1School Improvement Plan
NAALAD ELEMENTARY SCHOOL
119508
Naalad, City of Naga, Cebu
ENHANCED
SCHOOL
IMPROVEMENT
PLAN
School Year 2019-2022
2School Improvement Plan
TABLE OF CONTENTS
List of Acronyms
Certificate of Acceptance
CHAPTER 1. Department of Education’s Vision,
Mission, and Core Values Statement
School Planning Team
School Planning Time Table
Page 4
Page 5
Page 6
Page 8
Page 10
CHAPTER 2. Narrative Report on School’s Current
Situation
List of GAPs
Priority Improvement Area
Prioritizing PIAs
Page 11
Page 13
Page 16
Page 18
CHAPTER 3. School Improvement Planning Worksheet
List of Possible Solutions
Project Work Plan and Budget Matrix
Annual Improvement Plan
Page 19
Page 21
Page 22
Page 54
CHAPTER 4. Monitoring and Evaluation
ANNEXES
Annex 1A School Community Data Template
Annex 1B Child Mapping Tool
Annex 2A Child-Friendly School Survey
Annex 2B Child Protection Policy
Annex 2C Student -Led School Watching
and Hazard Mapping
Page 61
Page 78
Page 91
Page 111
Page 119
Page 122
3School Improvement Plan
Annex 3 GAP Analysis
Annex 4 Identifying Priority Improvement
Areas
Annex 5 Planning Worksheet
Annex 6 Guidelines in Listening to Voice of
Learners and Other Stakeholders
Annex 7 Walk the Process Guidelines
Annex 8 Root Cause Analysis
Annex 9 Project Work Plan and Budget
Annex 10 Annual Implementation Plan
Annex 11 SRC Summary of Information
Annex 12 School Report Card
Page 123
Page 137
Page 138
Page 140
Page 142
Page 146
Page 155
Page 187
Page 192
Page 200
4School Improvement Plan
LIST OF ACRONYMS
DepEd – Department of Education
SIP – School Improvement Program
AIP – Annual Implementation Plan
LGU- Local Government Unit
MGB –Mines and GeoSciences Bureau
DENR – Department of Environment and Natural Resources
SDRRM – School Disaster Risk Reduction Management
DPWH – Department of Public Works and Highways
APP- Annual Procurement Plan
NDRRMC –National Disaster Risk Reduction Management Council
5School Improvement Plan
HAPTER 1
VII
CITY OF NAGA
NAALAD ELEMENTARY SCHOOL
ROSALIE M. PASAOL, Ed.D., CESO V
6School Improvement Plan
Department of Education Mission, Vision, and Core Values
Statement
The DepEd Vision
We dream of Filipinos who passionately love their country and whose values
and competencies enable them to realize their full potential and contribute
meaningfully to building the nation.
As a learner-centered public institution, the Department of Education
continuously improves itself to better serve its stakeholders.
The DepEd Mission
To protect and promote the right of every Filipino to quality, equitable, culture-
based, and complete basic education where:
Students learn in a child-friendly, gender-sensitive, safe, and motivating
environment.
Teachers facilitate learning and constantly nurture every learner.
Administrators and staff, as stewards of the institution, ensure an enabling and
supportive environment for effective learning to happen.
Family, community, and other stakeholders are actively engaged and share
responsibility for developing life-long learners.
Our Core Values
Maka-Diyos
Maka-tao
Makakalikasan
Maka-Bansa
C
H
A
P
T
E
R
1
7School Improvement Plan
Naalad Elementary School is a learner-centered and child-friendly
government institution aligned to the Department of Education’s Mission
and Vision. In the next three years, we aspire to provide a haven for
holistic development to the learners by providing them a caring and
nurturing environment that will enable them, empower them and
encourage them to achieve their highest potential. The school’s
dedicated and competent teachers will enable the learners with
knowledge integrated with good values in different academic subjects
and skills in the performance tasks in technology, music, arts and
sports. The school administration aims to provide the best support it can
give to propel a 21st
century teaching and learning outcome.
We commit through the school’s administration and teaching staff
as we are geared towards working hand in hand to continually improve
the school’s performance in the aspects of access, quality and in good
governance through:
• Full implementation and monitoring of the programs and
projects of the school as mandated by the Department of
Education.
• Provide full support and training of teachers, coaches and
athletes to attain their maximum potential.
• Maintain a collaborative working relationship with the
community by engaging the Barangay Officials, parents and
stakeholders with the full functionality of the School Governing
Council.
• Attain one hundred percent curriculum implementation through
generously exposing teachers to opportunities for professional
development and through provision of technical support.
• Provide a happy, safe and secure school environment wherein
learners, teachers, parents and the community will coexist
performing each role in molding young minds to become
proactive and productive members of society in the generations
to come.
With the guidance and blessings of God almighty, these dreams
and aspirations are crafted for Naalad Elementary School Improvement
Plan for the next three years.
8School Improvement Plan
School Planning Team Roles, Responsibilities and Commitment.
We envision to provide quality education to each learner, in a
learner-centered, friendly and value-driven learning environment with
committed teachers and school head, adequate resources and facilities,
and strong, supportive stakeholders, all geared towards helping each
learner with special needs, out of school youth and adult to reach
her/his full potential for lifelong learning.
Stakeholders Roles Responsibilities
Lindy M. Pujante
School Head
Team Leader
• Convene the school Planning
Team
• Provides leadership and
guidance in the
development of the plan,
clearly explain the SIP
process to the planning
workshop
Joan Z. Soterio
Assistant
School Head
• Provide needed information
relative to teaching and
learning process
• Participate actively during
the development of the SIP
establishing priorities,
setting goals and
formulating implementation
strategies for the plan
