TIPOS DE CARGAS
Three categories of loads
 RESISTIVES
 INDUCTIVES
 CAPACITIVES
Ohms Ω
Henry Hy
Farad F
R
L
C
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
 RESISTIVE
 Furnaces
 Electrical heaters
 Electrical irons
 Light bulbs
 ....
 INDUCTIVE
 Transformers
 Induction motors
 Fluorescent lighting
 Induction furnaces
 Welding machines
 Drivers
 ........
 CAPACITIVE
 Capacitors
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
TIPOS DE CARGAS
OHMIC LOAD.
 RESISTIVE
VAC R
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Corriente IR = U/R Amper
Potencia P = RI² = U²/R Watts
OHMIC LOAD.
 RESISTIVE
IR
VAC R
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
IR
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
VAC
IR
ω
INDUCTIVE LOAD.
 INDUCTIVE
VAC L
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Corriente IL = U / ωL Amper.
Potencia P = U² / ωL var or kvar
INDUCTIVE LOAD.
 INDUCTIVE
IL
VAC L
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
IL
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
VAC
IL
ω
90°
CAPACITIVE LOAD.
 CAPACITIVE
VAC C
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Corriente Ic = ω C U Amper.
Potencia P = ω C U² var or kvar
CAPACITIVE LOAD.
 CAPACITIVE
IC
VAC C
-400
-300
-200
-100
0
100
200
300
400
0
45
90
135
180
225
270
315
360
405
450
495
540
VAC
IC
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
VAC
IC
ω90°
MIXED LOADS.
 Main industrial loads
I
V L
VR
VL
R
The majority of industrial
loadscan be regarded as
comprising resistor and
inductor in series.
V : supply voltage
VR: resistance voltage drop
VL: inductance voltage drop
I : total supply current
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
 Main industrial loads
I
V L
VR
VL
R
VR
VL
90°
ω
I
V
φ
"I" lags "V" by some angle φ
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
MIXED LOADS.
 Main industrial loads
φ
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
MIXED LOADS.
 CAPACITOR CONNECTION
I
L
R
V
IRL
IRL : current through the load
IC : current through the
capacitor
I : total current drawn from
supply
C
IC
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
MIXED LOADS.
 CAPACITOR CONNECTION
I
V L
R
IC ω
V
IRL
C
IRL
IC
I
ϕ1
ϕ2
ϕ1 ϕ2
ϕ cos ϕ I
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
MIXED LOADS.
k
W
- Active power (kW)
 performs the work (useful power)
kVA
- Apparent power (kVA)
 total power consumed
kv
ar
- Reactive power (kvar)
 sustains electromagnetic field (non useful power)
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
REACTIVE POWER COMPENSATION.
BASIC CONCEPTS.
kVA
Apparent power
φ
Active or useful power
kW
Reactive
power
kvar
kvar
Power factor
cos φ = kW / kVA
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
HOW CAN WE IMPROVE THE PF
CORRECTION AND THUS REDUCE THE
CONSUMED POWER?
kW
Kvar2
The capacitor connected in parallel will
draw kvar in the same way than the
load but in phase opposition (leading)
kVA
kvar1
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
BASIC CONCEPTS.
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
BASIC CONCEPTS.
φ1
kW
kvar
kVA1
φ2
kVA2
kvar2
kvar1
)2tan1kW(tankvarc
kW
kvar
tan
kvar²kW²
kW
cos
kvar²kW²kVA
kVA
kvar
sin
kVA
kW
cos
−=
=
+
=
+=
=
= kW
kvar
kVA
φ
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
BASIC CONCEPTS.
φφ
φφ
φ
φ
φ φ
Power factor correction chart
Kvar = k * kW
Desired PF
InitialPF
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
0.46
Nomogram
Kvar = k * kW
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
kW=410
kVA1=586
kvar1=419
φ1
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Ejemplo
kW=410
kVA1=586
kvar1=419
φ1
284
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Carga compensada
kW=410
kVA1=586
kvar1=419
φ1
kvar2=135284
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Carga compensada
kW=410
kVA1=586
kvar1=419
φ1 φ2
kVA2=432
kvar2=135284
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Carga compensada
Advantages of a good power factor
