Monitoring & Evaluation Support for the
President’s Programme for South Africa
A proven approach to large-scale capacity building,
monitoring & evaluation and service delivery.


Contents
1.  Executive Summary ........................................................... 2 
2.  Enabling cross-ministry and cross-sector working for success .. 3 
3.  ICT for capacity building, planning, monitoring & evaluation .... 4 
4.  Indicators linking local, continental and global programmes ..... 6 
5.  Meshworks for enabling government: a summary................... 7 
6.  Proven global best practice ............................................... 10 
7.  A practical approach ........................................................ 10 
8.  Meshwork Elements Reducing Cost Time and Risk ................ 11 
9.  Online Technology Platform and Shared Service Model .......... 12 
10.  Examples of software platform ........................................ 13 
11.  Meshwork Development Roadmap.................................... 16 
12.  Conclusion .................................................................... 18 
Appendix 1: Selection Criteria for software to support MIDIR ...... 19 
Appendix 2: Action Learning (and Project Khaedu) ..................... 21 
Contacts .............................................................................. 23 




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           1
1. Executive Summary
Our consortium is led by ICT-Works, a world-class women owned South
African business with the strongest BEE credentials. Our consortium
offers the government of South Africa a monitoring and evaluation (M&E)
solution for capacity building and service delivery based on the very best
international and South African experience and best practices. For the
last eight years members of our consortium have implemented
performance management and capacity building solutions, for example
the performance management systems at the two metros which won top
2008 “VUNA Awards for excellence in service delivery”, the City of Joburg
and Nelson Mandela Bay Metros.

The critical components of our solution are:

1. A proven, easy to use ICT solution that exceeds world class
     standards as defined by recent EU research, is highly flexible and is
     used in numerous government and institutional applications in South
     Africa, Europe and the USA.

2. An M&E approach that emphasises simplicity and robustness to
     empower and build confidence and capacity of government
     workers. Our clients’ experience proves that when M&E and
     performance management is made simple, it can build capacity and
     support service delivery improvements.

3. Use of the M&E process to build broad networks of learning and
   support across spheres of government, between departments and
   between government business and civil society. We call this a
   ‘Meshwork’. A meshwork enables government, business and civil
   society to work together to deliver on national objectives

4. A direct linkage through our partners, Africa International Advisors,
     with the DPSA’s very successful Action Learning programme –
     Project Khaedu. To date over 4,000 SMS members have participated in
     this innovative, yet demanding programme. Our approach allows us to
     take the existing and future deployment reports from Khaedu and feed
     them directly into both the M&E system and Meshwork learning
     networks. Khaedu has already uncovered many opportunities to apply
     South African service delivery best practices across all departments
     and spheres of government. Our solution can deliver this learning
     direct to the front line of government.

With this approach to M&E, the South African government can ensure that
the M&E process and system goes well beyond simply a ‘report card’.
Combined, these elements ensure that experience and learnings from
successful initiatives such as Khaedu and the DBSA’s Siyenza Manje can
be disseminated widely. The ultimate measure of success for the M&E
system is successful implementation of programmes across government.

Combining M&E and learning for government, business and civil
society will take service delivery to the next level and empower
South Africa as a learning nation.


Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           2
2. Enabling cross-ministry and cross-sector working for success
This paper focuses on implementation of the President’s programme as
outlined in the State of the Nation Address of June 3rd 2009 and the
Medium Term Strategic Framework (MTSF). The authors recognise the
importance of the national goals and the significance of creating new
ministries for strategic planning and monitoring & evaluation.

From experience, we recognise the transformative power of capacity
building, performance management and monitoring and evaluation here in
South Africa. Also from experience, we recognise that many solutions to
achieve our goals at national, provincial and local levels are already known
– somewhere in South Africa or internationally. By joining-up planning,
knowledge-sharing, capacity-building, monitoring and evaluation, as
South Africans we can fast-track service delivery and significantly reduce
the cost, time and risk of the transformation that we must achieve.

The President’s address makes clear the government’s commitment to
ending poverty and its commitment to work with all parts of our society to
deliver the national programme. The President’s address confirms that
attached to each commitment is a detailed project plan with targets and
critical milestones. The address includes an invitation to all South
Africans:

“As citizens we should at the same
time ask ourselves what is it that
we can do on our own to help
promote this national programme.
To be a citizen is not only about
rights, it is also about responsibility,
to make a contribution to make ours
a better country. […] Fellow South
Africans, working together we can
do more to realise our common
vision of a better and more
prosperous nation!”

Further, the recent Dinokeng scenarios identified “Walking Together” with
an Enabling Government for South Africa to develop and build the nation.




How can our government mobilise resources across ministries and
enable participation of civil society and all sectors to walk
together in national development?

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           3
3. ICT for capacity building, planning, monitoring & evaluation

Just as the Internet enabled President Barack Obama to make history as
the first African American US President, we believe that through the
Internet and ICT our new Presidency and South Africa can make history as
an enabling government, achieving comprehensive engagement, joined-
up government and service delivery through appropriate use of ICT and
the Internet.

ICT for planning, for performance management, for monitoring and
evaluation, for knowledge sharing and for collaboration can be the
nervous system of South Africa’s knowledge-based service delivery and
development. Extensive research, development and experience
internationally and in South Africa, confirms that South Africa is well
positioned for a leapfrog in development by becoming a learning nation
through knowledge-based government, partnering effectively with
business, NGOs, education and other constituencies.

As South Africans, we can dramatically improve service delivery by
using the power of Action Learning and ICTs to share knowledge,
monitor, learn and achieve our national goals.

This paper presents our proposal for a national capacity-building,
monitoring and learning solution, including Action Learning curricula, ICT
infrastructure and national service delivery knowledge base.

Catalysing change by engaging business and civil society
Government cannot single-handedly transform our country, but
government can improve joined-up working across ministries and the
spheres of government. Government can create the conditions for the
elimination of poverty, development of community and the achievement of
                                          growth.

                                                                   The South African Women in
                                                                   Dialogue (SAWID) research
                                                                   shows how Chile successfully
                                                                   created what we refer to as a
                                                                   “template” solution for poverty
                                                                   elevation.

                                                The Chile template developed
                                                pillars and conditions required
                                                to create a bridge (puente) for
                                                families to walk from poverty
                                                and social exclusion to self-
empowerment and prosperity. The government mobilised resources
across ministries and civil society to successfully take the project from an
initial pilot to a successful national roll-out. This paper discusses how
similar approaches of developing, piloting and then rolling out tried and

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           4
tested best practice templates are today being used in South Africa and
how this approach can be used to achieve the 2009-2014 MTSF
programme.

Overall the approach proposed for South Africa uses a simple roadmap for
scaling change: 1. find working solutions and combine to build a template,
2. pilot the combined solution and 3. scale their impact. A similar
approach is being taken in many contexts within South Africa, for
example, Project Khaedu, the DBSA’s Siyenza Manje and the South
African Cities Network all aim to develop networks, improve knowledge
sharing and scaling of good practices to accelerate development.

Learning from this lifecycle, the solution we propose includes a focussed
Action Learning capacity building and learning network with an online
platform to identify and connect the government, business and social
change leaders across South Africa’s society and diaspora. These can then
develop key collaborations based on shared goals and create the projects
to implement their goals.




    Roadmap for scaling change

    1.Develop Template
    2.Pilot
    3.Scale
                                                      3


       1                     2

    Copyright (c) 2009 Gaiasoft IP Ltd. International Patents Pending. All Rights Reserved.




Government cannot do what business and civil society can do, but
an “enabling government” can stimulate engagement and synergy
across business and civil society. With skilful use of ICT, South
Africa’s government can catalyse development towards national priorities
by stimulating contributions from the most appropriate stakeholders for
each priority.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           5
4. Indicators linking local, continental and global programmes
The meshwork approach to M&E is particularly suitable to national,
provincial and local mobilisation to achieve global objectives. For example,
the impact of local action in attaining the targets in the MDGs, Human
Development Index and Gender Development Index can be tracked,
knowledge and experienced can be gathered and effective solutions can
be identified. Local grassroots solutions can be rapidly rolled out across
the country and between countries, where relevant.

Achieving goals of international collaboration

Meshwork M&E provides a structure within which local and community
action contributes to national and international knowledge and
achievement of goals. At the same time, meshwork M&E can provide a
clear ‘line of sight’ for international bodies like the AU and SADC to track,
understand and impact progress down to local and ward level. The
meshwork approach can be used to benchmark and compare between
international partners, for example between South Africa and international
partners in SADC1 or IBSA2 working groups and to connect networks
across countries, for example for Women’s Rights, Conflict Prevention or
Climate Adaptation. The meshwork can be used to build expert
communities, develop templates for success and build local capacity. By
using the power of meshwork M&E, South African government and civil
society can lead and contribute to international partnerships.

Grassroots participation meshworks and citizen scorecards

Citizen scorecards capture needs and goals of civil society, businesses or
communities as a focus for measuring progress, convening of stakeholders
and giving feedback to government. By focussing on common indicators
between South African civil society, business and government, South
Africans can walk together to achieve national progress. Meshwork M&E
provides a framework for convening stakeholders around a national vision
and key strategic pillars and programmes. Young people, women’s
movements and other civil society groups can support where government
is effective and lead where government needs support.

Learning from international experience

The remainder of this paper is based, with permission, on a report
prepared by CHE Netherlands and Gaiasoft for the Dutch Government on
cross-ministry and civil society implementation and collaboration. It
refers to work for the Dutch government implementing change
programmes and also to projects in collaboration between government,
business and civil society. Elements of this approach were originally
developed and proven here in South Africa in government and private
sector monitoring and evaluation and performance management
implementations. With thanks to our clients and partners in preparation
of this document. Special thanks to Nelson Mandela Metro and
international clients for the screen shots used.

1
    SADC: Southern African Development Community
2
    IBSA: India, Brazil, South Africa

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           6
Meshworking – a support service for
Cross-cutting Government Programmes
A meshwork™ is a Structured Collaboration Across
 Organisations to Accelerate Learning and Results


5. Meshworks for enabling government: a summary


Every government faces the challenge of how to develop and implement
programmes effectively and efficiently. How can many ministries,
departments and agencies work together to fast track progress and
results? This paper references and builds on practical South African
experience by the authors and experience with CHE in the Netherlands
and internationally, and on the global best practice research of the EU
MIDIR research project.

This paper outlines a meshworki support service for developing and
implementing cross-cutting sustainability programmes.




Meshworking links people, performance and knowledge within a common
programme framework to achieve results. Meshworking support improves
collaboration, synergy and oversight, while reducing cost, time and risk of
delivering programme outcomes.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           7
The programme facilitation is a proven process that nurtures commitment
and confidence and develops team ownership, engagement and capacity.
The process is enabled by unique3 meshworking software which connects
people, manages accountability and actions, harvesting and re-using
knowledge to scale programme results.