• Assist in the implementation
of the plan, monitoring and
evaluation of the plan
implantation
• Participate in the
preparation of the School
Improvement Plan
Nash Eleine Caro
(SPG President)
Student
Representative
• Share insights about
learners’ difficulties in
school
• Provide technical and
financial support towards
the SIP implementation
• Assist in the implementation
of the plan, monitoring and
evaluation of the plan
implementation
• Participate in the
preparation of the School
Improvement Plan
9School Improvement Plan
• Assist the school in its
advocacy effort of the SIP
Edgar Torremocha
(PTA President)
Parent
Representative
• Share insights about what
their children need to learn
and the difficulties they face
in school, their aspiration for
the school and their
children, present other
areas of concerns; and
participates in setting goals,
strategies and priorities of
the school
• Assist in the implementation
of the plan, monitoring and
evaluation of the plan
implementation
• Participate in the
preparation of the School
Improvement Plan
Sandra L. Cañalita
(Barangay
Captain)
Barangay
Representative
• Participate in the
preparation of the School
Improvement Plan
• Share valuable information
on the interest of the
community in school
improvement and
participate in setting goals,
strategies and priorities of
the school
• Commit available resources
in the implementation of the
plan
• Assists in the
implementation of the plan
implementation
10School Improvement Plan
Table 1. SCHOOL PLANNING TEAM TIMETABLE
The table below shows the activities of the School Planning
Team in the preparation, implementation and monitoring of the School
Improvement Plan and Annual Implementation Plan which serve as
guide to all SPT members and the school-community.
ACTIVITIES SCHEDULE
PREPARATORY ACTIVITIES
School Head with Team will gather and organize
data using the School-Community Data
Template
January 7 – 11,
2020
Form and convene the SPT for orientation,
vision sharing, and scheduling
January 21 – 25,
2019
PHASE 1: ASSESS
School Planning Team will present and discuss
the information gather during the preparatory
activities.
Identify/Review the Priority Improvement Areas
through Focus Group Discussion.
February 4 – 8,
2019
SPT will discuss and set general objectives and
targets/ organize the project teams/ listen to
the voice of the learners and other
stakeholders/ analyze the school process/ select
area of focus/ do root cause analysis/ and
present root cause to the SPT
March 11 – 15,
2019
PHASE 2: PLAN
SPT will review general objectives and targets/
formulate solutions/ develop project designs/
April 8 – 12,
2019
Write the SIP/ and prepare the AIP
May 13 – 17,
2019
PHASE 3: ACT
Project Team will test the solutions
June – August
2019
Roll out the solutions
September 2,
2019
SPT will check the progress of AIP April 2019
Monitoring and Evaluation
October 28 – 31,
2019
April 13 – 17,
2019
11School Improvement Plan
CHAPTER 2
Assess
NARRATIVE REPORT ON SCHOOL’S CURRENT SITUATION
Naalad Elementary School is geographically located at the foot
of the hill northwest of the city proper about 2.5 kilometers away from
the City of Naga Division Office and nearby public and private
elementary and secondary schools. It can be reached by public utility
vehicle or by motorcycle. Naalad Elementary School adapts its name
of the barangay which is Naalad meaning “Fence”. This is so because
the barangay is surrounded by towering heights of hills and mountains.
It has a total land area of 4, 449 square meters and was established
in 1958. The school site was acquired through donation, executed and
entered into by and between City of Naga (formerly Municipality of
Naga), Cebu duly represented by the late Mayor Ferdinand M. Chiong
as the DONOR and the Department of Education (formerly Department
of Education Culture and Sports), Naalad Elementary School, duly
represented by the School Principal Dr. Dulcesima L. Valparaiso as the
DONEE on April 23, 2001 at Naga, Cebu as shown in the Deed of
Donation.
Naalad Elementary School is a complete mono-grade school. The
current eighteen (18) teaching and non-teaching staff of the school is
composed of one Head Teacher 3 serving as the School Head, one duly
designated Assistant School Head who is a Teacher 3, one Master
Teacher 2, five Teacher 3, five Teacher 2 and the rest are Teacher 1.
Out of these 17 teachers, only few are trained for ICT, while the rest
are trained in Kto12, Journalism and other trainings. LAC system is also
in place for teachers to gain insights on the methods from the best
practices of fellow teachers that will enhance their teaching process.
Currently, we have thirteen (13) classrooms being used and two
(2) classrooms for demolition which makes us short of 2 classrooms.
We also need a functional EPP/TLE Room, a Science Laboratory, a
Learning Center, a canteen, a functional school DRRM, a plant nursery
and material recovery facility to improve our Gulayan sa Paaralan.
Fortunately, we have no shortage of seats and chairs but we have a
number of textbook shortage particularly in Science 369 and EPP/TLE
365. These shortage in textbooks are composed mostly in higher grades
of Grades IV to Grade VI. Most in lower Grades 1 to Grade 3 have
enough textbooks.
C
H
A
P
T
E
R
2
12School Improvement Plan
Along with the challenges, the school has its triumphs to be proud
of. These are:
• 1st
place winner in photo journalism division level
• 1st
place winner in pop quiz division level
• 1st
place winner in speech choir competition division level
• 1st
place winner in volleyball male category division level
• 1st
place winner in volleyball female category division level
• Emerging school in the ECO-FRIENDLY Competition
In the next three years, we hope to achieve the following:
A) ACCESS
• Construct 4 handwashing facilities to achieve the standard 1:100
handwashing facility to pupil ratio
• Meet 100% standard classroom requirement
• Acquire high speed and stable internet connectivity
• Regain disconnected water from HelpMate
• Create one learning resource center