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Transformers and distribution cables
lightened ( I )
0.70.95
27%
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Reduced Joule losses ( RI² )
46
cos φ final values
cos φ initial values
% reduction in losses
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
CABLES
Reduced Joule losses ( RI² )
1150
6000
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
TRANSFORMER
Reduced Joule losses ( RI² )
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
kVA output reduced
cos φ initial
% kVA recovered
0.75
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Voltage drop in transformer
5.1
Voltage drop
cos φ
0.6
Low losses
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Normal losses
VOLTGE DROP
Cos ? = 0.6 * 5.1%
Cos ? = 0.6306
Cos φ = 0.6306
φ = 50.906
Typical PF encountered in industry
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Energy saving calculation.
400 kVA
400 V
P=80 kW
cos φ = 0.75
P=170 kW
cos φ = 0.75
1 cable
70 mm²
20 m
2 cables
70 mm²
100 m
A B
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Energy saving calculation.
Consumer's electricity bill:
• Monthly kWh consumed = 70125
• Monthly kvarh consumed = 63081
• Assuming an activity of :
340 days/year
15 hours/day
• Average kW = 70125/425 = 165 (66% of the full load)
• Average kvar = 63081/425 = 148
• Average kVA = √165² + 148² = 222
• Average P.F. = kW/ √kW² + kvar² = 0.744
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Energy saving calculation.
Min P.F. value to avoid penalty : 0.93
capacitor required = kW (tgφ1 - tgφ2)
=165 (0.898 - 0.395) = 83kvar
(in practice cap. size is increased by 5 to 10% to ensure a
P.F.> 0.93)
New situation
kW = 165 (unchanged)
kvar = 148 - 83 = 65 ()
kVA = √165² + 65² = 177 () (222 previously)
Monthly demand (kVA) is reduced by 20%
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Cable losses
Cos φ = 0.75
Workshop A :
I = P*0.66/ √3 V cos φ
= 80000 * 0.66/ √3 400 0.75 = 102A
Cable losses : P = 3 RI²L (R= ρ1/S)
= 3 * 246.10-6
Ω/m * (102)² * 20 =154W
5100 h/year P = 785kWh
Workshop B :
I = 170000 * 0.66/√3 400 0.75 = 216A
Cable losses : P = 2 (3RI²L)
= 2 * 3 * 246.10-6
* (216/2)² * 100 = 1722W
5100h/year P = 8782 kWh
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Cable losses
Cos φ : 0.93
Workshop A:
- I = 102 (0.75/0.93) = 82A
- Cable losses = 154 (82/102)² = 100W
- Cable losses/year = 150kWh
Workshop B:
- I = 216 (0.75/0.93) = 174A
- Cable losses = 1722 (174/216)² = 1117W
- Cables losses/year = 5697kWh
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Transformer losses
Before correction:
Total losses = 1000 + 5000 [(80+170) 0.66]² / (0.75 * 400)= 2513W
Total losses/year = 2513X5100 = 12814kWh
Total kWh = 785 + 8782 + 12814 = 22381
After correction:
Total losses = 1000 + 5000 [(80+170) 0.66]²/ (0.93 * 400) = 1984W
Total losses/year = 10118kWh
Total kWh/year = 510+5697+10118 = 16325
kWh reduction/year = 22381 - 16325 = 6056kWh
27% reduction
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
POWER FACTOR CORRECTION
The main reason for installing power capacitors is to
reduce reactive power costs and avoid the penalties.
Typical pay back period is less than 1-2 years.
Sometimes as little as a few months.
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
TYPICAL INSTALLATION
• Individual compensation of large motors (>50kW ≈ 70hp)
• Fixed compensation of transformers (+/-10 % of transformer rating)
• Automatic capacitor bank to compensate varying load
Locating capacitors on your system
Capacitors may be installed at various locations on your
electrical system.
1 : Capacitors on the incoming plant service
2 : Capacitors on the main bus
3 : Capacitors on the bus for various feeders
4 : Capacitors a the individual load point
Capacitor location
1 2 &3 4
Technical approach Best
Flexibility Least Less Best
Savings Least less Max.
Cost per kvar Least Lower Highest
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
TRANSFORMER COMPENSATION
- Increased useful capacity
- Reduced losses