The programme meshwork support solution enables the programme
management team to:

     •    build on the strengths and diverse perspectives of cross-cutting
          teams through facilitation, mentoring and online support

     •    integrate existing knowledge and information technology resources4
          within the framework of the programme meshwork

     •    build effective communities of practice for each cross-cutting
          project and for the project team within each ministry.



Core challenges that this approach addresses are:

     •    How to make the most effective use of diverse expertise and
          knowledge to achieve a defined objective.

     •    How to achieve effective collaboration between people who are not
          in the same ‘chain of command’ or management hierarchy and
          hence cannot be simply instructed to perform tasks.

3
  Gaiasoft’s South African and international patents and patents pending provide
unique security and openness, protecting what must be private behind the
firewall and connecting with people and resources from the public internet where
appropriate. An organising framework.
4
  Integration is through web services standards and Service Oriented
Architecture.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           8
•    How to work across organisational and departmental silos
          (boundaries) ensuring the most useful contribution from different
          stakeholders

     •    How to keep an overview of all activities, tracking progress,
          learning from the best, and supporting areas that are falling behind

     •    How to integrate performance and results focus with supportive
          people-processes to create a culture of learning, innovation and
          achievement

     •    How to identify and share best practices which are specifically
          relevant to an individual in their work e.g. through programmes like
          Project Khaedu

     •    How to link performance management to best practices knowledge-
          sharing and effective people collaboration e.g. tying together
          existing successful projects such as Siyenza Manje and Khaedu
          which are already uncovering many best practices.




The meshwork facilitates effective cross-cutting project-based
communities of practice and in-ministry communities of practice.

The same cross-cutting approach applies to collaboration between
business and civil society groups working together on national
development.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                           9
6. Proven global best practice


Global best practice research5 confirms that cross-cutting programmes are
most likely to succeed and scale if they:

     •    Take an integral approach, combining attention to collective
          structure and culture, as well as individual mindset and behaviour

     •    Combine a shared flexible template for performance

     •    Include a technology platform for monitoring, measuring,
          collaborating and driving implementation of the template within a
          particular context

     •    Give thorough attention to stakeholder engagement and
          mobilization

     •    Stimulate a culture and mindset of learning and innovation (rather
          than predict and control)


The same EU funded research identifies cross-cutting sustainability
programmes as an area where this approach is particularly relevant. The
selection criteria for tools to support this approach are in Appendix 1
below.

The performance and M&E elements of the meshwork have been in use in
South Africa since 2001. In Holland, the meshworking support service is
in use in the Dutch Ministry VROM and also the Dutch private sector
collaborative sustainability and biodiversity network “Leaders for Nature.”



7. A practical approach


A meshwork approach facilitates self-organisation, using the ‘wisdom of
the crowd’ to find the simple projects, knowledge and communities of
practice to achieve a complex task. A complex multi-stakeholder project
is translated into an appropriate hierarchy of pillars (areas for
collaboration) and conditions (which must be met to achieve success).

In the case of South Africa’s 2009-2014 programme, these pillars are
likely to be the cross-cutting government commitments which make up
the programme. A meshwork support process works from the core
purpose (e.g. eliminate poverty), identifying pillars to support that
purpose, conditions that need to be in place for a pillar to be strong,

5
  MIDIR European Union Research Project Contract n° 036708: Integration of Concept in
Real Risk Management Settings in Various Cultures – Online tools for developing
sustainability and resilience

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          10
action that puts those conditions in place, and best practices that can
formulate action in other parts of an organisation.

In simple terms, this approach gets every participating person and
organisation ‘on the same page’ understanding where they fit and their
role in the national programme. Each person is motivated by the
programme goal and understands where they fit in the larger programme
and where they can find the people, knowledge and resources to achieve
the programme results.

When this template is made explicit, it is possible to easily link individual
actions to conditions supporting the projects within the programme. It is
also possible to find best practices that are directly relevant to the specific
area that anyone is working on.



8. Meshwork Elements Reducing Cost Time and Risk


Meshwork has one great advantage for the South African government – it
can be built and implemented quickly and populated with the results from
Khaedu, Siyenza Manje and other successes, immediately.

       Meshwork Element                                               Reduces cost, time loss and
                                                                      risk
       An online technology platform that                             Without this, valuable time is
       combines performance management,                               lost, the organisation and
       knowledge exchange and a                                       administration overhead is
       collaboration platform.                                        excessive and energy and
                                                                      motivation are likely to dissipate.
       Facilitated meetings designed to                               Without this programme,
       generate the content of the                                    participants waste time finding
       programme, as well as ownership of                             the knowledge they need and end
       that content.                                                  up repeating mistakes or ‘re-
                                                                      inventing the wheel.’
       Action Learning training modules to                            Without this, lack of capacity,
       identify and teach proven solutions                            historic cultures and
       and to develop the mindset and                                 organisational boundaries limit
       capacity to deliver.                                           participation, progress and
                                                                      results.
       Peer-to-Peer mentoring supported by                            Without this, synergies and peer
       the visibility of the maturity of                              learning opportunities remain
       different parts of an organisation in                          unexploited, capacity building is
       their development.                                             slow and results are delayed.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          11
9. Online Technology Platform and Shared Service Model


Gaiasoft has over eight years experience in performance management,
M&E and program implementation in South Africa. Through this and
global experience, Gaiasoft has developed an online environment to
support the end-to-end lifecycle of a meshwork, from formulation of
purpose, planning, through collaboration, implementation, monitoring and
evaluation. The platform is fully and uniquely compliant with the selection
criteria published by the EU MIDIR best practice research project and set
out in Appendix 1 to this paper. Gaiasoft’s patented6 platform links
between (performance, transformation and cultural) indicators, emerging
best practice solutions and communities of practice. The platform uniquely
enables members of a meshwork to:

     •    Monitor and evaluate for results

     •    Do accountable performance management

     •    Implement results based compensation

     •    Link budget and service delivery

     •    Connect people and knowledge with focus and precision

     •    Eliminate re-inventing the wheel and repetition of costly mistakes

     •    Rapidly scale what works

     •    Make explicit the core areas of work and the level of progress in
          each area

     •    Benchmark progress in the different areas of work across different
          ministries and partners

     •    Identify peers from different parts of an organisation who are a step
          ahead and can mentor and teach

     •    Share and find best practices specific to people’s contexts and
          needs

     ICT Works and Gaiasoft are working with a Gauteng based team to
     provide a shared service for performance management, monitoring &
     evaluation and meshworking. The shared service model significantly
     reduces the cost to individual government departments and agencies
     and enables immediate joined-up working and knowledge sharing. The
     platform is designed to be scalable for every ministry and to allow the
     three spheres of government to work together on delivering the 2009-
     2014 programme and beyond.

     This is being implemented with private sector funding to “walk
     together” with government to achieve national goals and success.

6
  Patents relating, among other things, to the linking of knowledge and solutions to a measurement
structure. Pending patents in US, Europe, India, China, Brazil, Japan and South Africa.

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          12
10.       Examples of software platform


Following are South African and international examples that show the
Gaiasoft platform used to reduce the cost, time and risk of delivering
government and collaborative programmes.

Nelson Mandela Bay Metropolitan Municipality

Nelson Mandela Metro has used the Gaiasoft software platform for its
performance management and monitoring of its Integrated Development
Plan (IDP) since August 2004. The link between service delivery and
budget is of critical importance and is reflected in the following scorecard
showing the Service Delivery and Budget Implementation Plan. The
scorecard shows quarterly progress at the top level and by department.



                                                                                         Key Performance 
                                                                                               Area

                                                                                         Key Performance 
                                                                                             Element

                                                                                         Key Performance 
                                                                                            Indicator

                                                                                       Analysis explaining 
                                                                                         performance 
                                                                                           indicator


A department scorecard for Housing & Land




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          13
A monitoring report generated automatically from the system as an
Excel spreadsheet that can be printed for use in management
meetings.




Automated reports compile results measured across departments,
combined with analysis and outstanding actions to track implementation
of results. Different reports can be set up for different purposes. The
results recorded in the scorecard are used to measure progress on
performance agreements of senior managers and as a basis for calculating
remuneration.



Leaders for Nature

                                                                                   In the Leaders for
                                                                                   Nature Meshwork,
                                                                                   the program areas or
                                                                                   ‘pillars’ are Water,
                                                                                   Land Use, Energy
                                                                                   Use, etc. There is a
                                                                                   community of
                                                                                   practice for each of
                                                                                   these pillars.

                                                     This meshwork
                                                     screen shows people
                                                     in the Netherlands
                                                     in the Energy Sector
                                                     working on Energy
Use in different roles (Business, Government, NGO, Scientist,
Entrepreneurs, Media) and also best practices related to the same criteria.


Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          14
Resilient Cities Initiative
The scorecard shown below is
developed from London-
based Climate Change
Agency’s programme
management knowledge. It
shows the monthly progress
of a city sustainability
programme consisting of
programme areas and
projects. (The scorecard
shows demonstration data
only.)



The dark blue lines are
programme areas including
City, Transport, Buildings,
Industry, Energy, etc. The
traffic light cells show the
monthly progress of individual projects for the selected city.

The ‘cloud’ symbol to the left of a project name is used to access the best
practice solutions or shared knowledge available for that project. The
green arrow to the left of each project name is used to access the actions
outstanding for that project.

The scorecard below shows how the progress can be compared across
different cities to facilitate benchmarking and peer-learning.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          15
11. Meshwork Development Roadmap
The steps assume a programme being implemented across multiple ministries.
The same principle applies to government agencies, local governments and
public-private partnerships. In the case of South Africa, these steps are already
in progress. There is a common goal of eradicating poverty and specific
commitments with measures and milestones.

   The starting point is to align on and commit to a goal, in this case
implementing the 2009-2014 programme laid out in the State of the Nation
Address. This step requires engaging deep human commitment. This happens,
for example, when it becomes clear that the goal is achievable through
commitment and collaboration. The meshwork support process is designed to
demonstrate and presence the possibility and achievability of the programme
goal and its value as a replicable success, for example by other governments.

   Step two develops a shared story of how the committed goal can be
achieved. The 3rd Dinokeng scenario of walking together provides an example
of a story for achievement of a positive future.

  The third step is to develop a template consisting of pillars, conditions,
success stories, which in this case are the programme projects. In the case of
South Africa, the pillars are the major commitments in the State of the Nation
Address. The success stories are examples of service delivery successes that
can be used in Action Learning and capacity building. Gathering these stories
builds ownership.

   The fourth uses the template to define a monitoring and evaluation system.
In this case, breaking the programme into projects which can be colour-coded
using maturity models and progress tracked over time. This will make the
progress and success of the national programme visible and accountable at all
levels, enabling the three spheres of government, agencies and other
stakeholders to implement progress together. This is a similar approach to that
taken in Nelson Mandela Metro, but on a larger scale.

