SlideShare uma empresa Scribd logo
1 de 32
Ambitions: an opportunity for the whole region.
1. Iconic.
Attracted appearance set up a brand effect for Thialf, also becomes an
identity for the whole region.

2. Multifunction
Involve parts of the city function inside the project.
Opportunities( job, money..) for both Thialf and local dwellers.
Ice rink based local economy could be apart from the dependence of
the government.

3. Sustainable.
Climate strategy.
Structure solutions.
Material choose and quantity use.
Keep the foundation of the existing track.
Highway entrance




                                                                                                               Site
            Railway

                                                    Rail station


Urban analyze: Traffic situation shows a good quality of      connecting the site with other regions, which is
significant for bringing customers and selling iconic appearance as a brand to the passing passengers on the train and
bus. This also determines the layout of the founctions.




                  Rail station
                                                                   Bus and car
                                                                   entrance
Different layout attempt.           Chosen layout of the tracks .       Expansion of the site.
Based on remain the foundation      The main entrance next to the       Beyond the boundary effect of
of the existing ice track and the   rail station and the road cross.    the rails, transfer it into
ice hockey stadium.                                                     advantage.
                                    The supermarket will be
                                    combined as parts of the project.   Rise the function level of the
                                    It will focus the specificity on    training. Provide spaces and
                                    skating.                            facilities for research of ice
                                                                        racing. High level of profession
                                                                        brings high level of reputation.
Concept One: Mountain




-Experience top view
-Mountain/hill path
-Feel the shape of the roof
Munich Olympic Park




- Mountain/hill path
-Experience top view
-Feel the shape of the roof
Structure strategy: space column based, multi-type combined structure.
The whole building structure is a combination of different structure types.
The choose of the structure type is based on aspects such as function, climate
design, sustainable strategy, and so on.
Climate strategy one: climate facilities inside space columns. The columns play a chimney effect.




    Sendai Mediatheque




               Air flow
Climate strategy two:
Solar shading on top of the tracks. Prevent too much heat and absorb solar power.




                        Solar gain




  -Taiwan stadium 2009 World Games
  -8,844 solar panels/1.14 million KWh per year
Climate strategy three:
Rain water collection for toilets.




                                     -Castle in Gniew Poland. Rain collection roof
Envelop strategy: The choose of material based on function sustainability and other significant aspects .
forest



lake
Inspiration from forest




Pictures taken in the forest near the site
Structure strategy: Separated columns & Big span structure




                                      Big span               columns
Referrence
Proposal
                                     Referrence




    Structure:
    Separated Columns
Structure:
Big span stadium
Climate strategy




  Water collection system for toilets   Solar panel generating system
Climate strategy
Envelop strategy: The choose of material based on function sustainability and other significant aspects .

Mais conteúdo relacionado

Mais procurados

Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationCity of College Station
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21CramondandBarntonCom
 
Altamash portfolio final - 2016.02.29
Altamash portfolio   final - 2016.02.29Altamash portfolio   final - 2016.02.29
Altamash portfolio final - 2016.02.29Altamash Khan
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationCity of College Station
 
SLC RAC Sports Complex 2013
SLC RAC Sports Complex 2013SLC RAC Sports Complex 2013
SLC RAC Sports Complex 2013Jay Bollwinkel
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Planawweiss
 
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPmaria laura santamarina
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Phil Gray
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructurePostTensioningInstitute
 

Mais procurados (19)

Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer Presentation
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
Altamash portfolio final - 2016.02.29
Altamash portfolio   final - 2016.02.29Altamash portfolio   final - 2016.02.29
Altamash portfolio final - 2016.02.29
 
Destop case study
Destop case studyDestop case study
Destop case study
 
McKinney Place Garage
McKinney Place GarageMcKinney Place Garage
McKinney Place Garage
 
University Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer PresentationUniversity Town Center Rezoning - Developer Presentation
University Town Center Rezoning - Developer Presentation
 