• Create one Home Economics area
B) QUALITY AND RELEVANCE
• Attain one action research
• Attain 1 Science Investigatory Project
• Progress to Regional Festival of Talents and win
• Organize, train and win in Robotics competition
• Attain 100% functionality of the Supreme Pupil Government
• Organize, train and win in Ukulele competition
C) GOVERNANCE
• Enhance Gulayan sa Paaralan
• Make the School Disaster Risk Reduction Management Team fully
functional
• To create a school canteen with nutritious food
• To install CCTV in strategic area for security
13School Improvement Plan
After performing GAP analysis, we come up with the following list
of unaccomplished gaps.
Division
Targets/
Planning
Standards
Data
Needed
Current
Situation
Root
Cause/s
General
Objectiv
e/s
TIME FRAME
General Solution
Accomp
lished
Gap
SY
2019-
2020
SY
2020-
2021
SY
2021-
2022
A. Access
1:100
handwashin
g facility -
Pupil Ratio
634/2 4
No
assigned
area for
handwas
hing
facilities
and lack
of ample
water
supply
To build
additiona
l 4
handwas
hing
facilities
2 2
Allocate funds to
build 4 addional
hand washing
facilities
100%
Classrooms
in good
condition
12/15 3
Building
is
dilapidat
ed and
was due
for
demilitio
n
To build
additiona
l 3
classroo
ms and
repair
rooms
which
needed
repairs
1 1 1
To ask DepEd/LGU
assistance
Internet
Connectivity
per school
0/1
No
internet
connecti
vity in
the area
To
acquire
the
internet
connecti
vity of
the
school.
1
acquire for point to
point internet
access
Water
supply
connection
per school
0/1 1
Disconne
jcted
water
supply
from
Helpmat
e
To
acquire
the
connecti
on of
water
supply in
the
school.
1
to regain water
connection from
helpmate
1 Learning
Center per
school
0/1 1
No
enough
area.
To build
a
classroo
m for
learning
center.
1
Ask help from the
LGU or the school
stakeholder.
14School Improvement Plan
1 H.E.
Laboratory
0/1 1
Lack of
classroo
m.
To look
for a
place
and
budget
for
construct
ion of HE
Laborato
ry.
1
Ask help from the
stakehloders.
Fundraising
campaign.
B. Quality
and
Relevance
1 Action
Research
per school
0/2 1
No
assigned
teacher
for
research.
To
assign
qualified
teacher
for
research.
1 1
Allocate funding
from school
resources like PTA
and MOOE
Regional
Festival of
Talents
0 1
No
winners
progress
ed to
Regional
level
To win in
the
Regional
Festival
of
Talents
100
Train coach and
participants
Robotics
Contest
0 1
Lack of
training
for about
robotics
To
organize
a
robotics
team for
competiti
on
1 1
Conduct/participate
trainings and
seminars related to
robotics.
Functionality
of SPG and
SSG
30% 30%
SPG is
not
100%
functiona
l due to
time
constrain
t.
To attain
100%
functiona
lity of the
SPG in
school
for the
next
years.
10% 10% 10%
Organize and
conduct meeting or
conference with the
SPG advisers .
Creation of
Rondalla/
Ukelele
Ensemble
0/1 1
Non
existing
To
organize
Ukelele
Ensembl
e. To win
in
competit
ons.
1 1 1
To train MAPEH
teachers
C.
Governance
15School Improvement Plan
Gulayan Sa
Paaralan
0/1
No fully
functiona
l
gulayan,
with no
plant
nursery,
no mrf
To
intensify
the
impleme
ntation of
the
Gulayan
sa
Paaralan
100% 100%
Require all pupils to
have 1
containerized
vegetable plant
DRRM 0/1 1
No
school
continge
ncy plan
To
create a
fully
funcitona
l SDRRM
1
Create a
contingency plan
1 Canteen
per School
0/1 1
Canteen
was
demolish
ed due
to on-
going
construct
ion of the
building.
To put
up a
canteen
inside
the
school.
1
Tap stokeholders
for funds. Conduct a
fund raising
campaign.
5 CCTV per
school
0/5 1
No
alloted
budget
for
CCTV.
To put a
CCTV
inside
school
premises
.
1
Include CCTV
purchase in crafting
the APP.
16School Improvement Plan
We further analyze these unaccomplished GAPS and identify the
improvement areas that needs to be prioritized to wit:
IDENTIFY PRIORITY IMPROVEMENT AREAS
Improvement
Areas
Strategic
Importance
Urgency Magnitude Feasibility Average
Interpr
etation
A. Access
5 5 5 5 5
very
high
priority
1
1:100 handwashing facility -
Pupil Ratio
5 5 5 5 5
very
high
priority
2
100% Classrooms in good
condition
5 5 5 5 5
very
high
priority
3
Internet Connectivity per
school
5 5 5 5 5
very
high
priority
4
Water supply connection
per school
5 5 5 5 5
very
high
priority
5
1 Learning Center per
school
5 5 5 5 5
very
high
priority
6
1 H.E. Laboratory
5 5 5 5 5
very
high
priority
B. Quality and Relevance
7
1 Action Research per
school
5 5 5 5 5
very
high
priority
8
1 SIP (Science
Investigatory Project) per
school 5 5 5 5 5
very
high
priority
9
Regional Festival of Talents
5 5 5 5 5
very
high
priority
10
Robotics Contest
5 5 5 5 5
very
high
priority
11
Functionality of SPG
5 5 5 5 5
very
high
priority
12
Creation of Rondalla/
Ukelele Ensemble
5 5 5 5 5
very
high
priority
17School Improvement Plan
C. Governance
13
Gulayan Sa Paaralan
5 5 5 5 5
very
high
priority
14
DRRM
5 5 5 5 5
very
high
priority
15
1 Canteen per School
5 5 5 5 5
very
high
priority
16
5 CCTV per school
5 5 5 5 5
very
high
priority
18School Improvement Plan
Further, the list of GAPS will be prioritized for the next three years
in the following manner:
PRIORITIZING PIAs
Improvement Areas
VERY HIGH PRIORITY
40% 40% 20%
A. Access
1 1:100 handwashing facility -Pupil Ratio 
2 100% Classrooms in good condition 
3 Internet Connectivity per school 
4 Water supply connection per school 
5 1 Learning Center per school 
6 1 H.E. Laboratory 
B. Quality and Relevance
7 1 Action Research per school 
8 1 SIP (Science Investigatory Project) per school 
9 Regional Festival of Talents 
10 Robotics Contest 
11 Functionality of SPG 
12 Creation of Rondalla/ Ukelele Ensemble 
C. Governance
13 Gulayan Sa Paaralan 
14 DRRM 
15 1 Canteen per School 
16 5 CCTV per school 
19School Improvement Plan
CHAPTER 3
Plan
SCHOOL IMPROVEMENT PLANNING
PLANNING WORKSHEET
Priority
Improvement
Areas
General
Objective/s
Root
Cause/s
Time Frame
SY 2019-
2020
SY
2020-
2021
SY
2021-
2022
A. ACCESS
1:100 handwashing
facility -Pupil Ratio
To build additional 4
handwashing facilities to
meet the standard pupil-
handwashing facility
ratio
1. No assigned
area for
handwashing
facilities
2. lack of ample
water supply