   Step five develops collaborative communities of practice based on ministries
and projects. This is achieved through facilitated meetings, when participants
are asked to place their photos and other information at the coordinate of their
ministry and the particular project of the programme on which they choose to
focus. The resulting wall display of a meshwork – of project names along the
top and ministry names down the side, with participant’s faces placed on the
wall, is referred to as a Meshwall™. The same visual meshwork display is also
presented within the Gaiasoft meshwork software at the end of the facilitated
meeting. This building of ministry and project-based communities of practice is
an ongoing process which accelerates progress towards programme goals.

  The sixth step supports communities of practice across ministries to deliver
projects in ministries.

  The seventh step trains and supports internal consultants to facilitate
and scale implementation. These final two steps relate to scaling a
programme template and solutions across ministries to achieve the overall
programme goal.


Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          16
Stages in meshwork development roadmap



  Starting point                            Commitment to the national programme goals.

   Facilitated process, dialogue or         A scenario of future story for success – like the Dinokeng third scenario
presentation                                of enabling government “walking together.”

   Facilitate chosen cross-                 A “template” of Projects and
ministry, cross project network,            Conditions for success and                                                          Political
                                                                                                                              Commitment



task force or experts to develop            knowledge base of success                                         Partnership                           Legislation



“template” and roadmap for                  stories.
                                                                                                                                   MDGs 4&5

implementation.                                                                                            Cultural
                                                                                                                                   In Country
                                                                                                                                                          Financial
                                                                                                                                                         Resourcing
                                            These can be deduced from the                                  Practices




                                            project plans and milestones for                                           Education
                                                                                                                                                Health
                                                                                                                                                System

                                            national commitments.

  Implement collaborative                   Monitoring to track progress of projects and conditions over time,
monitoring and knowledge                    identify strengths, focus resources and fill gaps. Benchmarking to
sharing.                                    support peer learning. Similar to Nelson Mandela Metro’s IDP
                                            monitoring, but on a much larger scale.
(Gaiasoft’s scorecard combines
                                            Pill ar > Condition                 Mar-09       Apr-09       May-09                       Jun-09
Monitoring & Evaluation for                 Financial Resourci ng
projects and conditions with                Health Budgeting                    Performing   Performing   Performing                   Perf orming
tracking measures and actions,              Gende r Budgeting                   Developing   Developing   Performing                   Perf orming
                                            Insurance System                     Beginning   Developing   Developing                  Developing
and stores success stories.)                Free Services                        Beginning    Beginning    Beginning                    Beginning
                                            T axation support                   Developing   Performing   Performing                   Perf orming



   Coordinate development of                Develop online communities of
communities of practice. This               practice for project pillars and
begins with a face-to-face                  ministries. Photo below shows
meeting where a “meshwall” is               development of a meshwall.
used to connect people according
to, in this case, ministries and
projects. This process continues
in an online meshwork which
other stakeholders can later join.
This step is to facilitate
community building for
collaboration.
                                            Communities of practice extend to
                                            business, community, NGOs and
                                            education institutions.




   Coordinate and align                     Coordinating government, business, community, media, etc using
stakeholders working between                template to direct resources to identify pillars and conditions for success
different stakeholder groups and            in each place, e.g. Province/District.
communities.

  Training of community                     Training and support internal facilitators to align and implement
development specialists to scale.           programme projects.




       Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
       Netherlands. All Rights Reserved.                            17
12.       Conclusion


This paper proposes a shared service model for monitoring and evaluation
to fast track capacity building and achievement of national goals. We
propose a meshwork approach to programme management to enable
implementation across ministries and the three spheres of government,
and to enable collaboration with business, civil society and other
stakeholders. The meshwork approach is ideally suited to the urgent
service delivery and implementation commitments of the President and
the 2009-2014 programme. Global best practice from the EU MIDIR
research project clearly indicates the need for integrated programme
management for development. The solution outlined in this paper is
uniquely and fully compliant with EU MIDIR project selection criteria set
out in Appendix 1.

Meshworking is an integrated approach. The monitoring and evaluation
software platform proposed is proven in use in South Africa, for example
in Nelson Mandela Metro as described above. In addition, the
international meshworking examples of Dutch Government (Ministry
VROM), cross-sector sustainability projects (Leaders for Nature) and US
“Resilient Cities Initiative” demonstrate the generality of the approach.

Meshworking is uniquely suitable for cross-cutting government
programmes. Meshworking enables effective identification, sharing and
implementation of solutions to the complex challenges of eradicating
poverty, protecting jobs and achieving development. Meshworking
provides technology support which connects people, performance and
knowledge within the framework of the meshwork. The Action Learning
approach to capacity building is proven to work in South Africa through
project Khaedu, and makes an excellent fit with the meshwork solution
and philosophy.

ICT-Works, AIA and Gaiasoft are uniquely experienced in combining large-
scale ICT project experience, capacity building, performance management
and meshworking track record. ICT-Works, AIA and Gaiasoft offer a
programme meshwork support solution to reduce the cost, time and risk
of building capacity and implementing cross-cutting service delivery
programmes. The Action Learning approach finds grass roots solutions
that work. The meshwork approach works across organisation boundaries
even when solutions are not fully defined, bringing the rigour of
programme management to the challenges of implementing the
commitments of the 2009-2014 South African Government programme.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          18
Appendix 1: Selection Criteria for software to support MIDIR


These criteria are reproduced from the EU MIDIR Report 2.4 in the
paragraphs and table below

...the MIDIR methodology provides a solution to the rapid, scalable
transformation of complex systems through knowledge sharing and
learning. The approach applies directly to collaboration for climate change
response, implementation of resilience and sustainable development.
Figure 4.1 [of the quoted MIDIR Report 2.4] above depicts a generic end-
to-end process from goal to governance system.

To facilitate the implementation of the end to end process described
above, an integrated technology platform is required to support
accountability, measurement of performance, transformation and culture,
management of actions, capturing related knowledge of Positive Proof
Points as a reusable template or pattern library. These templates must be
implementable as a governance and management system at multiple
levels of organisation or governance, for example national, provincial and
local.

To facilitate the collaboration across functions and organisations, lenses
are required allowing different stakeholder groups to understand through
the perspectives of others. Finally the same collaboration platform must
be securely, shareable between different stakeholders across boundaries
of organisation and function, allowing different groups to receive the
information they need, but only what they are entitled to. The suitability
of a software tool or platform to support this approach can be assessed
using the requirements in Figure 6.1 “Selection Criteria for software to
support large-scale learning and implementation.”

In comparing and selecting tools, a prospective solution can be rated:

          Red/Yellow/Green or

          Non-Compliant/Partially Compliant/Compliant

for each of the requirements in the table below using a maturity
model/check list.

Below is Figure 6.1 Selection Criteria for software to support large-scale
learning and implementation from MIDIR Report 2.4.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          19
Requirement               Why it’s important                                                                                R   Y   G

1. Accountability         Accountability provides the basis for maintaining standards,
                          driving improvement and change.

2. Measuring              Measurement provides the basis for accountability.
   performance            Performance measures indicate whether a process is delivering.
                          Performance measures are most relevant to a stable
                          organisation. Where structural and cultural transformation is
                          required, the key accountability of leaders may be for
                          transformation and for culture and values.

3. Measuring              Transformation of an organisation depends on many projects
   transformation         and changes – structures, processes, systems. The
                          management system must be able to measure the
                          transformation of structures, processes and systems.

4. Measuring              Transformation of organisations depends on culture, on trust,
   culture                on collaboration. The management system must be able to
                          measure the culture of the organisation as it is and the gap
                          between current culture and desired culture.

5. Action                 Action management is the driver of results and the engine of
   management             continuous improvement (through the plan-do-check-act cycle
                          of quality management).

6. Knowledge:             Knowledge is organised according to the measure it impacts,
   Challenges,            the 80/20 challenges which must be met to perform in that
   Solutions &            measure and the 80/20 solutions, supported by case studies.ii
   Case Stories
7. Reusable               Reusable templates consist of measures, knowledge and Action
   templates              Learning resources which are used to drive change through a
                          performance management process.

8. Fractal –              Reusable templates appropriate to different types and levels of
   multiple levels        organisation, for example business and government at
   – National;            national, provincial and local levels. Management and
                          knowledge management systems enable collaboration and
   Provincial;            learning between types and levels of organisation. This is a
   Local                  requirement due to the increasing interdependency between
                          different sectors and organisation types.

9. Lenses –               Different stakeholders have different perspectives on the
   multiple views         transition – for example, financial, environmental, compliance
   for different          and regulatory.
   stakeholders
10. Interagency /         Different stakeholders and supply chain partners require
   multi                  confidential subsets of shared information to allow optimisation
   stakeholder –          and tuning of performance, for example across a network of
                          government agencies or businesses in a supply chain.
   lenses, filters,
   content


       Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
       Netherlands. All Rights Reserved.                          20
Appendix 2: Action Learning (and Project Khaedu)


Action Learning is the approach of learning by doing. In South Africa,
Action Learning has been extensively used and proven successful, for
example in the strategic transformation of South African Revenue Services
(SARS) and in Project Khaedu described below. We have many
committed managers, but many are struggling with how to implement
with limited hands on training. Action Learning addresses that gap. Why
does Action Learning work? Studies have shown the best way to learn is
‘by doing’.

          Skills absorption success rate

         80%

                       64%
            60


            40                             37%


            20                                                  19%

                                                                           8%

              0
                     By doing          Through            Lecturing     Lecturing
                                      observation         with exam   with no exam


  Source: US Government analysis of training efficiency, 2002
                                                                                     7


AIA has developed highly tailored Action Learning programmes for Health,
Education, Economic Development, Public Works, Local Government and
Municipal Managers based on AIA’s extensive work in these areas. In
addition there are cross-cutting programmes in Strategic Planning,
Modern Work Study, Modern Human Resource Management, Process
Analysis, Project Management, Organisation Design, Public Sector Finance
for non-financial managers and Training Design. All of these programmes
are very practically focused and build on the simple, robust best practices
that have been uncovered in many public institutions here in South Africa.
Action Learning exposes managers to these best practices and how they
can be implemented in their own environments.


Background to Project Khaedu

The Government introduced Batho Pele
in 1997 as an initiative to improve
service delivery in the public service
based on the principle of putting “people
first” In 2003, a survey was conducted
on the effectiveness of Batho Pele.
Cabinet’s view was that many senior
managers were “floating above” the
issues on the ground i.e. they were not
getting involved with service delivery at


Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                                     21
the “coal face”. As a result, in August 2004 Cabinet made a decision
which requires all SMS members to spend a period of at least 5 days
examining service delivery issues ‘at the Coal Face’. This mandate was
given to the DPSA to implement. To ensure that the deployment process
was as useful as possible, it was decided to combine the ‘Coal Face’
deployment with a period of intense problem solving skills development –
in combination with a programme called Project Khaedu (Venda for
“Challenge”). Piloted in 2004 and early 2005, Project Khaedu has proved
very successful with both participants and the organisations that have
hosted teams during their ‘Coal Face’ deployments.