- Reduced voltage drop
Degree of compensation :
1. "Rule of thumb" : +/- 10 % of transformer's nominal rating.
2. Calculation based on the individual transformer and its load pattern.
Note : check for resonance between transformer and capacitor.
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Individual transformer compensation
The resonant frequency can be calculated from the following
formula :
f fp
Psc
Pc
=
f = resonant frequency
fp = power frequency
Psc = short circuit power of the transformer (kVA)
Pc = power of the capacitor (kVAR)
If the frequency obtained is too close to that of a harmonic, the
value of the capacitor rating should be modified.
Most common harmonic frequencies, 3rd, 5th, 7th, etc...
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
MOTOR COMPENSATION
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
Methods for determining capacitor
rating for motor compensation
1.- Rule of thumb Qc = 40% of motor KW .
rating.
2.- Use of table the speed and motor power .
into acount
3.- Calculation based on exact individual
. motor charasteristics.
AUTOMATIC BANK COMPENSATION
Advantages of automatic capacitor banks :
- Regulation of cos φ.
- Better utilisation of the capacitor compared to individual compensation.
- Eliminates the possibility of overcompensation.
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
AUTOMATIC BANK COMPENSATION
Points to consider for automatic banks
• Choice of regulator characteristics (c/k and tolerance) and step size to
avoid hunting.
• Correlation between minimum interval between switching and discharge
device of capacitor to avoid energising a charged capacitor.
• Disconnecting of all steps in case of a mains outage.
• Insensitivity to harmonics.
• Possibility to extend existing banks without changes in the control
equipment.
CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
LVCP
THE NEW CHOICE FOR POWER
FACTOR CORRECTION
BANCO DE CONDENSADORES ING. HUBER
Compact
Modular
Safe
Reliable
Compact Small dimensions
210 mm
200 mm78 mm
Compact High
power density
 20 kvar
@ 400/415 V
BANCO DE CONDENSADORES ING. HUBER
Modular
Terminals sized for
common cable shoes
Built-in safety discharge
resistors (<75V in 3 min.)
Enclosure with double
casing insulation
BANCO DE CONDENSADORES ING. HUBER
Modular
Interconnection bars
Fixation holes
Clips system for group
assembly
BANCO DE CONDENSADORES ING. HUBER
Modular
Easy and quick assembly
of capacitor modules
BANCO DE CONDENSADORES ING. HUBER
DIN rail fixation
Examples of LVCP module assembly
30 kvar = 15 kvar + 15 kvar
35 kvar = 20 kvar + 15 kvar
40 kvar = 20 kvar + 20 kvar
400V/50Hz
BANCO DE CONDENSADORES ING. HUBER
Examples of LVCP module assembly
400V/50Hz
45kvar =
15kvar + 15kvar + 15kvar
50kvar =
16.7kvar + 16.7kvar + 16.7kvar
60kvar =
20kvar + 20kvar + 20kvar
BANCO DE CONDENSADORES ING. HUBER
Modular
External discharge device
Safe discharge
< 50V in 1
minute
BANCO DE CONDENSADORES ING. HUBER
Protective cover IP20
Safe
Built in safety discharge resistors
Fuse
Pressure sensitive disconnector
Thermo-setting resin
Dry type self healing capacitor winding
Insulating enclosure
BANCO DE CONDENSADORES ING. HUBER
system
Self-healing +
Internal fuse +
Pressure sensitive disconnector
BANCO DE CONDENSADORES ING. HUBER
Reliable
In-house
metallized film
 Voltage withstand capability
 Peak current
 Capacitance stability
 Life
 Self-healing
 Losses
BANCO DE CONDENSADORES ING. HUBER
Reliable
Automatized
manufacturing
process
 Controlled performance
 Repeatable quality
BANCO DE CONDENSADORES ING. HUBER
IEC 60831 1&2
ISO 9001
ISO 14001
Reliable
Comprehensive
testing
• Ageing
• Temperature
• Humidity
• Dielectric
• Self-healing
• Current
• Voltage
BANCO DE CONDENSADORES ING. HUBER
Range (50Hz)
0
2.5
5
7.5
10
12.5
15
17.5
20
230
400
415
450
465
KVAR
BANCO DE CONDENSADORES ING. HUBER
Range (60Hz)
0
2.5
5
7.5
10
12.5
15
17.5
20
220
240
380
440
450
BANCO DE CONDENSADORES ING. HUBER
THEN YOU ABB
BANCO DE CONDENSADORES ING. HUBER
YOUR choice for
Power Factor Correction