100% Classrooms in
good condition
To build additional 2
classrooms and repair
rooms which needed
repairs
3 Building is
dilapidated and
was due for
demolition

Internet Connectivity
per school
To acquire high speed
internet connectivity in
the school.
No internet
connectivity in
the area

Water supply
connection per school
To regain water
connection from
HelpMate in support of
other programs and
projects of the school
Disconnected
water supply
from Helpmate
since 2013

1 Learning Center per
school
To build and utilize a
space for learning
resource center.
No classroom
allocation

1 H.E. Laboratory To build or repair a
room budget for
construction of HE
Laboratory.
No classroom /
space allocation.

B. QUALITY AND
RELEVANCE
1 Action Research per
school
To create a functional
action research team
No assigned
teacher for
research.

1 Science
Investigatory Project
To create 1 Science
Investigatory Project
No trained
teacher to lead
the Project Team

Regional Festival of
Talents
To create teams, train
and win for the Regional
Festival of Talents
No winners
progressed to
Regional

20School Improvement Plan
Robotics Contest To create and train
robotics team to win
competitions
Lack of training
for about robotics 
Priority
Improvement
Areas
General
Objective/s Root
Cause/s
Time Frame
SY 2019-
2020
SY
2020-
2021
SY
2021-
2022
Functionality of SPG
and SSG
To attain 100%
functionality of the SPG
SPG is not 100%
functional due to
time constraint.

Creation of Ukelele
Ensemble
To organize and train
learners who are
inclined to music to win
in Ukelele contests.
No existing
ukulele
ensemble 
C. GOVERNANCE
Gulayan Sa Paaralan
To intensify the
implementation of the
Gulayan sa Paaralan
No fully
functional
gulayan, with no
plant nursery, no
mrf

DRRM To make School
Disaster Risk Reduction
Management Fully
Functional
No planning, no
empowerment,
no proper
delegation

1 Canteen per School To organize a canteen
with credible source of
nutritious food
Canteen was
demolished due
to on-going
construction of
the building.

5 CCTV per school To install 4 cctv in the
premises for security
No existing
CCTV

21School Improvement Plan
PIA’s Possible Solutions
MOOE/
PS
LGUs PTA
Fund
Raising
Adopt a
School
Prizes Canteen
Title of the
Program/Project/
Activity
1:100
handwashing
facility -Pupil
Ratio
1. construct addional 4
handwashing facilities
      
1.Clean Hands,
Healthy Body
100%
classrooms
in good
condition
Ask assistance from
DepEd, LGU,
Stakeholders
    2.Silid Kaalaman
Internet
connectivity
for the school
Scout for high speed
connectivity and
subscribe
 3.I-Konek Mo
Water
connection
supply per
school
1. Pay balance from
HelpMate
2. Reconnect water
supply to Helpmate
     4.Water is Life
1 learning
center per
school
Allocate one room to
be used as learning
resource center
      
5.Silid
Karunungan
HE laboratory
per school
Allocate one room for
HE Laboratory      
6. A Home in
School
Action
Research Per
school
Train and assign the
Master Teacher to
take the lead
  
7.DagDag
Kaalaman Dapat
Matuklasan
Science
Investigatory
Project Per
school
Train Science
Coordinator and
assigned learn to
conduct a SIP
  
8.Little Wiki
Einsteins
Regional
Festival of
Talents
Have an extensive
training for the coach
and for the
contestants
     
9.Talento Mo
Ibahagi Mo
Robotics
Contest
Train teacher /Coach
and contestant
     
10.Robot Ticks
Young Minds
Functionality
of SPG
Make SPG fully
functional
  
11.Little
Governors
Creation of
Ukulele
Create a Ukelele
Ensemble
     
12.Ukulele for
Little Hands
Gulayan sa
Paaralan
Create a plant nursery
Enhance gardening
methods
Create a vermiculture
     