Project Khaedu is an innovative Action Learning programme, aimed at
SMS and MMS managers in the public service, with:

      i Case-study based approach, following best practices at leading
        international business schools e.g. Harvard
      i Case-studies reflecting real SA public service experiences
      i Heavy emphasis on team-based challenges and problem solving
        skills
      i Focus on developing practical skills which can be used to improve
        your efficiency and effectiveness in your job today


Since its inception in 2004, Project Khaedu has enjoyed significant
success:

      •   Over 3,900 managers have attended with an average satisfaction
          score of 92%
      •   All 9 provincial governments and the overwhelming majority of
          national departments have participated
      •   Many of the deployment reports have been followed-up with
          significant impact in the respective sites


In late 2007, the programme was transferred from the DPSA to PALAMA7
(formerly the SAMDI) and was extended to MMS, as well as SMS
managers. Africa International Advisors remains the service provider for
the programme, in partnership with PALAMA.




7
    PALAMA = Public Administration Leadership and Management Academy

Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          22
Contacts


ICT-Works
Hannelie Pienaar: hannelie@ict-works.co.za                                       +27 82 551 2991

Nothukela Sereo:              nothukela@ict-works.co.za                          +27 73 643 7123

QVCS Africa, ICT-Works’ specialist implementation partner
Chris Kruger:    chris@qvcs.co.za                +27 83 268 9630

AIA, Africa International Advisors
Tim Hough:         timhough@africaia.com                                         +27 83 326 9007

Gaiasoft International
Morel Fourman:   morel.fourman@gaiasoft.com                                      +44 7710 307 011



i
 Meshwork as it relates to a social process is a trademark of CHE Netherlands on behalf of CHE Global. Meshwork as
it relates to collaboration, performance management or knowledge management software is a trademark of Gaiasoft
IP Ltd.
ii
 80/20 Challenges refer to the small number of key challenges which are barriers to performance.
80/20 solutions refer to the small number of key solutions that address each challenge. Case studies
refer to the positive proof points which demonstrate solutions.




Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE
Netherlands. All Rights Reserved.                          23

Mais conteúdo relacionado

Mais procurados

Niger Delta Youth Employment Pathways Case Study - ICT
Niger Delta Youth Employment Pathways Case Study - ICTNiger Delta Youth Employment Pathways Case Study - ICT
Niger Delta Youth Employment Pathways Case Study - ICTPIND Foundation
 
Key Competencies for Improving Local Governance Quick Guide
Key Competencies for Improving Local Governance Quick GuideKey Competencies for Improving Local Governance Quick Guide
Key Competencies for Improving Local Governance Quick Guideled4lgus
 
BIN@Sheffield 2014 Richard Motley: fab labs & maker spaces
BIN@Sheffield 2014 Richard Motley: fab labs & maker spacesBIN@Sheffield 2014 Richard Motley: fab labs & maker spaces
BIN@Sheffield 2014 Richard Motley: fab labs & maker spacesBusiness Innovation Network
 
Women's directorship programme 2015 factsheet
Women's directorship programme 2015 factsheetWomen's directorship programme 2015 factsheet
Women's directorship programme 2015 factsheetPauline Tang
 
Women’s Entrepreneurship Development
Women’s Entrepreneurship Development Women’s Entrepreneurship Development
Women’s Entrepreneurship Development Dr Lendy Spires
 
Aprm best practices and lessons learned
Aprm best practices and lessons learnedAprm best practices and lessons learned
Aprm best practices and lessons learnedDr Lendy Spires
 
Draft ECD CoP "Principles of Engagement" document- 29 May 2014
Draft ECD CoP "Principles of Engagement" document- 29 May 2014Draft ECD CoP "Principles of Engagement" document- 29 May 2014
Draft ECD CoP "Principles of Engagement" document- 29 May 2014kaleylemottee
 
Annual Report 2012-2013 DEFINITIEF
Annual Report 2012-2013 DEFINITIEFAnnual Report 2012-2013 DEFINITIEF
Annual Report 2012-2013 DEFINITIEFKelly Dixon
 
Promoting Local Economic Development through Strategic Planning
Promoting Local Economic Development through Strategic PlanningPromoting Local Economic Development through Strategic Planning
Promoting Local Economic Development through Strategic Planningled4lgus
 
Is APEC working for working women? (2004) Veronica Oxman
Is APEC working for working women? (2004) Veronica OxmanIs APEC working for working women? (2004) Veronica Oxman
Is APEC working for working women? (2004) Veronica OxmanVerónica Oxman
 
Sutton CVS presentation at South London Roadshow, 12 May 2015
Sutton CVS presentation at South London Roadshow, 12 May 2015Sutton CVS presentation at South London Roadshow, 12 May 2015
Sutton CVS presentation at South London Roadshow, 12 May 2015lvscsteve
 
CIPR President’s Q1 2014 report: Focus on vision and purpose
CIPR President’s Q1 2014 report: Focus on vision and purposeCIPR President’s Q1 2014 report: Focus on vision and purpose
CIPR President’s Q1 2014 report: Focus on vision and purposeStephen Waddington
 
LivityAfricaDeck_2016
LivityAfricaDeck_2016LivityAfricaDeck_2016
LivityAfricaDeck_2016Nozuko Poni
 
Getting Things Done in Government - PEMANDU's 8 Steps BFR Methodology
Getting Things Done in Government - PEMANDU's 8 Steps BFR MethodologyGetting Things Done in Government - PEMANDU's 8 Steps BFR Methodology
Getting Things Done in Government - PEMANDU's 8 Steps BFR MethodologyCaribbean Development Bank
 
ICT and Enterprise Development
ICT and Enterprise DevelopmentICT and Enterprise Development
ICT and Enterprise DevelopmentAmira Sobeih
 
Employers Guide to Apprenticeships
Employers Guide to ApprenticeshipsEmployers Guide to Apprenticeships
Employers Guide to ApprenticeshipsThe Pathway Group
 
Plugging the Leaks - Making the most of every pound that enters your local ec...
Plugging the Leaks - Making the most of every pound that enters your local ec...Plugging the Leaks - Making the most of every pound that enters your local ec...
Plugging the Leaks - Making the most of every pound that enters your local ec...led4lgus
 

Mais procurados (20)

Africa In Me
Africa In MeAfrica In Me
Africa In Me
 
Niger Delta Youth Employment Pathways Case Study - ICT
Niger Delta Youth Employment Pathways Case Study - ICTNiger Delta Youth Employment Pathways Case Study - ICT
Niger Delta Youth Employment Pathways Case Study - ICT
 
Key Competencies for Improving Local Governance Quick Guide
Key Competencies for Improving Local Governance Quick GuideKey Competencies for Improving Local Governance Quick Guide
Key Competencies for Improving Local Governance Quick Guide
 
BIN@Sheffield 2014 Richard Motley: fab labs & maker spaces
BIN@Sheffield 2014 Richard Motley: fab labs & maker spacesBIN@Sheffield 2014 Richard Motley: fab labs & maker spaces
BIN@Sheffield 2014 Richard Motley: fab labs & maker spaces
 
Women's directorship programme 2015 factsheet
Women's directorship programme 2015 factsheetWomen's directorship programme 2015 factsheet
Women's directorship programme 2015 factsheet
 
Women’s Entrepreneurship Development
Women’s Entrepreneurship Development Women’s Entrepreneurship Development
Women’s Entrepreneurship Development
 
IP Report to ICM 2014
IP Report to ICM 2014IP Report to ICM 2014
IP Report to ICM 2014
 
Aprm best practices and lessons learned
Aprm best practices and lessons learnedAprm best practices and lessons learned
Aprm best practices and lessons learned
 
Youth support-nc3211909enc
Youth support-nc3211909encYouth support-nc3211909enc
Youth support-nc3211909enc
 
Draft ECD CoP "Principles of Engagement" document- 29 May 2014
Draft ECD CoP "Principles of Engagement" document- 29 May 2014Draft ECD CoP "Principles of Engagement" document- 29 May 2014
Draft ECD CoP "Principles of Engagement" document- 29 May 2014
 
Annual Report 2012-2013 DEFINITIEF
Annual Report 2012-2013 DEFINITIEFAnnual Report 2012-2013 DEFINITIEF
Annual Report 2012-2013 DEFINITIEF
 
Promoting Local Economic Development through Strategic Planning
Promoting Local Economic Development through Strategic PlanningPromoting Local Economic Development through Strategic Planning
Promoting Local Economic Development through Strategic Planning
 
Is APEC working for working women? (2004) Veronica Oxman
Is APEC working for working women? (2004) Veronica OxmanIs APEC working for working women? (2004) Veronica Oxman
Is APEC working for working women? (2004) Veronica Oxman
 
Sutton CVS presentation at South London Roadshow, 12 May 2015
Sutton CVS presentation at South London Roadshow, 12 May 2015Sutton CVS presentation at South London Roadshow, 12 May 2015
Sutton CVS presentation at South London Roadshow, 12 May 2015
 
CIPR President’s Q1 2014 report: Focus on vision and purpose
CIPR President’s Q1 2014 report: Focus on vision and purposeCIPR President’s Q1 2014 report: Focus on vision and purpose
CIPR President’s Q1 2014 report: Focus on vision and purpose
 
LivityAfricaDeck_2016
LivityAfricaDeck_2016LivityAfricaDeck_2016
LivityAfricaDeck_2016
 
Getting Things Done in Government - PEMANDU's 8 Steps BFR Methodology
Getting Things Done in Government - PEMANDU's 8 Steps BFR MethodologyGetting Things Done in Government - PEMANDU's 8 Steps BFR Methodology
Getting Things Done in Government - PEMANDU's 8 Steps BFR Methodology
 
ICT and Enterprise Development
ICT and Enterprise DevelopmentICT and Enterprise Development
ICT and Enterprise Development
 
Employers Guide to Apprenticeships
Employers Guide to ApprenticeshipsEmployers Guide to Apprenticeships
Employers Guide to Apprenticeships
 
Plugging the Leaks - Making the most of every pound that enters your local ec...
Plugging the Leaks - Making the most of every pound that enters your local ec...Plugging the Leaks - Making the most of every pound that enters your local ec...
Plugging the Leaks - Making the most of every pound that enters your local ec...
 

