Understand the values of Project Managers and the art of delivery and process control, understand the tactics of how to be a good player sometimes in Chess, Puzzle and Domino.
Workshop outline:
-------------------------
- Adaptive is the only way for delivery!
- Management concepts: Planning, Controlling and Monitoring
- Why Agile methodologies is almost the Core delivery methodology
- Main Concepts of PMP methodologies
- Tools used that enhance process of delivery and ensure sustaining quality standards
Prescribed medication order and communication skills.pptx
Art of project management session
1. The Art of Project
Management
Prepared By
Mona Reda
2. Agenda
• What is PROJECT
• Traditional Project Management
• Agile Project Management
• Agile Vs. Traditional
• Integration Between Agile & Traditional
10/1/2015 The Art of Project Management 2
11. Project Life Cycle
• Is a methodology that define what you need to do to deliver project
deliverables
• Traditional (Predictive)
• Adaptive (Agile)
10/1/2015 The Art of Project Management 12
15. Planning Process
Collect Requirements
Define Scope
Create a Work Breakdown Structure WBS
Define and Sequence the Activities
Define Resources
Define Project Duration
Create a Project Schedule
Determine Project Costs and Budget
The Art of Project Management 1710/1/2015
16. Planning Process (Cont’d)
Code Activity Sequenc
e
Resources Duration Date
From
Date
to
Cost
A Activity 1 - Man power, machines
B Sub Activity 1 A Man power, materials
C Activity 2 - Machine, materials
D Activity 3 -
E Sub Activity 3 D
F Sub Activity 3 E
G Activity 4 E, C
H Activity 5 G
I Activity 6 H The Art of Project Management 1810/1/2015
17. Planning Process (Cont’d)
Code Activity Cost
A Work package 1 4,000
C Work package 2 6,000
D Work package 3 10,000
G Work package 4 8,000
H Work package 5 5,000
I Work package 6 2,000
Total budget 35,000 EGP
The Art of Project Management 1910/1/2015
23. Agile Advantages
• Customer Satisfaction
• People interactions
• Customers, developers and testers interaction
• Rapid delivery
• Face-to-Face conversation
• Continuous attention to technical excellence and good design.
• Regular adaptation to changing circumstances.
• Even late changes in requirements are welcomed.
The Art of Project Management 2510/1/2015
34. Agile vs. Traditional
Traditional
• Plan Driven
• Scope ,Cost and Time are
constant
• A process starts after successful
completion of another.
• Failure is measured by
delivering project on time and
within Budget
Agile
• Change Driven
• Cost and time are constant with
changing scope.
• we plan all the time.
• Failure is measure against
customer satisfaction
The Art of Project Management 3610/1/2015