13.OH (Our
Health) My Gulay
DRRM
Create a Contingency
Plan
Create a 7 Man Team
     
14.Safety for
One, Safety for
All
Canteen Per
School
Organize a school
canteen
   
15.Eat Right,
Stay Bright
5 CCTV in
School
Purchase and install
cctvs in strategic
locations
    16. ECCTV for
Security
List of Possible Solutions
22School Improvement Plan
Project Work Plan and Budget
Project Title: 1. CLEAN HANDS, HEALTHY BODY
Problem Statement: The school lacks hand washing facilities to meet the
requirement ratio of one hand washing facility per 100 learners
Project Objective Statement: To build additional four (4) hand washing facilities
to meet the standard pupil/hand washing ratio of 1:100
Root Cause: No area allocated for additional handwashing facility and no
ample water supply
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Assess the
Needs of the
Project
List of Needs
August 2019
School Head,
Asst. School
Head, Teachers,
PTA
Php.
300.00
PTA
Prepare Budget
Plan
Budget Plan August 2019
School Head,
Asst. School
Head, PTA
Php
300.00
PTA
Organize
Committees List of Committees August 2019
School Head,
Assistant School
Head, Teachers,
PTA
Php.
300.00
PTA
Tap Possible
Donors
List of Possible
Donors
August 2019
School Head,
Asst. School
Head, Teachers,
PTA , LGU,
NGOs, Alumni
Php.
500.00
PTA
Scout for donors
List of Donors Sent
with Solicitations
August-
September 2019
School Head,
Asst. School
Head, Teachers,
PTA , LGU,
NGOs, Alumni
Php
100.00
PTA
Implementation
Accept donations Donated Fund
August-January
2019
School Head,
Asst. School
Head, Teachers,
PTA , LGU,
NGOs, Alumni
Php.
500.00
PTA
Account
Proceeds
Accounting of
Proceeds
October 2019
School Head,
Asst. School
Head, Teachers,
parents
Php. 1
000.00
PTA
Procure materials
Purchase Official
Receipts
October 2019
School Head,
Asst. School
Head, Teachers
Php 300
000.00
PTA,
LGU,
NGOs,
Fund
Raising,
MOOE
Monitor the
progress of the
Work
Documentation
January2020-
March 2020
School Head,
Asst. School
Head, Teachers,
parents
Php.
100.00
PTA
Post
Implementation
23School Improvement Plan
Account
Generated Funds
and Expenses
Transparency
board of the
Generated Funds
and Expenses of
the hand washing
facilities
April 2020
School Head,
Asst. School
Head, Teachers,
PTA President
Php
1000.00
MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment of
Works
April 2020
School Head,
Asst. School
Head, Teachers,
Alumni, LGU,
NGOs, Parents
Php. 1
000.00
PTA
Give
Recognitions to
Donors
List of Donors
printed in a
tarpaulin
April 2020 ICT Coordinator
Php. 1
000.00
PTA
Turn over the
hand washing
facilities
Monitor and
Evaluate the
project for
continuous
improvement
Evaluation sheets May 2020 School Head
Php
1,000.00
PTA
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
24School Improvement Plan
Project Work Plan and Budget
Project Title: 2. SILID KAALAMAN
Problem Statement: The school lacks 2 standard classrooms
Project Objective Statement: To build additional 2 classrooms to meet 100%
classroom/learner ratio.
Root Cause: Inaccurate EBEIS data encoding so lacking classrooms are not
allocated funds.
Activity Output
Date of
Implementation
Person
Responsible
Budget
Source of
Budget
Pre-
Implementation
Make Assessment of
Needs
List of School
Needs
January 2020
School Head, Asst.
School Head
Php.
100.00
PTA
Write a letter request
to the Schools
Division
Superintendent
Letter Request January 2020
School Head, Asst.
School Head, SDS,
City Mayor
Php.
100.00
PTA
Make a follow-up of
the letter request
Follow up letter March 2020
School Head,
School Head, PTA
President, LGU,
City Engineer
Php.
500.00
PTA
Clear rooms for
demolition
Rooms ready for
demolition
March 2020
School Head/Assist
School
Head/Teachers
Php.
500.00
PTA/ MOOE
Ask approval of the
Project
Approved Project
Plan
April 2020 School Head, SDS
Php
100.00
PTA
During
Implementation
Construct the School
building
On-going
construction of
the building
September 2020
School Head, Asst.
School Head
Php 250
000.00
LGU/DepED
Monitor the Progress
of the 2Work
Documentation September 2020
School Head, Asst.
School Head,
Teachers, parents
Php.
100.00
PTA
Turn – over the new
building
Program of the
Turn-over
Ceremony
September 2021
School Head, Asst.
School Head,
Teachers, parents,
pupils , LGU
Php 5
000.00
PTA/MOOE
Post
Implementation
Account of Funds
Documents of the
Accounting of
Generated Funds
and Expenses
October 2021
School Head, Asst.
School Head,
Teachers, PTA
President
Php
1000.00
MOOE
Report the
Accomplishment of
Works
Report of the
Accomplishment
of Works
October 2021
School Head, Asst.
School Head,
Teachers, Alumni,
LGU
Php.
500.00
MOOE
Give Recognitions
to Donors
List of Donors
printed in a
tarpaulin
October 2021 ICT Coordinator
Php. 1
000.00
MOOE
Evaluation
sheets
May 2020 School Head
Php
1,000.00
PTA
25School Improvement Plan
Monitor and Evaluate
the project for
continuous
improvement
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
26School Improvement Plan
Project Work Plan and Budget
Project Title: 3. I-KONEK MO
Problem Statement: The school lacks high speed and stable internet connection
Project Objective Statement: To subscribe to a high speed internet connection
Root Cause: Low connectivity in the area
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Assess the Needs
List of Needs
January 2020 School Head,
ICT Coordinator
Php.
200.00
PTA
Prepare Budget
Plan
Budget Plan
January 2020
School Head,
Asst. School
Head, PTA
Php
100.00
PTA
Organize
Committees List of Committees
January 2020
School Head,
Assistant School
Head, Teachers,
PTA
Php.
300.00
PTA
Tap Possible
Donors
List of Possible
Donors
January 2020
School Head,
Asst. School
Head, Teachers,
PTA , LGU,
NGOs, Alumni
Php.
500.00
PTA
Implementation
Account
Proceeds
Accounting of
Proceeds
February 2020
School Head,
Asst. School
Head, Teachers,
parents
Php. 1
000.00
PTA
Procure materials
Purchase Official
Receipts
February 2020
School Head,
Asst. School
Head, Teachers
Php 300
000.00
PTA,
LGU,
NGOs,
Fund
Raising,
MOOE
Install Internet
connection
Internet connection February 2020
School Head,
Asst. School
Head, Teachers,
parents
Php 100
000.00
PTA,
LGU,
NGOs,
Fund
Raising,
MOOE
Monitor Progress
of the Work
Documentation February 2020
School Head,
Asst. School
Head, Teachers,
parents
Php.
100.00
PTA
Post
Implementation
Account
Generated Funds
and Expenses
Transparency
board of the
Generated Funds
and Expenses
February 2020
School Head,
Asst. School
Head, Teachers,
PTA President
Php
1000.00
MOOE
27School Improvement Plan