Destaque

Vacation Planner
Vacation PlannerVacation Planner
Vacation Plannerdrvoice
 
Case Study Meshwork 2020 Climate Leadership Campaign 1.5
Case Study Meshwork 2020 Climate Leadership Campaign 1.5Case Study Meshwork 2020 Climate Leadership Campaign 1.5
Case Study Meshwork 2020 Climate Leadership Campaign 1.5morelfourman
 
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainability
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For SustainabilityDutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainability
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainabilitymorelfourman
 
Case Study Meshwork Mdg5 Parliamantarians Take Action! 2009 03 08
Case Study Meshwork Mdg5 Parliamantarians Take Action!  2009 03 08Case Study Meshwork Mdg5 Parliamantarians Take Action!  2009 03 08
Case Study Meshwork Mdg5 Parliamantarians Take Action! 2009 03 08morelfourman
 
Case Study Meshwork 2020 Climate Leadership Campaign Final
Case Study Meshwork 2020 Climate Leadership Campaign FinalCase Study Meshwork 2020 Climate Leadership Campaign Final
Case Study Meshwork 2020 Climate Leadership Campaign Finalmorelfourman
 
Yes Meshwork Mini Case Study June 2010
Yes Meshwork   Mini Case Study June 2010Yes Meshwork   Mini Case Study June 2010
Yes Meshwork Mini Case Study June 2010morelfourman
 
The Allstate-Posit Science Partnership: Cognitive Training for Safer Driving
The Allstate-Posit Science Partnership: Cognitive Training for Safer DrivingThe Allstate-Posit Science Partnership: Cognitive Training for Safer Driving
The Allstate-Posit Science Partnership: Cognitive Training for Safer DrivingCognitiveHealthTrack
 
Morel Fourman Ecosystems Stewardship Safe Passage To Our Positive Future
Morel Fourman   Ecosystems Stewardship   Safe Passage To Our Positive FutureMorel Fourman   Ecosystems Stewardship   Safe Passage To Our Positive Future
Morel Fourman Ecosystems Stewardship Safe Passage To Our Positive Futuremorelfourman
 
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10morelfourman
 
A Venture Capitalist's View of the Healthy Games Opportunity
A Venture Capitalist's View of the Healthy Games OpportunityA Venture Capitalist's View of the Healthy Games Opportunity
A Venture Capitalist's View of the Healthy Games OpportunityCognitiveHealthTrack
 
Bird's Eye View of Cognitive Health Innovation
Bird's Eye View of Cognitive Health InnovationBird's Eye View of Cognitive Health Innovation
Bird's Eye View of Cognitive Health InnovationCognitiveHealthTrack
 
Medication Administration David Leard
Medication Administration David LeardMedication Administration David Leard
Medication Administration David Leardal hayat hospital
 
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...CognitiveHealthTrack
 

Destaque (16)

Vacation Planner
Vacation PlannerVacation Planner
Vacation Planner
 
Case Study Meshwork 2020 Climate Leadership Campaign 1.5
Case Study Meshwork 2020 Climate Leadership Campaign 1.5Case Study Meshwork 2020 Climate Leadership Campaign 1.5
Case Study Meshwork 2020 Climate Leadership Campaign 1.5
 
Heart Attack
Heart AttackHeart Attack
Heart Attack
 
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainability
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For SustainabilityDutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainability
Dutch Govt Cross Ministry Oversight And Knowledge Sharing For Sustainability
 
Case Study Meshwork Mdg5 Parliamantarians Take Action! 2009 03 08
Case Study Meshwork Mdg5 Parliamantarians Take Action!  2009 03 08Case Study Meshwork Mdg5 Parliamantarians Take Action!  2009 03 08
Case Study Meshwork Mdg5 Parliamantarians Take Action! 2009 03 08
 
One Piece 549
One Piece 549One Piece 549
One Piece 549
 
Case Study Meshwork 2020 Climate Leadership Campaign Final
Case Study Meshwork 2020 Climate Leadership Campaign FinalCase Study Meshwork 2020 Climate Leadership Campaign Final
Case Study Meshwork 2020 Climate Leadership Campaign Final
 
Yes Meshwork Mini Case Study June 2010
Yes Meshwork   Mini Case Study June 2010Yes Meshwork   Mini Case Study June 2010
Yes Meshwork Mini Case Study June 2010
 
The Allstate-Posit Science Partnership: Cognitive Training for Safer Driving
The Allstate-Posit Science Partnership: Cognitive Training for Safer DrivingThe Allstate-Posit Science Partnership: Cognitive Training for Safer Driving
The Allstate-Posit Science Partnership: Cognitive Training for Safer Driving
 
Morel Fourman Ecosystems Stewardship Safe Passage To Our Positive Future
Morel Fourman   Ecosystems Stewardship   Safe Passage To Our Positive FutureMorel Fourman   Ecosystems Stewardship   Safe Passage To Our Positive Future
Morel Fourman Ecosystems Stewardship Safe Passage To Our Positive Future
 
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10
Complexity Performance Management Global Corporate Citizenship 091105 Draft 1.10
 
A Venture Capitalist's View of the Healthy Games Opportunity
A Venture Capitalist's View of the Healthy Games OpportunityA Venture Capitalist's View of the Healthy Games Opportunity
A Venture Capitalist's View of the Healthy Games Opportunity
 
Bird's Eye View of Cognitive Health Innovation
Bird's Eye View of Cognitive Health InnovationBird's Eye View of Cognitive Health Innovation
Bird's Eye View of Cognitive Health Innovation
 
Medication Administration David Leard
Medication Administration David LeardMedication Administration David Leard
Medication Administration David Leard
 
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...
Speaker(s): Tom Warden, Allstate; Henry Mahncke, Posit Science; Peter Christi...
 
GraçAamado
GraçAamadoGraçAamado
GraçAamado
 

Semelhante a M&E For Presidents Programme For Sa Version 1.2

Raising the Platform: How Singapore Can Keep Leading the World in the Develop...
Raising the Platform: How Singapore Can Keep Leading the World in the Develop...Raising the Platform: How Singapore Can Keep Leading the World in the Develop...
Raising the Platform: How Singapore Can Keep Leading the World in the Develop...accenture
 
2015-africa-prosperity-summit-report
2015-africa-prosperity-summit-report2015-africa-prosperity-summit-report
2015-africa-prosperity-summit-reportMrAnthony1992
 
Training Models for Employment in the Digital Economy
Training Models for Employment in the Digital EconomyTraining Models for Employment in the Digital Economy
Training Models for Employment in the Digital EconomyThe Rockefeller Foundation
 
CSR in Africa with Activ8Change
CSR in Africa with Activ8ChangeCSR in Africa with Activ8Change
CSR in Africa with Activ8ChangeJay Baughan
 
Freelance-Strategy Primer.pdf
Freelance-Strategy Primer.pdfFreelance-Strategy Primer.pdf
Freelance-Strategy Primer.pdfFajar Baskoro
 
2015 Year in Review - UNDP
2015 Year in Review - UNDP2015 Year in Review - UNDP
2015 Year in Review - UNDPFGV
 
Afrika Tikkun Annual Review (2014-2015)
Afrika Tikkun Annual Review (2014-2015)Afrika Tikkun Annual Review (2014-2015)
Afrika Tikkun Annual Review (2014-2015)Afrika Tikkun USA
 
It4 All Organisational Outline
It4 All Organisational OutlineIt4 All Organisational Outline
It4 All Organisational Outlineit4all_africa
 
Africa needs an X factor
Africa needs an X factorAfrica needs an X factor
Africa needs an X factorTakudzwa Kufa
 
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...Michelle Richards
 
IAD 2015 Attendance Summary
IAD 2015 Attendance SummaryIAD 2015 Attendance Summary
IAD 2015 Attendance SummaryAdrian Hall
 
Connecting undp ict news fall 2014
Connecting undp ict news fall 2014Connecting undp ict news fall 2014
Connecting undp ict news fall 2014wallen1957
 
Amos Anyimadu's 2002 proposal to Canadian International Development Agency ...
Amos Anyimadu's  2002  proposal to Canadian International Development Agency ...Amos Anyimadu's  2002  proposal to Canadian International Development Agency ...
Amos Anyimadu's 2002 proposal to Canadian International Development Agency ...Amos Anyimadu
 
2014-95 ICT's Report Africa Unit_V1b_HR
2014-95 ICT's Report Africa Unit_V1b_HR2014-95 ICT's Report Africa Unit_V1b_HR
2014-95 ICT's Report Africa Unit_V1b_HRDaniella Ben-Attar
 
The use of ICTs to facilitate engagement and active citizenship between young...
The use of ICTs to facilitate engagement and active citizenship between young...The use of ICTs to facilitate engagement and active citizenship between young...
The use of ICTs to facilitate engagement and active citizenship between young...Daniella Ben-Attar
 
The primer series on ictd for youth part1 an introduction to ict for develo...
The primer series on ictd for youth part1   an introduction to ict for develo...The primer series on ictd for youth part1   an introduction to ict for develo...
The primer series on ictd for youth part1 an introduction to ict for develo...Dr Lendy Spires
 
Digital Vision for CALP
Digital Vision for CALPDigital Vision for CALP
Digital Vision for CALPtaipida
 

Semelhante a M&E For Presidents Programme For Sa Version 1.2 (20)

Raising the Platform: How Singapore Can Keep Leading the World in the Develop...
Raising the Platform: How Singapore Can Keep Leading the World in the Develop...Raising the Platform: How Singapore Can Keep Leading the World in the Develop...
Raising the Platform: How Singapore Can Keep Leading the World in the Develop...
 
2015-africa-prosperity-summit-report
2015-africa-prosperity-summit-report2015-africa-prosperity-summit-report
2015-africa-prosperity-summit-report
 
Training Models for Employment in the Digital Economy
Training Models for Employment in the Digital EconomyTraining Models for Employment in the Digital Economy
Training Models for Employment in the Digital Economy
 
CSR in Africa with Activ8Change
CSR in Africa with Activ8ChangeCSR in Africa with Activ8Change
CSR in Africa with Activ8Change
 
Trendscouting toolkit 2ndedition
Trendscouting toolkit 2ndeditionTrendscouting toolkit 2ndedition
Trendscouting toolkit 2ndedition
 
Freelance-Strategy Primer.pdf
Freelance-Strategy Primer.pdfFreelance-Strategy Primer.pdf
Freelance-Strategy Primer.pdf
 
2015 Year in Review - UNDP
2015 Year in Review - UNDP2015 Year in Review - UNDP
2015 Year in Review - UNDP
 
Afrika Tikkun Annual Review (2014-2015)
Afrika Tikkun Annual Review (2014-2015)Afrika Tikkun Annual Review (2014-2015)
Afrika Tikkun Annual Review (2014-2015)
 
It4 All Organisational Outline
It4 All Organisational OutlineIt4 All Organisational Outline
It4 All Organisational Outline
 
Africa needs an X factor
Africa needs an X factorAfrica needs an X factor
Africa needs an X factor
 
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...
Nexgen Empowerment Solutions (Pty) Ltd - Company Profile Doc 2016 - Empowerme...
 
IAD 2015 Attendance Summary
IAD 2015 Attendance SummaryIAD 2015 Attendance Summary
IAD 2015 Attendance Summary
 
Connecting undp ict news fall 2014
Connecting undp ict news fall 2014Connecting undp ict news fall 2014
Connecting undp ict news fall 2014
 
How young people are engaging with ict in the commonwealth
How young people are engaging with ict in the commonwealthHow young people are engaging with ict in the commonwealth
How young people are engaging with ict in the commonwealth
 
Achieving SDGs Through Technology-Driven Solutions
Achieving SDGs Through Technology-Driven SolutionsAchieving SDGs Through Technology-Driven Solutions
Achieving SDGs Through Technology-Driven Solutions
 
Amos Anyimadu's 2002 proposal to Canadian International Development Agency ...
Amos Anyimadu's  2002  proposal to Canadian International Development Agency ...Amos Anyimadu's  2002  proposal to Canadian International Development Agency ...
Amos Anyimadu's 2002 proposal to Canadian International Development Agency ...
 
