SlideShare uma empresa Scribd logo
1 de 19
Campus Site Plan                           High School Site Plan                  Floor Plan

                                                                                  In the summer of 2008 I was selected to
                                                                                  be a part of the design team for the
                                                                                  extensive renovation of this K-12
                                                                                  campus that had undergone a radical
                                                                                  shift from a rural farming community to a
                                                                                  suburb for the Metro Columbus area. In
                                                                                  order to accommodate current and
                                                                                  future enrollment growth, the new high
                                                                                  school building was designed for
                                                                                  expansion to accommodate ten years of
                                                                                  anticipated        enrollment     increases
                                                                                  consisting of approximately 113,000 SF
                                  Building Perspectives                           on       two      floors,    state-of-the-art
                                                                                  laboratories, classrooms, a media
                                                                                  center,     library,    gymnasium/physical
                                                                                  education complex, as well as future
                                                                                  expansion for additional classrooms and
                                                                                  a performing arts complex.




Highland High School
Sparta, Ohio
113,000 SF
Main Entry | Revit




                          The high school was completed on
                          time for the 2011-12 school year in
                          large part due to the use of Building
                          Information   Modeling    (BIM)    to
                          expedite the design and approval
                          process with the school board and
                          community which was then rolled
                          immediately    into   creating    the
                          construction documents. All images
                          shown here were produced with
                          Autodesk Revit 2008 & 2009, aside
                          from the photos of the completed
                          project.

                          The building achieved LEED Silver
                          certification   and   incorporates
                          geothermal as a primary source for
                          heating and cooling.


Main Entry | Completed


   Highland High School
   Sparta, Ohio
   113,000 SF
Gymnasium                 Presentation Drawing




Presentation Drawing          Auditorium | Cafeteria




   Highland High School
   Sparta, Ohio
   113,000 SF
Main Entry                                                                                  Plaza




 W est Elevation
                                                                  West Elevation looking North


                                              When this progressive software development
                                              company hired BurkettDesign as its architect in
                                              early 2009 we were given the responsibility of not
                                              only leading the owner through the design
                                              process, but also what city they would build their
                                              new headquarters in and what general contractor
                                              would build it. The two sites under consideration
                                              were Harmony Technology Park in Fort Collins
                                              and the Centerra Office Park in Loveland.
                                              Conceptual schemes were created for both sites
                                              concurrent with four GCs creating preliminary
                                              estimates based on the designs. Development
                                              and planning costs were also evaluated for each
                                              site along with FF&E estimates for each building
                                              design to show the owner which site would be
                     Site Plan   Space Plan
                                              most cost effective to build on.



Integware
Loveland, Colorado
80,000 SF
Site Axonometric




                                                                                   In order to provide a positive first
                                                                                   impression at the entrance of
                                                                                   their Waterton manufacturing
                                                                                   campus,        Lockheed       Martin
                                                                                   decided to have a new Visitor
                                                                                   Badging Center designed to
                                                                                   better facilitate their processes
                                                                                   involved with granting access to
                                                                                   visitors and personnel. The
                                                                                   project was also used as an
                                                                                   opportunity to showcase a
                                                                                   commitment to sustainability and
                                                                                   their new “Go Green” initiative
                                                                                   and pursue a LEED Silver
                                                                                   certification.   The       completed
                                                                                   building was eventually granted
                                                                                   Gold           certification.
Building Axonometric                                      Presentation Rendering




   Lockheed Martin Corporation | Visitor Badging Center
   Waterton Campus | Littleton, Colorado
   2,200 SF
Conference Room & Waiting Area




   East Façade




                                                                      The new Visitor Badging Center is a
                                                                      modern pavilion-type building that takes
                                                                      its cues from existing buildings on the
                                                                      campus as well as Waterton Valley’s
                                                                      impressive landscape. The masonry
                                                                      portion of the facility evokes the jutting
                                                                      rocks and hogback formations that are
                                                                      prevalent on the campus’s rolling hills.
                                                                      The glass cube with sloped roof provides
                                                                      maximum visibility to the security staff
                                                                      inside the building for monitoring traffic
                                                                      activity in and out of the plant, as well as
                                                                      vast amounts of natural light.



