SlideShare uma empresa Scribd logo
1 de 66
Update of
  Coral Bay Nickel Corporation’s
Hydrometallurgical Processing Plant
   For Low Grade Nickel Ores
The Project is located within the
industrial facility of Rio Tuba Nickel
Mining Corporation (RTNMC) in Brgy.
Rio Tuba, Bataraza, Palawan.


Since 1977, RTNMC has been mining
saprolitic nickel ores selling them to
ferro-nickel smelters abroad. In more    Coral Bay Nickel Corporation
than 25 years of operation, it also
generated mine wastes of about 25
million tonnes. Called low grade
limonitic mine wastes, these are
stockpiled around the mine area.
                                         Rio Tuba Nickel Mining Corp

CBNC will process these stockpiles
using the technology called HPAL or
high pressure acid leach.
HPP SIMPLIFIED FLOWSHEET

                                                        Flash                              Demin
                                                                                            H2 O
                                                        Tanks
                                                                           Scrubber

             H2SO4

Low grade nickel ore           AUTOCLAVE
 1.26 % Ni, 0.15 % Co
                                 HPAL
                               245oC, 4 Mpa                           Leached Slurry
                          High Pressure Acid Leaching
                            (HYDROMETALLURGICAL)

             Steam
                                     H2S                                   CCD
                                                        NiSO4,CoSO4
                                                                                           Limestone
                                                                                              Lime
                                           Reactor
                                                                        Tails Dam
                                                                  Fe2O3,CaSO4, Cr2O3
 NaOH          Scrubber                                               Other Solid Oxides
                                                                       And Hydroxides
                                           NiS,CoS
                                                                                            Effluent
                                       56 % Ni, 4.5 % Co
HPP LINE 1 (ECC granted July 10, 2002)             PERFORMANCE AFTER 4 YEARS
                                                       (April 2005 – April 2009)
  July, 2002 to August, 2004 – Construction
August, 2004 to March, 2005 – Commissioning           Ore Processed – 3,487,000 DMT
 April, 2005 – Start of Commercial Operation         Ore Grade – 1.26 % Ni, .089 % Co
                                                Production – 37,700 DMT Ni & 2,800 DMT Co
             Annual Production                     Metal Recoveries – 87.2 %Ni, 84.9 % Co
                                               Employed – 2,125 (7.5% Female, 71.3 % Locals)
      10,000 MT Nickel, 750 MT Cobalt                   Taxes Paid – Php 993 Million
HPP LINE 2 (ECC granted Feb. 1, 2007)           COMBINED PRODUCTION CAPACITY

  June, 2006 to Jan. 2009 – Construction     Designed:
 Feb. 2009 to May, 2009 – Commissioning      Annual Nickel Production – 20,000 DMT/yr
June, 2009 – Start of Commercial Operation   Annual Cobalt Production – 1,500 DMT/yr

           Annual Production                 Upgraded:
                                             Annual Nickel Production – 24,000 DMT/yr
     10,000 MT Nickel, 750 MT Cobalt         Annual Cobalt Production – 1,860 DMT/yr
Million US Dollars
                                   Line 1        Line 2
Total Investment                    200           308


                 Environmental Protection
Wastewater Treatment Facilities
                                     9            10
Air Pollution Control Facilities
                                     6            15
Tailings Dam Construction
                                     5            26
Total Million US $ (Percent)
                                   20 (10)      51 (16)
   Environmental Protection and Enhancement Program
    (EPEP)

   Social Development and Management Program
    (SDMP)

   Final Mine Rehabilitation and Development Program
    (FMR/DP)
Particulars        Requirements         Compliance            Remarks
1. CLRF             Php 5.25 M          Now > Php 6 M         At DBP in 2004
2. CAPEX on         10 % of Project     16% or Php 3.5B,  Installed
Pollution Control   CAPEX               of Php 25 B CAPEX modern
Facilities                                                facilities
3. OPEX on          3-5% of Operating   18-20% or Php 1.2 -   Used top
Pollution Control   Costs               1.4 B/yr, of OPEX     quality
Facilities                                                    materials
4. MRFC             9 Members           10 Members            Plus ERDS rep
5. MMT              10 Members          16 (+ 4 samplers)     Plus add’l
                                                              1MGB,1EMB,1
                                                              PCSD,2LGU
                                                              and Church
6. EMO              1 Officer (MEPEO)   1 Office of EMO       Provided staff
                                        plus 10 staffs        for all areas
Tailings Storage Facility




                       Water Treatment
Pier Site Facilities


                                         Rio Tuba River




                                           Macadam Road
                       RTN Townsite




                                      Airstrip
ELECTROSTATIC
                             STACK   PRECIPITATOR            BOILER




              GENERATOR




                    STACK                                             STACK   STACK

                   HEATERS
                                                     SCRUBBERS
FLASH TANKS          SCRUBBER




              AUTOCLAVE
Particulars             Parameters            Standards         Actual
1. Effluent Siltation       pH                  @         6.5 – 9.0    8.0 – 8.5
   Qualities pond           TSS                 <        70 mg/L           < 10
             effluent       Temperature         <      3 deg C rise   < 1 deg C
                            Oil and grease      <          5 mg/L          < 1.0
                            Cr +6               <         .2 mg/L          < .15
                            Pb                  <         .3 mg/L          < .05
              Tailings      pH                  @         6.0 – 9.0    8.0 – 8.5
              dam           TSS                 <        150 mg/L          < 10
              supernatant   Temperature         <      3 deg C rise   < 1 deg C
                            Oil and grease      <          5 mg/L          < 1.0
                            Cr +6               <         .2 mg/L          < .15
                            Pb                  <         .3 mg/L          < .05
Notes:
a) Quality of water from the pond and dam are well within the standards.
b) As, Hg and Cd contents are also analyzed and are below detection levels.
Particulars            Parameters             Standards         Actual
2. Air       Plant          CO                  < 500 mg/Ncm              60-100
   Qualities Emissions      NOx                 < 1,000 mg/Ncm            60-100
                            SOx                 < 700 mg/Ncm               60-80
                            Opacity             <      20 Percent          10-15
                            H2S                 <      7mg/Ncm                <1
                            Acid mist           <    .3 mg/Ncm              <.07
              Ambient Air TSP, at plant         <    300ug/Ncm            50-250
                          TSP, at houses        <    230ug/Ncm            10-150
                          Noise, at plant       <     85 Decibels          60-75
                          Noise, at houses      <     60 Decibels          45-50

Notes:

a) Actual air quality considerably lower than maximum allowable levels.
b) Monitoring done in plant site (for source specific standards) and populated
   areas (for ambient air quality standards).
Continuous Monitoring Systems




                          D
                          C
                          S




       CEMS                             CEMS   pH,
                        H2S Detectors    H2S
CO, Nox, SOx, Opacity                          Temp
Marine Waters         24 HR TSP
                      sampler




Inland Waters   NO2, SO2          Acid
                sampler           mist
                                  sampler
Annual Coastal
Resources Assessment
Findings:
A healthy marine ecosystem was
maintained at the primary impact zone
of CBNC’s coastal operations.

