Author: Martin Bíca
NPP Engineering Manager
ČEZ a.s., NPP Temelín, 37305 Temelín
martin.bica@cez.cz
NPP Temelín U1,2
Power Uprate Project
International Topical Meeting
VVER 2010 Experience & Perspectives
1 ÷ 3 November 2010, Prague, CZ
Temelín Introduction
PWR, 2 x VVER-1000 V-320
Rated Thermal Power: 3000 MWt
Generator nom. output: ≈ 1016 MWe
 10/2000 – U1 1st.
criticality
 12/2000 – U1 1st.
connection to grid
 01/2002 – U1 – 100%
 05/2002 – U2 1st.
criticality
 12/2002 – U2 1st.
connection to grid
 03/2003 – U2 – 100%
Annual Production: 13,25
TWh (2009), 13,8 TWh
(2010 – plan)
Safely 15-TERA Program
- to get into the first quarter of operated NPPs worldwide based on safety
indicators
- to achieve and maintain 15 TWh annual production
N = 100 % (3000 MWt) ……………..
N = 104 % (3120 MWt) ……………..
N = 1016 MWe
N = 1059 MWe
N = 1081 MWe
~
NPP Temelín – Power Uprate Project
Uprate of reactor thermal
power to 3120 MWt
New turbine LP parts
with increased
thermodynamic
efficiency (+22 MWe)
Reactor power uprate
+ new LP parts
= increase of power
output: 1081 MWe
NPP Temelín – Power Uprate Basic Principles
 Current TVSA-T fuel (as licensed for 3000 MWt)
 Analyses independent on particular reload scheme, supporting
core operation with cycle lengths 260-480 EFPD
 Flow-rates, functions and volumes of safety systems remain
unchanged
 Safety analysis acceptance criteria remain unchanged (i.e. same
as for 100%)
 Steam Generator nominal secondary pressure unchanged
 Changes expected in trip setpoints, methodologies, control
systems settings, …
Power Uprate Project is based on exploitation of the reserves
existing in the current design => no extensive modifications of
plant systems / equipment
NPP Temelín – Project Scope
Fuel and licensing
• Update of core design and safety evaluation methodologies
• 1st 104% cycle core design
• Safety analysis
• SAR revision
Transient analysis, optimization of I&C setpoints
Evaluation of power uprate impact on systems &
equipment parameters / performance
• Equipment strenght & lifetime reevaluation
• SG secondary side performance
• Specification of necessary modifications …
Expected modifications:
- Enhancement of generator, generator main breaker, encapsulated leads cooling
- Modifications of I&C systems settings (protection, limitation, control systems)
NPP Temelín – Project Scope (cont.)
Miscellaneous other evaluations
Power uprate impact on … operation, chemistry, equipment qualification …
Specification of startup tests and measurements
Update of impacted operational documentation
Environmental impact evaluation
No need for increase of any effluent limits or other environment related limits
(confirmed by already completed calculations)  no formal EIA procedure
necessary
NPP Temelín – Project Organisation
ČEZ a.s.
OWNER
JSC TVEL
NRI Řež
OKB Gidropress
(RCS Designer)
Main Subcontractor
Amendment 14 to
Fuel Contract
Uprate
Contract
Equipment
Manufacturers
Uprate
Contract
other czech
organisations
NPP Temelín – Project Schedule
2010 2011 2012
Contract, Initial data transfer
Steady State analysis
Transient Analysis
I&C Setpoint Study …
Update of Core Design / Safety Eval. Meth.
Core Design for 1st 104% cycle
Safety Analysis, SAR revision, …
Equipment Analysis …
Equipment Modifications
Operational Documentation Update
Ministry of Industry – Request for change in facility
utilization
State Office for Nuclear Safety – Request for modification
permission
U1 Project Implementation
Reference Schedule => several risks ! …
NPP Temelín – Power Uprate Project
Questions / Remarks
NPP Temelín – Power Uprate Project
Questions / Remarks

Mais conteúdo relacionado

Mais procurados

Standard design bop_sep10
Standard design bop_sep10Standard design bop_sep10
Standard design bop_sep10PRABIR DATTA
 
