IMPACTS OF ENERGY
 DEVELOPMENTS ON LOW
     VOLUME ROADS




Paul W. Wilke, P.E.
Principal Engineer
Presentation Outline
   Background - Wind & Gas Development
   Policy Considerations for Road Owners
   Global Impact vs Site Specific User Fee Approaches
   Technical Procedure for Each Approach
   Comparison of Approaches
   Special Considerations:
     Technical
     Administrative



                                  ARA Proprietary                 2
                       © 2011 Applied Research Associates, Inc.
Introduction
 Energy development boom across USA and
  Canada
 NY has wind & PA has gas…
   NY- many wind farms developed; gas coming soon?
   PA- natural gas development boom since 2008




                              ARA Proprietary                 3
                   © 2011 Applied Research Associates, Inc.
Effect on Transportation
 Large loads                                   Weak roads




                       ARA Proprietary                        4
            © 2011 Applied Research Associates, Inc.
How Large Are The Loads?
 Wind Farms:
   Large volume of “legal loads” (<80,000 lbs)
   Smaller number of “super loads”



 Gas Wells:
   Large volume of “legal loads”




                                   ARA Proprietary                 5
                        © 2011 Applied Research Associates, Inc.
Trucks Associated With Wind Farms
          (Turbine Components)
 Huge Blades
  • 3 blades/turbine
  • Typical length: 115-165 ft
  • Typical weight: 5-10 tons


 Huge Tower
  • 3 or 4 pieces
  • Typical height: 210-280 ft; can be
    as high as 330 ft
  • Each segment weighs 50-75 tons

                                 ARA Proprietary                 6
                      © 2011 Applied Research Associates, Inc.
Turbine Components (cont’d)

 Nacelle
  • 1 or 2 pieces
  • weight ~65-125 tons




 Base Concrete
  • 430 CY per turbine
    (43 truck loads)

                             ARA Proprietary                 7
                  © 2011 Applied Research Associates, Inc.
Turbine Cranes
 Main Cranes
   • Initial construction requires 35 trucks
   • Reconstruction requires 10 trucks
   • Reconstructed 5 times per 50 turbines
      (may vary with turbine layout)

 Support Cranes
   • 5 support cranes required for
     construction of each main crane
   • Each support crane requires 5 trucks



                                      ARA Proprietary                 8
                           © 2011 Applied Research Associates, Inc.
Other Sources of Loads

 Hauling Materials for Access Road
  Construction
  • Typical section : 16ft wide, 12-in thickness
  • Requires 313 10-CY trucks/mile of access road
  • 1 truckload of H2O per 105 CY aggregate on
    access roads
  • Access roads sprayed 1-3 times/day for dust
    control



                                  ARA Proprietary                 9
                       © 2011 Applied Research Associates, Inc.
Wind Farm Trucking
 Large number of “legal loads” & some “superloads”

 Sxxxesals




                                ARA Proprietary                 10
                     © 2011 Applied Research Associates, Inc.
Trucks Associated with Gas Wells
 Hydraulic Fracturing Process Requires Trucks For:
   • Water
   • Sand & other chemicals
   • Other construction materials
 Typically 1300 trucks/well site




                                  ARA Proprietary                 11
                       © 2011 Applied Research Associates, Inc.
Pennsylvania “Gas Rush”

 Drill Baby Drill….
 1000’s of wells developed last 4 years
 Anticipate 20 years development
 4,500 miles of roads affected
 PennDOT has jurisdiction over most roads
  (including “county roads”)
 Opportunity for NY to learn from PA



                               ARA Proprietary                 12
                    © 2011 Applied Research Associates, Inc.
Posted Roads in One PA County




                    ARA Proprietary                 13
         © 2011 Applied Research Associates, Inc.
Potential Marcellus Development in NY




                        ARA Proprietary                 14
             © 2011 Applied Research Associates, Inc.
Weak Roads
 Many energy sites accessed by low volume roads
  (County & Town owned)
 Pavements not designed for heavy truck traffic
 Substantial failures have
   occurred
 Many roads warranted
  structural upgrade
   before hauling


                               ARA Proprietary                 15
                    © 2011 Applied Research Associates, Inc.
How Should Road Owners Respond
        To This New Road Usage?
 Anticipate development & improve roads in advance
   Encourages development (should taxpayers pay?)
 Seek reimbursement from industry for road damage
 Policies should be developed- address these
   & many related issues




                                ARA Proprietary                 16
                     © 2011 Applied Research Associates, Inc.
Seeking Reimbursement From Developers
    (Two Fundamental Approaches)
                      Global impact recouped
                      through development
                      impact fee
                      Road & company specific
                      user fee




                        ARA Proprietary                 17
             © 2011 Applied Research Associates, Inc.
Global Impact Fee Approach
• Up-front effort to develop fair assessment
• Could include other impacts (bridges,
  environment)
• Less administrative effort once in place
• Some inequalities
   E.g. -County A collects impact fee
         - County A & B roads used




                                 ARA Proprietary                 18
                      © 2011 Applied Research Associates, Inc.
User Fee Approach
• More direct (project specific) allocation of costs
• Ongoing effort required to administer
• Some (or all) of administration cost could be borne
  by developer




                             ARA Proprietary                 19
                  © 2011 Applied Research Associates, Inc.
Methods Developed for PennDOT
 PennDOT using a hybrid approach
 User fee charged on “posted roads”
   Roads where significant traffic expected-posted for 10 Tons
   Hauler posts bond & enters an “excess maintenance”
    agreement
 Impact fee to compensate for “non-posted” roads
   ARA study to estimate global impact to non-posted roads
   State levied an impact fee to compensate for road & other
    impacts



                                  ARA Proprietary                 20
                       © 2011 Applied Research Associates, Inc.
General Concepts
 Impact is based on “pavement life” consumed
 Global impact & user fee methods similar
 Global impact
  • network level assessment of “projected” damage
  • assumed average pavement structure
 User fee
  • project level assessment
  • based on “actual” trucks, pavements & damage




                                 ARA Proprietary                 21
                      © 2011 Applied Research Associates, Inc.
Estimate of Global Impact
Big-picture, long-term assessment
useful
    Budgeting & capital planning
    Basis for development impact fee

       Bradford County                           Gas Well Impact Fee
       Tomkins County                                Basis of Fee
        10 Year Capital Plan




                                 ARA Proprietary                       22
                      © 2011 Applied Research Associates, Inc.
Global Impact Determination

 Cost impact = (% pavement life consumed) X
  (pavement replacement cost)



                       projected trucks (ESALs)
% pavement life =
   consumed                pavement life (ESALs)



                               ARA Proprietary                 23
                    © 2011 Applied Research Associates, Inc.
Projected Truck Trips
 1st- project the extent of development
 2nd- estimate truck loading related to development
 PennDOT example:
   • Number of wells projected from industry estimates (1,300
     trucks/well)
   • Average trip = 10 miles




                                  ARA Proprietary                 24
                       © 2011 Applied Research Associates, Inc.
Project Truck-Miles Associated
                with Expected Wells

                  Truck Miles Projection (10 Years)
County       # of Wells    # of Trucks    Avg Trip                    Truck-Miles
             Projected     per Well       Length (mi)                 Projected

County A            1,210                   1,300                10     15,730,000

County B              855                   1,300                10     11,115,000

County C            2,100                   1,300                10     27,300,000

County D              970                   1,300                10     12,610,000

Totals                                                                  66,755,000
                                 ARA Proprietary                                     25
                      © 2011 Applied Research Associates, Inc.
Need to Account For Variation in Loads
 AASHTO developed a method to convert various
  truck axle configurations & weights to one standard

 Standard = Equivalent Single Axle Load (ESAL )

 One ESAL is equivalent to an 18,000 lb.
  weight on a single axle with dual tires.


