The unmodified "waterfall model". Progress flows from the top to the
bottom, like a waterfall.
 Approach is simple
 It is more disciplined
 Is well structured
 the model itself progresses linearly through
discrete, easily understandable and
explainable phases
 Provides easily markable milestones in the
development process.
"Many times, thinking things out in advance saved us serious
development headaches later on. ... [on making a particular
specification change] ...
Making this change in the spec took an hour or two. If we had
made this change in code, it would have added weeks to the
schedule. I can’t tell you how strongly I believe in Big Design Up
Front, which the proponents of Extreme Programming consider
anathema.
I have consistently saved time and made better products by using
BDUF and I’m proud to use it, no matter what the XP fanatics
claim. They’re just wrong on this point and I can’t be any clearer
than that.“
- Joel Spolsky
 Software projects that are stable
 Unchanging requirements
 Where it is possible that designers will be
able to fully predict problems
 Where it is possible that designers produce a
correct design
Introduction to Scrum.ppt
 A bug found in the early stages is cheaper in
money, effort, and time, to fix than the same
bug found later on in the process.
 An early defect that is left undetected until
development or maintenance is estimated to
cost 50 to 200 times as much to fix as it
would have cost to fix at requirements time
 BDUF is poorly adaptable to changing requirements
 BDUF assumes that designers are able to foresee
problems without extensive prototyping.
 There is an overhead to be balanced between the time
spent planning and the time that fixing a defect would
actually cost.
 In most projects there is a significant lack of
comprehensive written requirements.
 In BDUF a lot of assumptions are made that later
prove to be false
e.g. The program's design should be perfect
before people begin to implement the design
 Doesn’t handle change very well
 Requirements specifications are an abstraction
and can be interpreted differently
 Business engagement is high at the start of the
project but then tapers off
 Insufficient testing during development
 Late integration
 QA is trailer-hitched, so quality isn’t baked in
and testing gets crunched at the end
 Progress measured by task % complete
 Often don’t know until it’s too late
 Whole project planned up-front
Introduction to Scrum.ppt
 16.1 % of projects as successful
 31.1% of software development projects get cancelled
 52.7% do not meet their original cost
Conclusion:
 The organization is immature and to aim for more
maturity
 More requirements documentation, more analysis,
more planning and tracking
"The Roman bridges of antiquity were very
inefficient structures.
By modern standards, they used too much
stone, and as a result, far too much labour to
build.
Over the years we have learned to build
bridges more efficiently, using fewer
materials and less labour to perform the
same task.―
-Tom Clancy (The Sum of All Fears)
 Business practices that accommodate
changes.
 Flexible model
Project Success Factors Points
1. User Involvement 19
2. Executive Management Support 16
3. Clear Statement of Requirements 15
4. Proper Planning 11
5. Realistic Expectations 10
6. Smaller Project Milestones 9
7. Competent Staff 8
8. Ownership 6
9. Clear Vision & Objectives 3
10. Hard-Working, Focused Staff 3
TOTAL 100
Introduction to Scrum.ppt
Introduction to Scrum.ppt
 Adaptive, empirical process
 Small repeating cycles
 Short-term planning with constant feedback,
inspection and adaptation
 Fail-early lifecycle
 Breaks complex projects down into simpler mini-projects
 Accommodates change easily
 Improves ROI
 Increased business involvement and satisfaction
 Increased visibility
 Lower development risk, higher quality, less defects
 Produce incremental product quickly
 Progress measured by running tested software
 Early and regular process improvement
 35 % of projects as successful
 19% of software development projects get
cancelled
 46% do not meet their original cost
 three reasons for the improvement in
software quality—better project management,
iterative development and the emerging Web
infrastructure.
Introduction to Scrum.ppt
Introduction to Scrum.ppt
Introduction to Scrum.ppt
 Individuals and interactions over processes
and tools
 Working software over comprehensive
documentation
 Customer collaboration over contract
negotiation
 Responding to change over following a plan
1. Customer satisfaction by rapid delivery of useful software
2. Welcome changing requirements, even late in development
3. Working software is delivered frequently
4. Working software is the principal measure of progress
5. Sustainable development, able to maintain a constant pace
6. Close, co-operation between business people and developers
7. Face-to-face conversation is the best form of communication
Projects are built around motivated individuals, who should be
trusted
8. Continuous attention to technical excellence and good design
9. Simplicity
10. Self-organizing teams
11. Regular adaptation to changing circumstances
 Agile Modeling
 Agile Unified Process (AUP)
 Dynamic Systems Development Method
(DSDM)
 Essential Unified Process (EssUP)
 Extreme Programming (XP)
 Feature Driven Development (FDD)
 Open Unified Process (OpenUP)
 Scrum
 Velocity tracking
Scrum
 Simple and scaleable
 Empirical process
 Short-term detailed planning with constant feedback
provides simple inspect and adapt cycle
 Simple techniques and work artifacts
 Requirements are captured as user stories in a list of
product backlog
 Progress is made in Sprints
 Teams collaborating with the Product Owner
 Optimises working environment
 Reduces organisational overhead
 Detects everything that gets in the way of delivery
 Fosters openness and demands visibility
 Contains all potential features, prioritized as an
absolute ordering by business value.
 It is therefore the ―What‖ that will be built, sorted
by importance.
 It contains rough estimates of both business
value and development effort.
 Those estimates help the Product Owner to
gauge the timeline and, to a limited extent
prioritize.
 Captures Product Vision
 Represents the voice of the customer
 Creates initial Product Backlog
 Writes customer-centric items
 Helps set the direction of the product