Reception Desk                                         Badging Area




Lockheed Martin Corporation | Visitor Badging Center
Waterton Campus | Littleton, Colorado
2,200 SF
North Façade
                                                                                                           South Façade | Riverwalk

                                                                                             This 4 story, $10 million structure was
                                                                                             completed on the Historic Arkansas
                                                                                             River Walk Project in September 2007.
                                                                                             Contextual relationships to Historic
                                                                                             downtown Pueblo, as well as a facility
                                                                                             which expresses the unique nature of
                                                                                             Bull Riding and the Wild West were
                                                                                             main      drivers    to   the    aesthetic
                                                                                             development       of    a   very    tightly
                                                                                             constrained site. Locally prevalent
                                                                                             materials of brick and limestone were
                                                                                             incorporated throughout the building as
                                                                                             part of the facade treatment making a
                                                                                             historic tie to downtown as well as
                                                                                             throughout the interior lobbies and
                                                                                             executive offices. In contrast, the south
                                                                                             facade of the building facing the
                                                                                             Arkansas River consists primarily of
                                                                                             glass and metal to both echo the
                                                                                             riverfront and provide a contemporary
                                                                                             vocabulary.
Corner Detail                                                     South Façade from bridge




   Professional Bull Riders, Inc. | World Headquarters Building
   Pueblo, Colorado
   Site - 1.38 acres | Building - 45,673 SF
Main Reception Area                                                                                  Executive Waiting Area




                                                                               The design intent for the
                                                                               building and interiors of the new
                                                                               PBR World Headquarters in
                                                                               Pueblo, CO was to create a
                                                                               dramatic     and      comfortable
                                                                               environment that would be a
                                                                               good fit for bull riders as
                                                                               businessmen         and     would
                                                                               capture     the      spirit   and
                                                                               excitement of the fastest
                                                                               growing sport in the country.
                                                                               Other materials evocative of the
                                                                               bull riders’ lifestyle were also
                                                                               introduced; leather floors and
                                                                               walls, wood flooring, wall
                                                                               panels and ceiling elements, as
                                                                               well as metal trim detailing
                                                                               culminating in a rolled steel
                                                                               “bullhorn” reception desk.


Bull Rider Hall of Fame Corridor                                  Board Room


   Professional Bull Riders, Inc. | World Headquarters Building
   Pueblo, Colorado
   Site - 1.38 acres | Building - 45,673 SF
Donor Playroom | Dining Room




West Façade




                                              Due to overwhelming demand at the two Houses already
                                              operating in the Denver area, this new house was built to
                                              accommodate an additional 45 families near the Children’s
                                              Hospital campus in Aurora. The $11 million, three-story structure
                                              opened in March 2008 and encompasses administrative spaces,
                                              several lounges, indoor/outdoor play areas, and a large
                                              enclosed garden. Guestrooms surround the perimeter of a sunny
                                              atrium space on the second and third floors. Paramount to the
                                              design is its residential quality with a deep, heavily articulated
                                              eave, the use of brick and wood on the exterior and interior, and
                                              an abundance of natural light. All design and material decisions
                                              were premised upon creating a warm, comfortable living
                                              environment for the families that are supported by the Ronald
                                              McDonald           House           and         its         donors.
Entry Portico              Atrium and Stair




   Ronald McDonald House
   Aurora, Colorado
   67,400 SF
View from East

                                       NREL sought a cost-effective solution for a
                                       new structure to test electric charging
                                       stations and the emissions of a wide range of
                                        vehicle types, from compact hybrids all the
                                       way up to big rigs. However, they still
                                       demanded a building that would maintain the
                                       aesthetic of the campus and represent the
                                       ideals of their organization by achieving a
                                       LEED Silver certification. The solution was a
                                       prefabricated metal building with some
                                       customized modifications, such as a masonry
                                       wainscoting, clerestory daylighting windows
                                       and radiant exhaust panels to provide natural
                                       ventilation.