Mais conteúdo relacionado

Mais procurados

Automatic power factor correction unit
Automatic power factor correction unitAutomatic power factor correction unit
Automatic power factor correction unitBiswajit Pratihari
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+nirajsoham patel
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Pulse Energy
 
Automatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerAutomatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerSanket Shitole
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensationkhaliq ahmed
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controllersingh1515
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportTheory to Practical
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentationAzhar Abbas
 
automatic power factor correction report
automatic power factor correction reportautomatic power factor correction report
automatic power factor correction reportamaljo joju e
 
Power control in power systems
Power control in power systemsPower control in power systems
Power control in power systemsAbhinash Yadav
 
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOM
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOMOptimal Reactive Power Compensation in Electric Transmission Line using STATCOM
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOMIOSR Journals
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxSveris COE Pandharpur
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsAbhinav Dubey
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction VIKAS KUMAR MANJHI
 

Mais procurados (20)

Automatic power factor correction unit
Automatic power factor correction unitAutomatic power factor correction unit
Automatic power factor correction unit
 
Power factor
Power factorPower factor
Power factor
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+niraj
 
Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...Power Factor: what it is, how to measure it and how to improve it to reduce u...
Power Factor: what it is, how to measure it and how to improve it to reduce u...
 
Automatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerAutomatic power factor controller by microcontroller
Automatic power factor controller by microcontroller
 
THE POWER FACTOR
THE POWER FACTOR THE POWER FACTOR
THE POWER FACTOR
 
Power factor
Power factorPower factor
Power factor
 
Power Factor Correction with Current Controlled Buck Converter for BLDC Motor...
Power Factor Correction with Current Controlled Buck Converter for BLDC Motor...Power Factor Correction with Current Controlled Buck Converter for BLDC Motor...
Power Factor Correction with Current Controlled Buck Converter for BLDC Motor...
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controller
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Power factor presentation
Power factor presentationPower factor presentation
Power factor presentation
 
automatic power factor correction report
automatic power factor correction reportautomatic power factor correction report
automatic power factor correction report
 
PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009PFC - Ducati ANIE 2009
PFC - Ducati ANIE 2009
 
Power factor
Power factorPower factor
Power factor
 
Power control in power systems
Power control in power systemsPower control in power systems
Power control in power systems
 
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOM
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOMOptimal Reactive Power Compensation in Electric Transmission Line using STATCOM
Optimal Reactive Power Compensation in Electric Transmission Line using STATCOM
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction
 

Semelhante a 2.. compensación reactiva

NORDAC Energy saving with inverter
NORDAC Energy saving with inverterNORDAC Energy saving with inverter
NORDAC Energy saving with inverterTevfik AKKUŞ
 