Further development of Enercon’s de-icing system Christoffer Jonsson, Enercon
Further development of Enercon’s de-icing system Christoffer Jonsson, EnerconFurther development of Enercon’s de-icing system Christoffer Jonsson, Enercon
Further development of Enercon’s de-icing system Christoffer Jonsson, EnerconWinterwind
 
Windpower Engineering Webinar - Vortex Generators on Wind Turbines
Windpower Engineering Webinar - Vortex Generators on Wind TurbinesWindpower Engineering Webinar - Vortex Generators on Wind Turbines
Windpower Engineering Webinar - Vortex Generators on Wind TurbinesUpWind Solutions
 
Monitoring of offshore turbines for design and O&M: an overview of the activi...
Monitoring of offshore turbines for design and O&M: an overview of the activi...Monitoring of offshore turbines for design and O&M: an overview of the activi...
Monitoring of offshore turbines for design and O&M: an overview of the activi...Pieter Jan Jordaens
 
ENVIRON Utility MACT Regulatory Summary
ENVIRON Utility MACT Regulatory SummaryENVIRON Utility MACT Regulatory Summary
ENVIRON Utility MACT Regulatory Summaryaskao555
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE코리아
 
Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearHariSantoso20
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenancePatrick Volluz
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine FleetGE_India
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...ProSIM R & D Pvt. Ltd.
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATELRakesh patel
 
substation 101
substation 101substation 101
substation 101danica11
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstationraja sukumar
 
Assement of-bag-filter-vs-esp-cpcb
Assement of-bag-filter-vs-esp-cpcbAssement of-bag-filter-vs-esp-cpcb
Assement of-bag-filter-vs-esp-cpcbmkpq pasha
 

Mais procurados (20)

Standard design bop_sep10
Standard design bop_sep10Standard design bop_sep10
Standard design bop_sep10
 
Engine blade
Engine bladeEngine blade
Engine blade
 
Further development of Enercon’s de-icing system Christoffer Jonsson, Enercon
Further development of Enercon’s de-icing system Christoffer Jonsson, EnerconFurther development of Enercon’s de-icing system Christoffer Jonsson, Enercon
Further development of Enercon’s de-icing system Christoffer Jonsson, Enercon
 
Windpower Engineering Webinar - Vortex Generators on Wind Turbines
Windpower Engineering Webinar - Vortex Generators on Wind TurbinesWindpower Engineering Webinar - Vortex Generators on Wind Turbines
Windpower Engineering Webinar - Vortex Generators on Wind Turbines
 
Monitoring of offshore turbines for design and O&M: an overview of the activi...
Monitoring of offshore turbines for design and O&M: an overview of the activi...Monitoring of offshore turbines for design and O&M: an overview of the activi...
Monitoring of offshore turbines for design and O&M: an overview of the activi...
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
Solutions for LNG facilities
Solutions for LNG facilitiesSolutions for LNG facilities
Solutions for LNG facilities
 
ENVIRON Utility MACT Regulatory Summary
ENVIRON Utility MACT Regulatory SummaryENVIRON Utility MACT Regulatory Summary
ENVIRON Utility MACT Regulatory Summary
 
GE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CCGE ADGT Application CHP-Cogen-CC
GE ADGT Application CHP-Cogen-CC
 
Aldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgearAldi widiartono gis eco efficient switchgear
Aldi widiartono gis eco efficient switchgear
 
Condition based maintenance
Condition based maintenanceCondition based maintenance
Condition based maintenance
 
Atef_2015_linkedin
Atef_2015_linkedinAtef_2015_linkedin
Atef_2015_linkedin
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
 
Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...Business Opportunity in LWR program and technical preparedness for Indian Ven...
Business Opportunity in LWR program and technical preparedness for Indian Ven...
 