           View from South




NREL | Vehicle Modification Facility
Golden, Colorado
3,000 SF
Reception Area                                                                         Waiting Area | Custom Light Fixture




                                                                     Janus is an international asset
                                                                     management                  company
                                                                     headquartered in the Cherry Creek
                                                                     North neighborhood in Denver,
                                                                     Colorado. As a fairly new employee
                                                                     at BURKETTDESIGN, I was chosen
                                                                     to     complete       the     Design
                                                                     Development       and    Construction
                                                                     Documents for this multi-team
                                                                     collaboration    for    the   interior
                                                                     architectural design of their new 7-
                                                                     story office tower.




                                              Executive Board Room
Reception Desk              Conference Room




   Janus Investment Group
   Denver, Colorado
   147,197 SF
Video Conference Room
                                                                                            Pantry
Corridor




                                                          The visitors to this facility include top
                                                          national and international business
                                                          leaders and Janus knew the importance
                                                          of having their facility make an
                                                          impressive statement of who they are.
                                                          The design team worked very closely
                                                          with Janus to develop and execute a
                                                          highly functional, high tech program
                                                          inside a timeless and understated
                                                          modern interior. The success of the
                                                          design is achieved through the simplicity
                                                          and strength of the materials and their
                                                          innovative application and detailing.




Conference Room                               Idea Room




   Janus Investment Group
   Denver, Colorado
   147,197 SF
Early Design Rendering




                                              Naropa University, an 800 student liberal
                                              and contemplative arts college, located in
                                              Boulder, Colorado, comprises twelve
                                              buildings on 3.7 acres in an impacted
                                              urban     setting.  The     Institute  had
                                              experienced phenomenal growth resulting
                                              in substantial overcrowding and overuse
                                              of the existing campus facility. Through a
                                              comprehensive design process involving
                                              open meetings and design charettes,
                                              including student representatives, faculty
                                              and administrative staff, an organizational
                                              scheme was devised creating a campus
                                              program and phased master plan. The
                                              first phase of this new plan consisted of
                                              building a new administration building on
                                              the northeast corner of the campus.



                         View from Arapahoe




   Nalanda Hall | Naropa University
   Boulder, Colorado
   18,000 SF
South Façade | Riverwalk




                                                                                                                         Tubular Skylights




 South Façade                         Ginsberg Library & Nalanda Hall   Nalanda Hall defines the edge of the campus on
                                                                        Arapahoe Avenue, one of the busiest streets in Boulder.
                                                                        The structure is also the biggest building on campus and
                                                                        defines both a new scale and aesthetic for the future
                                                                        development. The overall form is simple and a palette of
                                                                        materials, heavy timber, masonry, stucco and wood
                                                                        windows, was selected to relate the structure back to the
                                                                        established roots of the campus while balancing the
                                                                        specific identity and goals of this particular building.
                                                                        Complementary to the institution’s mission of a long term
                                                                        sustainable environment and low energy impact was
                                                                        implementing daylighting strategies as much as possible.
                                                                        This was accomplished with strategically placed light
                                                                        shelves and reflectors to bringing daylight into the center
                                                                        of the space through the use of tubular and conventional
                                                                        skylighting. This system is supplemented with high
                                                                        efficiency task lighting in work areas.
South Façade Rendering
                                    Ginsberg Library & South Façade




 Nalanda Hall | Naropa University
 Boulder, Colorado
 18,000 SF
North Façade




                                                                                            Model

                                                         This $1.5 million landmark structure was
                                                         planned as a gateway into the city as
                                                         well as the last link in a metropolitan
                                                         wide bike path system unifying two trail
                                                         systems at the confluence of Ralston
                                                         and Clear Creeks. I was given the
                                                         responsibility of completing construction
                                                         documents for the project and then
                                                         spending a substantial amount of time
                                                         on site during the construction
                                                         administration, working with the general
                                                         contractor, civil and structural engineers
                                                         in order to expedite resolution of
                                                         coordination items so that an especially
                                                         tight schedule could be met.



