Green
  Buildings

    That   Teach
       Brian Dunbar, Exec. Director
       Institute for the Built Environment
                Colorado State University
The biggest issue in green building infusion isn’t cost….

                     it’s education
   One thing you have experienced or have heard about
                    green buildings?
What can we convey through our buildings?
Buildings contribute . . .
• Construction and remodeling
  waste comprises 40% of landfill
  waste
• 48% of energy generated is
  used by buildings + over 30% of
  carbon emissions
• 66% of electricity is used by
  buildings + 1/6th of electricity
  generated is for building cooling
• Sick Building Syndrome leads to
  poor occupant health and loss of
  productivity
Sick Building Syndrome…

                                                …from unhealthy
                                                schools can cause
                                                asthma, skin and
                                                eye irritation, cold
                                                symptoms, fatigue,
                                                and headaches in
                                                both students and
                                                teachers.

Causes:
•Inadequate ventilation    •Chemical Contaminates from Indoor Sources
•Biological contaminants   •Chemical contaminants from outdoor sources
                                                  Sources:EPA, Indoor Air Quality and Student
                                                  Performance, YRG Sustainability Consultants
Sidwell Middle    Banner Bank
                                 Boise, ID
Average     School - Wash DC
Savings
of Green
Buildings                                                             WASTE
                                                                      COST
                                                  WATER
                                                                     SAVINGS
                                                   USE
                               CARBON                                 50-90%
                                                 SAVINGS
                60% less
                               SAVINGS            30-50%
             energy demand        35%
             ENERGY
             SAVINGS
                30%
                                                                     Toyota Campus
                                                                      Torrance, CA
                                 65% less                                95% of
                                 electricity   Boulder Associates      construction
Source:                              Test       43% less water use    waste diverted
Capital E
Fossil Ridge High School, Fort Collins, CO
                           Photos courtesy of David Paterson




High-performance, sustainable built environments…
Environmental & Economic Benefits
•Energy efficiency
•Water savings
•High performance lighting
•Improved indoor air quality
•Emissions reductions
                               Fossil Ridge High School, Fort Collins, CO
•Temperature control
•Reduced Construction Waste
•Lower operations and
 maintenance costs
                               Kinard Junior High School, Fort Collins, CO
Human Benefits
                                     •Student and faculty health
                                     •Teacher attraction/retention
                                     •Increased student performance
                                     •Better focus
                                     •Enrichment of learning
Bacon Elementary, Fort Collins, CO
                                     •Integration of sustainable
                                       curriculum
                                     •Increased productivity
                                     •Connection to nature
    Islandwood School, WA
Green Schools impact the Community…




 …and increase
 awareness about green building
Green Schools Connect to Nature…
                      humans spend


                              90%           of their time indoors

                          isolated from nature…


                   In the U.S., children ages 6-11
                   spend about


               30 hours
  per week looking at a TV or computer




…improving the learning            environment
“Our goal is to foster competent, responsible, and independent citizens who
love learning and respect themselves, other people and their environment.”
     Compass Montessori School, Golden, CO




                                     =
using nature as a model                         connection
                  for design                    to nature
Islandwood School, Bainbridge Island, WA




This earth friendly school in Washington nurtures and teaches children through the
connection to nature (www.islandwood.org).
Source: USGBC,
Which
classroom…
Freedom Elementary, Colorado Springs, CO




                                             Centennial R-1 School District, San Luis, CO,
                                             Photo Courtesy of Great Education Colorado




                                           …would you
                                           rather learn in?
All LEED Rating Systems use:

Guidelines addressing
6 primary areas:

Sustainable Sites
Water Efficiency
Energy and Atmosphere
Materials and Resources
Indoor Environmental Quality
Innovation and Design Process
LEED for Schools

The LEED for Schools Rating System
adds the following unique issues
related to schools:


                         Classroom Acoustics
                         Daylight and Views
                         Mold Prevention
                         Environmental Site Assessment

 To find out more about LEED for Schools, visit the following USGBC
 website:
Case Studies
                                                  Bacon Elementary, Fort Collins, CO
                                                  Features:
                                                  • Efficient irrigation & xeriscaping saves over $7,000
                                                  per year
                                                  • 100% Energy use offset by green power
                                                  • Over 85% of construction waste diverted from landfill
                                                  • “Truth walls” reveal building materials used as an
                                                  educational tool




      Harris Bilingual Elementary, Fort Collins, CO
      Features:
      • The play area is Synthetic turf made of recycled tires,
        providing innovative water management.
      • National Energy Star Schools award
      • Lots of Daylighting
      • Low VOC paints and finishes
Source: CSU Institute for the Built Environment


                    For links to more green school case studies:
        http://www.usgbccolorado.org/green-buildings/summitresources.html
Case Studies
                                                  Telluride Mountain School, Telluride, CO
                                                  Features:
                                                  • Playground is on a “living” roof
                                                  • School building tucked into hillside
                                                  • Very affordable- Cost: 1.5 M, $94 per sq. ft.
                                                  • Interior walls are capped with windows to bring
                                                  daylighting deeper into the building