                                ARA Proprietary                 26
                     © 2011 Applied Research Associates, Inc.
Individual Loads Converted to Standard
                    ESAL
 Any load can be converted to 18,000 lb ESALs
 Use Load Equivalency Factor
                              4
              AxleWeight 
       LEF              
              18,000lbs 

 Relationship between axle weight & inflicted
  pavement damage is not linear but exponential



                                   ARA Proprietary                 27
                        © 2011 Applied Research Associates, Inc.
ESAL Examples
     For Specific Axle Types & Weights
 Single axle (18,000 lbs)= 1.0 ESALs
 Single axle (12,000 lbs)=     0.19
  ESALs

 Tandem axle (24,000 lbs)= 0.26 ESALs
 Tandem axle (34,000 lbs)= 1.09 ESALs




                                ARA Proprietary                 28
                     © 2011 Applied Research Associates, Inc.
ESALs Determined for Specific Trucks
 Most trucks contain a combination of axle types &
  loads

 ESALs for entire truck = sum of ESALs for each axle




                               ARA Proprietary                 29
                    © 2011 Applied Research Associates, Inc.
Examples of ESALs For Common Trucks

 Water Truck (Triaxle)
  • 2.5 ESALs
  • 4.5 ESALs if 3rd Lift Axle is Up


 Water Truck (Tractor Trailer)
   • 1.00 ESALs


                                  ARA Proprietary                 30
                       © 2011 Applied Research Associates, Inc.
Total ESALs Projected
 Convert all truck types in fleet to ESALs
 Determine total ESAL- miles for all projected
  truck trips


                                                              Total ESAL- Miles




                              ARA Proprietary                                     31
                   © 2011 Applied Research Associates, Inc.
ESAL Life of Representative Pavement
 AASHTO design determines SN required to
  support projected ESALs




 Reverse process- ESAL life determined for
  known SN
                                 ARA Proprietary                 32
                      © 2011 Applied Research Associates, Inc.
AASHTO Design Nomograph




                ARA Proprietary                 33
     © 2011 Applied Research Associates, Inc.
DARwin Design Software




               ARA Proprietary                 34
    © 2011 Applied Research Associates, Inc.
Assess SN of Existing Roads
                In Network
    SN = a1 D1 + a2 D2 + a3 D3 m3
            AC                    AC                          Subbase
         Surface                  Base



ai = Layer coefficient of layer i
D i = Thickness of layer i
mi = Drainage coefficient of layer i



                              ARA Proprietary                           35
                   © 2011 Applied Research Associates, Inc.
Structural Layer Coefficient (ai)

 Indication of a material's structural contribution to
  pavement performance

 Example:2 inches of material with ai = 0.20 provides
  the same contribution as 1 inch of material with ai =
 0.40




                                ARA Proprietary                 36
                     © 2011 Applied Research Associates, Inc.
Typical Layer Coefficients


Asphaltic concrete wearing course                            0.44
Asphaltic concrete binder course                             0.44
Asphaltic concrete base course                               0.40
Granular subbase                                             0.11




                             ARA Proprietary                        37
                  © 2011 Applied Research Associates, Inc.
Example SN Calculation for Existing Pavement
          HMA                   HMA                           Subbase
         Surface               Binder
 SN = 1.5”x 0.44 + 2.5”x 0.44 + 6” x 0.11

 SN = 0.66 + 1.1 + 0.66

 SN = 2.42


                              ARA Proprietary                           38
                   © 2011 Applied Research Associates, Inc.
Example Sections
          SECTION                            SECTION                                SECTION
          A (THIN)                           B (Medium)                    4”       C (THICK)
                           2”


                                                                                                6”
                     6”

                                                                           6”
                                                                                                6”


     SN= 1.54
     (14,000 ESALs)                      SN= 2.42
                                         (215,000 ESALs)                        SN= 3.30
AC
                                                                                (1,600,000 ESALs)
                                  SUBGRADE
SUBBASE
                                  (FINE GRAINED)

                                           ARA Proprietary                                           39
                                © 2011 Applied Research Associates, Inc.
Global Impact Determination

 Cost impact = (% pavement life consumed) X
  (pavement replacement cost)



                    projected traffic (ESAL-miles)
% pavement life =
  consumed          pavement life (ESALs)



                               ARA Proprietary                 40
                    © 2011 Applied Research Associates, Inc.
Example Calculation

 100,000,000 ESAL-miles projected over road network
 Typical County pavement life = 200,000 ESALS



% pavement life =   100,000,000 ESAL-mi
  consumed
                     200,000ESALs (life)
 50 miles of pavement life fully consumed
 50 mi X $2M/mi = $100 M
                               ARA Proprietary                 41
                    © 2011 Applied Research Associates, Inc.
Two Alternative User Fee Approaches

 Charge developer based on pavement life consumed
    similar to global impact
    uses project specific data



 Charge developer for cost of repairing visible damage




                                    ARA Proprietary                 42
                         © 2011 Applied Research Associates, Inc.
User Fee Based on Pavement Life Consumed
          (Alternative Methods)

 Mechanistic-Empirical Method
  • Rigorous engineering procedure
  • Costs more to perform
 Empirical Method
  • Simpler approach
  • Less accurate
  • Less cost to perform
 Both Methods Based on SN-effective at start & end of
  development
                                  ARA Proprietary                 43
                       © 2011 Applied Research Associates, Inc.
Pre- & Post- Development Pavement Life
               Determination
 Mechanistic- Empirical Approach:
  • FWD testing & pavement cores
  • Back-calculation of elastic modulus
  • Determine effective SN & remaining life




                                  ARA Proprietary                 44
                       © 2011 Applied Research Associates, Inc.
Pre- & Post- Development Pavement Life
               Determination
 Empirical Approach:
  • Pavement cores & surface condition survey
  • Empirical correlations relate surface condition to equivalent
    structural layer coefficients (a i*)
  • SN effective = (a1*) + (a2*) + (a3*)
  • Remaining life determined from SN effective (AASHTO design
    equation)