2014-95 ICT's Report Africa Unit_V1b_HR
2014-95 ICT's Report Africa Unit_V1b_HR2014-95 ICT's Report Africa Unit_V1b_HR
2014-95 ICT's Report Africa Unit_V1b_HR
 
The use of ICTs to facilitate engagement and active citizenship between young...
The use of ICTs to facilitate engagement and active citizenship between young...The use of ICTs to facilitate engagement and active citizenship between young...
The use of ICTs to facilitate engagement and active citizenship between young...
 
The primer series on ictd for youth part1 an introduction to ict for develo...
The primer series on ictd for youth part1   an introduction to ict for develo...The primer series on ictd for youth part1   an introduction to ict for develo...
The primer series on ictd for youth part1 an introduction to ict for develo...
 
Digital Vision for CALP
Digital Vision for CALPDigital Vision for CALP
Digital Vision for CALP
 

M&E For Presidents Programme For Sa Version 1.2

  • 1. Monitoring & Evaluation Support for the President’s Programme for South Africa A proven approach to large-scale capacity building, monitoring & evaluation and service delivery. Contents 1.  Executive Summary ........................................................... 2  2.  Enabling cross-ministry and cross-sector working for success .. 3  3.  ICT for capacity building, planning, monitoring & evaluation .... 4  4.  Indicators linking local, continental and global programmes ..... 6  5.  Meshworks for enabling government: a summary................... 7  6.  Proven global best practice ............................................... 10  7.  A practical approach ........................................................ 10  8.  Meshwork Elements Reducing Cost Time and Risk ................ 11  9.  Online Technology Platform and Shared Service Model .......... 12  10.  Examples of software platform ........................................ 13  11.  Meshwork Development Roadmap.................................... 16  12.  Conclusion .................................................................... 18  Appendix 1: Selection Criteria for software to support MIDIR ...... 19  Appendix 2: Action Learning (and Project Khaedu) ..................... 21  Contacts .............................................................................. 23  Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 1
  • 2. 1. Executive Summary Our consortium is led by ICT-Works, a world-class women owned South African business with the strongest BEE credentials. Our consortium offers the government of South Africa a monitoring and evaluation (M&E) solution for capacity building and service delivery based on the very best international and South African experience and best practices. For the last eight years members of our consortium have implemented performance management and capacity building solutions, for example the performance management systems at the two metros which won top 2008 “VUNA Awards for excellence in service delivery”, the City of Joburg and Nelson Mandela Bay Metros. The critical components of our solution are: 1. A proven, easy to use ICT solution that exceeds world class standards as defined by recent EU research, is highly flexible and is used in numerous government and institutional applications in South Africa, Europe and the USA. 2. An M&E approach that emphasises simplicity and robustness to empower and build confidence and capacity of government workers. Our clients’ experience proves that when M&E and performance management is made simple, it can build capacity and support service delivery improvements. 3. Use of the M&E process to build broad networks of learning and support across spheres of government, between departments and between government business and civil society. We call this a ‘Meshwork’. A meshwork enables government, business and civil society to work together to deliver on national objectives 4. A direct linkage through our partners, Africa International Advisors, with the DPSA’s very successful Action Learning programme – Project Khaedu. To date over 4,000 SMS members have participated in this innovative, yet demanding programme. Our approach allows us to take the existing and future deployment reports from Khaedu and feed them directly into both the M&E system and Meshwork learning networks. Khaedu has already uncovered many opportunities to apply South African service delivery best practices across all departments and spheres of government. Our solution can deliver this learning direct to the front line of government. With this approach to M&E, the South African government can ensure that the M&E process and system goes well beyond simply a ‘report card’. Combined, these elements ensure that experience and learnings from successful initiatives such as Khaedu and the DBSA’s Siyenza Manje can be disseminated widely. The ultimate measure of success for the M&E system is successful implementation of programmes across government. Combining M&E and learning for government, business and civil society will take service delivery to the next level and empower South Africa as a learning nation. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 2
  • 3. 2. Enabling cross-ministry and cross-sector working for success This paper focuses on implementation of the President’s programme as outlined in the State of the Nation Address of June 3rd 2009 and the Medium Term Strategic Framework (MTSF). The authors recognise the importance of the national goals and the significance of creating new ministries for strategic planning and monitoring & evaluation. From experience, we recognise the transformative power of capacity building, performance management and monitoring and evaluation here in South Africa. Also from experience, we recognise that many solutions to achieve our goals at national, provincial and local levels are already known – somewhere in South Africa or internationally. By joining-up planning, knowledge-sharing, capacity-building, monitoring and evaluation, as South Africans we can fast-track service delivery and significantly reduce the cost, time and risk of the transformation that we must achieve. The President’s address makes clear the government’s commitment to ending poverty and its commitment to work with all parts of our society to deliver the national programme. The President’s address confirms that attached to each commitment is a detailed project plan with targets and critical milestones. The address includes an invitation to all South Africans: “As citizens we should at the same time ask ourselves what is it that we can do on our own to help promote this national programme. To be a citizen is not only about rights, it is also about responsibility, to make a contribution to make ours a better country. […] Fellow South Africans, working together we can do more to realise our common vision of a better and more prosperous nation!” Further, the recent Dinokeng scenarios identified “Walking Together” with an Enabling Government for South Africa to develop and build the nation. How can our government mobilise resources across ministries and enable participation of civil society and all sectors to walk together in national development? Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 3
  • 4. 3. ICT for capacity building, planning, monitoring & evaluation Just as the Internet enabled President Barack Obama to make history as the first African American US President, we believe that through the Internet and ICT our new Presidency and South Africa can make history as an enabling government, achieving comprehensive engagement, joined- up government and service delivery through appropriate use of ICT and the Internet. ICT for planning, for performance management, for monitoring and evaluation, for knowledge sharing and for collaboration can be the nervous system of South Africa’s knowledge-based service delivery and development. Extensive research, development and experience internationally and in South Africa, confirms that South Africa is well positioned for a leapfrog in development by becoming a learning nation through knowledge-based government, partnering effectively with business, NGOs, education and other constituencies. As South Africans, we can dramatically improve service delivery by using the power of Action Learning and ICTs to share knowledge, monitor, learn and achieve our national goals. This paper presents our proposal for a national capacity-building, monitoring and learning solution, including Action Learning curricula, ICT infrastructure and national service delivery knowledge base. Catalysing change by engaging business and civil society Government cannot single-handedly transform our country, but government can improve joined-up working across ministries and the spheres of government. Government can create the conditions for the elimination of poverty, development of community and the achievement of growth. The South African Women in Dialogue (SAWID) research shows how Chile successfully created what we refer to as a “template” solution for poverty elevation. The Chile template developed pillars and conditions required to create a bridge (puente) for families to walk from poverty and social exclusion to self- empowerment and prosperity. The government mobilised resources across ministries and civil society to successfully take the project from an initial pilot to a successful national roll-out. This paper discusses how similar approaches of developing, piloting and then rolling out tried and Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 4
  • 5. tested best practice templates are today being used in South Africa and how this approach can be used to achieve the 2009-2014 MTSF programme. Overall the approach proposed for South Africa uses a simple roadmap for scaling change: 1. find working solutions and combine to build a template, 2. pilot the combined solution and 3. scale their impact. A similar approach is being taken in many contexts within South Africa, for example, Project Khaedu, the DBSA’s Siyenza Manje and the South African Cities Network all aim to develop networks, improve knowledge sharing and scaling of good practices to accelerate development. Learning from this lifecycle, the solution we propose includes a focussed Action Learning capacity building and learning network with an online platform to identify and connect the government, business and social change leaders across South Africa’s society and diaspora. These can then develop key collaborations based on shared goals and create the projects to implement their goals. Roadmap for scaling change 1.Develop Template 2.Pilot 3.Scale 3 1 2 Copyright (c) 2009 Gaiasoft IP Ltd. International Patents Pending. All Rights Reserved. Government cannot do what business and civil society can do, but an “enabling government” can stimulate engagement and synergy across business and civil society. With skilful use of ICT, South Africa’s government can catalyse development towards national priorities by stimulating contributions from the most appropriate stakeholders for each priority. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 5
  • 6. 4. Indicators linking local, continental and global programmes The meshwork approach to M&E is particularly suitable to national, provincial and local mobilisation to achieve global objectives. For example, the impact of local action in attaining the targets in the MDGs, Human Development Index and Gender Development Index can be tracked, knowledge and experienced can be gathered and effective solutions can be identified. Local grassroots solutions can be rapidly rolled out across the country and between countries, where relevant. Achieving goals of international collaboration Meshwork M&E provides a structure within which local and community action contributes to national and international knowledge and achievement of goals. At the same time, meshwork M&E can provide a clear ‘line of sight’ for international bodies like the AU and SADC to track, understand and impact progress down to local and ward level. The meshwork approach can be used to benchmark and compare between international partners, for example between South Africa and international partners in SADC1 or IBSA2 working groups and to connect networks across countries, for example for Women’s Rights, Conflict Prevention or Climate Adaptation. The meshwork can be used to build expert communities, develop templates for success and build local capacity. By using the power of meshwork M&E, South African government and civil society can lead and contribute to international partnerships. Grassroots participation meshworks and citizen scorecards Citizen scorecards capture needs and goals of civil society, businesses or communities as a focus for measuring progress, convening of stakeholders and giving feedback to government. By focussing on common indicators between South African civil society, business and government, South Africans can walk together to achieve national progress. Meshwork M&E provides a framework for convening stakeholders around a national vision and key strategic pillars and programmes. Young people, women’s movements and other civil society groups can support where government is effective and lead where government needs support. Learning from international experience The remainder of this paper is based, with permission, on a report prepared by CHE Netherlands and Gaiasoft for the Dutch Government on cross-ministry and civil society implementation and collaboration. It refers to work for the Dutch government implementing change programmes and also to projects in collaboration between government, business and civil society. Elements of this approach were originally developed and proven here in South Africa in government and private sector monitoring and evaluation and performance management implementations. With thanks to our clients and partners in preparation of this document. Special thanks to Nelson Mandela Metro and international clients for the screen shots used. 1 SADC: Southern African Development Community 2 IBSA: India, Brazil, South Africa Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 6
  • 7. Meshworking – a support service for Cross-cutting Government Programmes A meshwork™ is a Structured Collaboration Across Organisations to Accelerate Learning and Results 5. Meshworks for enabling government: a summary Every government faces the challenge of how to develop and implement programmes effectively and efficiently. How can many ministries, departments and agencies work together to fast track progress and results? This paper references and builds on practical South African experience by the authors and experience with CHE in the Netherlands and internationally, and on the global best practice research of the EU MIDIR research project. This paper outlines a meshworki support service for developing and implementing cross-cutting sustainability programmes. Meshworking links people, performance and knowledge within a common programme framework to achieve results. Meshworking support improves collaboration, synergy and oversight, while reducing cost, time and risk of delivering programme outcomes. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 7