 Accountable for ensuring that the Team delivers value to the
business
 Responsible for:
◦ Product Backlog
◦ Prioritization
 Using story points instead of hours
 numeric sizing (1 through 10)
 t-shirt sizes (XS, S, M, L, XL, XXL, XXXL)
 Powers-of-2 (1,2,4,8...)
 the Fibonacci sequence (1, 2, 3, 5, 8, 13, 21, 34, etc.)
 Planning Poker
 Basing on historical trends
 The best people to make the estimates are the people who build the
product.
 These are the people who build products,
make estimates
 Scrum recommends team sizes of 7
 The teams are cross functional
 Combination of Coach, Fixer and Gatekeeper.
 Make sure the project is progressing
smoothly
 Every team member has the tool they need to
get the job done
 Sets meetings
 Monitors the work done
 Facilitates release planning
 to protect the team and keep them focused
on the tasks at hand
 servant-leader
 Three core roles and a range of ancillary roles
 Core Scrum roles:
◦ Product Owner
◦ Team
◦ Scrum Master
 Ancillary roles:
◦ Stakeholders (customers, vendors)
◦ Managers (including Project Managers)
Introduction to Scrum.ppt
 Start with the Product Backlog items
 Identify features to put into release
 Team prioritizes the features
 Is an iteration
 Can have 1 day of sprint planning, 4 days of work
and 1 day of sprint review
 Sprints are short duration milestones
 Sprints range from a couple of days to 30 days
 Need atleast 4 to a dozen sprints to get to the
release
 Break Release backlog items into several
tasks
 each sprint should deliver a fully tested
product with all the features of that sprint
backlog 100% complete
 late finish of the sprint is a great indicator
that the project is not on schedule
Introduction to Scrum.ppt
Actual estimates for each
feature in the backlog
during the initial planning
process
Actual estimates for each
feature in the backlog
during the initial planning
process
Daily progress on one
ore more features is
updated by team
member by updating the
amount of time
remaining for each of
their items
Introduction to Scrum.ppt
 Tracks bugs separately from features in their
own Defect Backlog
 Any bug found relating to the feature should
be dealt with immediately before marking the
feature complete
 Plan for 1-2 sprints focused only on Defect
backlogs
 Should not last more than 15 minutes.
 The meeting starts precisely on time.
 Every team member has to answer 3
questions –
◦ What have I done since last meeting?
◦ What will I do until next meeting?
◦ What problems do I have?
 ScrumMaster to facilitate resolution of these
impediments
 resolution should occur outside the Daily
Scrum itself to keep it under 15 minutes
Capitalizing software development costs – waterfall, agile
and cloud.
 Waterfall model
 Agile methodologies
 Cloud
 Preliminary project stage or evaluation phase
◦ essentially R&D costs, and are charged to opex
 Software development or application
configuration phase.
◦ Capex, because the end result is an asset.
 Post implementation or production phase
◦ This is opex because these are day-to-day running
costs
 Enterprise software licenses are capex, but the
corresponding annual maintenance costs are opex.
 Functional design is opex and technical design is capex,
but the border between the two can be blurred when done
by collaborative teams.
 Production upgrades or enhancements are capitalizable,
whereas maintenance and bug fixing are not, even though
they both have development costs.
 An ERP-to-CRM order entry interface is a capital cost,
whereas a one-time ERP-to-CRM data migration interface
is an expense.
 Software as a Service or SaaS is pure opex. Even if you end
up customizing a SaaS application, the development costs
will still be opex because you are renting.
 it is not the activity in itself that is
capitalizable, but rather the outcome of that
activity and the ownership of the resulting
asset.
 According to FASB, technological feasibility can be
based on either a detailed design or a working
product:
◦ Detailed design: ―The detail design of a computer software
product that takes product function, feature, and technical
requirements to their most detailed, logical form and is
ready for coding‖.
◦ Working model (or prototype): ―An operative version of the
computer software product that is completed in the same
software language as the product to be ultimately
marketed, performs all the major functions planned for the
product, and is ready for initial customer testing (usually
identified as beta testing)‖
 In Scrum, technological feasibility is reached after
a number of iterations after which capitalization
can start
 Amount of development costs which can be
capitalized is less as compared to waterfall’s
detailed design up-front approach
 Iterative development generally requires far less
time to reach technological feasibility compared
to waterfall, which is heavily front-loaded with
opex prior to the start of development.
 A waterfall or an agile project can be developed and run
either on-premises or in the cloud
 For IaaS and PaaS
◦ Capex vs opex rules apply when developing the software using
agile or waterfall.
 For Saas,
◦ There is no software assets created by the client
◦ So, even if you end up customizing your SaaS CRM application, for
example, the development costs will still be opex because you are
renting. You don’t own the asset, ie it doesn’t sit on your
company’s balance sheet.
 Public SaaS is therefore pure opex, and the capex vs opex
rules for waterfall and agile do not apply.
Lean startup solutions
We help you answer the question-‖Can a sustainable business be
built around this set of products and services?‖ and ―How can
we raise investment to do so?‖ We help startups follow the lean
startup approach by providing tools to test a vision
continuously.
We help you right from building each component of a sustainable
business model to weaving a financial model based on
extensive market research to producing VC-friendly attractive
data driven business plans.
We strictly follow the Lean Startup methodologies and tools
throughout our approach to help you solve real problems and
provide detailed specifications of what needs to be done to
build solution.
 ValueFacture Lean Startup Consultant
http://www.valuefacture.in
 Email me at
◦ Mohan@valuefacture.com
◦ Mohan.Late@gmail.com
 Skype me at
◦ mohan.late
Disclaimer : No animals (pigs/chickens) were harmed in the making of this presentation.
1 de 53