                                  ARA Proprietary                   45
                       © 2011 Applied Research Associates, Inc.
Visual Condition Survey
           To Estimate SN effective
 Alligator and L&T cracking % estimated
 Reduced structural coefficient related to %
  cracking
 AASHTO Table 5.2 provides coefficient ranges




                                                ytilibissoP fo mlaeR eht gnidnapxE




                             ARA Proprietary                                         46
                  © 2011 Applied Research Associates, Inc.
AASHTO Layer Coefficients




                  ARA Proprietary                 47
       © 2011 Applied Research Associates, Inc.
Pavement Damage Assessment
   (Based on Pavement Life Consumed)

 SN effective used to quantify damage
 Cost may be expresses as:
   (% Pavement life lost) X ($ to rebuild pavement);
   (% SN lost) X ($ to rebuild pavement)
   $ for structural overlay to restore original SN
 Same result, just different ways to express



                               ARA Proprietary                 48
                    © 2011 Applied Research Associates, Inc.
User Fee Method Based on Visible Damage Only
               ( “Patch & Go” Approach)
   Some agencies only require repair of visible surface defects
   Only condition survey required for assessment
   Underestimates full extent of damage
   Early fatigue cracking not considered




                                     ARA Proprietary                 49
                          © 2011 Applied Research Associates, Inc.
Consider Flexible Pavement Behavior
          & Fatigue Damage
                                                    Axle
                                                    Load



Surface      SUR                               d SUR

Base/Subbase                           SUB
Subgrade Soil
                           ARA Proprietary                 50
                © 2011 Applied Research Associates, Inc.
Propagation of Fatigue Cracking




                    ARA Proprietary                 51
         © 2011 Applied Research Associates, Inc.
Early Stage of Fatigue Cracking




                    ARA Proprietary                 52
         © 2011 Applied Research Associates, Inc.
Intermediate Stage of Fatigue Cracking




                        ARA Proprietary                 53
             © 2011 Applied Research Associates, Inc.
Advanced Stage- Fatigue Cracking




                     ARA Proprietary                 54
          © 2011 Applied Research Associates, Inc.
Special Considerations:
       Multiple Users of Permitted Roads
 Allocate repair costs based on ESALs
 Potential refinement for relative seasonal damage
 Equivalent ESALs = ESAL X Seasonal adjustment factor




                                ARA Proprietary                 55
                     © 2011 Applied Research Associates, Inc.
Seasonal Adjustment Factor
 Could derive factor for spring & winter

 Spring thaw damage factor (SDF) =
      Damage predicted during spring thaw
      Damage predicted remainder of year




                                ARA Proprietary                 56
                     © 2011 Applied Research Associates, Inc.
Seasonal Adjustment Factor
 Spring Damage Factor (SDF) depends on:
   • Asphalt layer stiffness & thickness
   • Granular subbase stiffness & thickness
   • Subgrade soil strength


 Use mechanistic analysis (WINJULEA software) &
  Asphalt Institute failure equation

 SDF typically 2 to 4+ (higher for thin pavements)


                                   ARA Proprietary                 57
                        © 2011 Applied Research Associates, Inc.
Other Issues To Consider

 Assessment & allocation of road damage is
   multi-faceted challenge
    Analogous to “layers of an onion”:….



 Consider the following:
      Effect of pavement condition at start of permit period
      Providing exemption for small haulers
      Requirement to keep road safe for motoring public
      Proactive maintenance/upgrade before winter
                                       ARA Proprietary                 58
                            © 2011 Applied Research Associates, Inc.
Effect of Pavement Condition at Start of Permit
  Is it fair to charge developer for rapid deterioration
   near end of pavement life?
  Is it fair for County to pay to rebuild a road not in CIP
   (to accomodate permittee)?
            Good                                     $1 to rehab
       Pavement
       Condition                                                   $4-10 to rehab

             Poor
                                           Time (Years)

                                   ARA Proprietary                                  59
                        © 2011 Applied Research Associates, Inc.
Administrative Considerations
 Post load restrictions & require Road Use Agreement
  (RUA)
 RUA provides mechanism for user fee
 Performance bond to help enforce RUA




                               ARA Proprietary                 60
                    © 2011 Applied Research Associates, Inc.
Components of Road Use Agreement
 Define methodology to assess road damage cost
  allocation
   Define procedure for pre & post- permit road inspections
   Most RUA’s require developer to pay for inspections
 Requirement for developer to maintain safe and
  passable road
   unsafe conditions corrected within 8 hrs
   Winter maintenance plan submitted each fall
    (avoid un-repairable condition)



                                  ARA Proprietary                 61
                       © 2011 Applied Research Associates, Inc.
Components of Road Use Agreement (cont’d)

 Developer responsible for repairs for 3 yrs

 Provide exemption for small haulers
    Establish threshold that triggers RUA




                                    ARA Proprietary                 62
                         © 2011 Applied Research Associates, Inc.
Summary
 Two fundamental approaches to road damage
  assessment
   Global impact recouped through development impact fee
   Road & company specific user fee
 Global impact may be estimated based on network
  level assessment of pavement life consumed by
  projected truck traffic
 User fee methods:
   Repair of visible damage that occurs during permit period
   Pavement life consumed (similar to global approach using site
    specific data)
                                  ARA Proprietary                   63
                       © 2011 Applied Research Associates, Inc.
Summary (cont’d)

 Pavement life consumed may be determined by:

   Empirical method (cores & visual assessment correlated to
    effective SN)
   Mechanistic-empirical method (FWD testing & mechanistic
    analysis to calculate effective SN)




                                   ARA Proprietary                 64
                        © 2011 Applied Research Associates, Inc.
Summary (cont’d)
 Issues to address in Road Use Agreement:
  • Damage assessment methodology to be used

  • Procedure to allocate damage costs when multiple users share
    same road

  • Could account for seasonal effects on damage per truckload

  • Requirement to maintain road in safe & passable condition

  • Exemption of small haulers

                                  ARA Proprietary                  65
                       © 2011 Applied Research Associates, Inc.
Summary (cont’d)
 Assessment of road damage is a multi-faceted challenge
 Many agencies in process of developing policies
 Need to balance:
   • Fairness/technical accuracy with ease/cost of administration
   • Encourage development while protecting taxpayer’s
     infrastructure investment
 No one solution that “fits all”
 Policies best developed by:
   • Technical experts that understand issues
   • Administrators that can implement efficient policies
   • Elected officials with appreciation of political ramifications
                                      ARA Proprietary                 66
                           © 2011 Applied Research Associates, Inc.
Learning Assessment
1. What are 2 “fundamental” ways counties can recoup
   cost to compensate for road damage from heavy
   haulers?




