If this Giant Must Walk: A Manifesto for a New Nigeria
Execution of a_cement_project_from_az[1]
1. Capital Market Day 2009 1
Execution of a cement project from A-Z
Per Mejnert Kristensen
VP, Head of Project Division EMEA/APAC, Cement
2. Capital Market Day 2009 2
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Agenda
3. Capital Market Day 2009 3
Per Mejnert Kristensen
• VP, Head of Project Division EMEA/APAC, Cement
• Joined FLSmidth in 1992
• Positions in FLSmidth:
– VP, Head of Project Division EMEA/APAC
– VP, Head of Project Division 1
– General Manger, FLSmidth China
– Chief Representative Thailand
– Ass. Site manager, 10,000 tpd project, Thailand
– Project Sales
5. Capital Market Day 2009 5
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Agenda
6. Capital Market Day 2009 6
Growing need for cement remains
despite current global crisis !
Long term trends
7. Capital Market Day 2009 7
Expected
future
average:
~ 60-75 mty
New global contracted cement kiln capacity
(excl. of China)
0
20
40
60
80
100
120
140
160
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009E
mty
2009E:
25-50 mty
Contracted kiln capacity is an indicator of total cement
capital investments. However, the kiln system only
accounts for around 25% of the value of a cement
production line and additionally, the lifetime of a kiln is
generally longer than the other equipment
8. Capital Market Day 2009 8
Growing need for cement remains
despite current global crisis !
Emerging markets will continue to
be the driver - now also Africa
Long term trends
9. Capital Market Day 2009 9
0
20
40
60
80
100
120
140
160
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
Asia (excl. China & India)
India
Russia
Europe
North America
South America
Middle East
Africa
Geographical distribution of
new global contracted cement kiln capacity
(excl. China)
mty
10. Capital Market Day 2009 10
Growing need for cement remains
despite current global crisis !
Emerging markets will continue to
be the driver - now also Africa
Cement kiln sizes growing
Long term trends
11. Capital Market Day 2009 11
Wet kilns
1892: 1.8x18 m
35 tpd
1967: 7.6x232 m
3500 tpd
Preheater kilns
1970: 6.0x96 m
4000 tpd
Precalciner kilns
1984: 5.0x80 m
5500 tpd
1990: 6.0x96 m
≥10,000 tpd
2006 →: 6.6x93 m
≥12,000 tpd
History of kiln capacity development
13. Capital Market Day 2009 13
Cement kiln sizes continue to grow
1000
2000
3000
4000
5000
6000
1970 1980 1990 2000 2010
Year
Averageplantclinkercapacity(t/d)
14. Capital Market Day 2009 14
Growing need for cement remains
despite current global crisis !
Emerging markets will continue to
be the driver - now also Africa
Cement kiln sizes growing
Increased environmental focus
Long term trends
15. Capital Market Day 2009 15
Half of the fuel used in German
cement plants is alternative fuel
Rapid increase in
alternative fuel
usage during the
past 5 years
- due to focus
on lowering
production costs in
a cement market
with excess
production
capacity0
10
20
30
40
50
60
1999 2000 2001 2002 2003 2004 2005
Alternative fuel energy coverage in %
16. Capital Market Day 2009 16
The trends
Going from here
To there ☺
Increased focus on emissions
17. Capital Market Day 2009 17
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Agenda
18. Capital Market Day 2009 18
A cement plant from A to Z
Feasibility study
Proposal stage and signing of contract
Design and order handling stage
Civil design and construction
Erection, start-up,
Commissioning, handover, guarantees
Production, operation and maintenance of the
plant
FLSmidth strengths
and capabilities
FLSmidth strengths
and capabilities
Customer
requirements
Customer
requirements
19. Capital Market Day 2009 19
Feasibility stage
Budget proposals
for various sizes
Budget proposals
for various sizes
Market size, cement prices,
investment costs ?
Market size, cement prices,
investment costs ?
? ?