Regular patrol prevented illegal
fishing practices and kept the area as a
de-facto sanctuary.
Trestle pile with soft corals




Trestle area teeming with fishes
The results of the study showed that
the flora and vegetation within the
project site and its vicinities are still
intact. Generally the type of vegetation
is secondary forest in a large extent,
grassland and a disturbance is
somewhat minimal and considered as
insignificant      considering        the
parameters used by the monitoring and
assessing team. Generally the type of
vegetation is secondary forest in a large
extent, grassland and brushland
formation which is dominated by the
pioneer species. In some observations
agricultural areas and agroforest were
observed including old follow or
abandoned kaingin.

The dominant plant form around the
area is trees followed by herbs, vines
and shrubs.
pH?
   ppm?
   mg/L?
Biodiversity?




  We just want to
 know if the fish,
the birds, the bees,
 the animals, and
  people will not
        die!
Bees as Air Quality Bio-Indicators
Fish (Fresh and Salt Water) as Water Bio-Indicators
For TESTING........




For TASTING........
TREE                      BUFFER
PLANTING                     ZONE




           CBNC Personnel
           And
           Contractors
Mangrove Planting at Nagoya Beach Area




       Eastern side of causeway




      Western side of causeway
Vermi-
composting
project to
produce
organic
fertilizer
By: BMP Environment and Community Care, Inc.
          June 16-19, 2006 Site Visit
bmp E    NVIRONMENT & COMMUNITY CARE, INC.




“The Environmental Audit highlighted
   the HPP Project’s REMARKABLE
     the HPP Project’s remarkable
 COMPLIANCE with conditions of the
 compliance with the the conditions of
    the Environmental Compliance
Environmental Compliance Certificate.
Certificate. Of the 33 major and 8 sub-
 Of the 33 major conditions conditions
and 8 sub-conditions, 40 conditions had
conditions, only 4 major
 Full Compliance (98 % Performance).
Partial Compliance and the rest had Full
             Compliance.”
Particulars    Requirements         Compliance           Commitment            Remarks

1. Financial      > 1 % of Direct   1. 02%, or P149 M    1. 00%, or P439 M    2.9 times higher
Allocations      Processing Cost    for SDMP 1           for SDMP 2
                 (for CBNC)         (2004-2008)          (2009-2013)

                 > 1 % of Gross     1.12 %, or P103 M    1.68 %, or P177 M    1.7 times higher
                 Rev./Direct        for SDMP 1           for SDMP 2
                 Mining Cost        (2004-2008)          (2009-2013)
                 (for RTNMC)

2.               Community          Com-Rel Sections     Com-Rel Sections     Compliance
Organizational   Relations Office   created to monitor   created to monitor
Requirement
                                    Rio Tuba Nickel      Rio Tuba Nickel      Implementor
                                    Foundation Inc.      Foundation Inc.

3. Coverage      5 Host and 5       5 Host and 6         5 Host and 6         Additional brgy
                 Neighboring        Neighboring          Neighboring          of MNLF rebel
                 Barangays          Barangays            Barangays            returnees

                 Interested ICCs    Twelve (12 ) ICCs    Twenty four (24)     Double pro-
                                                         ICCs                 mining group
SDMP COVERAGE OR IMPACT AREAS
SDMP COVERAGE OR IMPACT AREAS

Non- IP Communities : 11
IP Communities : 24
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM
                                     SDMP I Expenses vs SDMP II Budget
                                                                  COMBINED CBNC/RTNMC
                                                             SDMP I                    SDMP II
                                                            2004-2008                 2009-2013
ITEM                   PARTICULARS                     Expenses       Share        Budget        Share

                                                      Million Php   Percent     Million Php      Percent
A      Legal obligation (>1% of DMMC)                      238.16        1.00          544.38       1.00


D      Total Social Development Program                    251.83        1.06          615.91       1.13
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM
                                         SDMP I Expenses vs SDMP II Budget
                                                                      COMBINED CBNC/RTNMC
                                                                 SDMP I                    SDMP II
                                                                2004-2008                 2009-2013
ITEM                       PARTICULARS                     Expenses       Share        Budget        Share

                                                          Million Php   Percent     Million Php      Percent
A          Legal obligation (>1% of DMMC)                      238.16        1.00          544.38       1.00


B          Social Development Expenses/Budgets
        1 RTNFI Hospital Services for Non-dependents            57.38        0.24           70.00       0.13
        2 LSVMS School Subsidies for Non-dependents             48.62        0.20           60.00       0.11
        3 Community Relations Assistance                        14.00        0.06           70.00       0.13
        4 Gawad Kalinga Housing                                 10.00        0.04           50.00       0.09
        5 Indigenous Learning System                             6.00        0.02           30.00       0.06


C          SDMP Proper
       6.1 SDMP I - Community Development (Todate)              95.43        0.40
       6.2 SDMP II - Community Development (New)                                           289.72       0.53
        7 SDMP II -Training and IEC                             20.40        0.09           46.19       0.08


D          Total Social Development Program                    251.83        1.06          615.91       1.13
SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM
                                       SDMP I Expenses vs SDMP II Expenses
                                                                     COMBINED CBNC/RTNMC
                                                                 SDMP I                    SDMP II
                                                               2004-2008                1st Year - 2009
ITEM                       PARTICULARS                    Expenses        Share       Expenses       Share

                                                         Million Php   Percent      Million Php      Percent
A          Legal obligation (>1% of DMMC)                     238.16         1.00           78.47         1.00


B          Social Development Expenses/Budgets
        1 RTNFI Hospital Services for Non-dependents           57.38         0.24           22.28         0.28
        2 LSVMS School Subsidies for Non-dependents            48.62         0.20           14.60         0.19
        3 Community Relations Assistance                       14.00         0.06           15.23         0.19
        4 Gawad Kalinga Housing                                10.00         0.04            7.11         0.09
        5 Indigenous Learning System                            6.00         0.02            6.83         0.09


C          SDMP Proper
       6.1 SDMP I - Community Development (Balance)            95.43         0.40            2.58         0.03
       6.2 SDMP II - Community Development (New)                                            50.01         0.64
        7 SDMP II -Training and IEC                            20.40         0.09           18.08         0.23


D          Total Social Development Program                   251.83         1.06         136.70          1.74
RTNFOUNDATION, INC.
                    HOSPITAL
                                           Number of patients
Status     : Primary Hospital    40000
                                                                38015
                                                    31279
Workforce :          38 Staff    30000
   Doctors :          9                  19228
                                 20000
   Nurses :          14
  Other Staff:       15          10000

                                     0
                                         2007        2008       2009
Leonides S. Virata Memorial School


Status : Private school, supervised by De La             Number of Students
         Salle University, Bacolod City        1260                            1252
                                               1240               1233
Workforce :                         52 staff   1220
 a. School Principal :               1         1200    1188
 b. Primary & Elementary Faculty:   25
                                               1180
 c. Secondary :                     17
 d. Other Staff :                    9         1160
                                               1140
                                                      SY 07-08   SY 08-09     Sy 09-10
Indigenous Learning System (ILS)
   Concept      :         Arnold Jansen Catholic                     Enrolment Profile (06-09)
                           Mission Foundation
                                                          09-10
   Implementor:           St. Jude’s Parish, SVD Order
                                                          08-09                                   Level 3
   Levels:      Level 1: Non-literate                                                            Level 2
                                                          07-08                                   Level 1
                 Level 2: Elementary undergraduate                                                No. of sites

