTPS://GOO.GL/PZRCTI
CONNECT ON GOOGLE+
pmcmentor@gmail.com
RESOURCES TO PREPARE FOR PMP EXAM