Total Productivity Maintenance
TPM : Zero sum approach




• Zero defects
• Zero breakdowns
• Zero losses
Total productivity maintenance




Total Productive Maintenance is productive maintenance involving total
participation for increased productivity.
Why TPM: Downtime




(a) Breakdowns due to equipment failure.
(b) Setup and adjustment e.g . exchange of die injection moulding machines etc.
Why TPM - Speed losses




(a) Idling and minor stoppages e.g. abnormal operations of sensors
(b) Reduced speed e.g. discrepancies between design and actual speed of equipment
Why TPM - Defects




(a) Defect in process and rework ( scrap and quality defects requiring repair )
(b) Reduced yield between machine startup and stable production.
Requirements for TPM




Maintain basic equipment conditions
Maintain operating conditions
Restore deterioration
Correct design weaknesses
Improve technical skill
Expose hidden defects
FICCI   CE

More Related Content

What's hot

What's hot (14)

Bradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_ResumeBradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_Resume
 
Prerequisites of ppc
Prerequisites of ppcPrerequisites of ppc
Prerequisites of ppc
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Line balancing
Line balancingLine balancing
Line balancing
 
Scheduling
SchedulingScheduling
Scheduling
 
Layout10
Layout10Layout10
Layout10
 
Troy Schlegel- Accomplishments
Troy Schlegel- AccomplishmentsTroy Schlegel- Accomplishments
Troy Schlegel- Accomplishments
 
Line balancing
Line balancing Line balancing
Line balancing
 
Probing Plus Leaflet NX Edition
Probing Plus Leaflet NX EditionProbing Plus Leaflet NX Edition
Probing Plus Leaflet NX Edition
 
Maintenance
Maintenance Maintenance
Maintenance
 
My responsibilities as a whseman
My responsibilities as a whsemanMy responsibilities as a whseman
My responsibilities as a whseman
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
 
Ch07
Ch07Ch07
Ch07
 

Viewers also liked

The glass evaluation
The glass evaluationThe glass evaluation
The glass evaluationMohit Singla
 
The future of marketing & advertising
The future of marketing & advertisingThe future of marketing & advertising
The future of marketing & advertisingMohit Singla
 
Applying quality improvement principles for pmtct option b+ at lugeye dispens...
Applying quality improvement principles for pmtct option b+ at lugeye dispens...Applying quality improvement principles for pmtct option b+ at lugeye dispens...
Applying quality improvement principles for pmtct option b+ at lugeye dispens...Ben Mbwele
 
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...Ze Wehrmacht Beemer
 
International financial management working notes
International financial management working notesInternational financial management working notes
International financial management working notesAMIT KUMAR SINGH singh
 
Aptitude questions competitive exams-placements
Aptitude questions competitive exams-placementsAptitude questions competitive exams-placements
Aptitude questions competitive exams-placementsAMIT KUMAR SINGH singh
 
Quality Control and Assurance
Quality Control and AssuranceQuality Control and Assurance
Quality Control and Assurancemahmoudradwan25
 
The toyota way 14 mgmt principles
The toyota way 14 mgmt principlesThe toyota way 14 mgmt principles
The toyota way 14 mgmt principlesMohit Singla
 
Insurance approach scripts
Insurance   approach scriptsInsurance   approach scripts
Insurance approach scriptsMohit Singla
 
The one minute manager
The one minute managerThe one minute manager
The one minute managerMohit Singla
 
The goal is zero defects
The goal is zero defectsThe goal is zero defects
The goal is zero defectsMohit Singla
 
Operations - Managing Quality
Operations - Managing QualityOperations - Managing Quality
Operations - Managing Qualitytutor2u
 
ISO 9001:2015 Quality Management Principles
ISO 9001:2015 Quality Management PrinciplesISO 9001:2015 Quality Management Principles
ISO 9001:2015 Quality Management PrinciplesKaren Sharick
 