20. Capital Market Day 2009 20
Proposal stage and signing of contract
Leadtime as a conse-
quence of requirements
Leadtime as a conse-
quence of requirements
Tender requirements
on main features
or technical specialities
Tender requirements
on main features
or technical specialities
Basic
plant
Adapted
plant
Taylor
made
24 mth
Contract
21. Capital Market Day 2009 21
Proposal stage and signing of contract
FLSmidth tests the
raw materials
FLSmidth tests the
raw materials
Raw material
samples to FLSmidth
Raw material
samples to FLSmidth
R&D and test centre in
Denmark and India
22. Capital Market Day 2009 22
Proposal stage and signing of contract
Advanced process designAdvanced process designOptimal process and
low production cost
Optimal process and
low production cost
FLSmidth has in house laboratory with all
modern testing facilities.
FLSmidth process designers are carrying
a heritage of more than 100 years of
experience and know how.
FLSmidth is constantly increasing
investments in research and
development
23. Capital Market Day 2009 23
Proposal stage and signing of contract
FLSmidth has equipment
for the entire proces
FLSmidth has equipment
for the entire proces
Can we get the complete
package from FLSmidth ?
Can we get the complete
package from FLSmidth ?
Main machines & auxuilary equipment of FLSmidth design
Electrical equipment Vendor equipment
24. Capital Market Day 2009 24
Proposal stage and signing of contract
FLSmidth offers split-supplyFLSmidth offers split-supplyLocal supply and
manufacturing
Local supply and
manufacturing
1
2
4
6
5
18
3
12
7
40% imported
60% local manufactured
25. Capital Market Day 2009 25
Proposal stage and signing of contract
Typical cost compositionTypical cost compositionWhat are the total cost?What are the total cost?
Machinery
40%
Buildings
30%
Erection
15%
Supervision
5%
Transport
5%
Others
5%
26. Capital Market Day 2009 26
Proposal stage and signing of contract
Different options are
possible
Different options are
possible
Equipment, civil design
or turnkey?
Equipment, civil design
or turnkey?
Equipment
Civil design
Construction
Erection
27. Capital Market Day 2009 27
Proposal stage and signing of contract
All information sources
are used such as
Google Earth etc.
All information sources
are used such as
Google Earth etc.
Finding the right
site information?
Finding the right
site information?
28. Capital Market Day 2009 28
Proposal stage and signing of contract
3D layouts and models3D layouts and modelsVisualisation to
customer
Visualisation to
customer
29. Capital Market Day 2009 29
Proposal stage and signing of contract
3D layouts incorporated
in actual landscape
3D layouts incorporated
in actual landscapeVisualisation to authoritiesVisualisation to authorities
30. Capital Market Day 2009 30
Proposal stage and signing of contract
Quick order startQuick order startSigning the contractSigning the contract
31. Capital Market Day 2009 31
Design and order execution
A strong project teamA strong project teamSafe order handlingSafe order handling
Experience + skills + tools
32. Capital Market Day 2009 32
Design and order execution
Company size and
strengths in market
Company size and
strengths in market
Security in a
changing world
Security in a
changing world
Long track record
Global presence
Customer FLSmidth
Supply chain
Buying
power
Vendor
relations
33. Capital Market Day 2009 33
Design and order execution
World wide designWorld wide designClose contact to the
supplier
Close contact to the
supplier
Global design centres
design 24 hours a day
34. Capital Market Day 2009 34
Design and order execution
Fast civil designFast civil design Integrated technical
and civil design
Integrated technical
and civil design
35. Capital Market Day 2009 35
Manufacturing, inspection and expediting
High quality equipmentHigh quality equipment Close co-operation with
large workshops
Close co-operation with
large workshops
36. Capital Market Day 2009 36
Shipping
Safe transportSafe transport Odd-size equipment
or in containers
Odd-size equipment
or in containers
37. Capital Market Day 2009 37
Construction and installation
Swift and trouble free con-
struction and installation
Swift and trouble free con-
struction and installation
Experienced and
skilled supervisors
Experienced and
skilled supervisors
38. Capital Market Day 2009 38
Training of client’s staff
Training of staffTraining of staff FLSmidth Institute
- good training programme
FLSmidth Institute
- good training programme
39. Capital Market Day 2009 39
Commissioning, handover and guarantees
Vi har en god track rekord mht at opfylde
garantierne. Har vi evt nogle kurver eller
lignende?