                 Level 3: Secondary undergraduate         06-07


   Work force: 14 staff                                          0       100    200     300
Gawad Kalinga

   Aim : 1,000 houses in 10 years
   2009 : 100 houses turned over

       Established sites
       Sites being developed
       Site Dev’t. Programs (Sibol, Sagip,
       Productivity, Orderliness, Health,
       Neighborliness, & Cleanliness)

   Workforce: 5
   Volunteers: 30
GK Concept +
                             The IPs “SWEAT” Equity
  CBNC/RTNMC Funding
                            (At least 1000 manhours)
(Php 100 M = 1000 houses)
Gawad Kalinga – Kulantuod




   35 Units
Gawad Kalinga – Bongkol-Bongkol




                      48 Units
Gawad Kalinga – Ocayan




      17 Units
SDMP I Accomplishments (2004-2008)

Infrastructure:                     Social Services:

 16 Day Care Center                 20 Medical Outreach
 11 Health Center                   1 unit Ambulance
 13 Tribal Hall                     1 unit Fire Truck
 30 Road construction and repair    2 units Pick-up
 2 Gymnasium                        11 Multi-cab
 3 Public library                   14 Motorcycle with sidecar
 3 Irrigation system                19 Generator set
 26 Multi-purpose pavement          62 Petromax
 18 Church & Mosque repair          65 ICOM radio
 13 Other communal building         26 Cellular phone
                                     2 Water system
                                     15 Water tank
                                     115 Jetmatic pump
SDMP I Accomplishments (2004-2008)

 Livelihood:                           SUMMARY OF SCHOLARS   NON-IP   IP    TOTAL   No. of Grads

                                              2005-2006

  13 Handtractors w/trailers       College
                                    High School
                                                               82
                                                               41
                                                                      29
                                                                      66
                                                                             111
                                                                             107
  10 Fishing boats                 Elementary                 11     71     82

  37 Carabaos                                                134     166    300
                                              2006-2007
  17 Cows                          College                   131     48     179        11
  113 Swine                        High School                74     95     169
                                                               33     170    203
  4 Trainings & Seminars           Elementary
                                                              238     313    551        11
  12 Cooperatives funded                     2007-2008
                                    College                   153     56     209        27

 Education:                         High School
                                    Elementary
                                                               86
                                                               36
                                                                      119
                                                                      170
                                                                             205
                                                                             206
                                                              275     345    620        27
                                              2008-2009
  Scholarship Program              College                   161     37     198        39
  7 School buildings constructed   High School                82     123    205

  14 Classrooms constructed        Elementary                 21
                                                              264
                                                                      167
                                                                      327
                                                                             188
                                                                             591        39
  2 Classrooms repaired
                                    TOTAL NO. OF COLLEGE GRADUATES                      77
INFRASTRUCTURE PROJECTS
LIVELIHOOD PROJECTS
COMMUNITY SERVICES
OTHER COMMUNITY SERVICES
EDUCATIONAL ASSISTANCE




SDMP scholars during a team building seminar. 77 graduated.




 Some of the 7 school buildings, 14 classrooms constructed.
SDMP II Accomplishments (2009)

        Infrastructure:
       1 Road Concreting
       2 Construction of Bridges
       1 Tribal Hall
       7 Road improvements
       2 Bahay Tarukan
       1 Basketball Court
       2 Barangay Hall Improvement
       2 School Bldg. Construction
       1 School Bldg. Repair
       2 School Stage
SDMP II Accomplishments (2009)

Social Services:
 4 units Hi-Lux Vehicle
 2 units Ford Everest
 1 unit Ford Ranger
 4 units Sarao Jeepney
 11 Jetmatic pump installed
 8 Grass trimmers ICOM radio
 222 units Cellular phones
 2 units Typewriter
 27 units Mountain Bikes
 27 units Motorcycle (5 TMX; 22 XRM)
 3 sets of Books
 Funding of various activities & celebrations
 26 Churches/Mosque assisted
 70 Families Assisted (Medical/Calamity)
 1 unit Laptop (Lenovo)
 2 units Canon digital camera
 1 set Musical instruments
 2 sets Sound System
 19 units Generator set & electrical materials
SDMP II Accomplishments (2009)
SDMP II Accomplishments (2009)
       Livelihood:
    86 units Spraycan
    3 Fishing boats & accessories
    6 units Hand tractors
    72 heads Carabaos
    15 sacks Urea
    21 quarts Cymbush
    15 sacks 16-20
    70 pieces Shovel
    10 pieces Hoe
    52 units Plough & Harrow
SDMP II Accomplishments (2009)

    Education:
   2,316 Elem. pupils assisted
   84 Elementary Scholar
   243 High School Scholar
   214 College Scholar
   10 Lakbay-Aral Trips
   8 Annual Convention Attended
RTN FOUNDATION, INC.
Garnierite Avenue, RTNMC Town site, Rio Tuba, Bataraza, Palawan 5306
Mobile No.: 09175750135
Particulars      Requirements          Compliance        Remarks
1. Financial      Php 106 Million      To implement      Approved by
   Budget                              within 10 years   MGB on Dec.
                                       after closure.    14, 2009

2. Coordination   Must align with      After MGB         LGU still
   with LGU       their CLUP           approval.         preparing their
                                                         CLUP

3. Fund           To be deposited in   To comply.        MGB
   Allocation     a gov’t-assigned                       requirement
                  bank for 7 years,
                  from 2012 to 2019
HPP Project        Area    End-of-Project Land
    Site            (ha)            Use
HPP Complex          35    Forestland

Tailings Dam 1
&2

 Impoundment        187    Industrial tree plantation
 area
 Embankments         29    Reconstructed shrubland

Water storage        28    Aquaculture


Sanitary Landfill    4     Sports ground or public
                           open space

Port area            36    Coconut land
including
causeway
Environmental Management Office
Daghang Salamat, Arigato Guzaimasu, Maraming Salamat Po!