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
February 2020
School Head,
Asst. School
Head, Teachers,
Alumni, LGU,
NGOs, Parents
Php. 1
000.00
PTA
Give
Recognitions to
Donors
List of Donors
printed in a
tarpaulin
February 2020 ICT Coordinator
Php. 1
000.00
PTA
Monitor and
Evaluate project
for continuous
improvement
Evaluation Sheets December 2021
School Head,
Asst. School
Head, Project
Team Members
Php
2,000.00
PTA
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
28School Improvement Plan
Project Work Plan and Budget
Project Title: 4. WATER IS LIFE
Problem Statement: The school lacks water connection from a reliable and steady
source
Project Objective Statement: To regain water connection from Help Mate and
rehabilitate water pipes to support other programs and projects of the school.
Root Cause: Water was disconnected due to non payment of dues since 2013
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Assess the Needs
of the project List of Needs
January 2020
School Head,
ICT
Coordinator
Php. 200.00 PTA
Prepare Budget
Plan
Budget Plan
January 2020
School Head,
Asst. School
Head, PTA
Php 100.00 PTA
Organize
Committees
List of
Committees
January 2020
School Head,
Assistant
School Head,
Teachers, PTA
Php. 300.00 PTA
Tap Possible
Donors
List of Possible
Donors
January 2020
School Head,
Asst. School
Head,
Teachers, PTA
, LGU, NGOs,
Alumni
Php. 500.00 PTA
Implementation
Account
Proceeds and
expenses
Accounting of
Proceeds and
expenses
February 2020
School Head,
Asst. School
Head,
Teachers,
parents
Php. 1
000.00
PTA
Procure materials
Payment of
overdue amounts
April 2020
School Head,
Asst. School
Head, Teachers
Php 300
000.00
PTA,
LGU,
NGOs,
Fund
Raising,
MOOE
Secure
reinstallation of
water connection
Water connection October 2020
School Head,
Asst. School
Head,
Teachers,
parents
Php 100
000.00
PTA,
LGU,
NGOs,
Fund
Raising,
MOOE
Monitor the
Progress of the
Work
Documentation December 2020
School Head,
Asst. School
Head,
Teachers,
parents
Php. 100.00 PTA
Post
Implementation
29School Improvement Plan
Account
Generated Funds
and Expenses
Transparency
board of the
Generated Funds
and Expenses
January 2021
School Head,
Asst. School
Head,
Teachers, PTA
President
Php 1000.00 MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
February 2021
School Head,
Asst. School
Head,
Teachers,
Alumni, LGU,
NGOs, Parents
Php. 1
000.00
PTA
Give
Recognitions to
Donors
List of Donors
printed in a
tarpaulin
February 2021
ICT
Coordinator
Php. 1
000.00
PTA
Monitor and
Evaluate project
for Continuous
Improvement
Evaluation sheets December 2021
School Head,
Asst. School
Head and
Project Team
Php2,000.00 PTA
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
30School Improvement Plan
Project Work Plan and Budget
Project Title: 5.SILID KARUNUNGAN
Problem Statement: The school does not have a learning resource center
Project Objective Statement: To build and utilize a space for learning center. Root
Cause: No existing learning resource center
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make
Assessment of
Needs
List of School
Needs
May 2020
School Head,
Asst. School
Head
Php.
100.00
PTA
Write a letter
request to
stakeholders
Letter Request May 2020
School Head,
Asst. School
Head
Php.
100.00
PTA
Make the
Program of
Works
Program of
Works
May 2020
School Head,
School Head,
PTA President,
Php.
500.00
PTA
Approve the
Project
Approved Project
Plan
June 2020
School Head,
SDS
Php 100.00 PTA
During
Implementation
Construct the
School a learning
resource center
Functional
Resource Center
September 2020
School Head,
Asst. School
Head
Php 250
000.00
LGU
Monitor the
Progress of the
Work
Documentation September 2020
School Head,
Asst. School
Head, Teachers,
parents
Php.
100.00
PTA
Turn – over the
Learning
Resource Center
Program of the
Turn-over
Ceremony
January 2021
School Head,
Asst. School
Head, Teachers,
parents, pupils ,
stakeholders
Php 2
000.00
PTA,
MOOE
Post
Implementation
Account
Generated Funds
and expenses
Documents of the
Accounting of
Generated Funds
and Expenses
February 2021
School Head,
Asst. School
Head, Teachers,
PTA President
Php 500.00 PTA
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
February 2021
School Head,
Asst. School
Head, Teachers,
Alumni
Php.
500.00
PTA
Give
Recognitions to
Donors
List of Donors
printed in a
tarpaulin
February 2021 ICT Coordinator
Php. 1
000.00
PTA
31School Improvement Plan
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
32School Improvement Plan
Project Work Plan and Budget
Project Title: 6. A HOME IN SCHOOL
Problem Statement: The school does not have a Home Economics Center
Project Objective Statement: To build and utilize a space for Home Economics activities.
Root Cause: No existing Home Economics Center
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make
Assessment of
Needs
List of School
Needs
May 2020
School Head,
Asst. School
Head
Php.
100.00
PTA
Write a letter
request to the
City Mayor
Letter Request May 2020
School Head,
Asst. School
Head, SDS, City
Mayor
Php.
100.00
PTA
Make the
Program of
Works
Program of
Works
May 2020
School Head,
School Head,
PTA President,
LGU, City
Engineer
Php.
500.00
PTA
Seek Approval
of the Project
Approved
Project Plan
June 2020
School Head,
SDS
Php
100.00
PTA
During
Implementation
Procure
materials
Office Receipts July 2020
Rehabilitate
/Repair the old
room formerly
used as bodega
Repaired room September 2020
School Head,
Asst. School
Head
Php 250
000.00
LGU
Document
Projects
Pictures before
during and after
repair
May to
September 2020
School Head/
Project Team
Php
500.oo
MOOE
Monitor the
Progress of the
Work
Documentation September 2020
School Head,
Asst. School
Head, Teachers,
parents
Php.
100.00
PTA
Turn – over the
project
Program of the
Turn-over
Ceremony
January 2021
School Head,
Asst. School
Head, Teachers,
parents, pupils ,
LGU
Php 2
000.00
PTA,
MOOE
Post
Implementation
Account
Generated Funds
Documents of
the Accounting
of Generated
Funds and
Expenses
February 2021
School Head,
Asst. School
Head, Teachers,
PTA President
Php
500.00
PTA/MOOE
33School Improvement Plan
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
February 2021
School Head,
Asst. School
Head, Teachers,
Alumni, LGU
Php.
500.00
PTA/MOOE
Give
Recognitions to
Donors
List of Donors
printed in a
tarpaulin
February 2021 ICT Coordinator
Php. 1
000.00
PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation
Sheets
March 2021
School Head
and Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