                               ARA Proprietary                 67
                    © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
2. The relative effect of different truck types on
    pavement damage may be assessed by:
  a.   Gross weight of the truck
  b.   Number of axles on the truck
  c.   Number of equivalent single axle loads (ESALs) for the truck
  d.   All of the above




                                    ARA Proprietary                   68
                         © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
3. The concept of “pavement life consumed” used in
  damage assessment is based on:
a. the portion of paved surface worn off
b. the extent of rutting
c. the portion of ESALs applied compared to ESAL’s pavement is
    designed to accommodate
d. none of the above




                                    ARA Proprietary                 69
                         © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
4. What is a common technique used by highway
   agencies to “draw-in” developers to execute a Road
   Use Agreement ?




                                ARA Proprietary                 70
                     © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
5. The relationship between a truck’s axle weight &
   damage inflicted on the pavement is:
a. Exponential
b. Linear




                                ARA Proprietary                 71
                     © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
6. What affect(s) will raising the “lift axle” on a triaxle
   truck have:
a.   Reduce tire wear, thereby saving the truck owner money
b.   Increase pavement damage
c.   Increase the ESALs for the total truck regardless of cargo weight
d.   All of the above
e.   None of the above




                                      ARA Proprietary                    72
                           © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
7. The structural layer coefficient used in AASHTO
   pavement design:
a. Increases with pavement age and loading
b. Decreases with pavement age and loading
c. Is usually unaffected by pavement age and loading




                                   ARA Proprietary                 73
                        © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
8. The pavement life consumed may be estimated by
    considering:
  a. Visual distress correlated to pavement strength (Structural
     Number)
  b. Falling weight deflectometer testing
  c. Design life of the pavement (expressed in ESALs)
  d. All of the above




                                   ARA Proprietary                 74
                        © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
9. Assessing road damage based on visible distress alone:
   a. Is an unacceptable procedure
   b. Is easier to administer than other more rigorous procedures
   c. Is a good way to account for early stages of fatigue cracking
   d. Is rarely used by road owners




                                    ARA Proprietary                   75
                         © 2011 Applied Research Associates, Inc.
Learning Assessment (cont’d)
10. The extent of road damage per truck load is
  influenced by:
   a. The weight of the truck
   b. The number of axles supporting the truck
   c. The point in the service life of the pavement at the time of
      load application
   d. All of the above




                                    ARA Proprietary                  76
                         © 2011 Applied Research Associates, Inc.
Questions???




           ARA Proprietary                 77
© 2011 Applied Research Associates, Inc.

Mais conteúdo relacionado

Mais procurados

Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...The Piedmont Environmental Council
 
JMP Development Planning
JMP Development PlanningJMP Development Planning
JMP Development PlanningAlan Bain
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsFabio Brambilla
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKSTimothy Antos
 
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboBuilding a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboAndrew Wachtel
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21SCVTA
 
Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1Jim Delton
 
Illinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USAIllinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USAGlobal CCS Institute
 
RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115Bernadette Grafton
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 
October 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM PowerpointOctober 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM PowerpointChuck Thompson
 
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...brooksroadenvironmental
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)AGC of California
 

Mais procurados (20)

Four Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force PresentationFour Mile Run Joint Task Force Presentation
Four Mile Run Joint Task Force Presentation
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
JMP Development Planning
JMP Development PlanningJMP Development Planning
JMP Development Planning
 
Spe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wellsSpe sibiu-2010 reevaluation and extended exploitation of old wells
Spe sibiu-2010 reevaluation and extended exploitation of old wells
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
 
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumboBuilding a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
Building a haul road tor T282B Dump truck with GVM 600t same as A380 jumbo
 
VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21VTA North East County Open Houses Presentation, July 21
VTA North East County Open Houses Presentation, July 21
 
Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1Quiet asphalt 2005_symposium_layfette_indiana_1
Quiet asphalt 2005_symposium_layfette_indiana_1
 
Illinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USAIllinois Basin – Decatur Project, USA
Illinois Basin – Decatur Project, USA
 
Randy Iwasaki: Quiet pavements
Randy Iwasaki: Quiet pavementsRandy Iwasaki: Quiet pavements
Randy Iwasaki: Quiet pavements
 
RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
PM tools and techniques
PM tools and techniquesPM tools and techniques
PM tools and techniques
 
October 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM PowerpointOctober 27th 2011 RRMM Powerpoint
October 27th 2011 RRMM Powerpoint
 
Lindsay Minck 2015
Lindsay Minck 2015Lindsay Minck 2015
Lindsay Minck 2015
 
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
Brooks Road Landfill Vertical Capacity Expansion Environmental Assessment Pub...
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
 

Destaque

Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement designM Firdaus
 
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...Pranamesh Chakraborty
 
India 2010 Vehicle Present Scenario
India 2010 Vehicle Present ScenarioIndia 2010 Vehicle Present Scenario
India 2010 Vehicle Present Scenarioguest5365163
 
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges Hyeok Jin Choi
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2Rron de Guzman
 
pavement analysis
pavement analysis pavement analysis
pavement analysis Saeed Badeli
 
Pavement design
Pavement designPavement design
Pavement designhusna004
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "Nishant Pandey
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 

Destaque (15)

Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement design
 
Pavement design
Pavement designPavement design
Pavement design
 
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...
Critical Appraisal of Pavement Design of Ohio Department of Transportation (O...
 
Session 37 Bo Olofsson
Session 37 Bo OlofssonSession 37 Bo Olofsson
Session 37 Bo Olofsson
 
Session 30 Sigurdur Erlingsson
Session 30 Sigurdur ErlingssonSession 30 Sigurdur Erlingsson
Session 30 Sigurdur Erlingsson
 
India 2010 Vehicle Present Scenario
India 2010 Vehicle Present ScenarioIndia 2010 Vehicle Present Scenario
India 2010 Vehicle Present Scenario
 
Module 01 2004
Module 01   2004Module 01   2004
Module 01 2004
 
Aashto design
Aashto designAashto design
Aashto design
 
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
A Study on Development of Live Load Model for Passenger Vehicles-only Bridges
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2
 
pavement analysis
pavement analysis pavement analysis
pavement analysis
 
28 pavement design
28 pavement design28 pavement design
28 pavement design
 
Pavement design
Pavement designPavement design
Pavement design
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 

Semelhante a Impacts of energy development on low volume roads paul wilke, pe

Clean Ports Green Ports
Clean Ports Green PortsClean Ports Green Ports
Clean Ports Green Portsgjcoyle
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LRAndrew de Villiers
 
Arb port emission reduction
Arb port emission reductionArb port emission reduction
Arb port emission reductionyuweili14
 
Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Tengku Faisal Tg Arifin
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskar Neogi
 
Green Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol HargreavesGreen Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol HargreavesCarol Hargreaves
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET Journal
 
Electrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanElectrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanForth
 
Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)Tengku Faisal Tg Arifin
 
Transport Management & Theory Practices (14)
Transport Management & Theory Practices (14)Transport Management & Theory Practices (14)
Transport Management & Theory Practices (14)Tengku Faisal Tg Arifin
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019E'ville Eye
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
2010 nov.cv fueleconomy_webinar
2010 nov.cv fueleconomy_webinar2010 nov.cv fueleconomy_webinar
2010 nov.cv fueleconomy_webinarDriveAluminum
 
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski
 
IRJET - Design, Simulation of Loadcells for Commercial Vehicles
IRJET - Design, Simulation of Loadcells for Commercial VehiclesIRJET - Design, Simulation of Loadcells for Commercial Vehicles
IRJET - Design, Simulation of Loadcells for Commercial VehiclesIRJET Journal
 
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdfChain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdfCity of Fairfax, Va.
 