Recomendados

Scrum 101: Introduction to ScrumScrum 101: Introduction to Scrum
Scrum 101: Introduction to ScrumArrielle Mali
35.7K visualizações33 slides
What Is Agile ScrumWhat Is Agile Scrum
What Is Agile ScrumMichael Bourque
7.9K visualizações33 slides
Agile Scrum MethodologyAgile Scrum Methodology
Agile Scrum MethodologyRajeev Misra
105.5K visualizações29 slides
Agile Scrum Presentation-DetailedAgile Scrum Presentation-Detailed
Agile Scrum Presentation-DetailedPrashaanth T R
3.3K visualizações47 slides
Agile - Scrum PresentationAgile - Scrum Presentation
Agile - Scrum Presentationgihanlsw
2K visualizações18 slides
Scrum - Agile MethodologyScrum - Agile Methodology
Scrum - Agile MethodologyNiel Deckx
5.1K visualizações70 slides

Mais conteúdo relacionado

Mais procurados

Scrum 101 Scrum 101
Scrum 101 Ozgur Ertem
1.2K visualizações29 slides
Scrum ProcessScrum Process
Scrum ProcessJohn Lewis
15.2K visualizações21 slides
The Scrum PresentationThe Scrum Presentation
The Scrum PresentationOmar Morales
2.3K visualizações29 slides
Scrum pptScrum ppt
Scrum pptKishore Chava
9.5K visualizações26 slides
2017 Scrum by Picture2017 Scrum by Picture
2017 Scrum by PicturePawel Lewinski
2.2K visualizações36 slides