Mais conteúdo relacionado

Mais procurados

The State and Prospects of the Philippine Mining Industry
The State and Prospects of the Philippine Mining IndustryThe State and Prospects of the Philippine Mining Industry
The State and Prospects of the Philippine Mining IndustryRonald Recidoro
 
Sintesis de norma 141 sermarnat
Sintesis de norma 141 sermarnatSintesis de norma 141 sermarnat
Sintesis de norma 141 sermarnatBL17S
 
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...No to mining in Palawan
 
Material de arrastre: S.O.S a los ríos del Tolima
Material de arrastre: S.O.S a los ríos del TolimaMaterial de arrastre: S.O.S a los ríos del Tolima
Material de arrastre: S.O.S a los ríos del TolimaMiguel Ángel Barreto
 
Industrial Minerals Basics: Executive Primer
Industrial Minerals Basics: Executive PrimerIndustrial Minerals Basics: Executive Primer
Industrial Minerals Basics: Executive PrimerMike O'Driscoll
 
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...Yuyun Ismawati Drwiega
 
Mineral property valuation ags 2017 11feb17
Mineral property valuation ags 2017 11feb17Mineral property valuation ags 2017 11feb17
Mineral property valuation ags 2017 11feb17DALLAS DAVIS
 
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...Estudio de investigacion para la recuperacion de oro de relaves planta veta d...
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...Susana Condori
 
PERUMIN 31: La exploración minera frente a los permisos ambientales
PERUMIN 31: La exploración minera frente a los permisos ambientalesPERUMIN 31: La exploración minera frente a los permisos ambientales
PERUMIN 31: La exploración minera frente a los permisos ambientalesPERUMIN - Convención Minera
 

Mais procurados (20)

THE PHILIPPINES’ MINERAL POTENTIAL
THE PHILIPPINES’ MINERAL POTENTIALTHE PHILIPPINES’ MINERAL POTENTIAL
THE PHILIPPINES’ MINERAL POTENTIAL
 
Macventures MPSA 016_93_XIII
Macventures MPSA 016_93_XIIIMacventures MPSA 016_93_XIII
Macventures MPSA 016_93_XIII
 
Geokniga Diamond Geology
Geokniga Diamond GeologyGeokniga Diamond Geology
Geokniga Diamond Geology
 
Philippine Nickel Deposits 2010
Philippine Nickel Deposits 2010Philippine Nickel Deposits 2010
Philippine Nickel Deposits 2010
 
Beneficiation and mineral processing of sand and silica sand
Beneficiation and mineral processing of  sand and silica sandBeneficiation and mineral processing of  sand and silica sand
Beneficiation and mineral processing of sand and silica sand
 
The State and Prospects of the Philippine Mining Industry
The State and Prospects of the Philippine Mining IndustryThe State and Prospects of the Philippine Mining Industry
The State and Prospects of the Philippine Mining Industry
 
Sintesis de norma 141 sermarnat
Sintesis de norma 141 sermarnatSintesis de norma 141 sermarnat
Sintesis de norma 141 sermarnat
 
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...
Major Tailings Dam Disasters in the Philippines - Alyansa Tigil Mina (ATM) - ...
 
Material de arrastre: S.O.S a los ríos del Tolima
Material de arrastre: S.O.S a los ríos del TolimaMaterial de arrastre: S.O.S a los ríos del Tolima
Material de arrastre: S.O.S a los ríos del Tolima
 
Apatite
ApatiteApatite
Apatite
 
Zircon
ZirconZircon
Zircon
 
Industrial Minerals Basics: Executive Primer
Industrial Minerals Basics: Executive PrimerIndustrial Minerals Basics: Executive Primer
Industrial Minerals Basics: Executive Primer
 
nickel Ore
nickel Orenickel Ore
nickel Ore
 
Egyptian tantalum niobium and tin deposits
Egyptian tantalum  niobium and tin depositsEgyptian tantalum  niobium and tin deposits
Egyptian tantalum niobium and tin deposits
 
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...
Artisanal and Small-scale Gold Mining: Local Problems, Global Challenges. Pre...
 
Mineral economics
Mineral economicsMineral economics
Mineral economics
 
Mineral property valuation ags 2017 11feb17
Mineral property valuation ags 2017 11feb17Mineral property valuation ags 2017 11feb17
Mineral property valuation ags 2017 11feb17
 
CHROMITE ORE DEPOSITS IN EGYPT
CHROMITE ORE DEPOSITS IN EGYPTCHROMITE ORE DEPOSITS IN EGYPT
CHROMITE ORE DEPOSITS IN EGYPT
 
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...Estudio de investigacion para la recuperacion de oro de relaves planta veta d...
Estudio de investigacion para la recuperacion de oro de relaves planta veta d...
 
PERUMIN 31: La exploración minera frente a los permisos ambientales
PERUMIN 31: La exploración minera frente a los permisos ambientalesPERUMIN 31: La exploración minera frente a los permisos ambientales
PERUMIN 31: La exploración minera frente a los permisos ambientales
 

Destaque

Puerto Princesa Ecological Theatre Caravan 2009
Puerto Princesa Ecological Theatre Caravan 2009Puerto Princesa Ecological Theatre Caravan 2009
Puerto Princesa Ecological Theatre Caravan 2009No to mining in Palawan
 
Japanese Companies in India 2014
Japanese Companies in India 2014Japanese Companies in India 2014
Japanese Companies in India 2014arukakat
 
Lecture 05 Meiji 4
Lecture 05 Meiji 4Lecture 05 Meiji 4
Lecture 05 Meiji 4Rayman Soe
 
Maps and Charts of Japanese Imperialism
Maps and Charts of Japanese ImperialismMaps and Charts of Japanese Imperialism
Maps and Charts of Japanese ImperialismJonathan Dresner
 
Due Diligence - Looking for Gold in the Paper
Due Diligence - Looking for Gold in the PaperDue Diligence - Looking for Gold in the Paper
Due Diligence - Looking for Gold in the PaperNow Dentons
 
10 Sectors Factsheet
10 Sectors Factsheet10 Sectors Factsheet
10 Sectors FactsheetHang Pham.M
 
Perception of the Steel Industry
Perception of the Steel IndustryPerception of the Steel Industry
Perception of the Steel IndustryEstragon
 
Mining the Isa 2011 Conference Presentation_Nov11
Mining the Isa 2011 Conference Presentation_Nov11Mining the Isa 2011 Conference Presentation_Nov11
Mining the Isa 2011 Conference Presentation_Nov11Minotaur Exploration
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueTristan Wiggill
 
Iron and steel industry
Iron and steel industryIron and steel industry
Iron and steel industryAnirudh Gupta
 
Sustainability In Steel Construction
Sustainability In Steel ConstructionSustainability In Steel Construction
Sustainability In Steel ConstructionMahmoud Sayed Ahmed
 

Destaque (16)

Puerto Princesa Ecological Theatre Caravan 2009
Puerto Princesa Ecological Theatre Caravan 2009Puerto Princesa Ecological Theatre Caravan 2009
Puerto Princesa Ecological Theatre Caravan 2009
 
Steel
SteelSteel
Steel
 
Japanese Companies in India 2014
Japanese Companies in India 2014Japanese Companies in India 2014
Japanese Companies in India 2014
 
Lecture 05 Meiji 4
Lecture 05 Meiji 4Lecture 05 Meiji 4
Lecture 05 Meiji 4
 
Maps and Charts of Japanese Imperialism
Maps and Charts of Japanese ImperialismMaps and Charts of Japanese Imperialism
Maps and Charts of Japanese Imperialism
 
Iorn and steel industry
Iorn and steel industryIorn and steel industry
Iorn and steel industry
 
Due Diligence - Looking for Gold in the Paper
Due Diligence - Looking for Gold in the PaperDue Diligence - Looking for Gold in the Paper
Due Diligence - Looking for Gold in the Paper
 
10 Sectors Factsheet
10 Sectors Factsheet10 Sectors Factsheet
10 Sectors Factsheet
 
Perception of the Steel Industry
Perception of the Steel IndustryPerception of the Steel Industry
Perception of the Steel Industry
 