Semelhante a Impacts of energy development on low volume roads paul wilke, pe (20)

Clean Ports Green Ports
Clean Ports Green PortsClean Ports Green Ports
Clean Ports Green Ports
 
12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR12632_CSAsphalt_Enfield_Terminal_LR
12632_CSAsphalt_Enfield_Terminal_LR
 
Arb port emission reduction
Arb port emission reductionArb port emission reduction
Arb port emission reduction
 
G1 Here Comes the Sun
G1 Here Comes the SunG1 Here Comes the Sun
G1 Here Comes the Sun
 
Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)Transport Management & Theory Practices (6)
Transport Management & Theory Practices (6)
 
BhaskarNeogi - Resume
BhaskarNeogi - ResumeBhaskarNeogi - Resume
BhaskarNeogi - Resume
 
Green Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol HargreavesGreen Ship Research Dr Carol Hargreaves
Green Ship Research Dr Carol Hargreaves
 
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...IRJET-  	  Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
 
2015 March 16 ASCE TTG - I-405 Improvement Project
2015 March 16   ASCE TTG - I-405 Improvement Project 2015 March 16   ASCE TTG - I-405 Improvement Project
2015 March 16 ASCE TTG - I-405 Improvement Project
 
Electrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanElectrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal Kaufman
 
Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)Transport Management & Theory Practices (8)
Transport Management & Theory Practices (8)
 
Transport Management & Theory Practices (14)
Transport Management & Theory Practices (14)Transport Management & Theory Practices (14)
Transport Management & Theory Practices (14)
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019
 
SCAQMD
SCAQMDSCAQMD
SCAQMD
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
ORP FY13 Budget Workshop
ORP FY13 Budget WorkshopORP FY13 Budget Workshop
ORP FY13 Budget Workshop
 
2010 nov.cv fueleconomy_webinar
2010 nov.cv fueleconomy_webinar2010 nov.cv fueleconomy_webinar
2010 nov.cv fueleconomy_webinar
 
Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1Ron Sliwoski Dec 2015 Rev1
Ron Sliwoski Dec 2015 Rev1
 
IRJET - Design, Simulation of Loadcells for Commercial Vehicles
IRJET - Design, Simulation of Loadcells for Commercial VehiclesIRJET - Design, Simulation of Loadcells for Commercial Vehicles
IRJET - Design, Simulation of Loadcells for Commercial Vehicles
 
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdfChain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
 

Mais de mecocca5

Local Roads Matter Photo Slideshow
Local Roads Matter Photo SlideshowLocal Roads Matter Photo Slideshow
Local Roads Matter Photo Slideshowmecocca5
 
Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systemsmecocca5
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Somemecocca5
 
Subsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical EvaluationSubsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical Evaluationmecocca5
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Aremecocca5
 
Fwd thinking
Fwd thinkingFwd thinking
Fwd thinkingmecocca5
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...mecocca5
 
Pavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellonPavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellonmecocca5
 
What the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachuraWhat the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachuramecocca5
 
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOTNYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOTmecocca5
 
What would you do ethical choices questions and responses
What would you do ethical choices questions and responsesWhat would you do ethical choices questions and responses
What would you do ethical choices questions and responsesmecocca5
 
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...mecocca5
 
Quality Based Road Program
Quality Based Road ProgramQuality Based Road Program
Quality Based Road Programmecocca5
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilitiesmecocca5
 
Maintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know LawMaintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know Lawmecocca5
 
Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design mecocca5
 
Construction Materials Engineering and Testing
Construction Materials Engineering and TestingConstruction Materials Engineering and Testing
Construction Materials Engineering and Testingmecocca5
 
Big Challenge, Big Success
Big Challenge, Big SuccessBig Challenge, Big Success
Big Challenge, Big Successmecocca5
 
Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance mecocca5
 
Asset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, FundingAsset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, Fundingmecocca5
 

Mais de mecocca5 (20)

Local Roads Matter Photo Slideshow
Local Roads Matter Photo SlideshowLocal Roads Matter Photo Slideshow
Local Roads Matter Photo Slideshow
 
Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systems
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Some
 
Subsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical EvaluationSubsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical Evaluation
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Are
 
Fwd thinking
Fwd thinkingFwd thinking
Fwd thinking
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
 
Pavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellonPavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellon
 
What the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachuraWhat the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachura
 
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOTNYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
 
What would you do ethical choices questions and responses
What would you do ethical choices questions and responsesWhat would you do ethical choices questions and responses
What would you do ethical choices questions and responses
 
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
 
Quality Based Road Program
Quality Based Road ProgramQuality Based Road Program
Quality Based Road Program
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
 
Maintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know LawMaintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know Law
 
Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design
 
Construction Materials Engineering and Testing
Construction Materials Engineering and TestingConstruction Materials Engineering and Testing
Construction Materials Engineering and Testing
 
Big Challenge, Big Success
Big Challenge, Big SuccessBig Challenge, Big Success
Big Challenge, Big Success
 
Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance
 
Asset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, FundingAsset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, Funding
 

Último

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 

Último (20)

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Impacts of energy development on low volume roads paul wilke, pe