 Greybull Elementary School, Greybull, WY
 Features:
 • Built on old baseball fields that were relocated
 • $15,000 in gas savings in 6 months (compared to old school)
 • Natural ventilation and skylights
 • Over 90% of the spaces have visual connection to the outdoors
 •1st LEED certified school in Wyoming
Source: CSU Institute for the Built Environment


                    For links to more green school case studies:
        http://www.usgbccolorado.org/green-buildings/summitresources.html
Kinard Junior High School        “With the improvements
             Fort Collins, CO    in building envelope, use
                                 of daylighting, and the
                                 geo exchange system, this
                                 building is the most efficient
                                 school in our district, even
                                 exceeding Fossil Ridge High
                                 School.”
                                     -Stu Reeve, Energy Manager




                                Owner:     Poudre School District
                                School Capacity:   750 students
                                Completion Date:       Aug 2006
                                Const. Cost:             $14 M
                                Overall Cost:            $21 M
                                Size:              113,000 sq ft
                                Annual Energy Use: 25 kBtu/sf/yr
Kinard Junior High School      Energy and Atmosphere
            Fort Collins, CO     HVAC: Geo Exchange System
                                  (100 wells,300’ deep)
                                  provides heat / cooling. Heat
                                  recovery of exhaust air.
                                 Renewable Energy: Electricity
                                  use off-set with an on-site PV
                                  system and Green Power
                                  contract with local utility
                                 Energy Use: Exceeds ASHRAE
                                  90.1 by 50%; uses $40,000
                                  less energy than most recent
                                  district junior high
                                 Controls/Monitors: Building
                                  Energy Management System
                                  + each classroom has
                                  individual controls
                                 Lighting: No electric light
                                  used in many classrooms and
                                  common areas during
                                  daylight
Harris Bilingual Elementary Fort Collins, CO
                                         Owner:       Poudre School District
                                         Constructed:                  1919
The mission of HBIS promotes Spanish     Completion date:              2002
and English language competencies,       Capacity:     320 students, 43 staff
                                         Total size:              39,260 sf
academic achievement, high self-esteem   Addition:                21,525 sf
and positive cross-cultural attitudes    Renovation:              17,735 sf
                                         Annual Energy Use: 40.4 kBtu/sf/yr
Harris Bilingual Elementary
                                                Fort Collins, CO
Energy &
Atmosphere
• Recognized with a
  national Energy Star
  Schools award

• One of the oldest
  schools in the district,
  Harris has achieved the
  best energy rating in the
  46 school system

• Automated building and
  HVAC controls

• Energy efficient windows
  blend with historic
  architecture
                                          Photograph by John Evans
Bacon Elementary                           “It is our philosophy
                                                 at PSD to build
                            Fort Collins, CO
                                                 green. We believe
                                                 the earth is worth
                                                 preserving and
                                                 teaching kids about
                                                 it is fundamental.”
                                                                  Tammie Simpson
                                                 Construction Project Manager, PSD




                                               Owner:     Poudre School District
                                               School Capacity:    525 students
                                               Completion Date:        Fall 2003
                                               Cost:                     $6.3 M
                                               Size:                65,300 sq ft
                                               Annual Energy:     45 kBtu/sf/yr


Photograph by Paul J. Brokering
Bacon Elementary
         Fort Collins, CO



 “Bacon Elementary is
 a building that
 teaches. Real time
 energy use is
 displayed as well as
 exposed structural
 and mechanical
 systems. An array of
 building products
 made from recycled
 materials are used
 throughout the
 building.”
          George Brelig
        RB+B Architects
Bacon Elementary                    Energy and Atmosphere
                 Fort Collins, CO
                                    •Cooling system makes ice at
                                    night when energy costs are 60%
                                    lower
                                    •HVAC: Small, 97% efficiency
                                    boiler unit
                                    •Photocells monitor amount of
                                    light needed from interior
                                    fixtures
                                    •Booster heater at dishwasher
                                    reduces hot water system load
                                    •100% of electricity use is offset
                                    through green power


                                    “We raise the bar for construction
                                    and design with every school we
                                    build or remodel. Our new
                                    elementary schools are scoring in
                                    the 80’s (on a scale of one to 100)
                                    on the EPA Energy Star bench
                                    marking system.”
                                          Stu Reeve, Energy Manager PSD
Photograph by Tammie Simpson
Bacon Elementary
           Fort Collins, CO

Materials & Resources
• Recycled content materials
  throughout
• Rapidly renewable materials
  are attractive and educational
• Over 85% of construction
  waste diverted from landfill

 A school building that teaches




                         “Truth wall”   Photograph by Tammie Simpson
Student sketch of School Mech Systems
“The skylights help us work
                            better than when we were            “High
                            locked up.”                         performanc
                                                                e buildings
 What students &                    Samantha Stewart, 5 grader
                                    Greybull Elementary
                                                       th