34School Improvement Plan
Project Work Plan and Budget
Project Title: 7.DAGDAG KAALAMAN DAPAT MATUKLASAN
Problem Statement: The school does not have Action Research
Project Objective Statement: To create an Action Research
Root Cause: No proper training
Activity Output
Date of
Implementation
Person
Responsible
Budget Budget Source
Pre-
Implementation
Make
Assessment of
Needs
List of School
Needs
December 2020
School
Head, Asst.
School Head
Php. 100.00 MOOE/ PTA
Write a letter
request to the
Schools Division
Superintendent
about the
proposed
training to be
attended
Letter Request January 2021
School
Head, Asst.
School
Head, SDS,
Php. 100.00 MOOE/ PTA
Make and submit
the Research
Title
Title of Research January 2021
School
Head,
Project
Team /
Master
Teacher,
SDS
Php. 500.00 MOOE/ PTA
Secure approval
of the Research
Title
Approved
Research
February 2021
School
Head, SDS
Php 100.00 MOOE/ PTA
During
Implementation
Gather Data
Data of the
school
March 2021
Tabulate Data
Tabulation of
Data
May 2021
School
Head, Asst.
School Head
Php 250
000.00
MOOE/ PTA
Interpret Data Interpreted Data May 2021
Document
progress of
Project
Pictures before
during and after
research
May 2021
School
Head/
Project
Team
Php 500.oo MOOE/ PTA
Present the
Action Research
Action Research May 2021
School Head
Research
Panel/ SDS
Research
Team
Php
10,000.00
MOOE/ PTA
Revise and
Finalize based
on the
recommendation
Revised/Refined
Action Research
May 2021
School
Head/Master
Teacher
Php1,000.00 PTA/MOOE
Submit the
Action research
Submitted
researched
July 2021
School
Head,
Php 2
000.00
PTA, MOOE
35School Improvement Plan
Master
Teacher/
Research
Team, PTA
Post
Implementation
Account
Generated Funds
and utilization
Documents of
the Accounting
of Generated
Funds and
Expenses
August, 2021
School
Head, Asst.
School
Head,
Teachers,
PTA
President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
September 2021
School
Head, Asst.
School
Head,
Teachers,
Alumni,
Php. 500.00 PTA/MOOE
Give
Recognitions to
the Research
Team
List of Research
Team printed in
a tarpaulin
September 2021
ICT
Coordinator
Php. 1
000.00
PTA/MOOE
Monitor and
Evaluate the
project for
continuous
improvement
Evaluation
Sheets
October 2021
School Head
and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
36School Improvement Plan
Project Work Plan and Budget
Project Title: 8.WIKI LITTLE EINSTEINS
Problem Statement: The school does not have a School Investigatory Project
Project Objective Statement: To create a Science Investigatory Project
Root Cause: No proper training
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make
Assessment of
Needs
List of School
Needs
June 2020
School Head,
Master Teacher/
Research Teacher,
PTA
Php. 100.00
MOOE/
PTA
Identify a Project
Team
List of names for
Project Team
June 2020
School Head,
Master Teacher/
Research Team,
PTA
Write a letter
request to the
Schools Division
Superintendent
about the
proposed training
to be attended
Letter Request July 2020
School Head, Asst.
School Head, SDS,
Php. 100.00
MOOE/
PTA
Make the School
Project
Investigatory
Project Title
School
Investigatory
Title
July 2020
School Head,
Project Team /
Master Teacher,
SDS
Php. 500.00
MOOE/
PTA
Make the
Investigatory
Project Title be
approved
Approved
Investigatory
Project
July 2020
School Head,
Project Team /
Master Teacher,
SDS
Php 100.00
MOOE/
PTA
During
Implementation
Acquire
/Procure
Materials needed
Materials needed
for the project
August 2020
School Head,
Project Team
Php 5,000.00
MOOE/
PTA
Gather Data
Data of the
school
August 2020 Project Team Php 1,000.00
MOOE/
PTA
Tabulate Data
Tabulation of
Data
December 2020
Master Teacher/
Project Team
Php 1250
000.00
MOOE/
PTA
Interpret Data Interpreted Data December 2020 School Head Php 1,000.00
MOOE/
PTA
Present the
School
Improvement
Plan
School
Investigatory
Project
December 2020
School Head
Research Panel/
SDS Research
Team
Php
10,000.00
MOOE/
PTA
Revise Finalize
School
Investigatory
Project
Presentation
Revised/Refined
School
Investigatory
Project
Presentation
January 2021
School
Head/Master
Teacher /Project
Team
Php1,000.00 PTA/MOOE
37School Improvement Plan
Document
progress of the
Project
Pictures before
during and after
project
February 2021
School Head/
Project Team
Php 500.oo
MOOE/
PTA
Submit Project
Project
documentations
March 2021
School Head,
Master Teacher/
Research Team,
PTA
Php 2 000.00 PTA, MOOE
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
March 2021
School Head, Asst.
School Head,
Teachers, PTA
President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
March 2021
School Head, Asst.
School Head,
Teachers, Alumni,
LGU
Php. 500.00 PTA/MOOE
Give
Recognitions to
the Project Team
and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation
Sheets
October 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
38School Improvement Plan
Project Work Plan and Budget
Project Title: 9. TALENTO MO, IBAHAGI MO
Problem Statement: The school does not have winners in the Regional Festival of Talents
Project Objective Statement: To create and train learners to win in the Regional Festival
of Talents
Root Cause: No existing poll of contestants and coaches and learners need extensive
training
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
June 2020
School Head,
Asst. School
Head, MAPEH
and TLE
Coordinators,
PTA
Php. 100.00 MOOE/ PTA
Identify a Project
Team
List of names for
Project Team
June 2020
School Head,
Asst. School
Head, MAPEH
and TLE
Coordinators,
PTA
Write a letter
request to the
Schools Division
Superintendent
about the proposed
training to be
attended
Letter Request July 2020
School Head,
Asst. School
Head, SDS,
Php. 100.00 MOOE/ PTA
Create a Team for
Ukulele Ensemble,
Fruit and
Vegetable
Carving, Folk
Dance
Contestants
Ukulele
Ensemble, Folk
Dance and Fruit
and Vegetable
Carving
July 2020
School Head,
Asst. School
Head, MAPEH
and TLE
Coordinators,
PTA
Php20,000.00 MOOE/ PTA
Send Coaches to
Training
Trained Coaches July 2020
School Head,
, MAPEH and
TLE
Coordinators,
MAPEH and
TLE Coaches,
PTA
Php10,000.00 MOOE/ PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for the project
August 2020
MAPEH and
TLE
Coordinators,
MAPEH and
TLE Coaches,
PTA
Php 50,000.00 MOOE/ PTA
39School Improvement Plan
Train the
contestants
Trained
contestants
August 2020
MAPEH and
TLE
Coordinators,
MAPEH and
TLE Coaches,
PTA
Php 1,000.00 MOOE/ PTA
Send to
Division/Regional
Contests
Contestants/
participants
August 2020
Master Teacher/
Project Team
Php 20,000.00 MOOE/ PTA