Mais procurados(20)

Scrum 101 Scrum 101
Scrum 101
Ozgur Ertem1.2K visualizações
Scrum ProcessScrum Process
Scrum Process
John Lewis15.2K visualizações
The Scrum PresentationThe Scrum Presentation
The Scrum Presentation
Omar Morales2.3K visualizações
Scrum pptScrum ppt
Scrum ppt
Kishore Chava9.5K visualizações
Introduction agile scrum methodologyIntroduction agile scrum methodology
Introduction agile scrum methodology
Amit Verma1K visualizações
2017 Scrum by Picture2017 Scrum by Picture
2017 Scrum by Picture
Pawel Lewinski2.2K visualizações
Agile Software Development OverviewAgile Software Development Overview
Agile Software Development Overview
sunilkumar_2.9K visualizações
Scrum 101Scrum 101
Scrum 101
beLithe3.6K visualizações
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
Serge Rehem12.1K visualizações
Certified ScrumMaster TrainingCertified ScrumMaster Training
Certified ScrumMaster Training
borisgloger consulting GmbH3.7K visualizações
Agile Process IntroductionAgile Process Introduction
Agile Process Introduction
Nguyen Hai12.7K visualizações
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basics
Arun R2K visualizações
SCRUM – Agile MethodologySCRUM – Agile Methodology
SCRUM – Agile Methodology
Achchuthan Seetharan7.8K visualizações
What is ScrumWhat is Scrum
What is Scrum
Robert de Wolff5.7K visualizações
AGILE METHODOLOGYAGILE METHODOLOGY
AGILE METHODOLOGY
Deepak Agrawal1K visualizações
Scrum In 15 MinutesScrum In 15 Minutes
Scrum In 15 Minutes
Srikanth Shreenivas91.9K visualizações
Agile methodologyAgile methodology
Agile methodology
Dhruv Kumar1.1K visualizações
Agile Methodology pptAgile Methodology ppt
Agile Methodology ppt
OECLIB Odisha Electronics Control Library4K visualizações
ScrumScrum
Scrum
Balaji Sathram6K visualizações
Introduction To ScrumIntroduction To Scrum
Introduction To Scrum
Dave Neuman3.6K visualizações

Destaque

Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile MethodologyHaresh Karkar
251.5K visualizações25 slides
Agile Software Development OverviewAgile Software Development Overview
Agile Software Development OverviewStewart Rogers
96.6K visualizações32 slides
Agile MethodologyAgile Methodology
Agile MethodologySuresh Krishna Madhuvarsu
21.3K visualizações40 slides
Agile Methodology PPTAgile Methodology PPT
Agile Methodology PPTMohit Kumar
69.6K visualizações35 slides
Agile presentationAgile presentation
Agile presentationinfolock
53.3K visualizações26 slides

Destaque(18)

Overview of Agile MethodologyOverview of Agile Methodology
Overview of Agile Methodology
Haresh Karkar251.5K visualizações
Agile Software Development OverviewAgile Software Development Overview
Agile Software Development Overview
Stewart Rogers96.6K visualizações
Agile MethodologyAgile Methodology
Agile Methodology
Suresh Krishna Madhuvarsu21.3K visualizações
Agile Methodology PPTAgile Methodology PPT
Agile Methodology PPT
Mohit Kumar69.6K visualizações
Physically securing the wireless installationPhysically securing the wireless installation
Physically securing the wireless installation
Aruba, a Hewlett Packard Enterprise company4.1K visualizações
Agile presentationAgile presentation
Agile presentation
infolock53.3K visualizações
Scrum introductionScrum introduction
Scrum introduction
Martin Gasparovic931 visualizações
Running a Scrum process with TrelloRunning a Scrum process with Trello
Running a Scrum process with Trello
Robin Warren1.1K visualizações
What is scrum in Agile methodology?What is scrum in Agile methodology?
What is scrum in Agile methodology?
Mario Lucero1.5K visualizações
Scrum by pictureScrum by picture
Scrum by picture
Pawel Lewinski1.8K visualizações
Get Up! Stand Up!Get Up! Stand Up!
Get Up! Stand Up!
Oleksandr Lutsaievskyi11.2K visualizações
Learn Scrum Engineering in 5 minutesLearn Scrum Engineering in 5 minutes
Learn Scrum Engineering in 5 minutes
guest035e0d26.3K visualizações
Agile Methodology(SCRUM)Agile Methodology(SCRUM)
Agile Methodology(SCRUM)
KhushSlideShare7K visualizações
Scrum process powerpoint ppt slides.Scrum process powerpoint ppt slides.
Scrum process powerpoint ppt slides.
SlideTeam.net24.7K visualizações
Agile Scrum software methodologyAgile Scrum software methodology
Agile Scrum software methodology
Abdullah Raza2.6K visualizações
The Scrum ModelThe Scrum Model
The Scrum Model
Damian T. Gordon12.8K visualizações
Agile Is the New WaterfallAgile Is the New Waterfall
Agile Is the New Waterfall
Naresh Jain68.1K visualizações