                                                                are
teachers at green                                               achievable
   schools say…              “The natural light certainly and they
                             lends itself to a calmer sense don’t have
                             for our kids.”                     to cost
                                      Bill Smith, Principal     more.”
                                      Bacon Elementary
“It’s such a nice, clean place                                  Thomas Fernandez,
                                                                District 11 Energy
to come to work. There’s so                                     Manager

much light and fresh air.                      “I can see myself paddling
Kids like to be here.”                         down the hallway in my
        Paula Heuschkel,                       kayak.”
         Kindergarten teacher
                                                            Teacher, unknown
         Greybull Elementary
                                                            Telluride Mountain School

                For links to more green school articles and videos:
                 http://www.buildgreenschools.org/resources/
Daybreak Elementary
“The nationally recognized         South Jordan, UT
development combines
Bungalow style housing,
parks, hiking trails, natural
open space , green
elementary schools, a
community center and
garden. Daybreak has two
light rail stops for public
transport to Salt Lake and
surrounding areas.”
 Barbara Breen, Kennecott Land


Owner:         Kennecott Land,
          Jordan School District
School Capacity: 855 students
Completion Date: August 2006
Const. Cost:           $122/sf
Size:             117,574 sq.ft.
Daybreak Elementary Sustainable Sites
         South Jordan, UT   Joint use of school and
                            community center spaces
                            conserves materials, open
                            space, energy, and
                            development footprint
                            Trees positioned to shade
                            building


                            Water Efficiency
                            Saves 22% of indoor water
                            usage by using low flow
                            plumbing fixtures
                            High efficiency irrigation
                            technology and native,
                            drought tolerant
                            landscaping uses 50% less
                            site water
                            Water detention system
                            slows storm water run off
Daybreak Elementary
Energy & Atmosphere                            South Jordan, UT
Heating & Cooling:
Geothermal heating and cooling +
 energy recovery lower energy costs
Architectural shading devices
 incorporated in building exterior
Facility Manager constantly
 monitors energy efficiency in order
 to improve energy star rating
Lighting & Electricity:
Efficient florescent light fixtures
 decrease energy
Motion detectors in bathrooms
1.04 kw /sf per month, total elec.
Thermal Mass:
Exterior walls made from split face
 CMU
Corrugated aluminum composite
 panels over framing and insulation
“Daybreak is consistently the most
                                                        energy-efficient of our 89 schools.”
                                                                  Barry Newbold Superintendent
                                                                     South Jordan School District



                                                   Project Team
                                                   Architect:    Brixen & Christopher Architects
                                                   Struct. Eng:       Bsumek Mu and Associates
                                                   Mech. & Civil Eng:         Heath Engineering
                                                   Elect Eng:                              BNA
                                                   Landscape Arch:            Landmark Design
                                                   Contractor:      Bud Mahas Construction, Inc
                                                   Commissioning:                      Synergy
                                                 For more information on Green Schools & LEED:
                                                 USGBC-Colorado Chapter www.usgbccolorado.org

                                                 Case Study sponsored by USGBC Colorado Chapter




Photographs courtesy of Kennecott Land, Brixen   Case Study by Kristi Barnes, Joy Wagner & Brian Dunbar
& Christopher Architects, and Brian Dunbar              CSU Institute for the Built Environment
Pine Jog Elementary School &                     The School as a Teaching Tool
 Environmental Education Center                    Partnership:
                             West Palm, Florida    • Palm Beach County Schools,
                                                     Pine Jog Environmental Center
                                                     & Florida Atlantic University
                                                   Partnership benefits:
                                                   • 150 acre Pine Jog Nature
                                                     Preserve provides ongoing
                                                     environmental stewardship
                                                   • The two facilities include
                                                     interactive, site-oriented
                                                     learning activities
                                                    Elementary School:
                                                    K – 5th grade
                                                    960 students
                                                    140,000 sf
                                                    Environ. Education Center:
                                                    15,000 sf w/1 wet lab



LEED Registered – seeking Gold
Pine Jog Elementary School &
                              Environmental Education Center
                                                West Palm, Florida
Learning Opportunities:
•Solar Water Heating Panels

•Photovoltaic System

•Rainwater collection
demonstration areas

•Hand Pumped Wells

•Butterfly Gardens

•Performance measurements

•Interactive Sundial




                               The School as a Teaching Tool
Learning Opportunities:                Pine Jog Elementary School &
                                     Environmental Education Center
Butterfly Gardens                                               West Palm, Florida
  • A garden for each grade
  • Variety of caterpillars &
    butterflies attracted to plant
    mix
  • Students learn to propagate
    native apt plants

Monitoring devices
  • Grade levels measure:
     •Electricity
     •Water use
     •Recycling
     •Solar gain
     •Transportation miles

Green lunches
   • Low waste & water use
   • Making recycling easy           The School as a Teaching Tool
   • Low kitchen energy use                             All images by Zyskovich, Inc.
   • High % of locally produced          Case Study by Kristi Barnes & Brian Dunbar
    food                                      CSU Institute for the Built Environment
LEED        Innovation in Design
ID Credit 1:     Green Education




                                      Photo: Rachel Gutter
Photo: www.greentouchscreen.com
LEED Gold 2004                              Happy Feet Plus
                                                        Clearwater, Florida

          The First LEED Certified Retail Store in the World
                                                   Sustainable Sites
                                                     •Parking lot – storm
                                                     water absorption &
                                                     lowers heat island effect
                                                     •Restored wetlands