Arcelor mittal
Arcelor mittalArcelor mittal
Arcelor mittal
 
Mining the Isa 2011 Conference Presentation_Nov11
Mining the Isa 2011 Conference Presentation_Nov11Mining the Isa 2011 Conference Presentation_Nov11
Mining the Isa 2011 Conference Presentation_Nov11
 
Coal Logistic Challenges in Mozambique
Coal Logistic Challenges in MozambiqueCoal Logistic Challenges in Mozambique
Coal Logistic Challenges in Mozambique
 
Iron and steel industry
Iron and steel industryIron and steel industry
Iron and steel industry
 
Sustainability In Steel Construction
Sustainability In Steel ConstructionSustainability In Steel Construction
Sustainability In Steel Construction
 
3D Visualization
3D Visualization3D Visualization
3D Visualization
 
Amonit_EN_bd
Amonit_EN_bdAmonit_EN_bd
Amonit_EN_bd
 

Semelhante a Coral Bay Update on the Palawan HPAL Project

Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...
Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...
Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...No to mining in Palawan
 
Iptc 14285 Presentation
Iptc 14285  PresentationIptc 14285  Presentation
Iptc 14285 Presentationjdowns
 
ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...
 ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI... ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...
ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...iQHub
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten SaltYara International
 
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...PERUMIN - Convención Minera
 
Sart ING METALURGIA diseño de plantas
Sart ING METALURGIA diseño de plantas Sart ING METALURGIA diseño de plantas
Sart ING METALURGIA diseño de plantas RAULEDERMAMANIMACHAC
 
Ef coop meetingpres_11102011
Ef coop meetingpres_11102011Ef coop meetingpres_11102011
Ef coop meetingpres_11102011hrlubbers
 
Ef coop meetingpres_11102011
Ef coop meetingpres_11102011Ef coop meetingpres_11102011
Ef coop meetingpres_11102011hrlubbers
 
Final presentation compiled v12
Final presentation   compiled v12Final presentation   compiled v12
Final presentation compiled v12Henry Miyamoto
 
San Angelo City Council November 6, 2012 Hickory Update
San Angelo City Council November 6, 2012 Hickory UpdateSan Angelo City Council November 6, 2012 Hickory Update
San Angelo City Council November 6, 2012 Hickory UpdateCity of San Angelo Texas
 
Doug Carter - October 20
Doug Carter - October 20Doug Carter - October 20
Doug Carter - October 20p21decision
 
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Rare Earths / Rare Metals
 
Using new modeling technology to help solve heavy oil processing issues final
Using new modeling technology to help solve heavy oil processing issues finalUsing new modeling technology to help solve heavy oil processing issues final
Using new modeling technology to help solve heavy oil processing issues finalInvensys Operations Management
 
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)Dilip Kumar
 
8 b 8.1 - mercury abatement in the us cement industry v2
8   b 8.1 - mercury abatement in the us cement industry v28   b 8.1 - mercury abatement in the us cement industry v2
8 b 8.1 - mercury abatement in the us cement industry v2John Kline
 

Semelhante a Coral Bay Update on the Palawan HPAL Project (20)

Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...
Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...
Sumitomo Metal Mining Co.,Hydrometallurgical Processing Plant For Low Grade N...
 
Iptc 14285 Presentation
Iptc 14285  PresentationIptc 14285  Presentation
Iptc 14285 Presentation
 
ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...
 ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI... ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...
ONSHORE PROCESSING OF NODULES. A REVIEW OF METALLURGICAL FLOWSHEETS AND ACTI...
 
A New Generation of Molten Salt
A New Generation of Molten SaltA New Generation of Molten Salt
A New Generation of Molten Salt
 
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...
PERUMIN 31: The Hydrometallurgical Treatment of Copper Concentrates: An Alter...
 
Sart ING METALURGIA diseño de plantas
Sart ING METALURGIA diseño de plantas Sart ING METALURGIA diseño de plantas
Sart ING METALURGIA diseño de plantas
 
Ef coop meetingpres_11102011
Ef coop meetingpres_11102011Ef coop meetingpres_11102011
Ef coop meetingpres_11102011
 
Ef coop meetingpres_11102011
Ef coop meetingpres_11102011Ef coop meetingpres_11102011
Ef coop meetingpres_11102011
 
OMAE 2011-50298 Presentation
OMAE 2011-50298 PresentationOMAE 2011-50298 Presentation
OMAE 2011-50298 Presentation
 
Final presentation compiled v12
Final presentation   compiled v12Final presentation   compiled v12
Final presentation compiled v12
 
PRROSS Copper
PRROSS CopperPRROSS Copper
PRROSS Copper
 
San Angelo City Council November 6, 2012 Hickory Update
San Angelo City Council November 6, 2012 Hickory UpdateSan Angelo City Council November 6, 2012 Hickory Update
San Angelo City Council November 6, 2012 Hickory Update
 
ACS Symposium: Finding Alternatives to Critical Materials in Photovoltaics an...
ACS Symposium: Finding Alternatives to Critical Materials in Photovoltaics an...ACS Symposium: Finding Alternatives to Critical Materials in Photovoltaics an...
ACS Symposium: Finding Alternatives to Critical Materials in Photovoltaics an...
 
Doug Carter - October 20
Doug Carter - October 20Doug Carter - October 20
Doug Carter - October 20
 
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
Commerce Resources Corp. (TSXv: CCE) Corporate Presentation (Jan 2011)
 
Using new modeling technology to help solve heavy oil processing issues final
Using new modeling technology to help solve heavy oil processing issues finalUsing new modeling technology to help solve heavy oil processing issues final
Using new modeling technology to help solve heavy oil processing issues final
 
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
POWER PLANT CHEMISTRY( WATER TREATMENT FOR BOILERS)
 
Nickel_Processes.ppt
Nickel_Processes.pptNickel_Processes.ppt
Nickel_Processes.ppt
 
Mineral Industry Statistics
Mineral Industry StatisticsMineral Industry Statistics
Mineral Industry Statistics
 
8 b 8.1 - mercury abatement in the us cement industry v2
8   b 8.1 - mercury abatement in the us cement industry v28   b 8.1 - mercury abatement in the us cement industry v2
8 b 8.1 - mercury abatement in the us cement industry v2
 

Mais de No to mining in Palawan

Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalPhilippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalNo to mining in Palawan
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalNo to mining in Palawan
 
Philippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationPhilippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationNo to mining in Palawan
 
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...No to mining in Palawan
 
Mining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentMining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentNo to mining in Palawan
 
Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013No to mining in Palawan
 
Intex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationIntex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationNo to mining in Palawan
 
Philippine Mining Production Export Figures
Philippine Mining Production Export FiguresPhilippine Mining Production Export Figures
Philippine Mining Production Export FiguresNo to mining in Palawan
 
CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013No to mining in Palawan
 
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsPollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsNo to mining in Palawan
 
Draft Minerals Law (New) Mongolia December 5-2012
Draft  Minerals  Law (New) Mongolia December 5-2012Draft  Minerals  Law (New) Mongolia December 5-2012
Draft Minerals Law (New) Mongolia December 5-2012No to mining in Palawan
 

Mais de No to mining in Palawan (20)

Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_FinalPhilippine_ EITI_ Report_Volume_I_Contextual_Information_Final
Philippine_ EITI_ Report_Volume_I_Contextual_Information_Final
 
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_FinalPhilippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
Philippine _EITI_ Report_Volume_II_Reconciliation_Report_Final
 
Philippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_InformationPhilippine_EITI_Annexes_ Volume I_Contextual_Information
Philippine_EITI_Annexes_ Volume I_Contextual_Information
 
Mining Presentation-11142014
Mining Presentation-11142014Mining Presentation-11142014
Mining Presentation-11142014
 
Cetim cetim's statements at the un
Cetim   cetim's statements at the unCetim   cetim's statements at the un
Cetim cetim's statements at the un
 
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
Speech by Julian Payne, President, Canadian Chamber of Commerce of the Philip...
 