A swift start of the plantA swift start of the plant FLSmidth has a good record
for reaching all guarantees
FLSmidth has a good record
for reaching all guarantees
FLSmidth
40. Capital Market Day 2009 40
Operation of the plant
A safe and economical
operation of the plant
A safe and economical
operation of the plant
FLSmidth offers full
operation and maintenance
FLSmidth offers full
operation and maintenance
41. Capital Market Day 2009 41
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Agenda
42. Capital Market Day 2009 42
Progress of ongoing projects
(to be addressed in following slides)
When will signed LoI’s and non-effective contracts
materialise?
General market outlook very uncertain these days !
Even though our customers wants to move ahead with
projects, they are met by financing constraints,
- i.e. not even our customers can tell when they will
be able to go ahead !
Factors contributing to uncertainty about
project income
43. Capital Market Day 2009 43
Project Income Flow
-10%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
(P
AC
)
Period of execution
Contract
POC Net Sales CM SG&A EBIT
Typical project progress and income recognition
Down payment
Letter of Credit
Engineering
Procurement
Manufacture
Shipping
Installation
44. Capital Market Day 2009 44
Project Income Flow
-10%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23rd
24th
25th
26th
27th
28th
29th
30th
(P
AC
)
Period of execution
Contract
POC Net Sales CM SG&A EBIT
Typical project progress and income recognition
Down payment
Letter of Credit
Engineering
Procurement
Manufacture
Shipping
Installation
45. Capital Market Day 2009 45
Delayed supplies from vendors
Client not ready to receive goods or formalities not in place
(e.g. BTI)
Client wants to postpone project
Suspension of project due to ”temporary” problems with
financing
Termination of project due to client’s inability to continue
Risks in execution of a cement project
All of the above creates uncertainty about timing of income
recognition…
….and just a few months delay around New Year can
impact the annual result significantly !
47. Capital Market Day 2009 47
What happens when orders are cancelled or put on hold?
“Cancelled”
– Initiated work and issue of purchase orders stop
– Legal department gets involved
– We stick to our contractual rights - no matter
which client
– We have the right to be compensated for
incurred and committed costs and as well as a
pro-rata contribution margin
– Cancellation fee to be claimed
“Put on hold”
– Initiated work and issue of purchase orders stop
– Contract and time schedule is amended
– We preserve the right to be compensated for
any additional costs
– Some clients are constrained on cash, others are
adjusting priorities
48. Capital Market Day 2009 48
Overall approx. 10 % of order backlog currently on hold.
3 - 4 major projects are partly suspended
– no major cement projects cancelled so far (but some minor)
We are in very close contact with the customers and they are
all determined to carry on – but limited by financing
Recent events on (partly) suspended contracts:
Receipt of progress payment – strong indicator of commitment
Agreement on prolonged delivery schedule
Agreement on finalising engineering but procurement on hold for a
specified period
At this stage we thus feel relatively confident about our
existing cement project portfolio – but timing still uncertain
Status of our existing cement project portfolio
49. Capital Market Day 2009 49
Introduction
Long term trends in the global
cement industry
FLSmidth’s role in a cement
project from A-Z
Uncertainties and risks in
execution of cement projects
Outlook in Cement
Agenda
50. Capital Market Day 2009 50
We have the strongest brand in the market !
We have a global reach – present in every corner of the world !
Strong belief in future prospects, because:
51. Capital Market Day 2009 51
Project centres Rep. officesProduction
Global undertaking with a local presence
52. Capital Market Day 2009 52
We have the strongest brand in the market !
We have a global reach – present in every corner of the world !
We have a complete product portfolio !