  • 8. The programme facilitation is a proven process that nurtures commitment and confidence and develops team ownership, engagement and capacity. The process is enabled by unique3 meshworking software which connects people, manages accountability and actions, harvesting and re-using knowledge to scale programme results. The programme meshwork support solution enables the programme management team to: • build on the strengths and diverse perspectives of cross-cutting teams through facilitation, mentoring and online support • integrate existing knowledge and information technology resources4 within the framework of the programme meshwork • build effective communities of practice for each cross-cutting project and for the project team within each ministry. Core challenges that this approach addresses are: • How to make the most effective use of diverse expertise and knowledge to achieve a defined objective. • How to achieve effective collaboration between people who are not in the same ‘chain of command’ or management hierarchy and hence cannot be simply instructed to perform tasks. 3 Gaiasoft’s South African and international patents and patents pending provide unique security and openness, protecting what must be private behind the firewall and connecting with people and resources from the public internet where appropriate. An organising framework. 4 Integration is through web services standards and Service Oriented Architecture. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 8
  • 9. How to work across organisational and departmental silos (boundaries) ensuring the most useful contribution from different stakeholders • How to keep an overview of all activities, tracking progress, learning from the best, and supporting areas that are falling behind • How to integrate performance and results focus with supportive people-processes to create a culture of learning, innovation and achievement • How to identify and share best practices which are specifically relevant to an individual in their work e.g. through programmes like Project Khaedu • How to link performance management to best practices knowledge- sharing and effective people collaboration e.g. tying together existing successful projects such as Siyenza Manje and Khaedu which are already uncovering many best practices. The meshwork facilitates effective cross-cutting project-based communities of practice and in-ministry communities of practice. The same cross-cutting approach applies to collaboration between business and civil society groups working together on national development. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 9
  • 10. 6. Proven global best practice Global best practice research5 confirms that cross-cutting programmes are most likely to succeed and scale if they: • Take an integral approach, combining attention to collective structure and culture, as well as individual mindset and behaviour • Combine a shared flexible template for performance • Include a technology platform for monitoring, measuring, collaborating and driving implementation of the template within a particular context • Give thorough attention to stakeholder engagement and mobilization • Stimulate a culture and mindset of learning and innovation (rather than predict and control) The same EU funded research identifies cross-cutting sustainability programmes as an area where this approach is particularly relevant. The selection criteria for tools to support this approach are in Appendix 1 below. The performance and M&E elements of the meshwork have been in use in South Africa since 2001. In Holland, the meshworking support service is in use in the Dutch Ministry VROM and also the Dutch private sector collaborative sustainability and biodiversity network “Leaders for Nature.” 7. A practical approach A meshwork approach facilitates self-organisation, using the ‘wisdom of the crowd’ to find the simple projects, knowledge and communities of practice to achieve a complex task. A complex multi-stakeholder project is translated into an appropriate hierarchy of pillars (areas for collaboration) and conditions (which must be met to achieve success). In the case of South Africa’s 2009-2014 programme, these pillars are likely to be the cross-cutting government commitments which make up the programme. A meshwork support process works from the core purpose (e.g. eliminate poverty), identifying pillars to support that purpose, conditions that need to be in place for a pillar to be strong, 5 MIDIR European Union Research Project Contract n° 036708: Integration of Concept in Real Risk Management Settings in Various Cultures – Online tools for developing sustainability and resilience Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 10
  • 11. action that puts those conditions in place, and best practices that can formulate action in other parts of an organisation. In simple terms, this approach gets every participating person and organisation ‘on the same page’ understanding where they fit and their role in the national programme. Each person is motivated by the programme goal and understands where they fit in the larger programme and where they can find the people, knowledge and resources to achieve the programme results. When this template is made explicit, it is possible to easily link individual actions to conditions supporting the projects within the programme. It is also possible to find best practices that are directly relevant to the specific area that anyone is working on. 8. Meshwork Elements Reducing Cost Time and Risk Meshwork has one great advantage for the South African government – it can be built and implemented quickly and populated with the results from Khaedu, Siyenza Manje and other successes, immediately. Meshwork Element Reduces cost, time loss and risk An online technology platform that Without this, valuable time is combines performance management, lost, the organisation and knowledge exchange and a administration overhead is collaboration platform. excessive and energy and motivation are likely to dissipate. Facilitated meetings designed to Without this programme, generate the content of the participants waste time finding programme, as well as ownership of the knowledge they need and end that content. up repeating mistakes or ‘re- inventing the wheel.’ Action Learning training modules to Without this, lack of capacity, identify and teach proven solutions historic cultures and and to develop the mindset and organisational boundaries limit capacity to deliver. participation, progress and results. Peer-to-Peer mentoring supported by Without this, synergies and peer the visibility of the maturity of learning opportunities remain different parts of an organisation in unexploited, capacity building is their development. slow and results are delayed. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 11
  • 12. 9. Online Technology Platform and Shared Service Model Gaiasoft has over eight years experience in performance management, M&E and program implementation in South Africa. Through this and global experience, Gaiasoft has developed an online environment to support the end-to-end lifecycle of a meshwork, from formulation of purpose, planning, through collaboration, implementation, monitoring and evaluation. The platform is fully and uniquely compliant with the selection criteria published by the EU MIDIR best practice research project and set out in Appendix 1 to this paper. Gaiasoft’s patented6 platform links between (performance, transformation and cultural) indicators, emerging best practice solutions and communities of practice. The platform uniquely enables members of a meshwork to: • Monitor and evaluate for results • Do accountable performance management • Implement results based compensation • Link budget and service delivery • Connect people and knowledge with focus and precision • Eliminate re-inventing the wheel and repetition of costly mistakes • Rapidly scale what works • Make explicit the core areas of work and the level of progress in each area • Benchmark progress in the different areas of work across different ministries and partners • Identify peers from different parts of an organisation who are a step ahead and can mentor and teach • Share and find best practices specific to people’s contexts and needs ICT Works and Gaiasoft are working with a Gauteng based team to provide a shared service for performance management, monitoring & evaluation and meshworking. The shared service model significantly reduces the cost to individual government departments and agencies and enables immediate joined-up working and knowledge sharing. The platform is designed to be scalable for every ministry and to allow the three spheres of government to work together on delivering the 2009- 2014 programme and beyond. This is being implemented with private sector funding to “walk together” with government to achieve national goals and success. 6 Patents relating, among other things, to the linking of knowledge and solutions to a measurement structure. Pending patents in US, Europe, India, China, Brazil, Japan and South Africa. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 12
  • 13. 10. Examples of software platform Following are South African and international examples that show the Gaiasoft platform used to reduce the cost, time and risk of delivering government and collaborative programmes. Nelson Mandela Bay Metropolitan Municipality Nelson Mandela Metro has used the Gaiasoft software platform for its performance management and monitoring of its Integrated Development Plan (IDP) since August 2004. The link between service delivery and budget is of critical importance and is reflected in the following scorecard showing the Service Delivery and Budget Implementation Plan. The scorecard shows quarterly progress at the top level and by department. Key Performance  Area Key Performance  Element Key Performance  Indicator Analysis explaining  performance  indicator A department scorecard for Housing & Land Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 13
  • 14. A monitoring report generated automatically from the system as an Excel spreadsheet that can be printed for use in management meetings. Automated reports compile results measured across departments, combined with analysis and outstanding actions to track implementation of results. Different reports can be set up for different purposes. The results recorded in the scorecard are used to measure progress on performance agreements of senior managers and as a basis for calculating remuneration. Leaders for Nature In the Leaders for Nature Meshwork, the program areas or ‘pillars’ are Water, Land Use, Energy Use, etc. There is a community of practice for each of these pillars. This meshwork screen shows people in the Netherlands in the Energy Sector working on Energy Use in different roles (Business, Government, NGO, Scientist, Entrepreneurs, Media) and also best practices related to the same criteria. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 14
  • 15. Resilient Cities Initiative The scorecard shown below is developed from London- based Climate Change Agency’s programme management knowledge. It shows the monthly progress of a city sustainability programme consisting of programme areas and projects. (The scorecard shows demonstration data only.) The dark blue lines are programme areas including City, Transport, Buildings, Industry, Energy, etc. The traffic light cells show the monthly progress of individual projects for the selected city. The ‘cloud’ symbol to the left of a project name is used to access the best practice solutions or shared knowledge available for that project. The green arrow to the left of each project name is used to access the actions outstanding for that project. The scorecard below shows how the progress can be compared across different cities to facilitate benchmarking and peer-learning. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 15
  • 16. 11. Meshwork Development Roadmap The steps assume a programme being implemented across multiple ministries. The same principle applies to government agencies, local governments and public-private partnerships. In the case of South Africa, these steps are already in progress. There is a common goal of eradicating poverty and specific commitments with measures and milestones. The starting point is to align on and commit to a goal, in this case implementing the 2009-2014 programme laid out in the State of the Nation Address. This step requires engaging deep human commitment. This happens, for example, when it becomes clear that the goal is achievable through commitment and collaboration. The meshwork support process is designed to demonstrate and presence the possibility and achievability of the programme goal and its value as a replicable success, for example by other governments. Step two develops a shared story of how the committed goal can be achieved. The 3rd Dinokeng scenario of walking together provides an example of a story for achievement of a positive future. The third step is to develop a template consisting of pillars, conditions, success stories, which in this case are the programme projects. In the case of South Africa, the pillars are the major commitments in the State of the Nation Address. The success stories are examples of service delivery successes that can be used in Action Learning and capacity building. Gathering these stories builds ownership. The fourth uses the template to define a monitoring and evaluation system. In this case, breaking the programme into projects which can be colour-coded using maturity models and progress tracked over time. This will make the progress and success of the national programme visible and accountable at all levels, enabling the three spheres of government, agencies and other stakeholders to implement progress together. This is a similar approach to that taken in Nelson Mandela Metro, but on a larger scale. Step five develops collaborative communities of practice based on ministries and projects. This is achieved through facilitated meetings, when participants are asked to place their photos and other information at the coordinate of their ministry and the particular project of the programme on which they choose to focus. The resulting wall display of a meshwork – of project names along the top and ministry names down the side, with participant’s faces placed on the wall, is referred to as a Meshwall™. The same visual meshwork display is also presented within the Gaiasoft meshwork software at the end of the facilitated meeting. This building of ministry and project-based communities of practice is an ongoing process which accelerates progress towards programme goals. The sixth step supports communities of practice across ministries to deliver projects in ministries. The seventh step trains and supports internal consultants to facilitate and scale implementation. These final two steps relate to scaling a programme template and solutions across ministries to achieve the overall programme goal. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 16
