3. ADSL IP-NGDLC V5.2&E1 - NGDLC IP-AGW(160000 POTS) IN HOLD WHY GPON LEGACY copper Copper/Fiber Fiber/Cat 56 kb/s-2MB 9Mb/s 1.5KM 2/10/100/1000 Mb/s VOICE POTS-TP-VOIP-VOD, etc POTS/VOIP HFC PSTN DON CSDH/ATM IP-DSLAM I NTERNET TV LC/ATM LC/BHL GPON TP LC/ETHERNET MSAN IP-MPLS ATM / TDM / IP LC ETHERNET
4. E-VISION-TV HFC IP-TV (IP-DSLAM) 10000 LINES GPON- 2007 FORCASTE ? USING AGW WITH ADSL2+ (TEMP) ACTION: 1- Review the requirements foQ3&Q4, and 2007. 2- coordinate with marketing-E-VISSION to identify the coverage area. 3- CHECK A NOTHER SOLUTION IF SERVICE IS URGENTLY REQUIRED BEFORE GPON DEPLOYED. 4- Note the area covered with GPON are covered with IPTV. 5- Redeploy the MSAN if required in area not covered with GPON. 6- wirless solution could be concedered if no fixed infrstructure.
5. E-VISION-TV E-VISION COVERAGE REQUIREMENT-2007 TOTAL HP=35,880 600 Rashid hostpital 4000 Jabal ali accom 3000 Al shaab colony 180 Burjman center 400 Wafi city 800 Health city EST.HP AREA-DXB 2500 Al khan 600 University EST.HP AREA-SHJ 1100 OLD IDUSTRAIL AREA 600 AL BUSTAN 1100 RASHIDYA EST.HP AREA-AJM 2000 Sadyat 2000 Marfaa 2000 Al raha 15000 Al rwais EST.HP AREA-AUH
6. voice PSTN AGW – NGDLC-160000 LINES GPON Q3-Q4 2006&2007 FORCASTE? USING AGW (TEMP) IF REQUIRED ACTION: 1- Review the existing (PSTN) network and capacity . 1- Review the requirements foQ3&Q4, and 2007. 2- coordinate with region for Forecast and requirements. 3- Reuse part of the existing AGW for voice. 4- Develop the GPON Network.
7. Tender 113H-Huawei 67900 TOTAL 2000 WEST 38 5900 SOUTH 18000 WEST 42000 CENTRAL AUH 4700 NAD AL HAMAR 718000 TOTAL 2100 AWEER 1500 KHAWANEEJ 13800 RASHIDIYA 49700 DEIRA DXB 18000 TOTAL 2500 HILLI 2500 SAROOJ 13000 JIMMI AAN 12000 JUBAIL-AGW&AGW WC
8. 521 251 270 103 140 148 130 Total 4 4 0 1 0 3 0 RAK 6 10 10 0 6 0 4 0 EC 5 7 7 0 3 0 4 0 AAN 4 243 113 130 41 75 72 55 WC 3 140 45 95 18 47 27 48 DXB 2 117 72 45 34 18 38 27 AUH 1 O/D I/D O/D I/D O/D I/D NET TOTAL Total Q4 Q3 REGION Sr No 15-May-06 Date: NGDLC -FO CABINETS REQUIREMENTS - Q3, Q4-2006
10. Action: 1- Existing exchange capacity. 2- Number of NGDLC not installed. 3- Requirement up to end of 2006. 4- Use AGW for critical area. 5- Full plan for GPON.
11. HSI ATM-DSLAM MSAN GPON Q3-Q4 2006&2007 FORCASTE? USING AGW (TEMP) IF REQUIRED ACTION: 1- Review the existing network and capacity . 1- Review the requirements foQ3&Q4, and 2007. 2- coordinate with region for Forecast and requirements. 3- Reuse part of the existing AGW for HSI. 4- Develop the GPON Network.
12. 77.35 50,808 173,484 224,292 ~ All regions ~ 74.25 12,503 36,049 48,552 West Coast 82.83 1,174 5,662 6,836 Ras Al Khaimah 82.03 1,117 5,099 6,216 East Coast 78.55 20,053 73,447 93,500 Dubai 74.58 3,962 11,622 15,584 Al Ain 77.62 11,999 41,605 53,604 Abu Dhabi UTILIZATION (%) FREE PORTS USED PORTS INSTALLED PORTS REGION Overall ADSL Utilization as On 22-JUL-06
13.