               “We don’t sell typical shoes.
               We don’t have a typical store.”                                             Dragonfly motif

                             Jacob Wurtz

Project Team:
Owners:            Jacob Wurtz & Jane Srong
Architect:         Frank Fraze of Northstar Design and Construction
Builder:           First Florida Contracting Services, Inc.
LEED AP:           Dave Piggot of First Florida Contracting Services, Inc.
Envir. Cons.       Ken Benway                                                Shell & pervious concrete
“The new “green” store
  embodies our business                                      Happy Feet Plus
  philosophy of respect for                                        Clearwater, Florida
  people, employee empowerment,                                    LEED Gold 2004
  and environmental
  sustainability.”     Jacob Wurtz



    Indoor Environmental Quality
     •Low-Emitting finished materials
     •Exemplary daylighting & views
                                                                              Natural light / views




                                     Innovation & Design Process
                                     •Awarded all 5 points
                                     •Sustainable education
Green building educational posters
                                     •Over 40% materials w/in 500 miles      Photography by Kristi Barnes
A Sustainable Future…
“We have lived by the
  assumption that what was
  good for us will be good for
  the world. What is good for
  the world will be good for us.
  We must:
   – make the effort to know the
     world and to learn what is good
     for it.
   – abandon arrogance and stand
     in awe.
   – recover the sense of the
     majesty of the creation, it is only
     on the condition of humility and
     reverence before the world that
     our species will be able to
     remain in it.”     Wendell Berry
With Green, Living Buildings –
         that Teach
For the Benefit of:
The Planet



And All of its Species




For Generations to Come
Green Buildings that Teach:



                    Enrich and Sustain
                        the Planet with
                          your projects
                  Sustainability & …Regeneration
Green Schools Initiative                           Brian Dunbar
www.usgbccolorado.org           Institute for the Built Environment

Mais conteúdo relacionado

Semelhante a Brian Dunbar on "Green Buildings That Teach"

Hidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsHidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsorganicARCHITECT
 
Conferencia magistral robert kobet
Conferencia magistral robert kobetConferencia magistral robert kobet
Conferencia magistral robert kobetlideresacademicos
 
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdf
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdfGreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdf
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdfAKASHICWORLD
 
Welcome to Jian-An Elementary School
Welcome to Jian-An Elementary SchoolWelcome to Jian-An Elementary School
Welcome to Jian-An Elementary Schoolyawenh09
 
Green Aesthetic 21st Century Architecture
Green Aesthetic 21st Century ArchitectureGreen Aesthetic 21st Century Architecture
Green Aesthetic 21st Century Architecturegcecs2009
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionMiron Construction
 
Creative Solutions for Today's Educational Facilities' Needs - Kobet
Creative Solutions for Today's Educational Facilities' Needs - KobetCreative Solutions for Today's Educational Facilities' Needs - Kobet
Creative Solutions for Today's Educational Facilities' Needs - KobetMeg Thompson
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionMiron Construction
 
Rosedale Elementary School Wins Gold For Being Green
Rosedale Elementary School Wins Gold For Being GreenRosedale Elementary School Wins Gold For Being Green
Rosedale Elementary School Wins Gold For Being Greenkaufnic
 
UCC Library – maintaining momentum
UCC Library – maintaining momentumUCC Library – maintaining momentum
UCC Library – maintaining momentumldore1
 
Presentacion CM Robert Kobet
Presentacion CM Robert KobetPresentacion CM Robert Kobet
Presentacion CM Robert Kobetlideresacademicos
 
Built to Last - Jerry Young
Built to Last - Jerry YoungBuilt to Last - Jerry Young
Built to Last - Jerry YoungMeg Thompson
 
Arbor Day Foundation
Arbor Day FoundationArbor Day Foundation
Arbor Day Foundationjeremyking01
 
Engineered Wood Sustainability And Green Building Practices Slide Show
Engineered Wood Sustainability And Green Building Practices Slide ShowEngineered Wood Sustainability And Green Building Practices Slide Show
Engineered Wood Sustainability And Green Building Practices Slide Showdonaldsimon
 
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)EcoRise Youth Innovations: Eco-Audit (new curriculum sample)
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)EcoRise Youth Innovations
 
Healthy Schools Lecture
Healthy Schools LectureHealthy Schools Lecture
Healthy Schools LectureMarcel Harmon
 

Semelhante a Brian Dunbar on "Green Buildings That Teach" (20)

Hidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance SchoolsHidden Lessons in Designing High Performance Schools
Hidden Lessons in Designing High Performance Schools
 
Conferencia magistral robert kobet
Conferencia magistral robert kobetConferencia magistral robert kobet
Conferencia magistral robert kobet
 
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdf
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdfGreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdf
GreenEvolution-CaseStudy-TheSchoolKFI-2021 (1).pdf
 
Green building
Green buildingGreen building
Green building
 
Green building
Green buildingGreen building
Green building
 
Welcome to Jian-An Elementary School
Welcome to Jian-An Elementary SchoolWelcome to Jian-An Elementary School
Welcome to Jian-An Elementary School
 