City Hall Site Selection
City Hall Site SelectionCity Hall Site Selection
City Hall Site Selection
 
SLC RAC Sports Complex 2013
SLC RAC Sports Complex 2013SLC RAC Sports Complex 2013
SLC RAC Sports Complex 2013
 
Public Presentation V: Draft Master Plan
Public Presentation V: Draft Master PlanPublic Presentation V: Draft Master Plan
Public Presentation V: Draft Master Plan
 
University Town Center Rezoning
University Town Center RezoningUniversity Town Center Rezoning
University Town Center Rezoning
 
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
 
Xinxin Wang_Portfolio
Xinxin Wang_PortfolioXinxin Wang_Portfolio
Xinxin Wang_Portfolio
 
Section 2 Inventory and Assessment
Section 2  Inventory and AssessmentSection 2  Inventory and Assessment
Section 2 Inventory and Assessment
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
 
Shops at University Town Center
Shops at University Town CenterShops at University Town Center
Shops at University Town Center
 
Green Screen Parking Structure
Green Screen Parking StructureGreen Screen Parking Structure
Green Screen Parking Structure
 
Joint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking StructureJoint Traffic Management Center Parking Structure
Joint Traffic Management Center Parking Structure
 
Thoroughfare Plan Update
Thoroughfare Plan UpdateThoroughfare Plan Update
Thoroughfare Plan Update
 
Street Survey
Street SurveyStreet Survey
Street Survey
 

Destaque

XXL2012 - G3 - (Pre) Final Presentation
XXL2012 - G3 - (Pre) Final PresentationXXL2012 - G3 - (Pre) Final Presentation
XXL2012 - G3 - (Pre) Final PresentationMichela Turrin
 
XXL2013 - G2 - (Pre)Final Presentati...
XXL2013 - G2 - (Pre)Final Presentati...XXL2013 - G2 - (Pre)Final Presentati...
XXL2013 - G2 - (Pre)Final Presentati...Michela Turrin
 
XXL2012 - G2 - (Pre)final_presentation
XXL2012 - G2 - (Pre)final_presentationXXL2012 - G2 - (Pre)final_presentation
XXL2012 - G2 - (Pre)final_presentationMichela Turrin
 
Τα Νεα - Η Συνέντευξη
Τα Νεα - Η ΣυνέντευξηΤα Νεα - Η Συνέντευξη
Τα Νεα - Η ΣυνέντευξηThemis Ntamarelos
 
Fotografías de la práctica 1 grupo 5182_2014_1
Fotografías de la práctica 1 grupo 5182_2014_1Fotografías de la práctica 1 grupo 5182_2014_1
Fotografías de la práctica 1 grupo 5182_2014_1CiberGeneticaUNAM
 
XXL2010 - Team 2 - PinUp Presentation 11 Feb
XXL2010 - Team 2 - PinUp Presentation 11 Feb XXL2010 - Team 2 - PinUp Presentation 11 Feb
XXL2010 - Team 2 - PinUp Presentation 11 Feb Michela Turrin
 
14 resposta a acusação - penal
14 resposta a acusação - penal14 resposta a acusação - penal
14 resposta a acusação - penalConsultor JRSantana
 

Destaque (14)

Resume wade bumgarner
Resume wade bumgarnerResume wade bumgarner
Resume wade bumgarner
 
Expo: io comincio da qui
Expo: io comincio da quiExpo: io comincio da qui
Expo: io comincio da qui
 
XXL2012 - G3 - (Pre) Final Presentation
XXL2012 - G3 - (Pre) Final PresentationXXL2012 - G3 - (Pre) Final Presentation
XXL2012 - G3 - (Pre) Final Presentation
 
XXL2013 - G2 - (Pre)Final Presentati...
XXL2013 - G2 - (Pre)Final Presentati...XXL2013 - G2 - (Pre)Final Presentati...
XXL2013 - G2 - (Pre)Final Presentati...
 