Mining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-AssesmentMining Arangkada-3rd-Anniversary-Assesment
Mining Arangkada-3rd-Anniversary-Assesment
 
Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013Philippine Metallic Mining December 2013
Philippine Metallic Mining December 2013
 
Study Tampakan HRIA
Study Tampakan HRIAStudy Tampakan HRIA
Study Tampakan HRIA
 
Intex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose InformationIntex Breach of Duty to Publicly Disclose Information
Intex Breach of Duty to Publicly Disclose Information
 
Mineral Industry Statistics_May_2013
Mineral Industry Statistics_May_2013Mineral Industry Statistics_May_2013
Mineral Industry Statistics_May_2013
 
Philippine Mining Production Export Figures
Philippine Mining Production Export FiguresPhilippine Mining Production Export Figures
Philippine Mining Production Export Figures
 
Position Paper on Philex Mining Spill
Position Paper on Philex Mining SpillPosition Paper on Philex Mining Spill
Position Paper on Philex Mining Spill
 
CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013CSM Summary Senate Hearing March 19 2013
CSM Summary Senate Hearing March 19 2013
 
Philex Padcal Mine PAB Resolution
Philex Padcal Mine PAB ResolutionPhilex Padcal Mine PAB Resolution
Philex Padcal Mine PAB Resolution
 
Mining Arangkada Assessment_2013
Mining  Arangkada Assessment_2013Mining  Arangkada Assessment_2013
Mining Arangkada Assessment_2013
 
Mining Survey 2012-2013
Mining Survey 2012-2013Mining Survey 2012-2013
Mining Survey 2012-2013
 
Ochoa Tampakan Decision
Ochoa Tampakan DecisionOchoa Tampakan Decision
Ochoa Tampakan Decision
 
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act ViolationsPollution Adjudication Board fines Philex Mining over Clean Water Act Violations
Pollution Adjudication Board fines Philex Mining over Clean Water Act Violations
 
Draft Minerals Law (New) Mongolia December 5-2012
Draft  Minerals  Law (New) Mongolia December 5-2012Draft  Minerals  Law (New) Mongolia December 5-2012
Draft Minerals Law (New) Mongolia December 5-2012
 

Último

Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalayResources
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Probe Gold
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024CollectiveMining1
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 

Último (12)

Mandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR PresentationMandalay Resources 2024 April IR Presentation
Mandalay Resources 2024 April IR Presentation
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024Q1 Probe Gold Quarterly Update- April 2024
Q1 Probe Gold Quarterly Update- April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 10, 2024
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024Collective Mining | Corporate Presentation | April 2024
Collective Mining | Corporate Presentation | April 2024
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
Korea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment ReportKorea District Heating Corporation 071320 Algorithm Investment Report
Korea District Heating Corporation 071320 Algorithm Investment Report
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 