Green Aesthetic 21st Century Architecture
Green Aesthetic 21st Century ArchitectureGreen Aesthetic 21st Century Architecture
Green Aesthetic 21st Century Architecture
 
501 Ceu L Idcec 8 21 09
501 Ceu L Idcec 8 21 09501 Ceu L Idcec 8 21 09
501 Ceu L Idcec 8 21 09
 
Hillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron ConstructionHillcrest Primary School LEED Project Profile | Miron Construction
Hillcrest Primary School LEED Project Profile | Miron Construction
 
Creative Solutions for Today's Educational Facilities' Needs - Kobet
Creative Solutions for Today's Educational Facilities' Needs - KobetCreative Solutions for Today's Educational Facilities' Needs - Kobet
Creative Solutions for Today's Educational Facilities' Needs - Kobet
 
Lake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron ConstructionLake Mills Middle School LEED Project Profile | Miron Construction
Lake Mills Middle School LEED Project Profile | Miron Construction
 
Rosedale Elementary School Wins Gold For Being Green
Rosedale Elementary School Wins Gold For Being GreenRosedale Elementary School Wins Gold For Being Green
Rosedale Elementary School Wins Gold For Being Green
 
UCC Library – maintaining momentum
UCC Library – maintaining momentumUCC Library – maintaining momentum
UCC Library – maintaining momentum
 
Presentacion CM Robert Kobet
Presentacion CM Robert KobetPresentacion CM Robert Kobet
Presentacion CM Robert Kobet
 
Built to Last - Jerry Young
Built to Last - Jerry YoungBuilt to Last - Jerry Young
Built to Last - Jerry Young
 
Arbor Day Foundation
Arbor Day FoundationArbor Day Foundation
Arbor Day Foundation
 
Engineered Wood Sustainability And Green Building Practices Slide Show
Engineered Wood Sustainability And Green Building Practices Slide ShowEngineered Wood Sustainability And Green Building Practices Slide Show
Engineered Wood Sustainability And Green Building Practices Slide Show
 
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)EcoRise Youth Innovations: Eco-Audit (new curriculum sample)
EcoRise Youth Innovations: Eco-Audit (new curriculum sample)
 
Bae Won Koh Handout
Bae Won Koh HandoutBae Won Koh Handout
Bae Won Koh Handout
 
Healthy Schools Lecture
Healthy Schools LectureHealthy Schools Lecture
Healthy Schools Lecture
 

Mais de Plain Green Conference and Marketplace

Mais de Plain Green Conference and Marketplace (20)

Don Mordal on Smartrooms
Don Mordal on SmartroomsDon Mordal on Smartrooms
Don Mordal on Smartrooms
 
Kurt Hanson on NAHB Green Standards
Kurt Hanson on NAHB Green StandardsKurt Hanson on NAHB Green Standards
Kurt Hanson on NAHB Green Standards
 
Pat Garrity on Local Foods
Pat Garrity on Local FoodsPat Garrity on Local Foods
Pat Garrity on Local Foods
 
Mike Twedt on Green Energy Engineering
Mike Twedt on Green Energy EngineeringMike Twedt on Green Energy Engineering
Mike Twedt on Green Energy Engineering
 
Mark Luethold on Brookings HBA
Mark Luethold on Brookings HBAMark Luethold on Brookings HBA
Mark Luethold on Brookings HBA
 
Jon Jacobsen on Mary J Wegner Arboretum
Jon Jacobsen on Mary J Wegner ArboretumJon Jacobsen on Mary J Wegner Arboretum
Jon Jacobsen on Mary J Wegner Arboretum
 
Linda Nussbaumer on Indoor Environment
Linda Nussbaumer on Indoor EnvironmentLinda Nussbaumer on Indoor Environment
Linda Nussbaumer on Indoor Environment
 
Dean Isham on Many Bales One House
Dean Isham on Many Bales One HouseDean Isham on Many Bales One House
Dean Isham on Many Bales One House
 
Community Open Space Harvest
Community Open Space HarvestCommunity Open Space Harvest
Community Open Space Harvest
 
Brian Jennings on Ethanol
Brian Jennings on EthanolBrian Jennings on Ethanol
Brian Jennings on Ethanol
 
Gary Hanson on Essential Renewables
Gary Hanson on Essential RenewablesGary Hanson on Essential Renewables
Gary Hanson on Essential Renewables
 
Matthew Moore at Plain Green 08
Matthew Moore at Plain Green 08Matthew Moore at Plain Green 08
Matthew Moore at Plain Green 08
 
Greg Shinaut on What is Green?
Greg Shinaut on What is Green?Greg Shinaut on What is Green?
Greg Shinaut on What is Green?
 