                                   View from bike path




   Clear Creek Pedestrian Bridge
   Arvada, Colorado
   380 foot length
Details
Approach from East




                                                        Designed as a cable stayed span, the
                                                        concrete and steel bridge is identified by it's
                                                        100 foot tall mast that supports 250 feet of
                                                        its length with a series of tension cables.
                                                        The physical geometry of the bridge is
                                                        unique. The plan is configured into a
                                                        gradually tightening arc while in section, the
                                                        bridge dramatically changes elevation from
                                                        one end to the other to resolve the 20 foot
                                                        height difference between the pathways at
                                                        the creek bank and the park. However,
                                                        considering all of the complexities inherent
                                                        with the site and the design, one of the
                                                        most difficult components of the structure
                                                        for me to facilitate was the custom-
                                                        designed guardrail; deck lights clashed with
                                                        rebar which clashed with rail support
                                                        embed plates and bolts, not to mention
                                                        every horizontal member had a slightly
                                                        different radius.

                                   Approach from West




   Clear Creek Pedestrian Bridge
   Arvada, Colorado
   380 foot length

Mais conteúdo relacionado

Mais procurados

Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramCordoba Corp
 
Higher Education Brochure
Higher Education BrochureHigher Education Brochure
Higher Education Brochurewinstonh
 
Deutsch Portfolio 2010
Deutsch Portfolio 2010Deutsch Portfolio 2010
Deutsch Portfolio 2010randydeutsch
 
Tufts University Residence Hall
Tufts University Residence HallTufts University Residence Hall
Tufts University Residence Hallrandy wilmot
 
Paschal Volney Cv Sus
Paschal Volney Cv SusPaschal Volney Cv Sus
Paschal Volney Cv SusPaschalv
 

Mais procurados (8)

Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
Higher Education Brochure
Higher Education BrochureHigher Education Brochure
Higher Education Brochure
 
Deutsch Portfolio 2010
Deutsch Portfolio 2010Deutsch Portfolio 2010
Deutsch Portfolio 2010
 
Tufts University Residence Hall
Tufts University Residence HallTufts University Residence Hall
Tufts University Residence Hall
 
Chapter 10-TOR
Chapter 10-TORChapter 10-TOR
Chapter 10-TOR
 
Sparrow
SparrowSparrow
Sparrow
 
Krishen
KrishenKrishen
Krishen
 
Paschal Volney Cv Sus
Paschal Volney Cv SusPaschal Volney Cv Sus
Paschal Volney Cv Sus
 

Semelhante a Michael Schulz Portfolio Low Res

Development Magazine Tustin Commons A Tired Asset Comes of Age
Development Magazine Tustin Commons A Tired Asset Comes of AgeDevelopment Magazine Tustin Commons A Tired Asset Comes of Age
Development Magazine Tustin Commons A Tired Asset Comes of Agelarryarmstrong
 
Design Portfolio
Design PortfolioDesign Portfolio
Design Portfoliordillon6
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfoliotonytso
 
Arch Resume
Arch ResumeArch Resume
Arch Resumegosush
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conferencecassie111
 
Mark Sauer Portfolio 2011
Mark Sauer Portfolio 2011Mark Sauer Portfolio 2011
Mark Sauer Portfolio 2011Mark Sauer
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008mklein5156
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professionalchrisrohn
 
Skyline_02-15_The_Dalles_Readiness_Center (1)
Skyline_02-15_The_Dalles_Readiness_Center (1)Skyline_02-15_The_Dalles_Readiness_Center (1)
Skyline_02-15_The_Dalles_Readiness_Center (1)Jennifer Fulford
 
McMurray_Resume_01.07.17
McMurray_Resume_01.07.17McMurray_Resume_01.07.17
McMurray_Resume_01.07.17Andrew McMurray
 
Lakesmere overview 2012
Lakesmere overview 2012Lakesmere overview 2012
Lakesmere overview 2012Chris Horsfall
 
Salem Bush Environmental Planning Portfolio
Salem Bush Environmental Planning PortfolioSalem Bush Environmental Planning Portfolio
Salem Bush Environmental Planning Portfoliosalembush
 
The MET Sacramento High School
The MET Sacramento High SchoolThe MET Sacramento High School
The MET Sacramento High Schoolkarenatskw
 
Potted History of BIM from an MEP Perspective
Potted History of BIM from an MEP PerspectivePotted History of BIM from an MEP Perspective
Potted History of BIM from an MEP PerspectiveBe2camp Admin
 