Coral Bay Update on the Palawan HPAL Project

  • 1. Update of Coral Bay Nickel Corporation’s Hydrometallurgical Processing Plant For Low Grade Nickel Ores
  • 2. The Project is located within the industrial facility of Rio Tuba Nickel Mining Corporation (RTNMC) in Brgy. Rio Tuba, Bataraza, Palawan. Since 1977, RTNMC has been mining saprolitic nickel ores selling them to ferro-nickel smelters abroad. In more Coral Bay Nickel Corporation than 25 years of operation, it also generated mine wastes of about 25 million tonnes. Called low grade limonitic mine wastes, these are stockpiled around the mine area. Rio Tuba Nickel Mining Corp CBNC will process these stockpiles using the technology called HPAL or high pressure acid leach.
  • 3. HPP SIMPLIFIED FLOWSHEET Flash Demin H2 O Tanks Scrubber H2SO4 Low grade nickel ore AUTOCLAVE 1.26 % Ni, 0.15 % Co HPAL 245oC, 4 Mpa Leached Slurry High Pressure Acid Leaching (HYDROMETALLURGICAL) Steam H2S CCD NiSO4,CoSO4 Limestone Lime Reactor Tails Dam Fe2O3,CaSO4, Cr2O3 NaOH Scrubber Other Solid Oxides And Hydroxides NiS,CoS Effluent 56 % Ni, 4.5 % Co
  • 4. HPP LINE 1 (ECC granted July 10, 2002) PERFORMANCE AFTER 4 YEARS (April 2005 – April 2009) July, 2002 to August, 2004 – Construction August, 2004 to March, 2005 – Commissioning Ore Processed – 3,487,000 DMT April, 2005 – Start of Commercial Operation Ore Grade – 1.26 % Ni, .089 % Co Production – 37,700 DMT Ni & 2,800 DMT Co Annual Production Metal Recoveries – 87.2 %Ni, 84.9 % Co Employed – 2,125 (7.5% Female, 71.3 % Locals) 10,000 MT Nickel, 750 MT Cobalt Taxes Paid – Php 993 Million
  • 5. HPP LINE 2 (ECC granted Feb. 1, 2007) COMBINED PRODUCTION CAPACITY June, 2006 to Jan. 2009 – Construction Designed: Feb. 2009 to May, 2009 – Commissioning Annual Nickel Production – 20,000 DMT/yr June, 2009 – Start of Commercial Operation Annual Cobalt Production – 1,500 DMT/yr Annual Production Upgraded: Annual Nickel Production – 24,000 DMT/yr 10,000 MT Nickel, 750 MT Cobalt Annual Cobalt Production – 1,860 DMT/yr
  • 6. Million US Dollars Line 1 Line 2 Total Investment 200 308 Environmental Protection Wastewater Treatment Facilities 9 10 Air Pollution Control Facilities 6 15 Tailings Dam Construction 5 26 Total Million US $ (Percent) 20 (10) 51 (16)
  • 7. Environmental Protection and Enhancement Program (EPEP)  Social Development and Management Program (SDMP)  Final Mine Rehabilitation and Development Program (FMR/DP)
  • 8. Particulars Requirements Compliance Remarks 1. CLRF Php 5.25 M Now > Php 6 M At DBP in 2004 2. CAPEX on 10 % of Project 16% or Php 3.5B, Installed Pollution Control CAPEX of Php 25 B CAPEX modern Facilities facilities 3. OPEX on 3-5% of Operating 18-20% or Php 1.2 - Used top Pollution Control Costs 1.4 B/yr, of OPEX quality Facilities materials 4. MRFC 9 Members 10 Members Plus ERDS rep 5. MMT 10 Members 16 (+ 4 samplers) Plus add’l 1MGB,1EMB,1 PCSD,2LGU and Church 6. EMO 1 Officer (MEPEO) 1 Office of EMO Provided staff plus 10 staffs for all areas
  • 9. Tailings Storage Facility Water Treatment
  • 10. Pier Site Facilities Rio Tuba River Macadam Road RTN Townsite Airstrip
  • 11. ELECTROSTATIC STACK PRECIPITATOR BOILER GENERATOR STACK STACK STACK HEATERS SCRUBBERS FLASH TANKS SCRUBBER AUTOCLAVE
  • 12. Particulars Parameters Standards Actual 1. Effluent Siltation pH @ 6.5 – 9.0 8.0 – 8.5 Qualities pond TSS < 70 mg/L < 10 effluent Temperature < 3 deg C rise < 1 deg C Oil and grease < 5 mg/L < 1.0 Cr +6 < .2 mg/L < .15 Pb < .3 mg/L < .05 Tailings pH @ 6.0 – 9.0 8.0 – 8.5 dam TSS < 150 mg/L < 10 supernatant Temperature < 3 deg C rise < 1 deg C Oil and grease < 5 mg/L < 1.0 Cr +6 < .2 mg/L < .15 Pb < .3 mg/L < .05 Notes: a) Quality of water from the pond and dam are well within the standards. b) As, Hg and Cd contents are also analyzed and are below detection levels.
  • 13. Particulars Parameters Standards Actual 2. Air Plant CO < 500 mg/Ncm 60-100 Qualities Emissions NOx < 1,000 mg/Ncm 60-100 SOx < 700 mg/Ncm 60-80 Opacity < 20 Percent 10-15 H2S < 7mg/Ncm <1 Acid mist < .3 mg/Ncm <.07 Ambient Air TSP, at plant < 300ug/Ncm 50-250 TSP, at houses < 230ug/Ncm 10-150 Noise, at plant < 85 Decibels 60-75 Noise, at houses < 60 Decibels 45-50 Notes: a) Actual air quality considerably lower than maximum allowable levels. b) Monitoring done in plant site (for source specific standards) and populated areas (for ambient air quality standards).
  • 14. Continuous Monitoring Systems D C S CEMS CEMS pH, H2S Detectors H2S CO, Nox, SOx, Opacity Temp
  • 15.
  • 16. Marine Waters 24 HR TSP sampler Inland Waters NO2, SO2 Acid sampler mist sampler
  • 17. Annual Coastal Resources Assessment Findings: A healthy marine ecosystem was maintained at the primary impact zone of CBNC’s coastal operations. Regular patrol prevented illegal fishing practices and kept the area as a de-facto sanctuary.
  • 18. Trestle pile with soft corals Trestle area teeming with fishes
  • 19. The results of the study showed that the flora and vegetation within the project site and its vicinities are still intact. Generally the type of vegetation is secondary forest in a large extent, grassland and a disturbance is somewhat minimal and considered as insignificant considering the parameters used by the monitoring and assessing team. Generally the type of vegetation is secondary forest in a large extent, grassland and brushland formation which is dominated by the pioneer species. In some observations agricultural areas and agroforest were observed including old follow or abandoned kaingin. The dominant plant form around the area is trees followed by herbs, vines and shrubs.
  • 20.
  • 21.
  • 22.
  • 23. pH? ppm? mg/L? Biodiversity? We just want to know if the fish, the birds, the bees, the animals, and people will not die!
  • 24. Bees as Air Quality Bio-Indicators
  • 25. Fish (Fresh and Salt Water) as Water Bio-Indicators
  • 27.
  • 28. TREE BUFFER PLANTING ZONE CBNC Personnel And Contractors
  • 29. Mangrove Planting at Nagoya Beach Area Eastern side of causeway Western side of causeway
  • 30.
  • 32.
  • 33.
  • 34. By: BMP Environment and Community Care, Inc. June 16-19, 2006 Site Visit
  • 35. bmp E NVIRONMENT & COMMUNITY CARE, INC. “The Environmental Audit highlighted the HPP Project’s REMARKABLE the HPP Project’s remarkable COMPLIANCE with conditions of the compliance with the the conditions of the Environmental Compliance Environmental Compliance Certificate. Certificate. Of the 33 major and 8 sub- Of the 33 major conditions conditions and 8 sub-conditions, 40 conditions had conditions, only 4 major Full Compliance (98 % Performance). Partial Compliance and the rest had Full Compliance.”
  • 36. Particulars Requirements Compliance Commitment Remarks 1. Financial > 1 % of Direct 1. 02%, or P149 M 1. 00%, or P439 M 2.9 times higher Allocations Processing Cost for SDMP 1 for SDMP 2 (for CBNC) (2004-2008) (2009-2013) > 1 % of Gross 1.12 %, or P103 M 1.68 %, or P177 M 1.7 times higher Rev./Direct for SDMP 1 for SDMP 2 Mining Cost (2004-2008) (2009-2013) (for RTNMC) 2. Community Com-Rel Sections Com-Rel Sections Compliance Organizational Relations Office created to monitor created to monitor Requirement Rio Tuba Nickel Rio Tuba Nickel Implementor Foundation Inc. Foundation Inc. 3. Coverage 5 Host and 5 5 Host and 6 5 Host and 6 Additional brgy Neighboring Neighboring Neighboring of MNLF rebel Barangays Barangays Barangays returnees Interested ICCs Twelve (12 ) ICCs Twenty four (24) Double pro- ICCs mining group