Improvement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorImprovement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorIOSRJEEE
 
Pocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsPocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsSuresh Kumar
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)FunExplode
 
Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings RCREEE
 
Lect2 smatgrid-power systemspart1
Lect2 smatgrid-power systemspart1Lect2 smatgrid-power systemspart1
Lect2 smatgrid-power systemspart1Damaso Roque
 
Flexible grid management solutions in UK and Switzerland
Flexible grid management solutions in UK and SwitzerlandFlexible grid management solutions in UK and Switzerland
Flexible grid management solutions in UK and SwitzerlandThearkvalais
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Marcep Inc.
 
powersaving.pdf
powersaving.pdfpowersaving.pdf
powersaving.pdfHODEE15
 
Ulx inverter series residential single phase transformer-based
Ulx inverter series residential single phase transformer-basedUlx inverter series residential single phase transformer-based
Ulx inverter series residential single phase transformer-basedDanfoss India
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
DC двигатели Lenze
DC двигатели LenzeDC двигатели Lenze
DC двигатели LenzeArve
 
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) ContactorsABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) ContactorsThorne & Derrick International
 
4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdfSriGayatriDSR
 

Semelhante a 2.. compensación reactiva (20)

NORDAC Energy saving with inverter
NORDAC Energy saving with inverterNORDAC Energy saving with inverter
NORDAC Energy saving with inverter
 
Transformers
TransformersTransformers
Transformers
 
Epcos 5
Epcos 5Epcos 5
Epcos 5
 
Improvement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorImprovement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using Capacitor
 
Pocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systemsPocket book on energy efficiency in elec systems
Pocket book on energy efficiency in elec systems
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings
 
Power Management in BMS
Power Management in BMSPower Management in BMS
Power Management in BMS
 
Apfc panel
Apfc panelApfc panel
Apfc panel
 
Lect2 smatgrid-power systemspart1
Lect2 smatgrid-power systemspart1Lect2 smatgrid-power systemspart1
Lect2 smatgrid-power systemspart1
 
Flexible grid management solutions in UK and Switzerland
Flexible grid management solutions in UK and SwitzerlandFlexible grid management solutions in UK and Switzerland
Flexible grid management solutions in UK and Switzerland
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
 
Power saving ppt
Power saving pptPower saving ppt
Power saving ppt
 
powersaving.pdf
powersaving.pdfpowersaving.pdf
powersaving.pdf
 
Ulx inverter series residential single phase transformer-based
Ulx inverter series residential single phase transformer-basedUlx inverter series residential single phase transformer-based
Ulx inverter series residential single phase transformer-based
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
DC двигатели Lenze
DC двигатели LenzeDC двигатели Lenze
DC двигатели Lenze
 
Internship report
Internship reportInternship report
Internship report
 
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) ContactorsABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
ABB Contactors - 3 Pole Contactors ABB AF09 AF09Z (AC DC) Contactors
 
4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf
 

Último

PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsArubSultan
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxAvaniJani1
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxryandux83rd
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 

Último (20)

Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Shark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristicsShark introduction Morphology and its behaviour characteristics
Shark introduction Morphology and its behaviour characteristics
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Comparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptxComparative Literature in India by Amiya dev.pptx
Comparative Literature in India by Amiya dev.pptx
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptx
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 