Similar a Introduction to Scrum.ppt

Introduction to scrumIntroduction to scrum
Introduction to scrumJohnny Zraiby ☁
222 visualizações34 slides
Introduction to scrum agileIntroduction to scrum agile
Introduction to scrum agileJohnny Zraiby ☁
175 visualizações34 slides
Chapter 2 Chapter 2
Chapter 2 KaiEnTee1
19 visualizações57 slides

Similar a Introduction to Scrum.ppt(20)

Software Development Methodologies Software Development Methodologies
Software Development Methodologies
Frances Coronel65 visualizações
Introduction to scrumIntroduction to scrum
Introduction to scrum
Johnny Zraiby ☁222 visualizações
Introduction to scrum agileIntroduction to scrum agile
Introduction to scrum agile
Johnny Zraiby ☁175 visualizações
Software Development Process Models (SCRUM Methodology)Software Development Process Models (SCRUM Methodology)
Software Development Process Models (SCRUM Methodology)
Muhammad Ahmed3.7K visualizações
Chapter 2 Chapter 2
Chapter 2
KaiEnTee119 visualizações
CAI - Agile Scrum Development PresentationCAI - Agile Scrum Development Presentation
CAI - Agile Scrum Development Presentation
deyoepw4.7K visualizações
Lect7Lect7
Lect7
Sulman Ahmed62 visualizações
Lect7Lect7
Lect7
Sulman Ahmed28 visualizações
Agile software development Agile software development
Agile software development
saurabh goel230 visualizações
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
Saqib Raza38K visualizações
Close to agileClose to agile
Close to agile
philywu2K visualizações
Working Agile with Scrum and TFS 2013Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013
Moataz Nabil8.1K visualizações
Scrum overviewScrum overview
Scrum overview
Robert Bastian1.1K visualizações
Introduction to Agile & scrumIntroduction to Agile & scrum
Introduction to Agile & scrum
Elad Sofer797 visualizações
Agile Manifesto & XPAgile Manifesto & XP
Agile Manifesto & XP
Semen Arslan1.1K visualizações
A Pattern-Language-for-software-DevelopmentA Pattern-Language-for-software-Development
A Pattern-Language-for-software-Development
Shiraz316206 visualizações
Agile and its impact to Project Management 022218.pptxAgile and its impact to Project Management 022218.pptx
Agile and its impact to Project Management 022218.pptx
PerumalPitchandi28 visualizações
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
Sibel Kuzgun AKIN176 visualizações
Agile Development OverviewAgile Development Overview
Agile Development Overview
Mark Kovacevich381 visualizações
Agile Development OverviewAgile Development Overview
Agile Development Overview
guestb4c7702.2K visualizações

Último(20)