RESUME - RAKESH PATEL
RESUME - RAKESH PATELRESUME - RAKESH PATEL
RESUME - RAKESH PATEL
 
substation 101
substation 101substation 101
substation 101
 
Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstation
 
Rooftop pro
Rooftop proRooftop pro
Rooftop pro
 
Assement of-bag-filter-vs-esp-cpcb
Assement of-bag-filter-vs-esp-cpcbAssement of-bag-filter-vs-esp-cpcb
Assement of-bag-filter-vs-esp-cpcb
 
Introduction of CO2 Reduction Technologies in Steelworks
Introduction of  CO2 Reduction Technologies in SteelworksIntroduction of  CO2 Reduction Technologies in Steelworks
Introduction of CO2 Reduction Technologies in Steelworks
 

Semelhante a Temelin power uprate

S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016CETN
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Implementing Agreement (IA)
 
Ingeteam participates in round table on Power Transfer and Conversion
 Ingeteam participates in round table on Power Transfer and Conversion Ingeteam participates in round table on Power Transfer and Conversion
Ingeteam participates in round table on Power Transfer and ConversionIngeteam Wind Energy
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryUKTI2014
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordinationHimmelstern
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketLeonardo ENERGY
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice ReportPaul Soko
 
An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAlexander Wolski
 
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAll about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAnshul Tripathi
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerSatish Tumbare
 
R16 b.techeeeiv yearrevisedsyllabus
R16 b.techeeeiv yearrevisedsyllabusR16 b.techeeeiv yearrevisedsyllabus
R16 b.techeeeiv yearrevisedsyllabusPandu Kumar
 
Financing of New Nuclear Capacities
Financing of New Nuclear CapacitiesFinancing of New Nuclear Capacities
Financing of New Nuclear CapacitiesAlexander Wolski
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerahmed salah
 

Semelhante a Temelin power uprate (20)

S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016
 
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
IEA DSM Task 17: Integration of DSM, DG, RES and ES – Outcome of Phase 1 and ...
 
Ingeteam participates in round table on Power Transfer and Conversion
 Ingeteam participates in round table on Power Transfer and Conversion Ingeteam participates in round table on Power Transfer and Conversion
Ingeteam participates in round table on Power Transfer and Conversion
 
Ash Townes. AMEC. 27th January
Ash Townes. AMEC. 27th JanuaryAsh Townes. AMEC. 27th January
Ash Townes. AMEC. 27th January
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 
PERSONAL INFORMATION
PERSONAL INFORMATIONPERSONAL INFORMATION
PERSONAL INFORMATION
 
Mohamed hamdy cv
Mohamed hamdy cvMohamed hamdy cv
Mohamed hamdy cv
 
4330903.pdf
4330903.pdf4330903.pdf
4330903.pdf
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to Fukushima
 
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industryAll about Engineering-Power Plant,Oil&Gas,Water and Air industry
All about Engineering-Power Plant,Oil&Gas,Water and Air industry
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
R16 b.techeeeiv yearrevisedsyllabus
R16 b.techeeeiv yearrevisedsyllabusR16 b.techeeeiv yearrevisedsyllabus
R16 b.techeeeiv yearrevisedsyllabus
 
Financing of New Nuclear Capacities
Financing of New Nuclear CapacitiesFinancing of New Nuclear Capacities
Financing of New Nuclear Capacities
 
Ahmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineerAhmed_Salah-El-Din_ instrument service engineer
Ahmed_Salah-El-Din_ instrument service engineer
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
EFYP2 Presentation
EFYP2 PresentationEFYP2 Presentation
EFYP2 Presentation
 

Mais de myatom

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6myatom
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3myatom
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2myatom
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_atmyatom
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushimamyatom
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010myatom
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятцmyatom
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3myatom
 
рачков зятц
рачков зятцрачков зятц
рачков зятцmyatom
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформаmyatom
 
формирование кадров
формирование кадровформирование кадров
формирование кадровmyatom
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBMmyatom
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1myatom
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...myatom
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010myatom
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...myatom
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010myatom
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...myatom
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLmyatom
 
CANDU in Ukraine 2010
CANDU in Ukraine 2010CANDU in Ukraine 2010
CANDU in Ukraine 2010myatom
 

Mais de myatom (20)

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADL
 
CANDU in Ukraine 2010
CANDU in Ukraine 2010CANDU in Ukraine 2010
CANDU in Ukraine 2010
 

Último

Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Alkin Tezuysal
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Karmanjay Verma
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Nikki Chapple
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Mark Simos
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...itnewsafrica
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024TopCSSGallery
 

Último (20)

Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
Unleashing Real-time Insights with ClickHouse_ Navigating the Landscape in 20...
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
Microsoft 365 Copilot: How to boost your productivity with AI – Part two: Dat...
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
 
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
Irene Moetsana-Moeng: Stakeholders in Cybersecurity: Collaborative Defence fo...
 
Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024Top 10 Hubspot Development Companies in 2024
Top 10 Hubspot Development Companies in 2024
 

Temelin power uprate

  • 1. Author: Martin Bíca NPP Engineering Manager ČEZ a.s., NPP Temelín, 37305 Temelín martin.bica@cez.cz NPP Temelín U1,2 Power Uprate Project International Topical Meeting VVER 2010 Experience & Perspectives 1 ÷ 3 November 2010, Prague, CZ
  • 2. Temelín Introduction PWR, 2 x VVER-1000 V-320 Rated Thermal Power: 3000 MWt Generator nom. output: ≈ 1016 MWe  10/2000 – U1 1st. criticality  12/2000 – U1 1st. connection to grid  01/2002 – U1 – 100%  05/2002 – U2 1st. criticality  12/2002 – U2 1st. connection to grid  03/2003 – U2 – 100% Annual Production: 13,25 TWh (2009), 13,8 TWh (2010 – plan) Safely 15-TERA Program - to get into the first quarter of operated NPPs worldwide based on safety indicators - to achieve and maintain 15 TWh annual production
  • 3. N = 100 % (3000 MWt) …………….. N = 104 % (3120 MWt) …………….. N = 1016 MWe N = 1059 MWe N = 1081 MWe ~ NPP Temelín – Power Uprate Project Uprate of reactor thermal power to 3120 MWt New turbine LP parts with increased thermodynamic efficiency (+22 MWe) Reactor power uprate + new LP parts = increase of power output: 1081 MWe
  • 4. NPP Temelín – Power Uprate Basic Principles  Current TVSA-T fuel (as licensed for 3000 MWt)  Analyses independent on particular reload scheme, supporting core operation with cycle lengths 260-480 EFPD  Flow-rates, functions and volumes of safety systems remain unchanged  Safety analysis acceptance criteria remain unchanged (i.e. same as for 100%)  Steam Generator nominal secondary pressure unchanged  Changes expected in trip setpoints, methodologies, control systems settings, … Power Uprate Project is based on exploitation of the reserves existing in the current design => no extensive modifications of plant systems / equipment
  • 5. NPP Temelín – Project Scope Fuel and licensing • Update of core design and safety evaluation methodologies • 1st 104% cycle core design • Safety analysis • SAR revision Transient analysis, optimization of I&C setpoints Evaluation of power uprate impact on systems & equipment parameters / performance • Equipment strenght & lifetime reevaluation • SG secondary side performance • Specification of necessary modifications … Expected modifications: - Enhancement of generator, generator main breaker, encapsulated leads cooling - Modifications of I&C systems settings (protection, limitation, control systems)
  • 6. NPP Temelín – Project Scope (cont.) Miscellaneous other evaluations Power uprate impact on … operation, chemistry, equipment qualification … Specification of startup tests and measurements Update of impacted operational documentation Environmental impact evaluation No need for increase of any effluent limits or other environment related limits (confirmed by already completed calculations)  no formal EIA procedure necessary
  • 7. NPP Temelín – Project Organisation ČEZ a.s. OWNER JSC TVEL NRI Řež OKB Gidropress (RCS Designer) Main Subcontractor Amendment 14 to Fuel Contract Uprate Contract Equipment Manufacturers Uprate Contract other czech organisations
  • 8. NPP Temelín – Project Schedule 2010 2011 2012 Contract, Initial data transfer Steady State analysis Transient Analysis I&C Setpoint Study … Update of Core Design / Safety Eval. Meth. Core Design for 1st 104% cycle Safety Analysis, SAR revision, … Equipment Analysis … Equipment Modifications Operational Documentation Update Ministry of Industry – Request for change in facility utilization State Office for Nuclear Safety – Request for modification permission U1 Project Implementation Reference Schedule => several risks ! …
  • 9. NPP Temelín – Power Uprate Project Questions / Remarks
  • 10. NPP Temelín – Power Uprate Project Questions / Remarks