Courtside and Skybox Apartments
Courtside and Skybox ApartmentsCourtside and Skybox Apartments
Courtside and Skybox ApartmentsHeather Skeehan
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDANMani Kandan
 

Semelhante a Michael Schulz Portfolio Low Res (20)

Development Magazine Tustin Commons A Tired Asset Comes of Age
Development Magazine Tustin Commons A Tired Asset Comes of AgeDevelopment Magazine Tustin Commons A Tired Asset Comes of Age
Development Magazine Tustin Commons A Tired Asset Comes of Age
 
Design Portfolio
Design PortfolioDesign Portfolio
Design Portfolio
 
Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
Arch Resume
Arch ResumeArch Resume
Arch Resume
 
Sustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering ConferenceSustainable Facade Design and Engineering Conference
Sustainable Facade Design and Engineering Conference
 
Mark Sauer Portfolio 2011
Mark Sauer Portfolio 2011Mark Sauer Portfolio 2011
Mark Sauer Portfolio 2011
 
Summer Fall2008
Summer Fall2008Summer Fall2008
Summer Fall2008
 
Chris Rohn - Architectural Professional
Chris Rohn - Architectural ProfessionalChris Rohn - Architectural Professional
Chris Rohn - Architectural Professional
 
Skyline_02-15_The_Dalles_Readiness_Center (1)
Skyline_02-15_The_Dalles_Readiness_Center (1)Skyline_02-15_The_Dalles_Readiness_Center (1)
Skyline_02-15_The_Dalles_Readiness_Center (1)
 
Daewoo Engineering
Daewoo EngineeringDaewoo Engineering
Daewoo Engineering
 
McMurray_Resume_01.07.17
McMurray_Resume_01.07.17McMurray_Resume_01.07.17
McMurray_Resume_01.07.17
 
Lakesmere overview 2012
Lakesmere overview 2012Lakesmere overview 2012
Lakesmere overview 2012
 
Salem Bush Environmental Planning Portfolio
Salem Bush Environmental Planning PortfolioSalem Bush Environmental Planning Portfolio
Salem Bush Environmental Planning Portfolio
 
Portfolio
PortfolioPortfolio
Portfolio
 
EPCALpaper
EPCALpaperEPCALpaper
EPCALpaper
 
The MET Sacramento High School
The MET Sacramento High SchoolThe MET Sacramento High School
The MET Sacramento High School
 
Potted History of BIM from an MEP Perspective
Potted History of BIM from an MEP PerspectivePotted History of BIM from an MEP Perspective
Potted History of BIM from an MEP Perspective
 
RESUME_CConger
RESUME_CCongerRESUME_CConger
RESUME_CConger
 
Courtside and Skybox Apartments
Courtside and Skybox ApartmentsCourtside and Skybox Apartments
Courtside and Skybox Apartments
 
RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
 

Michael Schulz Portfolio Low Res

  • 1.
  • 2.
  • 3.
  • 4. Campus Site Plan High School Site Plan Floor Plan In the summer of 2008 I was selected to be a part of the design team for the extensive renovation of this K-12 campus that had undergone a radical shift from a rural farming community to a suburb for the Metro Columbus area. In order to accommodate current and future enrollment growth, the new high school building was designed for expansion to accommodate ten years of anticipated enrollment increases consisting of approximately 113,000 SF Building Perspectives on two floors, state-of-the-art laboratories, classrooms, a media center, library, gymnasium/physical education complex, as well as future expansion for additional classrooms and a performing arts complex. Highland High School Sparta, Ohio 113,000 SF
  • 5. Main Entry | Revit The high school was completed on time for the 2011-12 school year in large part due to the use of Building Information Modeling (BIM) to expedite the design and approval process with the school board and community which was then rolled immediately into creating the construction documents. All images shown here were produced with Autodesk Revit 2008 & 2009, aside from the photos of the completed project. The building achieved LEED Silver certification and incorporates geothermal as a primary source for heating and cooling. Main Entry | Completed Highland High School Sparta, Ohio 113,000 SF
  • 6. Gymnasium Presentation Drawing Presentation Drawing Auditorium | Cafeteria Highland High School Sparta, Ohio 113,000 SF
  • 7. Main Entry Plaza W est Elevation West Elevation looking North When this progressive software development company hired BurkettDesign as its architect in early 2009 we were given the responsibility of not only leading the owner through the design process, but also what city they would build their new headquarters in and what general contractor would build it. The two sites under consideration were Harmony Technology Park in Fort Collins and the Centerra Office Park in Loveland. Conceptual schemes were created for both sites concurrent with four GCs creating preliminary estimates based on the designs. Development and planning costs were also evaluated for each site along with FF&E estimates for each building design to show the owner which site would be Site Plan Space Plan most cost effective to build on. Integware Loveland, Colorado 80,000 SF
  • 8. Site Axonometric In order to provide a positive first impression at the entrance of their Waterton manufacturing campus, Lockheed Martin decided to have a new Visitor Badging Center designed to better facilitate their processes involved with granting access to visitors and personnel. The project was also used as an opportunity to showcase a commitment to sustainability and their new “Go Green” initiative and pursue a LEED Silver certification. The completed building was eventually granted Gold certification. Building Axonometric Presentation Rendering Lockheed Martin Corporation | Visitor Badging Center Waterton Campus | Littleton, Colorado 2,200 SF
  • 9. Conference Room & Waiting Area East Façade The new Visitor Badging Center is a modern pavilion-type building that takes its cues from existing buildings on the campus as well as Waterton Valley’s impressive landscape. The masonry portion of the facility evokes the jutting rocks and hogback formations that are prevalent on the campus’s rolling hills. The glass cube with sloped roof provides maximum visibility to the security staff inside the building for monitoring traffic activity in and out of the plant, as well as vast amounts of natural light. Reception Desk Badging Area Lockheed Martin Corporation | Visitor Badging Center Waterton Campus | Littleton, Colorado 2,200 SF
  • 10. North Façade South Façade | Riverwalk This 4 story, $10 million structure was completed on the Historic Arkansas River Walk Project in September 2007. Contextual relationships to Historic downtown Pueblo, as well as a facility which expresses the unique nature of Bull Riding and the Wild West were main drivers to the aesthetic development of a very tightly constrained site. Locally prevalent materials of brick and limestone were incorporated throughout the building as part of the facade treatment making a historic tie to downtown as well as throughout the interior lobbies and executive offices. In contrast, the south facade of the building facing the Arkansas River consists primarily of glass and metal to both echo the riverfront and provide a contemporary vocabulary. Corner Detail South Façade from bridge Professional Bull Riders, Inc. | World Headquarters Building Pueblo, Colorado Site - 1.38 acres | Building - 45,673 SF
  • 11. Main Reception Area Executive Waiting Area The design intent for the building and interiors of the new PBR World Headquarters in Pueblo, CO was to create a dramatic and comfortable environment that would be a good fit for bull riders as businessmen and would capture the spirit and excitement of the fastest growing sport in the country. Other materials evocative of the bull riders’ lifestyle were also introduced; leather floors and walls, wood flooring, wall panels and ceiling elements, as well as metal trim detailing culminating in a rolled steel “bullhorn” reception desk. Bull Rider Hall of Fame Corridor Board Room Professional Bull Riders, Inc. | World Headquarters Building Pueblo, Colorado Site - 1.38 acres | Building - 45,673 SF