XXL2012 - G2 - (Pre)final_presentation
XXL2012 - G2 - (Pre)final_presentationXXL2012 - G2 - (Pre)final_presentation
XXL2012 - G2 - (Pre)final_presentation
 
Τα Νεα - Η Συνέντευξη
Τα Νεα - Η ΣυνέντευξηΤα Νεα - Η Συνέντευξη
Τα Νεα - Η Συνέντευξη
 
Fotografías de la práctica 1 grupo 5182_2014_1
Fotografías de la práctica 1 grupo 5182_2014_1Fotografías de la práctica 1 grupo 5182_2014_1
Fotografías de la práctica 1 grupo 5182_2014_1
 
XXL2010 - Team 2 - PinUp Presentation 11 Feb
XXL2010 - Team 2 - PinUp Presentation 11 Feb XXL2010 - Team 2 - PinUp Presentation 11 Feb
XXL2010 - Team 2 - PinUp Presentation 11 Feb
 
Unfulfilled potential Irrigation and small farmers- 2 case studies from Tanz...
Unfulfilled potential  Irrigation and small farmers- 2 case studies from Tanz...Unfulfilled potential  Irrigation and small farmers- 2 case studies from Tanz...
Unfulfilled potential Irrigation and small farmers- 2 case studies from Tanz...
 
Raghavendra
RaghavendraRaghavendra
Raghavendra
 
African Farmer-led Irrigation Development: re-framing agricultural investments?
African Farmer-led Irrigation Development: re-framing agricultural investments?African Farmer-led Irrigation Development: re-framing agricultural investments?
African Farmer-led Irrigation Development: re-framing agricultural investments?
 
Resposta a acusação - Penal
Resposta a acusação - PenalResposta a acusação - Penal
Resposta a acusação - Penal
 
14 resposta a acusação - penal
14 resposta a acusação - penal14 resposta a acusação - penal
14 resposta a acusação - penal
 
Review Presentation
Review PresentationReview Presentation
Review Presentation
 

Semelhante a XXL2013 - Team 3 - PinUp Presentation

The Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionThe Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionBrij Consulting, LLC
 
Aijaz_Aiman_Portfolio.pdf
Aijaz_Aiman_Portfolio.pdfAijaz_Aiman_Portfolio.pdf
Aijaz_Aiman_Portfolio.pdfAimanAijaz8
 
shopping mall Er.Rajesh maurya
shopping mall Er.Rajesh mauryashopping mall Er.Rajesh maurya
shopping mall Er.Rajesh mauryaRajesh Maurya
 
18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdfAkashV75
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airportNilanjana Pal
 
Landscape architecture design portfolio
Landscape architecture design portfolioLandscape architecture design portfolio
Landscape architecture design portfolioJoan Marie Tachado
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsJIT KUMAR GUPTA
 
Portfolio 28 February 2016 reduced
Portfolio 28 February 2016 reducedPortfolio 28 February 2016 reduced
Portfolio 28 February 2016 reducedNatalia Kaminska
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM tekenstudio 3D
 
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptx
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptxCLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptx
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptxcsimiyu079
 
How to Model Trees with Porous Media — Pedestrian Wind Comfort
How to Model Trees with Porous Media — Pedestrian Wind Comfort How to Model Trees with Porous Media — Pedestrian Wind Comfort
How to Model Trees with Porous Media — Pedestrian Wind Comfort SimScale
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Prasad Thanthratey
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolionikoladakic
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolionikoladakic
 

Semelhante a XXL2013 - Team 3 - PinUp Presentation (20)

+
++
+
 
Poster 3
Poster 3Poster 3
Poster 3
 
The Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionThe Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical Production
 
Aijaz_Aiman_Portfolio.pdf
Aijaz_Aiman_Portfolio.pdfAijaz_Aiman_Portfolio.pdf
Aijaz_Aiman_Portfolio.pdf
 
shopping mall Er.Rajesh maurya
shopping mall Er.Rajesh mauryashopping mall Er.Rajesh maurya
shopping mall Er.Rajesh maurya
 