Strong belief in future prospects, because:
53. Capital Market Day 2009 53
Cement plant flow sheet
3
Cement
silo
Cement
silo
Cement
silo
Cement mill
Separator
Roller press
Gear unit
Clinker
Silo
2
Packers
Ship loading
Ship unloading
Limestone Clay Sand Iron
1 2 3 4
1
2
34
Storage
Crusher
Analyzer
Filter Filter
Grate
cooler
Raw meal
silo
Raw mill
Coal mill
54. Capital Market Day 2009 54
Cement kiln sizes continue to grow
ATOX mills
OK mills
MMC Cooler
ILC preheater
3-support kiln
DUOFLEX burner
Holcim Ste. Genevieve
The world’s first 12,000 tpd single kiln line
55. Capital Market Day 2009 55
We have the strongest brand in the market !
We have a global reach – present in every corner of the world !
We have a complete product portfolio !
We have an unsurpassed reference list !
Strong belief in future prospects, because:
56. Capital Market Day 2009 56
VKu/15.03.2007
Ozarow 2
7000 tpd
Ain Soukna
5000 tpd
Kursk
3500 tpd
Holcim
5500 tpd
Carribean Cement
3250 tpd
ACC, Rabigh
7000 tpd
Jovein
3900 tpd
Lappeenranta
1800 tpd
CIBA (Orascom)
1500 tpd
Unicem, Calabar
6250 tpd
Dwaalboom
3300 tpd
Natal Simuma
1500 tpd
EMCC (Orascom)
7500 tpd
Ash Grove foreman
4200 tpd
Rio Grande Pueblo
3000 tpd
Ha Long
5500 tpd
ABG Kutch
10000 tpd
CIBA Grey
6250 tpdArabian CC, Ramliya
6000 tpdSinai, Gabal Lebni 2
4200 tpd
Sinai White 2
1300 tpd
Madras Cement
7600 tpdAbyek Cement
4500 tpdKhuzestan, Ramhormoz
5500 tpd
Karcement
3200 tpd
AUCC 2
5000 tpdTepeaca
10000 tpd Dalmia
3x4500 tpd
Cimsa Eskisehir
2100 tpd
Ivano-Frankivsk
2300 tpd
Star Cement
6500 tpd
Ash Grove, Moapa
4350 tpd Essroc, Martinsburg
5000 tpd Keystone, Bath
3000 tpdSte. Genevieve
12000 tpd
Hoang Thach 3
3300 tpd
Sanghi, Kutch
10000 tpdOrient, Adilabad
4000 tpd
Platin
4000 tpd
Kokshe Cement
5500 tpd
Cem. Andorra
2350 tpd
Marquesado
3300 tpd
Al Takamol
4500 tpd Indocement
700 tpd
Fancesa
750 tpd
ACC Chanda
7000 tpd
CSN
2 x OK 39
Binani 2
6500 tpd
LSR Slantsy
5000 tpd
Volyn
6000 tpd
Golden Bay
350 tpd
Lafarge Joppa
7200 tpd
Gulf Cement
5000 tpd
Molins
4100 tpd
Argos
4500 tpd
Aleppo
7500 tpd
Ait Baha
5000 tpd
Podgorensky
6000 tpd
Akbulak
6000 tpdJP Kutch
10000 tpd
Projects the last 4 - 5 years !
> 100 new production lines
> 150 mtpy capacity !
57. Capital Market Day 2009 57
CIS
>45
Africa
>96
India
>141
South America
>162
Central America
>94
Middle East
>55
Australia
>25
North America
>356
Rest of Asia
>269
FLSmidth has built ~ 2000 cement kilns worldwide since 1898
Europe
>674
58. Capital Market Day 2009 58
We have the strongest brand in the market !
We have a global reach – present in every corner of the world !
We have a complete product portfolio !
We have an unsurpassed reference list !
We are investing most in R&D !
Strong belief in future prospects, because:
60. Capital Market Day 2009 60
We have the strongest brand in the market !
We have a global reach – present in every corner of the world !
We have a complete product portfolio !
We have an unsurpassed reference list !
We are investing most in R&D !
We are the strongest Group – Cement & Minerals
Strong belief in future prospects, because:
We are very well positioned for the future !