  • 1. IMPACTS OF ENERGY DEVELOPMENTS ON LOW VOLUME ROADS Paul W. Wilke, P.E. Principal Engineer
  • 2. Presentation Outline  Background - Wind & Gas Development  Policy Considerations for Road Owners  Global Impact vs Site Specific User Fee Approaches  Technical Procedure for Each Approach  Comparison of Approaches  Special Considerations:  Technical  Administrative ARA Proprietary 2 © 2011 Applied Research Associates, Inc.
  • 3. Introduction  Energy development boom across USA and Canada  NY has wind & PA has gas…  NY- many wind farms developed; gas coming soon?  PA- natural gas development boom since 2008 ARA Proprietary 3 © 2011 Applied Research Associates, Inc.
  • 4. Effect on Transportation  Large loads  Weak roads ARA Proprietary 4 © 2011 Applied Research Associates, Inc.
  • 5. How Large Are The Loads?  Wind Farms:  Large volume of “legal loads” (<80,000 lbs)  Smaller number of “super loads”  Gas Wells:  Large volume of “legal loads” ARA Proprietary 5 © 2011 Applied Research Associates, Inc.
  • 6. Trucks Associated With Wind Farms (Turbine Components)  Huge Blades • 3 blades/turbine • Typical length: 115-165 ft • Typical weight: 5-10 tons  Huge Tower • 3 or 4 pieces • Typical height: 210-280 ft; can be as high as 330 ft • Each segment weighs 50-75 tons ARA Proprietary 6 © 2011 Applied Research Associates, Inc.
  • 7. Turbine Components (cont’d)  Nacelle • 1 or 2 pieces • weight ~65-125 tons  Base Concrete • 430 CY per turbine (43 truck loads) ARA Proprietary 7 © 2011 Applied Research Associates, Inc.
  • 8. Turbine Cranes  Main Cranes • Initial construction requires 35 trucks • Reconstruction requires 10 trucks • Reconstructed 5 times per 50 turbines (may vary with turbine layout)  Support Cranes • 5 support cranes required for construction of each main crane • Each support crane requires 5 trucks ARA Proprietary 8 © 2011 Applied Research Associates, Inc.
  • 9. Other Sources of Loads  Hauling Materials for Access Road Construction • Typical section : 16ft wide, 12-in thickness • Requires 313 10-CY trucks/mile of access road • 1 truckload of H2O per 105 CY aggregate on access roads • Access roads sprayed 1-3 times/day for dust control ARA Proprietary 9 © 2011 Applied Research Associates, Inc.
  • 10. Wind Farm Trucking  Large number of “legal loads” & some “superloads”  Sxxxesals ARA Proprietary 10 © 2011 Applied Research Associates, Inc.
  • 11. Trucks Associated with Gas Wells  Hydraulic Fracturing Process Requires Trucks For: • Water • Sand & other chemicals • Other construction materials  Typically 1300 trucks/well site ARA Proprietary 11 © 2011 Applied Research Associates, Inc.
  • 12. Pennsylvania “Gas Rush”  Drill Baby Drill….  1000’s of wells developed last 4 years  Anticipate 20 years development  4,500 miles of roads affected  PennDOT has jurisdiction over most roads (including “county roads”)  Opportunity for NY to learn from PA ARA Proprietary 12 © 2011 Applied Research Associates, Inc.
  • 13. Posted Roads in One PA County ARA Proprietary 13 © 2011 Applied Research Associates, Inc.
  • 14. Potential Marcellus Development in NY ARA Proprietary 14 © 2011 Applied Research Associates, Inc.
  • 15. Weak Roads  Many energy sites accessed by low volume roads (County & Town owned)  Pavements not designed for heavy truck traffic  Substantial failures have occurred  Many roads warranted structural upgrade before hauling ARA Proprietary 15 © 2011 Applied Research Associates, Inc.
  • 16. How Should Road Owners Respond To This New Road Usage?  Anticipate development & improve roads in advance  Encourages development (should taxpayers pay?)  Seek reimbursement from industry for road damage  Policies should be developed- address these & many related issues ARA Proprietary 16 © 2011 Applied Research Associates, Inc.
  • 17. Seeking Reimbursement From Developers (Two Fundamental Approaches) Global impact recouped through development impact fee Road & company specific user fee ARA Proprietary 17 © 2011 Applied Research Associates, Inc.
  • 18. Global Impact Fee Approach • Up-front effort to develop fair assessment • Could include other impacts (bridges, environment) • Less administrative effort once in place • Some inequalities  E.g. -County A collects impact fee - County A & B roads used ARA Proprietary 18 © 2011 Applied Research Associates, Inc.
  • 19. User Fee Approach • More direct (project specific) allocation of costs • Ongoing effort required to administer • Some (or all) of administration cost could be borne by developer ARA Proprietary 19 © 2011 Applied Research Associates, Inc.
  • 20. Methods Developed for PennDOT  PennDOT using a hybrid approach  User fee charged on “posted roads”  Roads where significant traffic expected-posted for 10 Tons  Hauler posts bond & enters an “excess maintenance” agreement  Impact fee to compensate for “non-posted” roads  ARA study to estimate global impact to non-posted roads  State levied an impact fee to compensate for road & other impacts ARA Proprietary 20 © 2011 Applied Research Associates, Inc.
  • 21. General Concepts  Impact is based on “pavement life” consumed  Global impact & user fee methods similar  Global impact • network level assessment of “projected” damage • assumed average pavement structure  User fee • project level assessment • based on “actual” trucks, pavements & damage ARA Proprietary 21 © 2011 Applied Research Associates, Inc.
  • 22. Estimate of Global Impact Big-picture, long-term assessment useful Budgeting & capital planning Basis for development impact fee Bradford County Gas Well Impact Fee Tomkins County Basis of Fee 10 Year Capital Plan ARA Proprietary 22 © 2011 Applied Research Associates, Inc.
  • 23. Global Impact Determination  Cost impact = (% pavement life consumed) X (pavement replacement cost) projected trucks (ESALs) % pavement life = consumed pavement life (ESALs) ARA Proprietary 23 © 2011 Applied Research Associates, Inc.
  • 24. Projected Truck Trips  1st- project the extent of development  2nd- estimate truck loading related to development  PennDOT example: • Number of wells projected from industry estimates (1,300 trucks/well) • Average trip = 10 miles ARA Proprietary 24 © 2011 Applied Research Associates, Inc.
  • 25. Project Truck-Miles Associated with Expected Wells Truck Miles Projection (10 Years) County # of Wells # of Trucks Avg Trip Truck-Miles Projected per Well Length (mi) Projected County A 1,210 1,300 10 15,730,000 County B 855 1,300 10 11,115,000 County C 2,100 1,300 10 27,300,000 County D 970 1,300 10 12,610,000 Totals 66,755,000 ARA Proprietary 25 © 2011 Applied Research Associates, Inc.
  • 26. Need to Account For Variation in Loads  AASHTO developed a method to convert various truck axle configurations & weights to one standard  Standard = Equivalent Single Axle Load (ESAL )  One ESAL is equivalent to an 18,000 lb. weight on a single axle with dual tires. ARA Proprietary 26 © 2011 Applied Research Associates, Inc.