Leadership - Training by Spreadminds
Leadership - Training by SpreadmindsLeadership - Training by Spreadminds
Leadership - Training by SpreadmindsMohamad Badr
 

Viewers also liked (17)

The glass evaluation
The glass evaluationThe glass evaluation
The glass evaluation
 
Vision mission
Vision missionVision mission
Vision mission
 
The future of marketing & advertising
The future of marketing & advertisingThe future of marketing & advertising
The future of marketing & advertising
 
Applying quality improvement principles for pmtct option b+ at lugeye dispens...
Applying quality improvement principles for pmtct option b+ at lugeye dispens...Applying quality improvement principles for pmtct option b+ at lugeye dispens...
Applying quality improvement principles for pmtct option b+ at lugeye dispens...
 
Introduction to Information Quality
Introduction to Information QualityIntroduction to Information Quality
Introduction to Information Quality
 
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...
Root Cause Analysis, Delay Sending of Specimen to Referral Laboratory (Sample...
 
International financial management working notes
International financial management working notesInternational financial management working notes
International financial management working notes
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
Aptitude questions competitive exams-placements
Aptitude questions competitive exams-placementsAptitude questions competitive exams-placements
Aptitude questions competitive exams-placements
 
Quality Control and Assurance
Quality Control and AssuranceQuality Control and Assurance
Quality Control and Assurance
 
The toyota way 14 mgmt principles
The toyota way 14 mgmt principlesThe toyota way 14 mgmt principles
The toyota way 14 mgmt principles
 
Insurance approach scripts
Insurance   approach scriptsInsurance   approach scripts
Insurance approach scripts
 
The one minute manager
The one minute managerThe one minute manager
The one minute manager
 
The goal is zero defects
The goal is zero defectsThe goal is zero defects
The goal is zero defects
 
Operations - Managing Quality
Operations - Managing QualityOperations - Managing Quality
Operations - Managing Quality
 
ISO 9001:2015 Quality Management Principles
ISO 9001:2015 Quality Management PrinciplesISO 9001:2015 Quality Management Principles
ISO 9001:2015 Quality Management Principles
 
Leadership - Training by Spreadminds
Leadership - Training by SpreadmindsLeadership - Training by Spreadminds
Leadership - Training by Spreadminds
 

Similar to Total Productivity Maintenance: Zero Defects, Breakdowns, Losses

16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdfssuser72dffc
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdfPTD QUYCOCTU
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentationguest03d3e3
 
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceGF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceMachine Tool Systems Inc.
 
Industrialising AM - AMUG - draft 1
Industrialising AM - AMUG - draft 1Industrialising AM - AMUG - draft 1
Industrialising AM - AMUG - draft 1Marc Saunders
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationAmeya Margaj
 
AM Solution Centres - TCT - issue 1-2
AM Solution Centres - TCT - issue 1-2AM Solution Centres - TCT - issue 1-2
AM Solution Centres - TCT - issue 1-2Marc Saunders
 
General Presentation Techniprodec 2016
General Presentation Techniprodec 2016General Presentation Techniprodec 2016
General Presentation Techniprodec 2016Luis Aguilar
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINALGOBI S
 
Chapter 2 design of production system
Chapter 2  design of production systemChapter 2  design of production system
Chapter 2 design of production systemDr. Ravneet Kaur
 
Reducing costs with condition based maintenance, IBC conference Singapore, 2010
Reducing costs with condition based maintenance, IBC conference Singapore, 2010Reducing costs with condition based maintenance, IBC conference Singapore, 2010
Reducing costs with condition based maintenance, IBC conference Singapore, 2010Shaun West
 

Similar to Total Productivity Maintenance: Zero Defects, Breakdowns, Losses (20)