  • 37. SDMP COVERAGE OR IMPACT AREAS
  • 38. SDMP COVERAGE OR IMPACT AREAS Non- IP Communities : 11 IP Communities : 24
  • 39. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Budget COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 2009-2013 ITEM PARTICULARS Expenses Share Budget Share Million Php Percent Million Php Percent A Legal obligation (>1% of DMMC) 238.16 1.00 544.38 1.00 D Total Social Development Program 251.83 1.06 615.91 1.13
  • 40. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Budget COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 2009-2013 ITEM PARTICULARS Expenses Share Budget Share Million Php Percent Million Php Percent A Legal obligation (>1% of DMMC) 238.16 1.00 544.38 1.00 B Social Development Expenses/Budgets 1 RTNFI Hospital Services for Non-dependents 57.38 0.24 70.00 0.13 2 LSVMS School Subsidies for Non-dependents 48.62 0.20 60.00 0.11 3 Community Relations Assistance 14.00 0.06 70.00 0.13 4 Gawad Kalinga Housing 10.00 0.04 50.00 0.09 5 Indigenous Learning System 6.00 0.02 30.00 0.06 C SDMP Proper 6.1 SDMP I - Community Development (Todate) 95.43 0.40 6.2 SDMP II - Community Development (New) 289.72 0.53 7 SDMP II -Training and IEC 20.40 0.09 46.19 0.08 D Total Social Development Program 251.83 1.06 615.91 1.13
  • 41. SOCIAL DEVELOPMENT AND MANAGEMENT PROGRAM SDMP I Expenses vs SDMP II Expenses COMBINED CBNC/RTNMC SDMP I SDMP II 2004-2008 1st Year - 2009 ITEM PARTICULARS Expenses Share Expenses Share Million Php Percent Million Php Percent A Legal obligation (>1% of DMMC) 238.16 1.00 78.47 1.00 B Social Development Expenses/Budgets 1 RTNFI Hospital Services for Non-dependents 57.38 0.24 22.28 0.28 2 LSVMS School Subsidies for Non-dependents 48.62 0.20 14.60 0.19 3 Community Relations Assistance 14.00 0.06 15.23 0.19 4 Gawad Kalinga Housing 10.00 0.04 7.11 0.09 5 Indigenous Learning System 6.00 0.02 6.83 0.09 C SDMP Proper 6.1 SDMP I - Community Development (Balance) 95.43 0.40 2.58 0.03 6.2 SDMP II - Community Development (New) 50.01 0.64 7 SDMP II -Training and IEC 20.40 0.09 18.08 0.23 D Total Social Development Program 251.83 1.06 136.70 1.74
  • 42. RTNFOUNDATION, INC. HOSPITAL Number of patients Status : Primary Hospital 40000 38015 31279 Workforce : 38 Staff 30000 Doctors : 9 19228 20000 Nurses : 14 Other Staff: 15 10000 0 2007 2008 2009
  • 43. Leonides S. Virata Memorial School Status : Private school, supervised by De La Number of Students Salle University, Bacolod City 1260 1252 1240 1233 Workforce : 52 staff 1220 a. School Principal : 1 1200 1188 b. Primary & Elementary Faculty: 25 1180 c. Secondary : 17 d. Other Staff : 9 1160 1140 SY 07-08 SY 08-09 Sy 09-10
  • 44. Indigenous Learning System (ILS)  Concept : Arnold Jansen Catholic Enrolment Profile (06-09) Mission Foundation 09-10  Implementor: St. Jude’s Parish, SVD Order 08-09 Level 3  Levels: Level 1: Non-literate Level 2 07-08 Level 1 Level 2: Elementary undergraduate No. of sites Level 3: Secondary undergraduate 06-07  Work force: 14 staff 0 100 200 300
  • 45. Gawad Kalinga  Aim : 1,000 houses in 10 years  2009 : 100 houses turned over Established sites Sites being developed Site Dev’t. Programs (Sibol, Sagip, Productivity, Orderliness, Health, Neighborliness, & Cleanliness)  Workforce: 5  Volunteers: 30
  • 46. GK Concept + The IPs “SWEAT” Equity CBNC/RTNMC Funding (At least 1000 manhours) (Php 100 M = 1000 houses)
  • 47. Gawad Kalinga – Kulantuod 35 Units
  • 48. Gawad Kalinga – Bongkol-Bongkol 48 Units
  • 49. Gawad Kalinga – Ocayan 17 Units
  • 50. SDMP I Accomplishments (2004-2008) Infrastructure: Social Services:  16 Day Care Center  20 Medical Outreach  11 Health Center  1 unit Ambulance  13 Tribal Hall  1 unit Fire Truck  30 Road construction and repair  2 units Pick-up  2 Gymnasium  11 Multi-cab  3 Public library  14 Motorcycle with sidecar  3 Irrigation system  19 Generator set  26 Multi-purpose pavement  62 Petromax  18 Church & Mosque repair  65 ICOM radio  13 Other communal building  26 Cellular phone  2 Water system  15 Water tank  115 Jetmatic pump
  • 51. SDMP I Accomplishments (2004-2008) Livelihood: SUMMARY OF SCHOLARS NON-IP IP TOTAL No. of Grads 2005-2006  13 Handtractors w/trailers College High School 82 41 29 66 111 107  10 Fishing boats Elementary 11 71 82  37 Carabaos 134 166 300 2006-2007  17 Cows College 131 48 179 11  113 Swine High School 74 95 169 33 170 203  4 Trainings & Seminars Elementary 238 313 551 11  12 Cooperatives funded 2007-2008 College 153 56 209 27 Education: High School Elementary 86 36 119 170 205 206 275 345 620 27 2008-2009  Scholarship Program College 161 37 198 39  7 School buildings constructed High School 82 123 205  14 Classrooms constructed Elementary 21 264 167 327 188 591 39  2 Classrooms repaired TOTAL NO. OF COLLEGE GRADUATES 77
  • 56. EDUCATIONAL ASSISTANCE SDMP scholars during a team building seminar. 77 graduated. Some of the 7 school buildings, 14 classrooms constructed.
  • 57. SDMP II Accomplishments (2009) Infrastructure:  1 Road Concreting  2 Construction of Bridges  1 Tribal Hall  7 Road improvements  2 Bahay Tarukan  1 Basketball Court  2 Barangay Hall Improvement  2 School Bldg. Construction  1 School Bldg. Repair  2 School Stage
  • 58. SDMP II Accomplishments (2009) Social Services:  4 units Hi-Lux Vehicle  2 units Ford Everest  1 unit Ford Ranger  4 units Sarao Jeepney  11 Jetmatic pump installed  8 Grass trimmers ICOM radio  222 units Cellular phones  2 units Typewriter  27 units Mountain Bikes  27 units Motorcycle (5 TMX; 22 XRM)  3 sets of Books  Funding of various activities & celebrations  26 Churches/Mosque assisted  70 Families Assisted (Medical/Calamity)  1 unit Laptop (Lenovo)  2 units Canon digital camera  1 set Musical instruments  2 sets Sound System  19 units Generator set & electrical materials
  • 60. SDMP II Accomplishments (2009) Livelihood:  86 units Spraycan  3 Fishing boats & accessories  6 units Hand tractors  72 heads Carabaos  15 sacks Urea  21 quarts Cymbush  15 sacks 16-20  70 pieces Shovel  10 pieces Hoe  52 units Plough & Harrow
  • 61. SDMP II Accomplishments (2009) Education:  2,316 Elem. pupils assisted  84 Elementary Scholar  243 High School Scholar  214 College Scholar  10 Lakbay-Aral Trips  8 Annual Convention Attended
  • 62. RTN FOUNDATION, INC. Garnierite Avenue, RTNMC Town site, Rio Tuba, Bataraza, Palawan 5306 Mobile No.: 09175750135
  • 63. Particulars Requirements Compliance Remarks 1. Financial Php 106 Million To implement Approved by Budget within 10 years MGB on Dec. after closure. 14, 2009 2. Coordination Must align with After MGB LGU still with LGU their CLUP approval. preparing their CLUP 3. Fund To be deposited in To comply. MGB Allocation a gov’t-assigned requirement bank for 7 years, from 2012 to 2019
  • 64. HPP Project Area End-of-Project Land Site (ha) Use HPP Complex 35 Forestland Tailings Dam 1 &2 Impoundment 187 Industrial tree plantation area Embankments 29 Reconstructed shrubland Water storage 28 Aquaculture Sanitary Landfill 4 Sports ground or public open space Port area 36 Coconut land including causeway
  • 66. Daghang Salamat, Arigato Guzaimasu, Maraming Salamat Po!