Responsibilities: E&I QA/QC Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I) Jobs.QA/QC with the help of specification, drawings. Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery Note. Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional drawings. Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing. Responsible for all Red Marks/As Built drawing as per site modification. Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer installation. Inspection for Heating Tracing cables and Testing. Having Good Knowledge of (NEC) National Electrical Code. American Petroleum Institute (API ) Standards IEC- international ELECTROTECHNICAL Commission Standards. Inspection for the Installation of MCT’s. Inspection for Lightning Protection (Lightning Arresters). Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints, Earth Bus Bar, EARTHING Test. Inspection for Motor Installation, Resistance/IR test & Motor torque test. Inspection for Cable Continuity/IR, Cable termination, EARTHING test. Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S. Complete QA/QC Documentation as per Project specification. Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT. Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT. Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing) Inspection for Impulse Line Leak test. Inspection for JB’S Installation, Panels, Cabinets Installation. Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre- Commissioning with the attachments of Instrument loop package index, Functional loop test CR, Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop Diagram & P& ID’S. Responsible for clear the Punch Points. Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion Department (MC) Final Walk Down of Hand over System (HOS) with Client.
Responsibilities: E&I QA/QC Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I) Jobs.QA/QC with the help of specification, drawings. Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery Note. Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional drawings. Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing. Responsible for all Red Marks/As Built drawing as per site modification. Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer installation. Inspection for Heating Tracing cables and Testing. Having Good Knowledge of (NEC) National Electrical Code. American Petroleum Institute (API ) Standards IEC- international ELECTROTECHNICAL Commission Standards. Inspection for the Installation of MCT’s. Inspection for Lightning Protection (Lightning Arresters). Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints, Earth Bus Bar, EARTHING Test. Inspection for Motor Installation, Resistance/IR test & Motor torque test. Inspection for Cable Continuity/IR, Cable termination, EARTHING test. Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S. Complete QA/QC Documentation as per Project specification. Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT. Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT. Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing) Inspection for Impulse Line Leak test. Inspection for JB’S Installation, Panels, Cabinets Installation. Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre- Commissioning with the attachments of Instrument loop package index, Functional loop test CR, Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop Diagram & P& ID’S. Responsible for clear the Punch Points. Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion Department (MC) Final Walk Down of Hand over System (HOS) with Client.