  • 27. Individual Loads Converted to Standard ESAL  Any load can be converted to 18,000 lb ESALs  Use Load Equivalency Factor 4  AxleWeight  LEF     18,000lbs   Relationship between axle weight & inflicted pavement damage is not linear but exponential ARA Proprietary 27 © 2011 Applied Research Associates, Inc.
  • 28. ESAL Examples For Specific Axle Types & Weights  Single axle (18,000 lbs)= 1.0 ESALs  Single axle (12,000 lbs)= 0.19 ESALs  Tandem axle (24,000 lbs)= 0.26 ESALs  Tandem axle (34,000 lbs)= 1.09 ESALs ARA Proprietary 28 © 2011 Applied Research Associates, Inc.
  • 29. ESALs Determined for Specific Trucks  Most trucks contain a combination of axle types & loads  ESALs for entire truck = sum of ESALs for each axle ARA Proprietary 29 © 2011 Applied Research Associates, Inc.
  • 30. Examples of ESALs For Common Trucks  Water Truck (Triaxle) • 2.5 ESALs • 4.5 ESALs if 3rd Lift Axle is Up  Water Truck (Tractor Trailer) • 1.00 ESALs ARA Proprietary 30 © 2011 Applied Research Associates, Inc.
  • 31. Total ESALs Projected  Convert all truck types in fleet to ESALs  Determine total ESAL- miles for all projected truck trips Total ESAL- Miles ARA Proprietary 31 © 2011 Applied Research Associates, Inc.
  • 32. ESAL Life of Representative Pavement  AASHTO design determines SN required to support projected ESALs  Reverse process- ESAL life determined for known SN ARA Proprietary 32 © 2011 Applied Research Associates, Inc.
  • 33. AASHTO Design Nomograph ARA Proprietary 33 © 2011 Applied Research Associates, Inc.
  • 34. DARwin Design Software ARA Proprietary 34 © 2011 Applied Research Associates, Inc.
  • 35. Assess SN of Existing Roads In Network SN = a1 D1 + a2 D2 + a3 D3 m3 AC AC Subbase Surface Base ai = Layer coefficient of layer i D i = Thickness of layer i mi = Drainage coefficient of layer i ARA Proprietary 35 © 2011 Applied Research Associates, Inc.
  • 36. Structural Layer Coefficient (ai)  Indication of a material's structural contribution to pavement performance  Example:2 inches of material with ai = 0.20 provides the same contribution as 1 inch of material with ai = 0.40 ARA Proprietary 36 © 2011 Applied Research Associates, Inc.
  • 37. Typical Layer Coefficients Asphaltic concrete wearing course 0.44 Asphaltic concrete binder course 0.44 Asphaltic concrete base course 0.40 Granular subbase 0.11 ARA Proprietary 37 © 2011 Applied Research Associates, Inc.
  • 38. Example SN Calculation for Existing Pavement HMA HMA Subbase Surface Binder SN = 1.5”x 0.44 + 2.5”x 0.44 + 6” x 0.11 SN = 0.66 + 1.1 + 0.66 SN = 2.42 ARA Proprietary 38 © 2011 Applied Research Associates, Inc.
  • 39. Example Sections SECTION SECTION SECTION A (THIN) B (Medium) 4” C (THICK) 2” 6” 6” 6” 6” SN= 1.54 (14,000 ESALs) SN= 2.42 (215,000 ESALs) SN= 3.30 AC (1,600,000 ESALs) SUBGRADE SUBBASE (FINE GRAINED) ARA Proprietary 39 © 2011 Applied Research Associates, Inc.
  • 40. Global Impact Determination  Cost impact = (% pavement life consumed) X (pavement replacement cost) projected traffic (ESAL-miles) % pavement life = consumed pavement life (ESALs) ARA Proprietary 40 © 2011 Applied Research Associates, Inc.
  • 41. Example Calculation  100,000,000 ESAL-miles projected over road network  Typical County pavement life = 200,000 ESALS % pavement life = 100,000,000 ESAL-mi consumed 200,000ESALs (life)  50 miles of pavement life fully consumed  50 mi X $2M/mi = $100 M ARA Proprietary 41 © 2011 Applied Research Associates, Inc.
  • 42. Two Alternative User Fee Approaches  Charge developer based on pavement life consumed  similar to global impact  uses project specific data  Charge developer for cost of repairing visible damage ARA Proprietary 42 © 2011 Applied Research Associates, Inc.
  • 43. User Fee Based on Pavement Life Consumed (Alternative Methods)  Mechanistic-Empirical Method • Rigorous engineering procedure • Costs more to perform  Empirical Method • Simpler approach • Less accurate • Less cost to perform  Both Methods Based on SN-effective at start & end of development ARA Proprietary 43 © 2011 Applied Research Associates, Inc.
  • 44. Pre- & Post- Development Pavement Life Determination  Mechanistic- Empirical Approach: • FWD testing & pavement cores • Back-calculation of elastic modulus • Determine effective SN & remaining life ARA Proprietary 44 © 2011 Applied Research Associates, Inc.
  • 45. Pre- & Post- Development Pavement Life Determination  Empirical Approach: • Pavement cores & surface condition survey • Empirical correlations relate surface condition to equivalent structural layer coefficients (a i*) • SN effective = (a1*) + (a2*) + (a3*) • Remaining life determined from SN effective (AASHTO design equation) ARA Proprietary 45 © 2011 Applied Research Associates, Inc.
  • 46. Visual Condition Survey To Estimate SN effective  Alligator and L&T cracking % estimated  Reduced structural coefficient related to % cracking  AASHTO Table 5.2 provides coefficient ranges ytilibissoP fo mlaeR eht gnidnapxE ARA Proprietary 46 © 2011 Applied Research Associates, Inc.
  • 47. AASHTO Layer Coefficients ARA Proprietary 47 © 2011 Applied Research Associates, Inc.
  • 48. Pavement Damage Assessment (Based on Pavement Life Consumed)  SN effective used to quantify damage  Cost may be expresses as:  (% Pavement life lost) X ($ to rebuild pavement);  (% SN lost) X ($ to rebuild pavement)  $ for structural overlay to restore original SN  Same result, just different ways to express ARA Proprietary 48 © 2011 Applied Research Associates, Inc.
  • 49. User Fee Method Based on Visible Damage Only ( “Patch & Go” Approach)  Some agencies only require repair of visible surface defects  Only condition survey required for assessment  Underestimates full extent of damage  Early fatigue cracking not considered ARA Proprietary 49 © 2011 Applied Research Associates, Inc.
  • 50. Consider Flexible Pavement Behavior & Fatigue Damage Axle Load Surface  SUR d SUR Base/Subbase  SUB Subgrade Soil ARA Proprietary 50 © 2011 Applied Research Associates, Inc.
  • 51. Propagation of Fatigue Cracking ARA Proprietary 51 © 2011 Applied Research Associates, Inc.
  • 52. Early Stage of Fatigue Cracking ARA Proprietary 52 © 2011 Applied Research Associates, Inc.
  • 53. Intermediate Stage of Fatigue Cracking ARA Proprietary 53 © 2011 Applied Research Associates, Inc.
  • 54. Advanced Stage- Fatigue Cracking ARA Proprietary 54 © 2011 Applied Research Associates, Inc.
  • 55. Special Considerations: Multiple Users of Permitted Roads  Allocate repair costs based on ESALs  Potential refinement for relative seasonal damage  Equivalent ESALs = ESAL X Seasonal adjustment factor ARA Proprietary 55 © 2011 Applied Research Associates, Inc.
  • 56. Seasonal Adjustment Factor  Could derive factor for spring & winter  Spring thaw damage factor (SDF) = Damage predicted during spring thaw Damage predicted remainder of year ARA Proprietary 56 © 2011 Applied Research Associates, Inc.
