 Where a risk is highlighted as GREEN no further
controls need be put in place.
 Where a risk is highlighted as YELLOW controls should
be reviewed.
 Where a risk is highlighted as RED the risk must be
reduced before any activities take place.
APPENDIX
Complete HIRARC
To use this matrix, first find the severity column that best describes the outcome of risk.
Then follow the likelihood row to find the description that best suits the likelihood that the
severity will occur. The risk level is given in the box where the row and column meet.
The relative risk value can be used to prioritize necessary actions to effectively manage work
place hazards. Table 5 determines priority based on the following ranges:
Table 5
RISK DESCRIPTION ACTION
15 - 25 HIGH A HIGH risk requires immediate action to control
the hazard as detailed in the hierarchy of control.
Actions taken must be documented on the risk
assessment form including date for completion.
5 - 12 MEDIUM A MEDIUM risk requires a planned approach to
controlling the hazard and applies temporary
measure if required. Actions taken must be
documented on the risk assessment form including
date for completion.
1 - 4 LOW A risk identified as LOW may be considered as
acceptable and further reduction may not be
necessary.
However, if the risk can be resolved quickly and
efficiently, control measures should be
implemented and recorded.
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
1 2 3 4 5
Likelihood
Risk
Severity
Severity
Table 6: Complete HIRARC table
1. Hazard Identification 2. Risk Assessment 3. Risk Control
No Work Activity Hazard Cause/Effect Existing risk control Likelihood Severity Risk Recommendation Control
1. Site Clearing
(cut and fill
work)
Dust
Sharp object
Injured/ Will
harm the body
Workers rotate the job 3 3 9 Using the PPE provided and
suitable
Build the barriers
2. Excavation
work.
Landslide
hazard,
Un-safety
land
Fatal/Injured/
slips
Safe work procedures .3 5 15 Build the barriers around the
excavation work
3. Piling Landslide
hazard and
un-safety land
Injured/ Fatal Safe work procedure 3 5 15 Initial training on safe work
procedures
Redesign the processes can be
worked to make safer
4. Falling and
Moving
objects
Fall of objects Head
injury/fatal
Clean the place.
Weight load
specifications on
shelving to be
observed. Regular
visual inspections for
overloading.
4 3 12 Wearing the suitable PPE such
as safety helmet during work
Provided the safe work
procedures
5. Work at
Height Place
(Using
Scaffolds)
The height
place / the
unsafe
condition
Collapse/fatal All corridors to be
kept clear of
obstruction.
4 4 16 Initial training on safe work
procedures
Wearing the suitable PPE
Provided the safe work
procedures
6. Manual
Handling of
Tools
(Electricity)
Electric
current/sharp
object
Electric
shock/injured
All hirers / users of the
building are to be
responsible for
ensuring those tasked
with manual handling
are correctly trained
.3 3 9 Wearing the suitable PPE such
as glove when handling
Housekeeping to make sure the
place is safe to work
7. Chipping,
grinding,
sawing,
hammering
Fall of objects Injured No heavy objects to be
stored above head
height. Weight load
specifications on
shelving to be
observed. Regular
visual inspections for
overloading.
3 2 6 Wearing the suitable PPE
during work
Provided the safe work
procedure such as rules and
sign board
Hirarc table

More Related Content

What's hot

Incident prevention
Incident preventionIncident prevention
Incident prevention
Cheq Sue
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Lee Oi Wah
 

What's hot (20)

Hirarc slide
Hirarc slideHirarc slide
Hirarc slide
 
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay versionHazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
Hazard Identification, Risk Assessment and Risk Control (HIRARC) Malay version
 
Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)Factories and Machinery Act (BOWEC)
Factories and Machinery Act (BOWEC)
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
HIRARC
HIRARCHIRARC
HIRARC
 
Chapter 01 -Introduction of OSHA
Chapter 01 -Introduction of OSHAChapter 01 -Introduction of OSHA
Chapter 01 -Introduction of OSHA
 
Pengenalan JKKP / DOSH & Safety and Health Commitee
Pengenalan JKKP / DOSH & Safety and Health CommiteePengenalan JKKP / DOSH & Safety and Health Commitee
Pengenalan JKKP / DOSH & Safety and Health Commitee
 
