    Completing the Project
        InfoComm International




Objectives
• To use a framework for AV project
  planning, execution and closure
   l                     d l
• To be familiar with project planning
  tools and AV standard documentation




                                                1
7/25/2011




On Time – On Budget
• Why don’t our
  projects end?
             d
• Why do we
  keep going
  back?
• I’m losing
  money on this




The End Starts At The Beginning
• What are expectations?
  – What the stakeholder thinks they are
    getting from the designer and integrator
  – What the designer thinks they told the
    customer and integrator
  – What the integrator thinks the designer
    and stakeholder wants and needs




                                                      2
7/25/2011




Project Management Process
Definitions (Lifecycle)
                               Execution/
    Initiation   Preparation                Close
                                Control




So What Did You Agree To Do?
•   Scope of Work
•   Quality of Work
•   Time Line
•   Price
•   Terms and C diti
    T        d Conditions




                                                           3
7/25/2011




    Project Elements / Constraints


       Optimize
                                       Quality is
    project outcome
                                     impacted by all
     by managing
                                        elements
      constraints




                      Cost ≠ Price




    Improving Performance
•   Requires      a repeatable structure
•   Requires      industry standard documents
•   Requires      transparency
•   Requires      a check list




                                                              4
7/25/2011




Project Comparison




Standards Guide




                            5
7/25/2011




Standards Guide for AV Systems
Design and Coordination Processes

• Guide for documenting AV projects
• Guide for coordinating with other
  trades
• Method for setting expectations




What are the Parts?
•   Scope, Purpose, and Application
•   Referenced Publications
•   Definitions
•   Requirements
•   Verification
    V ifi ti
•   Appendix




                                             6
7/25/2011




Scope - Purpose – Application
• Provides a method for documentation
• Provides a recognition and method of
  coordinating with other disciplines
  and trades
• Provides a practical guideline for
  verifying cross trade responsibilities




Method For Documentation
•   Project Planning & Coordination
•   Program Phase
•   Design Phase
•   Construction Phase
•   Verification
    V ifi ti




                                                  7
7/25/2011




Exceptions




Guide Requirements Section
• The largest portion of                     Planning and
                                             Coordination


  the document
   h d
• Describes in detail all   Construction
                                           Requirements
                                                            Program


  aspects of the design
                               Phase                         Phase




  p
  process from p j
                project
  planning to a verified                     Design Phase



  completed project




                                                                             8
7/25/2011




Planning & Coord Meetings
• Schedule of meetings
  – Dates and times
            d
  – Length and location
• Meeting members
  – Who is on the list?
  – Who is not on the list?
• Agenda for meetings




Establishing a Governance Structure
• Who do you need to
  make h
     k happy? ?
• Managing expectations
• Stakeholder
  relationships
• Conflict and Escalation
• How are you doing?




                                             9
7/25/2011




Program Phase
• Needs analysis           Needs

• Program report
                        Applications



                           Tasks



                   Functions and Features




Design Phase
• Architectural
  and interior
    d
  design
• AV System
  Documents




                                                  10
7/25/2011




Program and Design Phases
• Gather Information
• Needs Analysis
• Site Survey
• Recommend Changes & Create
  Scope
• Determine AV Solution
  Components
• Design AV Solution




Construction Phase
•   Construction drawings
•   Facilities drawings
•   System Drawings
•   Reference Documentation
•   Testing and acceptance
    T ti        d      t
•   Project closeout




                                     11
7/25/2011




Verification
• All trades coordination and
  expectations
• Provides responsibility check
  list
• Avoids planning and delivery
  holes
• Creates better understanding
  amongst client, GC, and trade
  partners




Who Will Manage The Project
•   Technician
•   Designer
•   Sales manager
•   Consultant
•   Customer
    C t
•   Project manager




                                        12
7/25/2011




Roles And Perspectives
• Technicians / Engineers            • Project Manager
   –   Seeks optimal solutions          – Seeks pragmatic decisions
   –   Strives for precision            – Strives for accuracy
   –   Deals with things                – Deals with people
   –   Focuses on processes             – Focuses on outcomes
   –   Reactionary problem solving      – Proactive planning
   –   Works with immutable laws        – Works with situational
   –   Succeeds individually              rules
                                        – Succeeds through others