Greg Johnson on National Green Building Standard
Greg Johnson on National Green Building StandardGreg Johnson on National Green Building Standard
Greg Johnson on National Green Building Standard
 
Shaun Coen at Plain Green 08
Shaun Coen at Plain Green 08Shaun Coen at Plain Green 08
Shaun Coen at Plain Green 08
 
Jeff Hanson on Sioux Falls Green Project
Jeff Hanson on Sioux Falls Green ProjectJeff Hanson on Sioux Falls Green Project
Jeff Hanson on Sioux Falls Green Project
 
Erica Beck on City of Sioux Falls Leading Green Initiative
Erica Beck on City of Sioux Falls Leading Green InitiativeErica Beck on City of Sioux Falls Leading Green Initiative
Erica Beck on City of Sioux Falls Leading Green Initiative
 
Anne Haber on Cherapa Place
Anne Haber on Cherapa PlaceAnne Haber on Cherapa Place
Anne Haber on Cherapa Place
 
Jeff Scherschligt on Cherapa Place
Jeff Scherschligt on Cherapa PlaceJeff Scherschligt on Cherapa Place
Jeff Scherschligt on Cherapa Place
 
Plain Green 10 New Release Strawbale Shed Community Service Project
Plain Green 10 New Release Strawbale Shed Community Service ProjectPlain Green 10 New Release Strawbale Shed Community Service Project
Plain Green 10 New Release Strawbale Shed Community Service Project
 

Último

Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一Fi ss
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Yantram Animation Studio Corporation
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一diploma 1
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 

Último (20)

Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
办理(麻省罗威尔毕业证书)美国麻省大学罗威尔校区毕业证成绩单原版一比一
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 

Brian Dunbar on "Green Buildings That Teach"