PROGRAMME.pdfPROGRAMME.pdf
PROGRAMME.pdf
HiNedHaJar64 visualizações
Voice Broadcasting - A Web Based Voice PromotionVoice Broadcasting - A Web Based Voice Promotion
Voice Broadcasting - A Web Based Voice Promotion
Nirmal Sharma18 visualizações
23BBA10204-ASHNISH KUMAR.pdf23BBA10204-ASHNISH KUMAR.pdf
23BBA10204-ASHNISH KUMAR.pdf
shreyajha73121 visualizações
chung chi tam compact chiu axitchung chi tam compact chiu axit
chung chi tam compact chiu axit
MaiThiAnh10 visualizações
Effective Supervisory SkillEffective Supervisory Skill
Effective Supervisory Skill
Seta Wicaksana13 visualizações
TNR Gold Shotgun Gold Project PresentationTNR Gold Shotgun Gold Project Presentation
TNR Gold Shotgun Gold Project Presentation
Kirill Klip40 visualizações
Personal Brand Exploration - Gray LeePersonal Brand Exploration - Gray Lee
Personal Brand Exploration - Gray Lee
grayl340 visualizações
Ceramic Grinding Roller.pdfCeramic Grinding Roller.pdf
Ceramic Grinding Roller.pdf
TomasChien217 visualizações
ANTHROPOIDS WHITE PAPER.pdfANTHROPOIDS WHITE PAPER.pdf
ANTHROPOIDS WHITE PAPER.pdf
Anthropoids Nfts 34 visualizações
TOP SEO MISTAKES TO AVOIDTOP SEO MISTAKES TO AVOID
TOP SEO MISTAKES TO AVOID
nihadudigital23 visualizações
Greece opens countless opportunities for techiesGreece opens countless opportunities for techies
Greece opens countless opportunities for techies
Abhinav Immigration Services Pvt. Ltd.16 visualizações
The Business Tycoons(March-2023) - Womens Day MagazineThe Business Tycoons(March-2023) - Womens Day Magazine
The Business Tycoons(March-2023) - Womens Day Magazine
Global India Business Forum14 visualizações
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
Operational Excellence Consulting (Singapore)30 visualizações
How do I select the right EBARA pressure pump for my needs? How do I select the right EBARA pressure pump for my needs?
How do I select the right EBARA pressure pump for my needs?
KK Tech Eco Products13 visualizações
Motorcycle - Scooter license plate holder.pdfMotorcycle - Scooter license plate holder.pdf
Motorcycle - Scooter license plate holder.pdf
JAWADIQBAL40176 visualizações