Module 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in MalaysiaModule 2 Legislation of OSH in Malaysia
Module 2 Legislation of OSH in Malaysia
 
Skop tugas dan fungsi jkkp
Skop tugas dan fungsi jkkpSkop tugas dan fungsi jkkp
Skop tugas dan fungsi jkkp
 
Occupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction IndustryOccupational Safety and Health Management in Construction Industry
Occupational Safety and Health Management in Construction Industry
 
NIOSH WPA SHO Paper 4
NIOSH WPA SHO Paper 4 NIOSH WPA SHO Paper 4
NIOSH WPA SHO Paper 4
 
Chapter 2 osha legislation
Chapter 2 osha legislationChapter 2 osha legislation
Chapter 2 osha legislation
 
Keselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaanKeselamatan & kesihatan pekerjaan
Keselamatan & kesihatan pekerjaan
 
Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)Occupational safety and health act 1994 (act 514)
Occupational safety and health act 1994 (act 514)
 
Fma 1967 & the regulations
Fma 1967 & the regulationsFma 1967 & the regulations
Fma 1967 & the regulations
 
CLASS Regulation 2013
CLASS Regulation 2013CLASS Regulation 2013
CLASS Regulation 2013
 
Kecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur PengosonganKecemasan Kebakaran & Prosedur Pengosongan
Kecemasan Kebakaran & Prosedur Pengosongan
 
Seminar Cakna KKP - Site Safety Supervisor (SSS)
Seminar Cakna KKP - Site Safety Supervisor (SSS)Seminar Cakna KKP - Site Safety Supervisor (SSS)
Seminar Cakna KKP - Site Safety Supervisor (SSS)
 
Incident prevention
Incident preventionIncident prevention
Incident prevention
 
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy settingSenarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
Senarai semak pemeriksaan krselamatan tempat kerja dan healthy setting
 

Viewers also liked (20)

Taller sistemas laura evelin
Taller sistemas laura evelinTaller sistemas laura evelin
Taller sistemas laura evelin
 
Was macht susanne 1
Was macht susanne 1Was macht susanne 1
Was macht susanne 1
 
Virtues balance
Virtues balanceVirtues balance
Virtues balance
 
Fot de hermes 1 franco
Fot de hermes 1 francoFot de hermes 1 franco
Fot de hermes 1 franco
 
Practica
PracticaPractica
Practica
 
ingles
inglesingles
ingles
 
Contactos 8c
Contactos 8cContactos 8c
Contactos 8c
 
Libro1 7D
Libro1 7DLibro1 7D
Libro1 7D
 
Fish¡¡
Fish¡¡Fish¡¡
Fish¡¡
 
06
0606
06
 
Metodologia de evaluacion UML.pdf
Metodologia de evaluacion UML.pdfMetodologia de evaluacion UML.pdf
Metodologia de evaluacion UML.pdf
 
Miniboletín santeles
Miniboletín santelesMiniboletín santeles
Miniboletín santeles
 
Valores siglo xxi por quino
Valores siglo xxi por quinoValores siglo xxi por quino
Valores siglo xxi por quino
 
Geografiacoordenadas2
Geografiacoordenadas2Geografiacoordenadas2
Geografiacoordenadas2
 
Mapa mental
Mapa mentalMapa mental
Mapa mental
 
Mileidy alzate
Mileidy alzateMileidy alzate
Mileidy alzate
 
Miniboletín Callobre - BNG A Estrada
Miniboletín Callobre - BNG A  EstradaMiniboletín Callobre - BNG A  Estrada
Miniboletín Callobre - BNG A Estrada
 
Camino3
Camino3Camino3
Camino3
 
Excel
ExcelExcel
Excel
 
Lk
LkLk
Lk
 

Similar to Hirarc table

JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
Ravithokal2
 
Risk Management Process
Risk Management ProcessRisk Management Process
Risk Management Process
no suhaila
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Yuvraj Shrivastava
 

Similar to Hirarc table (20)

7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptx7EL996_Risk Assessment_FINAL_2023.pptx
7EL996_Risk Assessment_FINAL_2023.pptx
 
JSA Laying of heavy cable.doc
JSA Laying of heavy cable.docJSA Laying of heavy cable.doc
JSA Laying of heavy cable.doc
 