Making A Timeline
• You have what needs to
  be done
  b d
• How long will it take?
• Break it down
• Create milestones
• Assign people




                                                                            13
7/25/2011




Risk Response Planning Strategies
• Threats
• O
  Opportunities
            ii
• Strategies
  •   Avoidance
  •   Transference
  •   Mitigation
  •   Acceptance




                                          14
7/25/2011




Work Breakdown Structure
                                     AV Production System


   Audio
   A di       Lighting
              Li hti       Rigging
                           Ri i             Video
                                            Vid             Display
                                                            Di l      Support
                                                                      S     t       General
                                                                                    G      l
                                                                                    Session
                                                                                     Intro


Microphones       Mixer        Amplifiers    Loudspeakers              P&D       ENG Cam BOH

 Dynamic         Cabling        Cabling             FOH               Scaffold   Talent Mic BOH


Condenser        Power           Power          Monitors


  Stands

                What is the required result?
  Cabling
                  Specific, measurable, verifiable, unambiguous




Logic Network Diagram




                                                                                                        15
7/25/2011




Estimate – Effort & Duration
• Time to complete the task?
• Aggregate time to complete the task?




Mature Display of a Project Schedule
Hiding or Padding
  5 days / 2 days
                    5 days / 2 days
                                         6 days / 2 days
  7 days shown                                                   22 days
                    7 days shown                                 planned
                                         8 days shown                        26 days
                                                                              actual
Mature Use of Uncertainty and Reserves
   5 days
                5 days
                               6 days         2 days
   5 days                                    mitigation
   shown        5 days                                             y
                                                               4 days
                shown          6 days                          reserve       26 days
                               shown               4 days                    planned
                                                 uncertainty
                                                                         24 days
                                                                          actual




                                                                                             16
7/25/2011




Labor
• Jurisdiction
• Work Rules
• Scales within
  scales
• Premium time
• Penalties
       l
• Payroll




                        17
7/25/2011




Event Closure
Take the time to Look Back and Learn
  Preparation         Executing &       Closing
     Phase          Controlling Phase    Phase



                What did we do well?
        What could we have done better?
  What were the key events for each phase?




How Will This Affect Me?
• Project quality will be improved
• Coordination with other trades will be
  improved
• Costs will be reduced
• Expectations will be met
• Stress will be reduced




                                                        18
7/25/2011




Project Completion




When you finished doing all the things
    that you said you would do.




                                               19

More Related Content

What's hot

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beeneNASAPMC
 
P&msp2010 09 integration-&-testing
P&msp2010 09 integration-&-testingP&msp2010 09 integration-&-testing
P&msp2010 09 integration-&-testingEmanuele Della Valle
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchellNASAPMC
 
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo
 
Taylor.randall
Taylor.randallTaylor.randall
Taylor.randallNASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leisingNASAPMC
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02guest2aa104
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliottNASAPMC
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreysNASAPMC
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonceNASAPMC
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileAgileSparks
 
Petze.lara
Petze.laraPetze.lara
Petze.laraNASAPMC
 
Majerowicz
MajerowiczMajerowicz
MajerowiczNASAPMC
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paulNASAPMC
 
Developments around basel 2
Developments around basel 2Developments around basel 2
Developments around basel 2Luisa Ramirez
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frankNASAPMC
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management DashboardsBob Prieto
 

What's hot (19)

Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
K.pagel.beene
K.pagel.beeneK.pagel.beene
K.pagel.beene
 
P&msp2010 09 integration-&-testing
P&msp2010 09 integration-&-testingP&msp2010 09 integration-&-testing
P&msp2010 09 integration-&-testing
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
Project Controls Expo 13th Nov 2013 - "To Baseline or Not to Baseline What sh...
 