18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf18ARC71_SustainableSite_AV_PDF.pdf
18ARC71_SustainableSite_AV_PDF.pdf
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
 
Landscape architecture design portfolio
Landscape architecture design portfolioLandscape architecture design portfolio
Landscape architecture design portfolio
 
Pm project 1
Pm project 1Pm project 1
Pm project 1
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural Projects
 
Portfolio 28 February 2016 reduced
Portfolio 28 February 2016 reducedPortfolio 28 February 2016 reduced
Portfolio 28 February 2016 reduced
 
Marine park design
Marine park designMarine park design
Marine park design
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM Presentation - Theunis Bridge - Dynamo BIM
Presentation - Theunis Bridge - Dynamo BIM
 
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptx
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptxCLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptx
CLINTON SIMIYU BTECH CONSTRUCTION MANAGEMENTPT.pptx
 
How to Model Trees with Porous Media — Pedestrian Wind Comfort
How to Model Trees with Porous Media — Pedestrian Wind Comfort How to Model Trees with Porous Media — Pedestrian Wind Comfort
How to Model Trees with Porous Media — Pedestrian Wind Comfort
 
RESUME-AR.VEERAMANI 5+ years exp
RESUME-AR.VEERAMANI  5+ years expRESUME-AR.VEERAMANI  5+ years exp
RESUME-AR.VEERAMANI 5+ years exp
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
Nikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural PortfolioNikola Dakic - Architectural Portfolio
Nikola Dakic - Architectural Portfolio
 
Nikola Dakic - Portfolio
Nikola Dakic - PortfolioNikola Dakic - Portfolio
Nikola Dakic - Portfolio
 

Mais de Michela Turrin

XXl2013 - G1 - (Pre)Final Presentation
XXl2013 - G1 - (Pre)Final PresentationXXl2013 - G1 - (Pre)Final Presentation
XXl2013 - G1 - (Pre)Final PresentationMichela Turrin
 
XXL2013 - G3 - (Pre)Final Presentation
XXL2013 - G3 - (Pre)Final PresentationXXL2013 - G3 - (Pre)Final Presentation
XXL2013 - G3 - (Pre)Final PresentationMichela Turrin
 
XXL2012 - G1 - (Pre)final_presentation
XXL2012 - G1 - (Pre)final_presentationXXL2012 - G1 - (Pre)final_presentation
XXL2012 - G1 - (Pre)final_presentationMichela Turrin
 
XXL2013 - Team 2 - PinUp Presentation
XXL2013 - Team 2 - PinUp PresentationXXL2013 - Team 2 - PinUp Presentation
XXL2013 - Team 2 - PinUp PresentationMichela Turrin
 
XXL2013 - Team 1 - PinUp presentation
XXL2013 - Team 1 - PinUp presentationXXL2013 - Team 1 - PinUp presentation
XXL2013 - Team 1 - PinUp presentationMichela Turrin
 
XXL Workshop 2013 - course guidelines
XXL Workshop 2013 - course guidelinesXXL Workshop 2013 - course guidelines
XXL Workshop 2013 - course guidelinesMichela Turrin
 
IFoU Summer School 2012, Beijing - Brochure
IFoU Summer School 2012, Beijing - BrochureIFoU Summer School 2012, Beijing - Brochure
IFoU Summer School 2012, Beijing - BrochureMichela Turrin
 
Lecture by Marcel de Boer - Arup
Lecture by Marcel de Boer - ArupLecture by Marcel de Boer - Arup
Lecture by Marcel de Boer - ArupMichela Turrin
 
XXl 2012 - Pin up - pictures
XXl 2012 - Pin up - picturesXXl 2012 - Pin up - pictures
XXl 2012 - Pin up - picturesMichela Turrin
 