Introduction to Scrum.ppt

  • 2. The unmodified "waterfall model". Progress flows from the top to the bottom, like a waterfall.
  • 3.  Approach is simple  It is more disciplined  Is well structured  the model itself progresses linearly through discrete, easily understandable and explainable phases  Provides easily markable milestones in the development process.
  • 4. "Many times, thinking things out in advance saved us serious development headaches later on. ... [on making a particular specification change] ... Making this change in the spec took an hour or two. If we had made this change in code, it would have added weeks to the schedule. I can’t tell you how strongly I believe in Big Design Up Front, which the proponents of Extreme Programming consider anathema. I have consistently saved time and made better products by using BDUF and I’m proud to use it, no matter what the XP fanatics claim. They’re just wrong on this point and I can’t be any clearer than that.“ - Joel Spolsky
  • 5.  Software projects that are stable  Unchanging requirements  Where it is possible that designers will be able to fully predict problems  Where it is possible that designers produce a correct design
  • 7.  A bug found in the early stages is cheaper in money, effort, and time, to fix than the same bug found later on in the process.  An early defect that is left undetected until development or maintenance is estimated to cost 50 to 200 times as much to fix as it would have cost to fix at requirements time
  • 8.  BDUF is poorly adaptable to changing requirements  BDUF assumes that designers are able to foresee problems without extensive prototyping.  There is an overhead to be balanced between the time spent planning and the time that fixing a defect would actually cost.  In most projects there is a significant lack of comprehensive written requirements.  In BDUF a lot of assumptions are made that later prove to be false e.g. The program's design should be perfect before people begin to implement the design
  • 9.  Doesn’t handle change very well  Requirements specifications are an abstraction and can be interpreted differently  Business engagement is high at the start of the project but then tapers off  Insufficient testing during development  Late integration  QA is trailer-hitched, so quality isn’t baked in and testing gets crunched at the end  Progress measured by task % complete  Often don’t know until it’s too late  Whole project planned up-front
  • 11.  16.1 % of projects as successful  31.1% of software development projects get cancelled  52.7% do not meet their original cost Conclusion:  The organization is immature and to aim for more maturity  More requirements documentation, more analysis, more planning and tracking
  • 12. "The Roman bridges of antiquity were very inefficient structures. By modern standards, they used too much stone, and as a result, far too much labour to build. Over the years we have learned to build bridges more efficiently, using fewer materials and less labour to perform the same task.― -Tom Clancy (The Sum of All Fears)
  • 13.  Business practices that accommodate changes.  Flexible model
  • 14. Project Success Factors Points 1. User Involvement 19 2. Executive Management Support 16 3. Clear Statement of Requirements 15 4. Proper Planning 11 5. Realistic Expectations 10 6. Smaller Project Milestones 9 7. Competent Staff 8 8. Ownership 6 9. Clear Vision & Objectives 3 10. Hard-Working, Focused Staff 3 TOTAL 100
  • 17.  Adaptive, empirical process  Small repeating cycles  Short-term planning with constant feedback, inspection and adaptation  Fail-early lifecycle
  • 18.  Breaks complex projects down into simpler mini-projects  Accommodates change easily  Improves ROI  Increased business involvement and satisfaction  Increased visibility  Lower development risk, higher quality, less defects  Produce incremental product quickly  Progress measured by running tested software  Early and regular process improvement
  • 19.  35 % of projects as successful  19% of software development projects get cancelled  46% do not meet their original cost  three reasons for the improvement in software quality—better project management, iterative development and the emerging Web infrastructure.
  • 23.  Individuals and interactions over processes and tools  Working software over comprehensive documentation  Customer collaboration over contract negotiation  Responding to change over following a plan
  • 24. 1. Customer satisfaction by rapid delivery of useful software 2. Welcome changing requirements, even late in development 3. Working software is delivered frequently 4. Working software is the principal measure of progress 5. Sustainable development, able to maintain a constant pace 6. Close, co-operation between business people and developers 7. Face-to-face conversation is the best form of communication Projects are built around motivated individuals, who should be trusted 8. Continuous attention to technical excellence and good design 9. Simplicity 10. Self-organizing teams 11. Regular adaptation to changing circumstances
  • 25.  Agile Modeling  Agile Unified Process (AUP)  Dynamic Systems Development Method (DSDM)  Essential Unified Process (EssUP)  Extreme Programming (XP)  Feature Driven Development (FDD)  Open Unified Process (OpenUP)  Scrum  Velocity tracking
  • 26. Scrum
  • 27.  Simple and scaleable  Empirical process  Short-term detailed planning with constant feedback provides simple inspect and adapt cycle  Simple techniques and work artifacts  Requirements are captured as user stories in a list of product backlog  Progress is made in Sprints  Teams collaborating with the Product Owner  Optimises working environment  Reduces organisational overhead  Detects everything that gets in the way of delivery  Fosters openness and demands visibility
  • 28.  Contains all potential features, prioritized as an absolute ordering by business value.  It is therefore the ―What‖ that will be built, sorted by importance.  It contains rough estimates of both business value and development effort.  Those estimates help the Product Owner to gauge the timeline and, to a limited extent prioritize.
  • 29.  Captures Product Vision  Represents the voice of the customer  Creates initial Product Backlog  Writes customer-centric items  Helps set the direction of the product  Accountable for ensuring that the Team delivers value to the business  Responsible for: ◦ Product Backlog ◦ Prioritization