14. Provisioning of E1 (2MB) Services through Copper ATM / FR SWITCH ODF Customer’s Premises SHDSL CO SHDSL RUM COPPER Œ E1 V.35/X.21/ G.703 Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits SDH
15. Provisioning of E1 (2 MB) Circuits through C.SDH Customer’s Premises SHDSL CO SHDSL RUM ATM / FR SWITCH ODF C.SDH C.SDH E1 V.35/X.21/ G.703 Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits SDH
16. Provisioning of E3 Services through Fiber ATM / FR SWITCH ODF Customer’s Premises CO C.SDH DDF E3 RT C.SDH E3 Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits SDH
17. Provisioning of 64 k to 128 k Circuits ATM / FR SWITCH DDF Customer’s Premises PDMUX V.35 / X.21/ V.24/ V.28 D X C VAM Modem Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits
18. Provisioning of 256 k to 1 MB Circuits ATM / FR SWITCH DDF Customer’s Premises PDMUX D X C SHDSL CO SHDSL RUM V.35/X.21/ G.703 Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits
19. Provisioning of STM-1 / STM-4/ GE Services through Dark Fiber ATM / FR SWITCH ODF Customer’s Premises ODF STM-1/4 Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits
20. Provisioning of 10/100 Ethernet Services through Dark Fiber ATM / FR SWITCH ODF Customer’s Premises ODF E/O Converter O/E Converter 10/100 Eth 10/100 Eth Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits
21. Provisioning of 10/100 Ethernet Services through C.SDH ATM / FR SWITCH ODF Customer’s Premises ODF 10/100 Eth 10/100 Eth CO C.SDH RT C.SDH Schematic Diagram of Etisalat specific network configuration for Different Leased Line Circuits
22. DON : Digital overlay network for Leased Lines PDMUX PDMUX Digital Cross-Connect N x 2Mbit/s G.703 N x 64kb N x 64kb V.36 V.36 G.703 64kb G.703 64kb V.28 V.28 19.2k 19.2k Transport SDH 2 Mbit/s G.703 2 Mbit/s G.703
23. DON & User Interface Summary Copper Pair HDSL Copper line Direct connection PDMUX Remote 2x64k 128k ISDN-BA 2Mb/s ISDN-PRA Nx64k-LL PSTN/Hotline/ Payphone PBX/PABX Magneto Set 64k-LL & V.110 Subrate Nx64k-LL Analogue-LL Hifi-audio
24. CHALLENGE 1- Full coordination with marketing to identify the road map to introduce Ethernet LC instead of Traditional interface (v35,x21,G703). (64kb/s and above.). 2-Explore alternative solutions (Technical &commercial) for low speed circuit below 64KB/S.
25. Distribution FO Cable (16F) 10 G Fiber Optic Cable GPON Network ONU for each apartment ONU for each apartment 2 fibers Indoor Cable for each customer CAT-6 RJ45 Router Metro Core Network Telecom Room The Maximum Distance from OLT to ONU = 20 Km ONU Box 1:32 2F 2F 2F (78 Mega) (78 Mega) (78 Mega) 16F Fiber Optic Cable ONU (CAT-6) RJ45 16Fibers 16 Splitters 2.5G Each 22/07/2006 Max Distance 90 m ODF OLT Each Fiber 2.5G Exchange Underground Closure Building ONU Fibers Fiber termination Box Patch Panel Rectifier Battery Power Fan Residential Area 1F Working 1F Standby OLT ONU Socket Splitters 1:32
26. Router AUC (AUQ) Exch 10 G SBA Exch A2E Exch 16F (2) 16F (2) 1F 1F 1F ONU 4F (2) 1F ONU 4F (2) Splitters Splitters 1:32 1:32 1:32 1:32 (2F) (2F) 2.5 G 2.5 G Telecom Room, Joint box or Shell GPON ( PILOT PROJECT ) - AUH Subscriber Subscriber Distance from OLT to ONU = 20 Km (MAX) as loop distance OLT JUN Cable (4.1 Km) JUN Cable (3 Km) 2.5G 2.5G 2.5G 2.5G 78 Mega 78 Mega
27. 10 G MIF Exch 16F (4F) JUN Cable (4F) (5Km) Distance from OLT to ONU = 20 Km (MAX) as loop distance 2.5 G 1F ONU 4F (2) Splitter 1:32 Telecom Room, Joint box or Shell GPON ( PILOT PROJECT ) - DXB 1F 1F 1F Subscriber 4 Splitter to be used Router RYH Exch OLT 10 G 16F (2F) 2.5 G Router BSD Exch OLT 1F 1F ONU 4F (2) Splitters 1:32 1:32 Subscriber 2 Splitter to be used 2.5G 2.5G 2.5G 2.5G 2.5G 2.5G 78 Mega 78 Mega
28. Router JBL Exch 10 G QSA Exch NKL Exch 16F (2) 16F (2) JUN Cable (3 Km) JUN Cable (8 Km) 1F 1F 1F ONU 4F (2) 1F ONU 4F (2) Splitters Splitters 1:32 1:32 1:32 1:32 2.5 G 2.5 G Telecom Room, Joint box or Shell GPON ( PILOT PROJECT ) - WC Subscriber Subscriber Distance from OLT to ONU = 20 Km (MAX) as loop distance OLT (2F) (2F) 2.5G 2.5G 2.5G 2.5G 78 Mega 78 Mega