Taylor.randall
Taylor.randallTaylor.randall
Taylor.randall
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
 
Backup darren elliott
Backup darren elliottBackup darren elliott
Backup darren elliott
 
Gary.humphreys
Gary.humphreysGary.humphreys
Gary.humphreys
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonce
 
Ravit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in AgileRavit Danino HP - Roles and Collaboration in Agile
Ravit Danino HP - Roles and Collaboration in Agile
 
Petze.lara
Petze.laraPetze.lara
Petze.lara
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Developments around basel 2
Developments around basel 2Developments around basel 2
Developments around basel 2
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Program Management Dashboards
Program Management DashboardsProgram Management Dashboards
Program Management Dashboards
 

Similar to Vancouver project management presentation

Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementationITZHAK123
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Processstorybridge
 
Change Management for Sustainability
Change Management for SustainabilityChange Management for Sustainability
Change Management for SustainabilityPeter Hess
 
Discovery on terra incognita
Discovery on terra incognitaDiscovery on terra incognita
Discovery on terra incognitaeugenemospan
 
Day26 - E2E SD RandR_Operating model.pptx
Day26 - E2E SD RandR_Operating model.pptxDay26 - E2E SD RandR_Operating model.pptx
Day26 - E2E SD RandR_Operating model.pptxashok145643
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Synergis Engineering Design Solutions
 
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleDiscovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleRazorleaf Corporation
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectivessombat nirund
 
Iwsm2014 solution based estimating (eltjo poort)
Iwsm2014   solution based estimating (eltjo poort)Iwsm2014   solution based estimating (eltjo poort)
Iwsm2014 solution based estimating (eltjo poort)Nesma
 
Directions NA Water-Agile-Fall methodology and NAV implementation
Directions NA Water-Agile-Fall methodology and NAV implementationDirections NA Water-Agile-Fall methodology and NAV implementation
Directions NA Water-Agile-Fall methodology and NAV implementationAleksandar Totovic
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 

Similar to Vancouver project management presentation (20)

Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
Day 5
Day 5Day 5
Day 5
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementation
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
Change Management for Sustainability
Change Management for SustainabilityChange Management for Sustainability
Change Management for Sustainability
 
Discovery on terra incognita
Discovery on terra incognitaDiscovery on terra incognita
Discovery on terra incognita
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Day26 - E2E SD RandR_Operating model.pptx
Day26 - E2E SD RandR_Operating model.pptxDay26 - E2E SD RandR_Operating model.pptx
Day26 - E2E SD RandR_Operating model.pptx
 
JAD Guidelines
JAD GuidelinesJAD Guidelines
JAD Guidelines
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
 
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion LifecycleDiscovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
Discovering New Product Introduction (NPI) using Autodesk Fusion Lifecycle
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Iwsm2014 solution based estimating (eltjo poort)
Iwsm2014   solution based estimating (eltjo poort)Iwsm2014   solution based estimating (eltjo poort)
Iwsm2014 solution based estimating (eltjo poort)
 
Directions NA Water-Agile-Fall methodology and NAV implementation
Directions NA Water-Agile-Fall methodology and NAV implementationDirections NA Water-Agile-Fall methodology and NAV implementation
Directions NA Water-Agile-Fall methodology and NAV implementation
 
Project design and management
Project design and managementProject design and management
Project design and management
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 

Recently uploaded

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 

Recently uploaded (20)