  • 57. Seasonal Adjustment Factor  Spring Damage Factor (SDF) depends on: • Asphalt layer stiffness & thickness • Granular subbase stiffness & thickness • Subgrade soil strength  Use mechanistic analysis (WINJULEA software) & Asphalt Institute failure equation  SDF typically 2 to 4+ (higher for thin pavements) ARA Proprietary 57 © 2011 Applied Research Associates, Inc.
  • 58. Other Issues To Consider  Assessment & allocation of road damage is multi-faceted challenge  Analogous to “layers of an onion”:….  Consider the following:  Effect of pavement condition at start of permit period  Providing exemption for small haulers  Requirement to keep road safe for motoring public  Proactive maintenance/upgrade before winter ARA Proprietary 58 © 2011 Applied Research Associates, Inc.
  • 59. Effect of Pavement Condition at Start of Permit  Is it fair to charge developer for rapid deterioration near end of pavement life?  Is it fair for County to pay to rebuild a road not in CIP (to accomodate permittee)? Good $1 to rehab Pavement Condition $4-10 to rehab Poor Time (Years) ARA Proprietary 59 © 2011 Applied Research Associates, Inc.
  • 60. Administrative Considerations  Post load restrictions & require Road Use Agreement (RUA)  RUA provides mechanism for user fee  Performance bond to help enforce RUA ARA Proprietary 60 © 2011 Applied Research Associates, Inc.
  • 61. Components of Road Use Agreement  Define methodology to assess road damage cost allocation  Define procedure for pre & post- permit road inspections  Most RUA’s require developer to pay for inspections  Requirement for developer to maintain safe and passable road  unsafe conditions corrected within 8 hrs  Winter maintenance plan submitted each fall (avoid un-repairable condition) ARA Proprietary 61 © 2011 Applied Research Associates, Inc.
  • 62. Components of Road Use Agreement (cont’d)  Developer responsible for repairs for 3 yrs  Provide exemption for small haulers  Establish threshold that triggers RUA ARA Proprietary 62 © 2011 Applied Research Associates, Inc.
  • 63. Summary  Two fundamental approaches to road damage assessment  Global impact recouped through development impact fee  Road & company specific user fee  Global impact may be estimated based on network level assessment of pavement life consumed by projected truck traffic  User fee methods:  Repair of visible damage that occurs during permit period  Pavement life consumed (similar to global approach using site specific data) ARA Proprietary 63 © 2011 Applied Research Associates, Inc.
  • 64. Summary (cont’d)  Pavement life consumed may be determined by:  Empirical method (cores & visual assessment correlated to effective SN)  Mechanistic-empirical method (FWD testing & mechanistic analysis to calculate effective SN) ARA Proprietary 64 © 2011 Applied Research Associates, Inc.
  • 65. Summary (cont’d)  Issues to address in Road Use Agreement: • Damage assessment methodology to be used • Procedure to allocate damage costs when multiple users share same road • Could account for seasonal effects on damage per truckload • Requirement to maintain road in safe & passable condition • Exemption of small haulers ARA Proprietary 65 © 2011 Applied Research Associates, Inc.
  • 66. Summary (cont’d)  Assessment of road damage is a multi-faceted challenge  Many agencies in process of developing policies  Need to balance: • Fairness/technical accuracy with ease/cost of administration • Encourage development while protecting taxpayer’s infrastructure investment  No one solution that “fits all”  Policies best developed by: • Technical experts that understand issues • Administrators that can implement efficient policies • Elected officials with appreciation of political ramifications ARA Proprietary 66 © 2011 Applied Research Associates, Inc.
  • 67. Learning Assessment 1. What are 2 “fundamental” ways counties can recoup cost to compensate for road damage from heavy haulers? ARA Proprietary 67 © 2011 Applied Research Associates, Inc.
  • 68. Learning Assessment (cont’d) 2. The relative effect of different truck types on pavement damage may be assessed by: a. Gross weight of the truck b. Number of axles on the truck c. Number of equivalent single axle loads (ESALs) for the truck d. All of the above ARA Proprietary 68 © 2011 Applied Research Associates, Inc.
  • 69. Learning Assessment (cont’d) 3. The concept of “pavement life consumed” used in damage assessment is based on: a. the portion of paved surface worn off b. the extent of rutting c. the portion of ESALs applied compared to ESAL’s pavement is designed to accommodate d. none of the above ARA Proprietary 69 © 2011 Applied Research Associates, Inc.
  • 70. Learning Assessment (cont’d) 4. What is a common technique used by highway agencies to “draw-in” developers to execute a Road Use Agreement ? ARA Proprietary 70 © 2011 Applied Research Associates, Inc.
  • 71. Learning Assessment (cont’d) 5. The relationship between a truck’s axle weight & damage inflicted on the pavement is: a. Exponential b. Linear ARA Proprietary 71 © 2011 Applied Research Associates, Inc.
  • 72. Learning Assessment (cont’d) 6. What affect(s) will raising the “lift axle” on a triaxle truck have: a. Reduce tire wear, thereby saving the truck owner money b. Increase pavement damage c. Increase the ESALs for the total truck regardless of cargo weight d. All of the above e. None of the above ARA Proprietary 72 © 2011 Applied Research Associates, Inc.
  • 73. Learning Assessment (cont’d) 7. The structural layer coefficient used in AASHTO pavement design: a. Increases with pavement age and loading b. Decreases with pavement age and loading c. Is usually unaffected by pavement age and loading ARA Proprietary 73 © 2011 Applied Research Associates, Inc.
  • 74. Learning Assessment (cont’d) 8. The pavement life consumed may be estimated by considering: a. Visual distress correlated to pavement strength (Structural Number) b. Falling weight deflectometer testing c. Design life of the pavement (expressed in ESALs) d. All of the above ARA Proprietary 74 © 2011 Applied Research Associates, Inc.
  • 75. Learning Assessment (cont’d) 9. Assessing road damage based on visible distress alone: a. Is an unacceptable procedure b. Is easier to administer than other more rigorous procedures c. Is a good way to account for early stages of fatigue cracking d. Is rarely used by road owners ARA Proprietary 75 © 2011 Applied Research Associates, Inc.
  • 76. Learning Assessment (cont’d) 10. The extent of road damage per truck load is influenced by: a. The weight of the truck b. The number of axles supporting the truck c. The point in the service life of the pavement at the time of load application d. All of the above ARA Proprietary 76 © 2011 Applied Research Associates, Inc.
  • 77. Questions??? ARA Proprietary 77 © 2011 Applied Research Associates, Inc.