2.. compensación reactiva

  • 1. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Expositor : Huber Murillo M.
  • 2. TIPOS DE CARGAS Three categories of loads  RESISTIVES  INDUCTIVES  CAPACITIVES Ohms Ω Henry Hy Farad F R L C CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 3.  RESISTIVE  Furnaces  Electrical heaters  Electrical irons  Light bulbs  ....  INDUCTIVE  Transformers  Induction motors  Fluorescent lighting  Induction furnaces  Welding machines  Drivers  ........  CAPACITIVE  Capacitors CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO TIPOS DE CARGAS
  • 4. OHMIC LOAD.  RESISTIVE VAC R -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Corriente IR = U/R Amper Potencia P = RI² = U²/R Watts
  • 5. OHMIC LOAD.  RESISTIVE IR VAC R -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC IR CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO VAC IR ω
  • 6. INDUCTIVE LOAD.  INDUCTIVE VAC L -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Corriente IL = U / ωL Amper. Potencia P = U² / ωL var or kvar
  • 7. INDUCTIVE LOAD.  INDUCTIVE IL VAC L -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC IL CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO VAC IL ω 90°
  • 8. CAPACITIVE LOAD.  CAPACITIVE VAC C -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Corriente Ic = ω C U Amper. Potencia P = ω C U² var or kvar
  • 9. CAPACITIVE LOAD.  CAPACITIVE IC VAC C -400 -300 -200 -100 0 100 200 300 400 0 45 90 135 180 225 270 315 360 405 450 495 540 VAC IC CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO VAC IC ω90°
  • 10. MIXED LOADS.  Main industrial loads I V L VR VL R The majority of industrial loadscan be regarded as comprising resistor and inductor in series. V : supply voltage VR: resistance voltage drop VL: inductance voltage drop I : total supply current CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 11.  Main industrial loads I V L VR VL R VR VL 90° ω I V φ "I" lags "V" by some angle φ CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO MIXED LOADS.
  • 12.  Main industrial loads φ CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO MIXED LOADS.
  • 13.  CAPACITOR CONNECTION I L R V IRL IRL : current through the load IC : current through the capacitor I : total current drawn from supply C IC CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO MIXED LOADS.
  • 14.  CAPACITOR CONNECTION I V L R IC ω V IRL C IRL IC I ϕ1 ϕ2 ϕ1 ϕ2 ϕ cos ϕ I CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO MIXED LOADS.
  • 15. k W - Active power (kW)  performs the work (useful power) kVA - Apparent power (kVA)  total power consumed kv ar - Reactive power (kvar)  sustains electromagnetic field (non useful power) CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO REACTIVE POWER COMPENSATION.
  • 16. BASIC CONCEPTS. kVA Apparent power φ Active or useful power kW Reactive power kvar kvar Power factor cos φ = kW / kVA CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO HOW CAN WE IMPROVE THE PF CORRECTION AND THUS REDUCE THE CONSUMED POWER?
  • 17. kW Kvar2 The capacitor connected in parallel will draw kvar in the same way than the load but in phase opposition (leading) kVA kvar1 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO BASIC CONCEPTS.
  • 18. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO BASIC CONCEPTS. φ1 kW kvar kVA1 φ2 kVA2 kvar2 kvar1
  • 20. Power factor correction chart Kvar = k * kW Desired PF InitialPF CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 21. 0.46 Nomogram Kvar = k * kW CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 22. kW=410 kVA1=586 kvar1=419 φ1 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Ejemplo
  • 23. kW=410 kVA1=586 kvar1=419 φ1 284 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Carga compensada
  • 24. kW=410 kVA1=586 kvar1=419 φ1 kvar2=135284 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Carga compensada
  • 25. kW=410 kVA1=586 kvar1=419 φ1 φ2 kVA2=432 kvar2=135284 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Carga compensada