  • 1. Green Buildings That Teach Brian Dunbar, Exec. Director Institute for the Built Environment Colorado State University
  • 2. The biggest issue in green building infusion isn’t cost…. it’s education One thing you have experienced or have heard about green buildings?
  • 3. What can we convey through our buildings?
  • 4. Buildings contribute . . . • Construction and remodeling waste comprises 40% of landfill waste • 48% of energy generated is used by buildings + over 30% of carbon emissions • 66% of electricity is used by buildings + 1/6th of electricity generated is for building cooling • Sick Building Syndrome leads to poor occupant health and loss of productivity
  • 5. Sick Building Syndrome… …from unhealthy schools can cause asthma, skin and eye irritation, cold symptoms, fatigue, and headaches in both students and teachers. Causes: •Inadequate ventilation •Chemical Contaminates from Indoor Sources •Biological contaminants •Chemical contaminants from outdoor sources Sources:EPA, Indoor Air Quality and Student Performance, YRG Sustainability Consultants
  • 6. Sidwell Middle Banner Bank Boise, ID Average School - Wash DC Savings of Green Buildings WASTE COST WATER SAVINGS USE CARBON 50-90% SAVINGS 60% less SAVINGS 30-50% energy demand 35% ENERGY SAVINGS 30% Toyota Campus Torrance, CA 65% less 95% of electricity Boulder Associates construction Source: Test 43% less water use waste diverted Capital E
  • 7. Fossil Ridge High School, Fort Collins, CO Photos courtesy of David Paterson High-performance, sustainable built environments…
  • 8. Environmental & Economic Benefits •Energy efficiency •Water savings •High performance lighting •Improved indoor air quality •Emissions reductions Fossil Ridge High School, Fort Collins, CO •Temperature control •Reduced Construction Waste •Lower operations and maintenance costs Kinard Junior High School, Fort Collins, CO
  • 9. Human Benefits •Student and faculty health •Teacher attraction/retention •Increased student performance •Better focus •Enrichment of learning Bacon Elementary, Fort Collins, CO •Integration of sustainable curriculum •Increased productivity •Connection to nature Islandwood School, WA
  • 10. Green Schools impact the Community… …and increase awareness about green building
  • 11. Green Schools Connect to Nature… humans spend 90% of their time indoors isolated from nature… In the U.S., children ages 6-11 spend about 30 hours per week looking at a TV or computer …improving the learning environment
  • 12. “Our goal is to foster competent, responsible, and independent citizens who love learning and respect themselves, other people and their environment.” Compass Montessori School, Golden, CO = using nature as a model connection for design to nature
  • 13. Islandwood School, Bainbridge Island, WA This earth friendly school in Washington nurtures and teaches children through the connection to nature (www.islandwood.org).
  • 15. Which classroom… Freedom Elementary, Colorado Springs, CO Centennial R-1 School District, San Luis, CO, Photo Courtesy of Great Education Colorado …would you rather learn in?
  • 16.
  • 17. All LEED Rating Systems use: Guidelines addressing 6 primary areas: Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation and Design Process
  • 18. LEED for Schools The LEED for Schools Rating System adds the following unique issues related to schools: Classroom Acoustics Daylight and Views Mold Prevention Environmental Site Assessment To find out more about LEED for Schools, visit the following USGBC website:
  • 19. Case Studies Bacon Elementary, Fort Collins, CO Features: • Efficient irrigation & xeriscaping saves over $7,000 per year • 100% Energy use offset by green power • Over 85% of construction waste diverted from landfill • “Truth walls” reveal building materials used as an educational tool Harris Bilingual Elementary, Fort Collins, CO Features: • The play area is Synthetic turf made of recycled tires, providing innovative water management. • National Energy Star Schools award • Lots of Daylighting • Low VOC paints and finishes Source: CSU Institute for the Built Environment For links to more green school case studies: http://www.usgbccolorado.org/green-buildings/summitresources.html
  • 20. Case Studies Telluride Mountain School, Telluride, CO Features: • Playground is on a “living” roof • School building tucked into hillside • Very affordable- Cost: 1.5 M, $94 per sq. ft. • Interior walls are capped with windows to bring daylighting deeper into the building Greybull Elementary School, Greybull, WY Features: • Built on old baseball fields that were relocated • $15,000 in gas savings in 6 months (compared to old school) • Natural ventilation and skylights • Over 90% of the spaces have visual connection to the outdoors •1st LEED certified school in Wyoming Source: CSU Institute for the Built Environment For links to more green school case studies: http://www.usgbccolorado.org/green-buildings/summitresources.html
  • 21. Kinard Junior High School “With the improvements Fort Collins, CO in building envelope, use of daylighting, and the geo exchange system, this building is the most efficient school in our district, even exceeding Fossil Ridge High School.” -Stu Reeve, Energy Manager Owner: Poudre School District School Capacity: 750 students Completion Date: Aug 2006 Const. Cost: $14 M Overall Cost: $21 M Size: 113,000 sq ft Annual Energy Use: 25 kBtu/sf/yr
  • 22. Kinard Junior High School Energy and Atmosphere Fort Collins, CO  HVAC: Geo Exchange System (100 wells,300’ deep) provides heat / cooling. Heat recovery of exhaust air.  Renewable Energy: Electricity use off-set with an on-site PV system and Green Power contract with local utility  Energy Use: Exceeds ASHRAE 90.1 by 50%; uses $40,000 less energy than most recent district junior high  Controls/Monitors: Building Energy Management System + each classroom has individual controls  Lighting: No electric light used in many classrooms and common areas during daylight
  • 23. Harris Bilingual Elementary Fort Collins, CO Owner: Poudre School District Constructed: 1919 The mission of HBIS promotes Spanish Completion date: 2002 and English language competencies, Capacity: 320 students, 43 staff Total size: 39,260 sf academic achievement, high self-esteem Addition: 21,525 sf and positive cross-cultural attitudes Renovation: 17,735 sf Annual Energy Use: 40.4 kBtu/sf/yr
  • 24. Harris Bilingual Elementary Fort Collins, CO Energy & Atmosphere • Recognized with a national Energy Star Schools award • One of the oldest schools in the district, Harris has achieved the best energy rating in the 46 school system • Automated building and HVAC controls • Energy efficient windows blend with historic architecture Photograph by John Evans
  • 25. Bacon Elementary “It is our philosophy at PSD to build Fort Collins, CO green. We believe the earth is worth preserving and teaching kids about it is fundamental.” Tammie Simpson Construction Project Manager, PSD Owner: Poudre School District School Capacity: 525 students Completion Date: Fall 2003 Cost: $6.3 M Size: 65,300 sq ft Annual Energy: 45 kBtu/sf/yr Photograph by Paul J. Brokering
  • 26. Bacon Elementary Fort Collins, CO “Bacon Elementary is a building that teaches. Real time energy use is displayed as well as exposed structural and mechanical systems. An array of building products made from recycled materials are used throughout the building.” George Brelig RB+B Architects