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 

Vancouver project management presentation

  • 1. 7/25/2011 Completing the Project InfoComm International Objectives • To use a framework for AV project planning, execution and closure l d l • To be familiar with project planning tools and AV standard documentation 1
  • 2. 7/25/2011 On Time – On Budget • Why don’t our projects end? d • Why do we keep going back? • I’m losing money on this The End Starts At The Beginning • What are expectations? – What the stakeholder thinks they are getting from the designer and integrator – What the designer thinks they told the customer and integrator – What the integrator thinks the designer and stakeholder wants and needs 2
  • 3. 7/25/2011 Project Management Process Definitions (Lifecycle) Execution/ Initiation Preparation Close Control So What Did You Agree To Do? • Scope of Work • Quality of Work • Time Line • Price • Terms and C diti T d Conditions 3
  • 4. 7/25/2011 Project Elements / Constraints Optimize Quality is project outcome impacted by all by managing elements constraints Cost ≠ Price Improving Performance • Requires a repeatable structure • Requires industry standard documents • Requires transparency • Requires a check list 4
  • 6. 7/25/2011 Standards Guide for AV Systems Design and Coordination Processes • Guide for documenting AV projects • Guide for coordinating with other trades • Method for setting expectations What are the Parts? • Scope, Purpose, and Application • Referenced Publications • Definitions • Requirements • Verification V ifi ti • Appendix 6
  • 7. 7/25/2011 Scope - Purpose – Application • Provides a method for documentation • Provides a recognition and method of coordinating with other disciplines and trades • Provides a practical guideline for verifying cross trade responsibilities Method For Documentation • Project Planning & Coordination • Program Phase • Design Phase • Construction Phase • Verification V ifi ti 7
  • 8. 7/25/2011 Exceptions Guide Requirements Section • The largest portion of Planning and Coordination the document h d • Describes in detail all Construction Requirements Program aspects of the design Phase Phase p process from p j project planning to a verified Design Phase completed project 8
  • 9. 7/25/2011 Planning & Coord Meetings • Schedule of meetings – Dates and times d – Length and location • Meeting members – Who is on the list? – Who is not on the list? • Agenda for meetings Establishing a Governance Structure • Who do you need to make h k happy? ? • Managing expectations • Stakeholder relationships • Conflict and Escalation • How are you doing? 9
  • 10. 7/25/2011 Program Phase • Needs analysis Needs • Program report Applications Tasks Functions and Features Design Phase • Architectural and interior d design • AV System Documents 10
  • 11. 7/25/2011 Program and Design Phases • Gather Information • Needs Analysis • Site Survey • Recommend Changes & Create Scope • Determine AV Solution Components • Design AV Solution Construction Phase • Construction drawings • Facilities drawings • System Drawings • Reference Documentation • Testing and acceptance T ti d t • Project closeout 11
  • 12. 7/25/2011 Verification • All trades coordination and expectations • Provides responsibility check list • Avoids planning and delivery holes • Creates better understanding amongst client, GC, and trade partners Who Will Manage The Project • Technician • Designer • Sales manager • Consultant • Customer C t • Project manager 12
  • 13. 7/25/2011 Roles And Perspectives • Technicians / Engineers • Project Manager – Seeks optimal solutions – Seeks pragmatic decisions – Strives for precision – Strives for accuracy – Deals with things – Deals with people – Focuses on processes – Focuses on outcomes – Reactionary problem solving – Proactive planning – Works with immutable laws – Works with situational – Succeeds individually rules – Succeeds through others Making A Timeline • You have what needs to be done b d • How long will it take? • Break it down • Create milestones • Assign people 13
  • 14. 7/25/2011 Risk Response Planning Strategies • Threats • O Opportunities ii • Strategies • Avoidance • Transference • Mitigation • Acceptance 14
  • 15. 7/25/2011 Work Breakdown Structure AV Production System Audio A di Lighting Li hti Rigging Ri i Video Vid Display Di l Support S t General G l Session Intro Microphones Mixer Amplifiers Loudspeakers P&D ENG Cam BOH Dynamic Cabling Cabling FOH Scaffold Talent Mic BOH Condenser Power Power Monitors Stands What is the required result? Cabling Specific, measurable, verifiable, unambiguous Logic Network Diagram 15
  • 16. 7/25/2011 Estimate – Effort & Duration • Time to complete the task? • Aggregate time to complete the task? Mature Display of a Project Schedule Hiding or Padding 5 days / 2 days 5 days / 2 days 6 days / 2 days 7 days shown 22 days 7 days shown planned 8 days shown 26 days actual Mature Use of Uncertainty and Reserves 5 days 5 days 6 days 2 days 5 days mitigation shown 5 days y 4 days shown 6 days reserve 26 days shown 4 days planned uncertainty 24 days actual 16
  • 17. 7/25/2011 Labor • Jurisdiction • Work Rules • Scales within scales • Premium time • Penalties l • Payroll 17
  • 18. 7/25/2011 Event Closure Take the time to Look Back and Learn Preparation Executing & Closing Phase Controlling Phase Phase What did we do well? What could we have done better? What were the key events for each phase? How Will This Affect Me? • Project quality will be improved • Coordination with other trades will be improved • Costs will be reduced • Expectations will be met • Stress will be reduced 18
  • 19. 7/25/2011 Project Completion When you finished doing all the things that you said you would do. 19