XXL 2012 - Pin up - Team 3
XXL 2012 - Pin up - Team 3XXL 2012 - Pin up - Team 3
XXL 2012 - Pin up - Team 3Michela Turrin
 
XXL2012 - Pin up - Team 2
XXL2012 - Pin up - Team 2XXL2012 - Pin up - Team 2
XXL2012 - Pin up - Team 2Michela Turrin
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1Michela Turrin
 
Turrin Nourian Chatzikonstantinou GH Workshop
Turrin Nourian Chatzikonstantinou GH WorkshopTurrin Nourian Chatzikonstantinou GH Workshop
Turrin Nourian Chatzikonstantinou GH WorkshopMichela Turrin
 
M.Majowiecki - Stadia
M.Majowiecki - Stadia   M.Majowiecki - Stadia
M.Majowiecki - Stadia Michela Turrin
 
RobertFransen_XXLworkshop2012
RobertFransen_XXLworkshop2012RobertFransen_XXLworkshop2012
RobertFransen_XXLworkshop2012Michela Turrin
 
XXL 2012 - on the plot
XXL 2012 - on the plotXXL 2012 - on the plot
XXL 2012 - on the plotMichela Turrin
 
XXL Workshop 2012 - guidelines and schedule
XXL Workshop 2012 - guidelines and scheduleXXL Workshop 2012 - guidelines and schedule
XXL Workshop 2012 - guidelines and scheduleMichela Turrin
 
XXL Workshop 2011 - Opening
XXL Workshop 2011 - OpeningXXL Workshop 2011 - Opening
XXL Workshop 2011 - OpeningMichela Turrin
 

Mais de Michela Turrin (20)

XXl2013 - G1 - (Pre)Final Presentation
XXl2013 - G1 - (Pre)Final PresentationXXl2013 - G1 - (Pre)Final Presentation
XXl2013 - G1 - (Pre)Final Presentation
 
XXL2013 - G3 - (Pre)Final Presentation
XXL2013 - G3 - (Pre)Final PresentationXXL2013 - G3 - (Pre)Final Presentation
XXL2013 - G3 - (Pre)Final Presentation
 
XXL2012 - G1 - (Pre)final_presentation
XXL2012 - G1 - (Pre)final_presentationXXL2012 - G1 - (Pre)final_presentation
XXL2012 - G1 - (Pre)final_presentation
 
XXL2013 - Team 2 - PinUp Presentation
XXL2013 - Team 2 - PinUp PresentationXXL2013 - Team 2 - PinUp Presentation
XXL2013 - Team 2 - PinUp Presentation
 
XXL2013 - Team 1 - PinUp presentation
XXL2013 - Team 1 - PinUp presentationXXL2013 - Team 1 - PinUp presentation
XXL2013 - Team 1 - PinUp presentation
 
XXL Workshop 2013 - course guidelines
XXL Workshop 2013 - course guidelinesXXL Workshop 2013 - course guidelines
XXL Workshop 2013 - course guidelines
 
IFoU Summer School 2012, Beijing - Brochure
IFoU Summer School 2012, Beijing - BrochureIFoU Summer School 2012, Beijing - Brochure
IFoU Summer School 2012, Beijing - Brochure
 
Lecture by Marcel de Boer - Arup
Lecture by Marcel de Boer - ArupLecture by Marcel de Boer - Arup
Lecture by Marcel de Boer - Arup
 
XXl 2012 - Pin up - pictures
XXl 2012 - Pin up - picturesXXl 2012 - Pin up - pictures
XXl 2012 - Pin up - pictures
 
XXL 2012 - Pin up - Team 3
XXL 2012 - Pin up - Team 3XXL 2012 - Pin up - Team 3
XXL 2012 - Pin up - Team 3
 
XXL2012 - Pin up - Team 2
XXL2012 - Pin up - Team 2XXL2012 - Pin up - Team 2
XXL2012 - Pin up - Team 2
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1
 