  • 27. Bacon Elementary Energy and Atmosphere Fort Collins, CO •Cooling system makes ice at night when energy costs are 60% lower •HVAC: Small, 97% efficiency boiler unit •Photocells monitor amount of light needed from interior fixtures •Booster heater at dishwasher reduces hot water system load •100% of electricity use is offset through green power “We raise the bar for construction and design with every school we build or remodel. Our new elementary schools are scoring in the 80’s (on a scale of one to 100) on the EPA Energy Star bench marking system.” Stu Reeve, Energy Manager PSD Photograph by Tammie Simpson
  • 28. Bacon Elementary Fort Collins, CO Materials & Resources • Recycled content materials throughout • Rapidly renewable materials are attractive and educational • Over 85% of construction waste diverted from landfill A school building that teaches “Truth wall” Photograph by Tammie Simpson
  • 29. Student sketch of School Mech Systems
  • 30. “The skylights help us work better than when we were “High locked up.” performanc e buildings What students & Samantha Stewart, 5 grader Greybull Elementary th are teachers at green achievable schools say… “The natural light certainly and they lends itself to a calmer sense don’t have for our kids.” to cost Bill Smith, Principal more.” Bacon Elementary “It’s such a nice, clean place Thomas Fernandez, District 11 Energy to come to work. There’s so Manager much light and fresh air. “I can see myself paddling Kids like to be here.” down the hallway in my Paula Heuschkel, kayak.” Kindergarten teacher Teacher, unknown Greybull Elementary Telluride Mountain School For links to more green school articles and videos: http://www.buildgreenschools.org/resources/
  • 31. Daybreak Elementary “The nationally recognized South Jordan, UT development combines Bungalow style housing, parks, hiking trails, natural open space , green elementary schools, a community center and garden. Daybreak has two light rail stops for public transport to Salt Lake and surrounding areas.” Barbara Breen, Kennecott Land Owner: Kennecott Land, Jordan School District School Capacity: 855 students Completion Date: August 2006 Const. Cost: $122/sf Size: 117,574 sq.ft.
  • 32. Daybreak Elementary Sustainable Sites South Jordan, UT Joint use of school and community center spaces conserves materials, open space, energy, and development footprint Trees positioned to shade building Water Efficiency Saves 22% of indoor water usage by using low flow plumbing fixtures High efficiency irrigation technology and native, drought tolerant landscaping uses 50% less site water Water detention system slows storm water run off
  • 33. Daybreak Elementary Energy & Atmosphere South Jordan, UT Heating & Cooling: Geothermal heating and cooling + energy recovery lower energy costs Architectural shading devices incorporated in building exterior Facility Manager constantly monitors energy efficiency in order to improve energy star rating Lighting & Electricity: Efficient florescent light fixtures decrease energy Motion detectors in bathrooms 1.04 kw /sf per month, total elec. Thermal Mass: Exterior walls made from split face CMU Corrugated aluminum composite panels over framing and insulation
  • 34. “Daybreak is consistently the most energy-efficient of our 89 schools.” Barry Newbold Superintendent South Jordan School District Project Team Architect: Brixen & Christopher Architects Struct. Eng: Bsumek Mu and Associates Mech. & Civil Eng: Heath Engineering Elect Eng: BNA Landscape Arch: Landmark Design Contractor: Bud Mahas Construction, Inc Commissioning: Synergy For more information on Green Schools & LEED: USGBC-Colorado Chapter www.usgbccolorado.org Case Study sponsored by USGBC Colorado Chapter Photographs courtesy of Kennecott Land, Brixen Case Study by Kristi Barnes, Joy Wagner & Brian Dunbar & Christopher Architects, and Brian Dunbar CSU Institute for the Built Environment
  • 35. Pine Jog Elementary School & The School as a Teaching Tool Environmental Education Center Partnership: West Palm, Florida • Palm Beach County Schools, Pine Jog Environmental Center & Florida Atlantic University Partnership benefits: • 150 acre Pine Jog Nature Preserve provides ongoing environmental stewardship • The two facilities include interactive, site-oriented learning activities Elementary School: K – 5th grade 960 students 140,000 sf Environ. Education Center: 15,000 sf w/1 wet lab LEED Registered – seeking Gold
  • 36. Pine Jog Elementary School & Environmental Education Center West Palm, Florida Learning Opportunities: •Solar Water Heating Panels •Photovoltaic System •Rainwater collection demonstration areas •Hand Pumped Wells •Butterfly Gardens •Performance measurements •Interactive Sundial The School as a Teaching Tool
  • 37. Learning Opportunities: Pine Jog Elementary School & Environmental Education Center Butterfly Gardens West Palm, Florida • A garden for each grade • Variety of caterpillars & butterflies attracted to plant mix • Students learn to propagate native apt plants Monitoring devices • Grade levels measure: •Electricity •Water use •Recycling •Solar gain •Transportation miles Green lunches • Low waste & water use • Making recycling easy The School as a Teaching Tool • Low kitchen energy use All images by Zyskovich, Inc. • High % of locally produced Case Study by Kristi Barnes & Brian Dunbar food CSU Institute for the Built Environment
  • 38. LEED Innovation in Design ID Credit 1: Green Education Photo: Rachel Gutter
  • 40. LEED Gold 2004 Happy Feet Plus Clearwater, Florida The First LEED Certified Retail Store in the World Sustainable Sites •Parking lot – storm water absorption & lowers heat island effect •Restored wetlands “We don’t sell typical shoes. We don’t have a typical store.” Dragonfly motif Jacob Wurtz Project Team: Owners: Jacob Wurtz & Jane Srong Architect: Frank Fraze of Northstar Design and Construction Builder: First Florida Contracting Services, Inc. LEED AP: Dave Piggot of First Florida Contracting Services, Inc. Envir. Cons. Ken Benway Shell & pervious concrete
  • 41. “The new “green” store embodies our business Happy Feet Plus philosophy of respect for Clearwater, Florida people, employee empowerment, LEED Gold 2004 and environmental sustainability.” Jacob Wurtz Indoor Environmental Quality •Low-Emitting finished materials •Exemplary daylighting & views Natural light / views Innovation & Design Process •Awarded all 5 points •Sustainable education Green building educational posters •Over 40% materials w/in 500 miles Photography by Kristi Barnes
  • 42. A Sustainable Future… “We have lived by the assumption that what was good for us will be good for the world. What is good for the world will be good for us. We must: – make the effort to know the world and to learn what is good for it. – abandon arrogance and stand in awe. – recover the sense of the majesty of the creation, it is only on the condition of humility and reverence before the world that our species will be able to remain in it.” Wendell Berry
  • 43. With Green, Living Buildings – that Teach
  • 44. For the Benefit of: The Planet And All of its Species For Generations to Come
  • 45. Green Buildings that Teach: Enrich and Sustain the Planet with your projects Sustainability & …Regeneration Green Schools Initiative Brian Dunbar www.usgbccolorado.org Institute for the Built Environment