  • 17. Stages in meshwork development roadmap Starting point Commitment to the national programme goals. Facilitated process, dialogue or A scenario of future story for success – like the Dinokeng third scenario presentation of enabling government “walking together.” Facilitate chosen cross- A “template” of Projects and ministry, cross project network, Conditions for success and Political Commitment task force or experts to develop knowledge base of success Partnership Legislation “template” and roadmap for stories. MDGs 4&5 implementation. Cultural In Country Financial Resourcing These can be deduced from the Practices project plans and milestones for Education Health System national commitments. Implement collaborative Monitoring to track progress of projects and conditions over time, monitoring and knowledge identify strengths, focus resources and fill gaps. Benchmarking to sharing. support peer learning. Similar to Nelson Mandela Metro’s IDP monitoring, but on a much larger scale. (Gaiasoft’s scorecard combines Pill ar > Condition Mar-09 Apr-09 May-09 Jun-09 Monitoring & Evaluation for Financial Resourci ng projects and conditions with Health Budgeting Performing Performing Performing Perf orming tracking measures and actions, Gende r Budgeting Developing Developing Performing Perf orming Insurance System Beginning Developing Developing Developing and stores success stories.) Free Services Beginning Beginning Beginning Beginning T axation support Developing Performing Performing Perf orming Coordinate development of Develop online communities of communities of practice. This practice for project pillars and begins with a face-to-face ministries. Photo below shows meeting where a “meshwall” is development of a meshwall. used to connect people according to, in this case, ministries and projects. This process continues in an online meshwork which other stakeholders can later join. This step is to facilitate community building for collaboration. Communities of practice extend to business, community, NGOs and education institutions. Coordinate and align Coordinating government, business, community, media, etc using stakeholders working between template to direct resources to identify pillars and conditions for success different stakeholder groups and in each place, e.g. Province/District. communities. Training of community Training and support internal facilitators to align and implement development specialists to scale. programme projects. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 17
  • 18. 12. Conclusion This paper proposes a shared service model for monitoring and evaluation to fast track capacity building and achievement of national goals. We propose a meshwork approach to programme management to enable implementation across ministries and the three spheres of government, and to enable collaboration with business, civil society and other stakeholders. The meshwork approach is ideally suited to the urgent service delivery and implementation commitments of the President and the 2009-2014 programme. Global best practice from the EU MIDIR research project clearly indicates the need for integrated programme management for development. The solution outlined in this paper is uniquely and fully compliant with EU MIDIR project selection criteria set out in Appendix 1. Meshworking is an integrated approach. The monitoring and evaluation software platform proposed is proven in use in South Africa, for example in Nelson Mandela Metro as described above. In addition, the international meshworking examples of Dutch Government (Ministry VROM), cross-sector sustainability projects (Leaders for Nature) and US “Resilient Cities Initiative” demonstrate the generality of the approach. Meshworking is uniquely suitable for cross-cutting government programmes. Meshworking enables effective identification, sharing and implementation of solutions to the complex challenges of eradicating poverty, protecting jobs and achieving development. Meshworking provides technology support which connects people, performance and knowledge within the framework of the meshwork. The Action Learning approach to capacity building is proven to work in South Africa through project Khaedu, and makes an excellent fit with the meshwork solution and philosophy. ICT-Works, AIA and Gaiasoft are uniquely experienced in combining large- scale ICT project experience, capacity building, performance management and meshworking track record. ICT-Works, AIA and Gaiasoft offer a programme meshwork support solution to reduce the cost, time and risk of building capacity and implementing cross-cutting service delivery programmes. The Action Learning approach finds grass roots solutions that work. The meshwork approach works across organisation boundaries even when solutions are not fully defined, bringing the rigour of programme management to the challenges of implementing the commitments of the 2009-2014 South African Government programme. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 18
  • 19. Appendix 1: Selection Criteria for software to support MIDIR These criteria are reproduced from the EU MIDIR Report 2.4 in the paragraphs and table below ...the MIDIR methodology provides a solution to the rapid, scalable transformation of complex systems through knowledge sharing and learning. The approach applies directly to collaboration for climate change response, implementation of resilience and sustainable development. Figure 4.1 [of the quoted MIDIR Report 2.4] above depicts a generic end- to-end process from goal to governance system. To facilitate the implementation of the end to end process described above, an integrated technology platform is required to support accountability, measurement of performance, transformation and culture, management of actions, capturing related knowledge of Positive Proof Points as a reusable template or pattern library. These templates must be implementable as a governance and management system at multiple levels of organisation or governance, for example national, provincial and local. To facilitate the collaboration across functions and organisations, lenses are required allowing different stakeholder groups to understand through the perspectives of others. Finally the same collaboration platform must be securely, shareable between different stakeholders across boundaries of organisation and function, allowing different groups to receive the information they need, but only what they are entitled to. The suitability of a software tool or platform to support this approach can be assessed using the requirements in Figure 6.1 “Selection Criteria for software to support large-scale learning and implementation.” In comparing and selecting tools, a prospective solution can be rated: Red/Yellow/Green or Non-Compliant/Partially Compliant/Compliant for each of the requirements in the table below using a maturity model/check list. Below is Figure 6.1 Selection Criteria for software to support large-scale learning and implementation from MIDIR Report 2.4. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 19
  • 20. Requirement Why it’s important R Y G 1. Accountability Accountability provides the basis for maintaining standards, driving improvement and change. 2. Measuring Measurement provides the basis for accountability. performance Performance measures indicate whether a process is delivering. Performance measures are most relevant to a stable organisation. Where structural and cultural transformation is required, the key accountability of leaders may be for transformation and for culture and values. 3. Measuring Transformation of an organisation depends on many projects transformation and changes – structures, processes, systems. The management system must be able to measure the transformation of structures, processes and systems. 4. Measuring Transformation of organisations depends on culture, on trust, culture on collaboration. The management system must be able to measure the culture of the organisation as it is and the gap between current culture and desired culture. 5. Action Action management is the driver of results and the engine of management continuous improvement (through the plan-do-check-act cycle of quality management). 6. Knowledge: Knowledge is organised according to the measure it impacts, Challenges, the 80/20 challenges which must be met to perform in that Solutions & measure and the 80/20 solutions, supported by case studies.ii Case Stories 7. Reusable Reusable templates consist of measures, knowledge and Action templates Learning resources which are used to drive change through a performance management process. 8. Fractal – Reusable templates appropriate to different types and levels of multiple levels organisation, for example business and government at – National; national, provincial and local levels. Management and knowledge management systems enable collaboration and Provincial; learning between types and levels of organisation. This is a Local requirement due to the increasing interdependency between different sectors and organisation types. 9. Lenses – Different stakeholders have different perspectives on the multiple views transition – for example, financial, environmental, compliance for different and regulatory. stakeholders 10. Interagency / Different stakeholders and supply chain partners require multi confidential subsets of shared information to allow optimisation stakeholder – and tuning of performance, for example across a network of government agencies or businesses in a supply chain. lenses, filters, content Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 20
  • 21. Appendix 2: Action Learning (and Project Khaedu) Action Learning is the approach of learning by doing. In South Africa, Action Learning has been extensively used and proven successful, for example in the strategic transformation of South African Revenue Services (SARS) and in Project Khaedu described below. We have many committed managers, but many are struggling with how to implement with limited hands on training. Action Learning addresses that gap. Why does Action Learning work? Studies have shown the best way to learn is ‘by doing’. Skills absorption success rate 80% 64% 60 40 37% 20 19% 8% 0 By doing Through Lecturing Lecturing observation with exam with no exam Source: US Government analysis of training efficiency, 2002 7 AIA has developed highly tailored Action Learning programmes for Health, Education, Economic Development, Public Works, Local Government and Municipal Managers based on AIA’s extensive work in these areas. In addition there are cross-cutting programmes in Strategic Planning, Modern Work Study, Modern Human Resource Management, Process Analysis, Project Management, Organisation Design, Public Sector Finance for non-financial managers and Training Design. All of these programmes are very practically focused and build on the simple, robust best practices that have been uncovered in many public institutions here in South Africa. Action Learning exposes managers to these best practices and how they can be implemented in their own environments. Background to Project Khaedu The Government introduced Batho Pele in 1997 as an initiative to improve service delivery in the public service based on the principle of putting “people first” In 2003, a survey was conducted on the effectiveness of Batho Pele. Cabinet’s view was that many senior managers were “floating above” the issues on the ground i.e. they were not getting involved with service delivery at Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 21
  • 22. the “coal face”. As a result, in August 2004 Cabinet made a decision which requires all SMS members to spend a period of at least 5 days examining service delivery issues ‘at the Coal Face’. This mandate was given to the DPSA to implement. To ensure that the deployment process was as useful as possible, it was decided to combine the ‘Coal Face’ deployment with a period of intense problem solving skills development – in combination with a programme called Project Khaedu (Venda for “Challenge”). Piloted in 2004 and early 2005, Project Khaedu has proved very successful with both participants and the organisations that have hosted teams during their ‘Coal Face’ deployments. Project Khaedu is an innovative Action Learning programme, aimed at SMS and MMS managers in the public service, with: i Case-study based approach, following best practices at leading international business schools e.g. Harvard i Case-studies reflecting real SA public service experiences i Heavy emphasis on team-based challenges and problem solving skills i Focus on developing practical skills which can be used to improve your efficiency and effectiveness in your job today Since its inception in 2004, Project Khaedu has enjoyed significant success: • Over 3,900 managers have attended with an average satisfaction score of 92% • All 9 provincial governments and the overwhelming majority of national departments have participated • Many of the deployment reports have been followed-up with significant impact in the respective sites In late 2007, the programme was transferred from the DPSA to PALAMA7 (formerly the SAMDI) and was extended to MMS, as well as SMS managers. Africa International Advisors remains the service provider for the programme, in partnership with PALAMA. 7 PALAMA = Public Administration Leadership and Management Academy Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 22
  • 23. Contacts ICT-Works Hannelie Pienaar: hannelie@ict-works.co.za +27 82 551 2991 Nothukela Sereo: nothukela@ict-works.co.za +27 73 643 7123 QVCS Africa, ICT-Works’ specialist implementation partner Chris Kruger: chris@qvcs.co.za +27 83 268 9630 AIA, Africa International Advisors Tim Hough: timhough@africaia.com +27 83 326 9007 Gaiasoft International Morel Fourman: morel.fourman@gaiasoft.com +44 7710 307 011 i Meshwork as it relates to a social process is a trademark of CHE Netherlands on behalf of CHE Global. Meshwork as it relates to collaboration, performance management or knowledge management software is a trademark of Gaiasoft IP Ltd. ii 80/20 Challenges refer to the small number of key challenges which are barriers to performance. 80/20 solutions refer to the small number of key solutions that address each challenge. Case studies refer to the positive proof points which demonstrate solutions. Copyright (c) 2009, Gaiasoft IP Ltd. Portions copyright ICT-Works (Pty) Ltd, Africa International Advisors and CHE Netherlands. All Rights Reserved. 23