16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdf
 
Amts Presentation
Amts PresentationAmts Presentation
Amts Presentation
 
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - AerospaceGF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
GF Machining Solutions - AgieCharmilles Model Cut 200 Dedicated - Aerospace
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Industrialising AM - AMUG - draft 1
Industrialising AM - AMUG - draft 1Industrialising AM - AMUG - draft 1
Industrialising AM - AMUG - draft 1
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Cnc machine training
Cnc machine trainingCnc machine training
Cnc machine training
 
om
omom
om
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
 
AM Solution Centres - TCT - issue 1-2
AM Solution Centres - TCT - issue 1-2AM Solution Centres - TCT - issue 1-2
AM Solution Centres - TCT - issue 1-2
 
OEE
OEEOEE
OEE
 
OEE
OEEOEE
OEE
 
OEE
OEEOEE
OEE
 
General Presentation Techniprodec 2016
General Presentation Techniprodec 2016General Presentation Techniprodec 2016
General Presentation Techniprodec 2016
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINAL
 
LECTURE 01.pptx
LECTURE 01.pptxLECTURE 01.pptx
LECTURE 01.pptx
 
Chapter 2 design of production system
Chapter 2  design of production systemChapter 2  design of production system
Chapter 2 design of production system
 
Reducing costs with condition based maintenance, IBC conference Singapore, 2010
Reducing costs with condition based maintenance, IBC conference Singapore, 2010Reducing costs with condition based maintenance, IBC conference Singapore, 2010
Reducing costs with condition based maintenance, IBC conference Singapore, 2010
 

More from Mohit Singla

More from Mohit Singla (20)

Work vs. prison
Work vs. prisonWork vs. prison
Work vs. prison
 
Word of mouth
Word of mouthWord of mouth
Word of mouth
 
Why the moon
Why the moonWhy the moon
Why the moon
 
What if
What ifWhat if
What if
 
Value of food
Value of foodValue of food
Value of food
 
Universe
UniverseUniverse
Universe
 
Trust
TrustTrust
Trust
 
Time management
Time managementTime management
Time management
 
Three shakti’s
Three shakti’sThree shakti’s
Three shakti’s
 
The salary theorem
The salary theoremThe salary theorem
The salary theorem
 
The partition of india
The partition of indiaThe partition of india
The partition of india
 
The lost mumbai
The lost mumbaiThe lost mumbai
The lost mumbai
 
The digestive system
The digestive systemThe digestive system
The digestive system
 
The art of being well
The art of being wellThe art of being well
The art of being well
 
The 90 10 principle
The 90 10 principleThe 90 10 principle
The 90 10 principle
 
The 7 habits of highly effective people
The 7 habits of highly effective peopleThe 7 habits of highly effective people
The 7 habits of highly effective people
 
Ten ways to get rich
Ten ways to get richTen ways to get rich
Ten ways to get rich
 
Ten commandments of time
Ten commandments of timeTen commandments of time
Ten commandments of time
 
Team stages
Team   stagesTeam   stages
Team stages
 
Taguchi quality guru
Taguchi quality guruTaguchi quality guru
Taguchi quality guru
 

Total Productivity Maintenance: Zero Defects, Breakdowns, Losses

  • 2. TPM : Zero sum approach • Zero defects • Zero breakdowns • Zero losses
  • 3. Total productivity maintenance Total Productive Maintenance is productive maintenance involving total participation for increased productivity.
  • 4. Why TPM: Downtime (a) Breakdowns due to equipment failure. (b) Setup and adjustment e.g . exchange of die injection moulding machines etc.
  • 5. Why TPM - Speed losses (a) Idling and minor stoppages e.g. abnormal operations of sensors (b) Reduced speed e.g. discrepancies between design and actual speed of equipment
  • 6. Why TPM - Defects (a) Defect in process and rework ( scrap and quality defects requiring repair ) (b) Reduced yield between machine startup and stable production.
  • 7. Requirements for TPM Maintain basic equipment conditions Maintain operating conditions Restore deterioration Correct design weaknesses Improve technical skill Expose hidden defects
  • 8. FICCI CE