  • 26. Advantages of a good power factor CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 27. Transformers and distribution cables lightened ( I ) 0.70.95 27% CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 28. Reduced Joule losses ( RI² ) 46 cos φ final values cos φ initial values % reduction in losses CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO CABLES
  • 29. Reduced Joule losses ( RI² ) 1150 6000 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO TRANSFORMER
  • 30. Reduced Joule losses ( RI² ) CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 31. kVA output reduced cos φ initial % kVA recovered 0.75 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 32. Voltage drop in transformer 5.1 Voltage drop cos φ 0.6 Low losses CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Normal losses VOLTGE DROP Cos ? = 0.6 * 5.1% Cos ? = 0.6306 Cos φ = 0.6306 φ = 50.906
  • 33. Typical PF encountered in industry CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 34. Energy saving calculation. 400 kVA 400 V P=80 kW cos φ = 0.75 P=170 kW cos φ = 0.75 1 cable 70 mm² 20 m 2 cables 70 mm² 100 m A B CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 35. Energy saving calculation. Consumer's electricity bill: • Monthly kWh consumed = 70125 • Monthly kvarh consumed = 63081 • Assuming an activity of : 340 days/year 15 hours/day • Average kW = 70125/425 = 165 (66% of the full load) • Average kvar = 63081/425 = 148 • Average kVA = √165² + 148² = 222 • Average P.F. = kW/ √kW² + kvar² = 0.744 CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 36. Energy saving calculation. Min P.F. value to avoid penalty : 0.93 capacitor required = kW (tgφ1 - tgφ2) =165 (0.898 - 0.395) = 83kvar (in practice cap. size is increased by 5 to 10% to ensure a P.F.> 0.93) New situation kW = 165 (unchanged) kvar = 148 - 83 = 65 () kVA = √165² + 65² = 177 () (222 previously) Monthly demand (kVA) is reduced by 20% CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 37. Cable losses Cos φ = 0.75 Workshop A : I = P*0.66/ √3 V cos φ = 80000 * 0.66/ √3 400 0.75 = 102A Cable losses : P = 3 RI²L (R= ρ1/S) = 3 * 246.10-6 Ω/m * (102)² * 20 =154W 5100 h/year P = 785kWh Workshop B : I = 170000 * 0.66/√3 400 0.75 = 216A Cable losses : P = 2 (3RI²L) = 2 * 3 * 246.10-6 * (216/2)² * 100 = 1722W 5100h/year P = 8782 kWh CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 38. Cable losses Cos φ : 0.93 Workshop A: - I = 102 (0.75/0.93) = 82A - Cable losses = 154 (82/102)² = 100W - Cable losses/year = 150kWh Workshop B: - I = 216 (0.75/0.93) = 174A - Cable losses = 1722 (174/216)² = 1117W - Cables losses/year = 5697kWh CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 39. Transformer losses Before correction: Total losses = 1000 + 5000 [(80+170) 0.66]² / (0.75 * 400)= 2513W Total losses/year = 2513X5100 = 12814kWh Total kWh = 785 + 8782 + 12814 = 22381 After correction: Total losses = 1000 + 5000 [(80+170) 0.66]²/ (0.93 * 400) = 1984W Total losses/year = 10118kWh Total kWh/year = 510+5697+10118 = 16325 kWh reduction/year = 22381 - 16325 = 6056kWh 27% reduction CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 40. POWER FACTOR CORRECTION The main reason for installing power capacitors is to reduce reactive power costs and avoid the penalties. Typical pay back period is less than 1-2 years. Sometimes as little as a few months. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO TYPICAL INSTALLATION • Individual compensation of large motors (>50kW ≈ 70hp) • Fixed compensation of transformers (+/-10 % of transformer rating) • Automatic capacitor bank to compensate varying load