  • 30.  Using story points instead of hours  numeric sizing (1 through 10)  t-shirt sizes (XS, S, M, L, XL, XXL, XXXL)  Powers-of-2 (1,2,4,8...)  the Fibonacci sequence (1, 2, 3, 5, 8, 13, 21, 34, etc.)  Planning Poker  Basing on historical trends  The best people to make the estimates are the people who build the product.
  • 31.  These are the people who build products, make estimates  Scrum recommends team sizes of 7  The teams are cross functional
  • 32.  Combination of Coach, Fixer and Gatekeeper.  Make sure the project is progressing smoothly  Every team member has the tool they need to get the job done  Sets meetings  Monitors the work done  Facilitates release planning  to protect the team and keep them focused on the tasks at hand  servant-leader
  • 33.  Three core roles and a range of ancillary roles  Core Scrum roles: ◦ Product Owner ◦ Team ◦ Scrum Master  Ancillary roles: ◦ Stakeholders (customers, vendors) ◦ Managers (including Project Managers)
  • 35.  Start with the Product Backlog items  Identify features to put into release  Team prioritizes the features
  • 36.  Is an iteration  Can have 1 day of sprint planning, 4 days of work and 1 day of sprint review  Sprints are short duration milestones  Sprints range from a couple of days to 30 days  Need atleast 4 to a dozen sprints to get to the release
  • 37.  Break Release backlog items into several tasks  each sprint should deliver a fully tested product with all the features of that sprint backlog 100% complete  late finish of the sprint is a great indicator that the project is not on schedule
  • 39. Actual estimates for each feature in the backlog during the initial planning process
  • 40. Actual estimates for each feature in the backlog during the initial planning process Daily progress on one ore more features is updated by team member by updating the amount of time remaining for each of their items
  • 42.  Tracks bugs separately from features in their own Defect Backlog  Any bug found relating to the feature should be dealt with immediately before marking the feature complete  Plan for 1-2 sprints focused only on Defect backlogs
  • 43.  Should not last more than 15 minutes.  The meeting starts precisely on time.  Every team member has to answer 3 questions – ◦ What have I done since last meeting? ◦ What will I do until next meeting? ◦ What problems do I have?  ScrumMaster to facilitate resolution of these impediments  resolution should occur outside the Daily Scrum itself to keep it under 15 minutes
  • 44. Capitalizing software development costs – waterfall, agile and cloud.
  • 45.  Waterfall model  Agile methodologies  Cloud
  • 46.  Preliminary project stage or evaluation phase ◦ essentially R&D costs, and are charged to opex  Software development or application configuration phase. ◦ Capex, because the end result is an asset.  Post implementation or production phase ◦ This is opex because these are day-to-day running costs
  • 47.  Enterprise software licenses are capex, but the corresponding annual maintenance costs are opex.  Functional design is opex and technical design is capex, but the border between the two can be blurred when done by collaborative teams.  Production upgrades or enhancements are capitalizable, whereas maintenance and bug fixing are not, even though they both have development costs.  An ERP-to-CRM order entry interface is a capital cost, whereas a one-time ERP-to-CRM data migration interface is an expense.  Software as a Service or SaaS is pure opex. Even if you end up customizing a SaaS application, the development costs will still be opex because you are renting.
  • 48.  it is not the activity in itself that is capitalizable, but rather the outcome of that activity and the ownership of the resulting asset.
  • 49.  According to FASB, technological feasibility can be based on either a detailed design or a working product: ◦ Detailed design: ―The detail design of a computer software product that takes product function, feature, and technical requirements to their most detailed, logical form and is ready for coding‖. ◦ Working model (or prototype): ―An operative version of the computer software product that is completed in the same software language as the product to be ultimately marketed, performs all the major functions planned for the product, and is ready for initial customer testing (usually identified as beta testing)‖
  • 50.  In Scrum, technological feasibility is reached after a number of iterations after which capitalization can start  Amount of development costs which can be capitalized is less as compared to waterfall’s detailed design up-front approach  Iterative development generally requires far less time to reach technological feasibility compared to waterfall, which is heavily front-loaded with opex prior to the start of development.
  • 51.  A waterfall or an agile project can be developed and run either on-premises or in the cloud  For IaaS and PaaS ◦ Capex vs opex rules apply when developing the software using agile or waterfall.  For Saas, ◦ There is no software assets created by the client ◦ So, even if you end up customizing your SaaS CRM application, for example, the development costs will still be opex because you are renting. You don’t own the asset, ie it doesn’t sit on your company’s balance sheet.  Public SaaS is therefore pure opex, and the capex vs opex rules for waterfall and agile do not apply.
  • 52. Lean startup solutions We help you answer the question-‖Can a sustainable business be built around this set of products and services?‖ and ―How can we raise investment to do so?‖ We help startups follow the lean startup approach by providing tools to test a vision continuously. We help you right from building each component of a sustainable business model to weaving a financial model based on extensive market research to producing VC-friendly attractive data driven business plans. We strictly follow the Lean Startup methodologies and tools throughout our approach to help you solve real problems and provide detailed specifications of what needs to be done to build solution.
  • 53.  ValueFacture Lean Startup Consultant http://www.valuefacture.in  Email me at ◦ Mohan@valuefacture.com ◦ Mohan.Late@gmail.com  Skype me at ◦ mohan.late Disclaimer : No animals (pigs/chickens) were harmed in the making of this presentation.