  • 12. Donor Playroom | Dining Room West Façade Due to overwhelming demand at the two Houses already operating in the Denver area, this new house was built to accommodate an additional 45 families near the Children’s Hospital campus in Aurora. The $11 million, three-story structure opened in March 2008 and encompasses administrative spaces, several lounges, indoor/outdoor play areas, and a large enclosed garden. Guestrooms surround the perimeter of a sunny atrium space on the second and third floors. Paramount to the design is its residential quality with a deep, heavily articulated eave, the use of brick and wood on the exterior and interior, and an abundance of natural light. All design and material decisions were premised upon creating a warm, comfortable living environment for the families that are supported by the Ronald McDonald House and its donors. Entry Portico Atrium and Stair Ronald McDonald House Aurora, Colorado 67,400 SF
  • 13. View from East NREL sought a cost-effective solution for a new structure to test electric charging stations and the emissions of a wide range of vehicle types, from compact hybrids all the way up to big rigs. However, they still demanded a building that would maintain the aesthetic of the campus and represent the ideals of their organization by achieving a LEED Silver certification. The solution was a prefabricated metal building with some customized modifications, such as a masonry wainscoting, clerestory daylighting windows and radiant exhaust panels to provide natural ventilation. View from South NREL | Vehicle Modification Facility Golden, Colorado 3,000 SF
  • 14. Reception Area Waiting Area | Custom Light Fixture Janus is an international asset management company headquartered in the Cherry Creek North neighborhood in Denver, Colorado. As a fairly new employee at BURKETTDESIGN, I was chosen to complete the Design Development and Construction Documents for this multi-team collaboration for the interior architectural design of their new 7- story office tower. Executive Board Room Reception Desk Conference Room Janus Investment Group Denver, Colorado 147,197 SF
  • 15. Video Conference Room Pantry Corridor The visitors to this facility include top national and international business leaders and Janus knew the importance of having their facility make an impressive statement of who they are. The design team worked very closely with Janus to develop and execute a highly functional, high tech program inside a timeless and understated modern interior. The success of the design is achieved through the simplicity and strength of the materials and their innovative application and detailing. Conference Room Idea Room Janus Investment Group Denver, Colorado 147,197 SF
  • 16. Early Design Rendering Naropa University, an 800 student liberal and contemplative arts college, located in Boulder, Colorado, comprises twelve buildings on 3.7 acres in an impacted urban setting. The Institute had experienced phenomenal growth resulting in substantial overcrowding and overuse of the existing campus facility. Through a comprehensive design process involving open meetings and design charettes, including student representatives, faculty and administrative staff, an organizational scheme was devised creating a campus program and phased master plan. The first phase of this new plan consisted of building a new administration building on the northeast corner of the campus. View from Arapahoe Nalanda Hall | Naropa University Boulder, Colorado 18,000 SF
  • 17. South Façade | Riverwalk Tubular Skylights South Façade Ginsberg Library & Nalanda Hall Nalanda Hall defines the edge of the campus on Arapahoe Avenue, one of the busiest streets in Boulder. The structure is also the biggest building on campus and defines both a new scale and aesthetic for the future development. The overall form is simple and a palette of materials, heavy timber, masonry, stucco and wood windows, was selected to relate the structure back to the established roots of the campus while balancing the specific identity and goals of this particular building. Complementary to the institution’s mission of a long term sustainable environment and low energy impact was implementing daylighting strategies as much as possible. This was accomplished with strategically placed light shelves and reflectors to bringing daylight into the center of the space through the use of tubular and conventional skylighting. This system is supplemented with high efficiency task lighting in work areas. South Façade Rendering Ginsberg Library & South Façade Nalanda Hall | Naropa University Boulder, Colorado 18,000 SF
  • 18. North Façade Model This $1.5 million landmark structure was planned as a gateway into the city as well as the last link in a metropolitan wide bike path system unifying two trail systems at the confluence of Ralston and Clear Creeks. I was given the responsibility of completing construction documents for the project and then spending a substantial amount of time on site during the construction administration, working with the general contractor, civil and structural engineers in order to expedite resolution of coordination items so that an especially tight schedule could be met. View from bike path Clear Creek Pedestrian Bridge Arvada, Colorado 380 foot length
  • 19. Details Approach from East Designed as a cable stayed span, the concrete and steel bridge is identified by it's 100 foot tall mast that supports 250 feet of its length with a series of tension cables. The physical geometry of the bridge is unique. The plan is configured into a gradually tightening arc while in section, the bridge dramatically changes elevation from one end to the other to resolve the 20 foot height difference between the pathways at the creek bank and the park. However, considering all of the complexities inherent with the site and the design, one of the most difficult components of the structure for me to facilitate was the custom- designed guardrail; deck lights clashed with rebar which clashed with rail support embed plates and bolts, not to mention every horizontal member had a slightly different radius. Approach from West Clear Creek Pedestrian Bridge Arvada, Colorado 380 foot length