  • 41. Locating capacitors on your system Capacitors may be installed at various locations on your electrical system. 1 : Capacitors on the incoming plant service 2 : Capacitors on the main bus 3 : Capacitors on the bus for various feeders 4 : Capacitors a the individual load point Capacitor location 1 2 &3 4 Technical approach Best Flexibility Least Less Best Savings Least less Max. Cost per kvar Least Lower Highest CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 42. TRANSFORMER COMPENSATION - Increased useful capacity - Reduced losses - Reduced voltage drop Degree of compensation : 1. "Rule of thumb" : +/- 10 % of transformer's nominal rating. 2. Calculation based on the individual transformer and its load pattern. Note : check for resonance between transformer and capacitor. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 43. Individual transformer compensation The resonant frequency can be calculated from the following formula : f fp Psc Pc = f = resonant frequency fp = power frequency Psc = short circuit power of the transformer (kVA) Pc = power of the capacitor (kVAR) If the frequency obtained is too close to that of a harmonic, the value of the capacitor rating should be modified. Most common harmonic frequencies, 3rd, 5th, 7th, etc... CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 44. MOTOR COMPENSATION CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO Methods for determining capacitor rating for motor compensation 1.- Rule of thumb Qc = 40% of motor KW . rating. 2.- Use of table the speed and motor power . into acount 3.- Calculation based on exact individual . motor charasteristics.
  • 45. AUTOMATIC BANK COMPENSATION Advantages of automatic capacitor banks : - Regulation of cos φ. - Better utilisation of the capacitor compared to individual compensation. - Eliminates the possibility of overcompensation. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 46. AUTOMATIC BANK COMPENSATION Points to consider for automatic banks • Choice of regulator characteristics (c/k and tolerance) and step size to avoid hunting. • Correlation between minimum interval between switching and discharge device of capacitor to avoid energising a charged capacitor. • Disconnecting of all steps in case of a mains outage. • Insensitivity to harmonics. • Possibility to extend existing banks without changes in the control equipment. CARGAS INDUSTRIALES - COMPENSACION REACTIVA ING. HUBER MURILLO
  • 47. LVCP THE NEW CHOICE FOR POWER FACTOR CORRECTION BANCO DE CONDENSADORES ING. HUBER Compact Modular Safe Reliable
  • 48. Compact Small dimensions 210 mm 200 mm78 mm Compact High power density  20 kvar @ 400/415 V BANCO DE CONDENSADORES ING. HUBER
  • 49. Modular Terminals sized for common cable shoes Built-in safety discharge resistors (<75V in 3 min.) Enclosure with double casing insulation BANCO DE CONDENSADORES ING. HUBER
  • 50. Modular Interconnection bars Fixation holes Clips system for group assembly BANCO DE CONDENSADORES ING. HUBER
  • 51. Modular Easy and quick assembly of capacitor modules BANCO DE CONDENSADORES ING. HUBER DIN rail fixation
  • 52. Examples of LVCP module assembly 30 kvar = 15 kvar + 15 kvar 35 kvar = 20 kvar + 15 kvar 40 kvar = 20 kvar + 20 kvar 400V/50Hz BANCO DE CONDENSADORES ING. HUBER
  • 53. Examples of LVCP module assembly 400V/50Hz 45kvar = 15kvar + 15kvar + 15kvar 50kvar = 16.7kvar + 16.7kvar + 16.7kvar 60kvar = 20kvar + 20kvar + 20kvar BANCO DE CONDENSADORES ING. HUBER
  • 54. Modular External discharge device Safe discharge < 50V in 1 minute BANCO DE CONDENSADORES ING. HUBER Protective cover IP20
  • 55. Safe Built in safety discharge resistors Fuse Pressure sensitive disconnector Thermo-setting resin Dry type self healing capacitor winding Insulating enclosure BANCO DE CONDENSADORES ING. HUBER
  • 56. system Self-healing + Internal fuse + Pressure sensitive disconnector BANCO DE CONDENSADORES ING. HUBER
  • 57. Reliable In-house metallized film  Voltage withstand capability  Peak current  Capacitance stability  Life  Self-healing  Losses BANCO DE CONDENSADORES ING. HUBER
  • 58. Reliable Automatized manufacturing process  Controlled performance  Repeatable quality BANCO DE CONDENSADORES ING. HUBER IEC 60831 1&2 ISO 9001 ISO 14001
  • 59. Reliable Comprehensive testing • Ageing • Temperature • Humidity • Dielectric • Self-healing • Current • Voltage BANCO DE CONDENSADORES ING. HUBER
  • 62. THEN YOU ABB BANCO DE CONDENSADORES ING. HUBER YOUR choice for Power Factor Correction