Turrin Nourian Chatzikonstantinou GH Workshop
Turrin Nourian Chatzikonstantinou GH WorkshopTurrin Nourian Chatzikonstantinou GH Workshop
Turrin Nourian Chatzikonstantinou GH Workshop
 
M.Majowiecki - Stadia
M.Majowiecki - Stadia   M.Majowiecki - Stadia
M.Majowiecki - Stadia
 
RobertFransen_XXLworkshop2012
RobertFransen_XXLworkshop2012RobertFransen_XXLworkshop2012
RobertFransen_XXLworkshop2012
 
XXL 2012 - on the plot
XXL 2012 - on the plotXXL 2012 - on the plot
XXL 2012 - on the plot
 
XXL2012 on the plot
XXL2012 on the plotXXL2012 on the plot
XXL2012 on the plot
 
Turrin opening2012
Turrin opening2012Turrin opening2012
Turrin opening2012
 
XXL Workshop 2012 - guidelines and schedule
XXL Workshop 2012 - guidelines and scheduleXXL Workshop 2012 - guidelines and schedule
XXL Workshop 2012 - guidelines and schedule
 
XXL Workshop 2011 - Opening
XXL Workshop 2011 - OpeningXXL Workshop 2011 - Opening
XXL Workshop 2011 - Opening
 

XXL2013 - Team 3 - PinUp Presentation

  • 1.
  • 2.
  • 3.
  • 4. Ambitions: an opportunity for the whole region. 1. Iconic. Attracted appearance set up a brand effect for Thialf, also becomes an identity for the whole region. 2. Multifunction Involve parts of the city function inside the project. Opportunities( job, money..) for both Thialf and local dwellers. Ice rink based local economy could be apart from the dependence of the government. 3. Sustainable. Climate strategy. Structure solutions. Material choose and quantity use. Keep the foundation of the existing track.
  • 5. Highway entrance Site Railway Rail station Urban analyze: Traffic situation shows a good quality of connecting the site with other regions, which is significant for bringing customers and selling iconic appearance as a brand to the passing passengers on the train and bus. This also determines the layout of the founctions. Rail station Bus and car entrance
  • 6. Different layout attempt. Chosen layout of the tracks . Expansion of the site. Based on remain the foundation The main entrance next to the Beyond the boundary effect of of the existing ice track and the rail station and the road cross. the rails, transfer it into ice hockey stadium. advantage. The supermarket will be combined as parts of the project. Rise the function level of the It will focus the specificity on training. Provide spaces and skating. facilities for research of ice racing. High level of profession brings high level of reputation.
  • 7. Concept One: Mountain -Experience top view -Mountain/hill path -Feel the shape of the roof
  • 8. Munich Olympic Park - Mountain/hill path -Experience top view -Feel the shape of the roof
  • 9.
  • 10. Structure strategy: space column based, multi-type combined structure.
  • 11.
  • 12.
  • 13. The whole building structure is a combination of different structure types. The choose of the structure type is based on aspects such as function, climate design, sustainable strategy, and so on.
  • 14. Climate strategy one: climate facilities inside space columns. The columns play a chimney effect. Sendai Mediatheque Air flow
  • 15.
  • 16. Climate strategy two: Solar shading on top of the tracks. Prevent too much heat and absorb solar power. Solar gain -Taiwan stadium 2009 World Games -8,844 solar panels/1.14 million KWh per year
  • 17. Climate strategy three: Rain water collection for toilets. -Castle in Gniew Poland. Rain collection roof
  • 18. Envelop strategy: The choose of material based on function sustainability and other significant aspects .
  • 20.
  • 21.
  • 22. Inspiration from forest Pictures taken in the forest near the site
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Structure strategy: Separated columns & Big span structure Big span columns
  • 28. Referrence Proposal Referrence Structure: Separated Columns
  • 30. Climate strategy Water collection system for toilets Solar panel generating system
  • 32. Envelop strategy: The choose of material based on function sustainability and other significant aspects .