HIRA
HIRAHIRA
HIRA
 
HIRADC
HIRADCHIRADC
HIRADC
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
1662426180_hirarc OSH C.pptx
1662426180_hirarc OSH C.pptx1662426180_hirarc OSH C.pptx
1662426180_hirarc OSH C.pptx
 
Hira
HiraHira
Hira
 
Managing Safety and Health.pptx
Managing Safety and Health.pptxManaging Safety and Health.pptx
Managing Safety and Health.pptx
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
GAR Model
GAR ModelGAR Model
GAR Model
 
02._SGW-_Risk_Assessment__Management.pptx
02._SGW-_Risk_Assessment__Management.pptx02._SGW-_Risk_Assessment__Management.pptx
02._SGW-_Risk_Assessment__Management.pptx
 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
 
Safety and Health Program Management
Safety and Health Program ManagementSafety and Health Program Management
Safety and Health Program Management
 
Risk Management Process
Risk Management ProcessRisk Management Process
Risk Management Process
 
Risk management process
Risk management processRisk management process
Risk management process
 
Risk Assessment - Refresher Training for Managers
Risk Assessment - Refresher Training for ManagersRisk Assessment - Refresher Training for Managers
Risk Assessment - Refresher Training for Managers
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
Task Risk Assessment .pdf
Task Risk Assessment .pdfTask Risk Assessment .pdf
Task Risk Assessment .pdf
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 

Recently uploaded

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Recently uploaded (20)

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Hirarc table

  • 1.  Where a risk is highlighted as GREEN no further controls need be put in place.  Where a risk is highlighted as YELLOW controls should be reviewed.  Where a risk is highlighted as RED the risk must be reduced before any activities take place. APPENDIX Complete HIRARC To use this matrix, first find the severity column that best describes the outcome of risk. Then follow the likelihood row to find the description that best suits the likelihood that the severity will occur. The risk level is given in the box where the row and column meet. The relative risk value can be used to prioritize necessary actions to effectively manage work place hazards. Table 5 determines priority based on the following ranges: Table 5 RISK DESCRIPTION ACTION 15 - 25 HIGH A HIGH risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion. 5 - 12 MEDIUM A MEDIUM risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion. 1 - 4 LOW A risk identified as LOW may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded. 5 5 10 15 20 25 4 4 8 12 16 20 3 3 6 9 12 15 2 2 4 6 8 10 1 1 2 3 4 5 1 2 3 4 5 Likelihood Risk Severity
  • 2. Severity Table 6: Complete HIRARC table 1. Hazard Identification 2. Risk Assessment 3. Risk Control No Work Activity Hazard Cause/Effect Existing risk control Likelihood Severity Risk Recommendation Control 1. Site Clearing (cut and fill work) Dust Sharp object Injured/ Will harm the body Workers rotate the job 3 3 9 Using the PPE provided and suitable Build the barriers 2. Excavation work. Landslide hazard, Un-safety land Fatal/Injured/ slips Safe work procedures .3 5 15 Build the barriers around the excavation work 3. Piling Landslide hazard and un-safety land Injured/ Fatal Safe work procedure 3 5 15 Initial training on safe work procedures Redesign the processes can be worked to make safer 4. Falling and Moving objects Fall of objects Head injury/fatal Clean the place. Weight load specifications on shelving to be observed. Regular visual inspections for overloading. 4 3 12 Wearing the suitable PPE such as safety helmet during work Provided the safe work procedures 5. Work at Height Place (Using Scaffolds) The height place / the unsafe condition Collapse/fatal All corridors to be kept clear of obstruction. 4 4 16 Initial training on safe work procedures Wearing the suitable PPE Provided the safe work procedures
  • 3. 6. Manual Handling of Tools (Electricity) Electric current/sharp object Electric shock/injured All hirers / users of the building are to be responsible for ensuring those tasked with manual handling are correctly trained .3 3 9 Wearing the suitable PPE such as glove when handling Housekeeping to make sure the place is safe to work 7. Chipping, grinding, sawing, hammering Fall of objects Injured No heavy objects to be stored above head height. Weight load specifications on shelving to be observed. Regular visual inspections for overloading. 3 2 6 Wearing the suitable PPE during work Provided the safe work procedure such as rules and sign board