Document of
Projects
Pictures before
during and after
project
August 2020
School Head/
Project Team
Php 5000.oo MOOE/ PTA
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
September 2020
School Head,
Asst. School
Head, Teachers,
PTA President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
September 2020
School Head,
Asst. School
Head, Teachers,
Alumni,
Php. 500.00 PTA/MOOE
Give Recognitions
to the Project
Team and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation
Sheets
October 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
40School Improvement Plan
Project Work Plan and Budget
Project Title: 10. ROBOT TICKS YOUNG MINDS
Problem Statement: There is no existing School Robotics Team
Project Objective Statement: To provide avenue for learning as additional item for
Science subject
Root Cause: No robotics tools and equipment due to its very high cost
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
June 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php. 100.00 MOOE/ PTA
Identify a Project
Team
List of names for
Project Team
June 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Write a letter
request to the
Schools Division
Superintendent
about the proposed
training to be
attended
Letter Request July 2020
School Head,
Head, SDS,
Php. 100.00 MOOE/ PTA
Send Coaches to
Training
Trained Coaches July 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php10,000.00 MOOE/ PTA
Create a Team for
Robotics Contestants for
Robotics
July 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php10,000.00 MOOE/ PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for the project
August 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php 50,000.00 MOOE/ PTA
Train the
contestants
Trained
contestants
August 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php20,000.00 MOOE/ PTA
Send to
Division/Regional
Contests
Contestants/
participants
August 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php 20,000.00 MOOE/ PTA
Document of
Projects
Pictures before
during and after
project
August 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Php 5000.oo MOOE/ PTA
41School Improvement Plan
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
September 2020
School Head,
Asst. School
Head, Teachers,
PTA President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
September 2020
School Head,
Asst. School
Head, Teachers,
Alumni,
Php. 500.00 PTA/MOOE
Give Recognitions
to the Project
Team and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation
Sheets
October 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
42School Improvement Plan
Project Work Plan and Budget
Project Title: 11. LITTLE GOVERNORS
Problem Statement: Supreme Pupil Government is not 100% functional
Project Objective Statement: To make Supreme Pupil Government fully functional
Root Cause: No plan of action to make SPG fully functional
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
January 2020
School Head,
Asst. School
Head, SPG
Adviser, PTA
Php. 100.00 MOOE/ PTA
Identify a Project
Team thru SPG
Election
List of SPG
Officers
February
School Head,
Asst. School
Head, SPG
Adviser, PTA
Induct new SPG
Officers
Newly elected
SPG Officers
March 2020
School Head,
Asst. School
Head, SPG
Adviser, PTA,
Php. 100.00 MOOE/ PTA
Create an Action
Plan for the whole
year
Action Plan for
the whole year
March 2020
School Head,
Asst. School
Head, SPG
Adviser, PTA
Php1,000.00 MOOE/ PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for SPG
projects/activities
April 2020
School Head,
Asst. School
Head, SPG
Adviser, PTA
Php
10,000.00
MOOE/ PTA
Implement
projects and
programs of SPG
Starting from
Brigada to EOSY
Closing
Ceremony
Projects and
programs
May 2020-March
2021
School Head,
Asst. School
Head, SPG
Adviser, SPG
Officers, PTA
Ph30,000.00 MOOE/ PTA
Document of
Projects
Pictures before
during and after
project
May 2020-March
2021
School Head,
Asst. School
Head, SPG
Adviser, SPG
Officers, PTA
Php 5000.oo MOOE/ PTA
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
May 2020 to
March 2021
School Head,
Asst. School
Head, Teachers,
PTA President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
April 2021
School Head,
Asst. School
Php. 500.00 PTA/MOOE
43School Improvement Plan
Head, Teachers,
Alumni,
Give Recognitions
to the Project
Team and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 5000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation Sheets October 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
44School Improvement Plan
Project Work Plan and Budget
Project Title: 12. UKULELE FOR LITTLE HANDS
Problem Statement: There is no existing School Ukulele Ensemble
Project Objective Statement: To provide avenue for learning as additional item for Music
and Arts in preparation of Regional Festival of Talents
Root Cause: No trained coach and trained learners for ukulele
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
March 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php. 100.00 MOOE/ PTA
Identify a Project
Team
List of names of
learners to form
Ukulele
Ensemble
March 2020
School Head,
Asst. School
Head, Science
Coordinator PTA
Write a letter
request to the
Schools Division
Superintendent
about the proposed
training to be
attended
Letter Request April 2020
School Head,
Head, SDS,
Php. 100.00 MOOE/ PTA
Send Coaches to
Training
Trained Coaches April 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php10,000.00 MOOE/ PTA
Meet and Orient
Ukulele Team and
their parents
Oriented Ukulele
Ensemble Team
Members and
parents
April 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php1,000.00 MOOE/ PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for the project
May 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php 10,000.00 MOOE/ PTA
Train the Ukulele
Ensemble Team
Trained Ukulele
Players
June 2020 to
December 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php40,000.00 MOOE/ PTA
Send to Division/
Regional Contests
Contestants/
participants
August 2020
December 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php 20,000.00 MOOE/ PTA
45School Improvement Plan
Document of
Projects
Pictures before
during and after
project
June 2020 to
December 2020
School Head,
Asst. School
Head, MAPEH
Coordinator,
PTA
Php 5000.oo MOOE/ PTA
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
January 2021
School Head,
Asst. School
Head, Teachers,
PTA President
Php 500.00 PTA/MOOE
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
January 2021
School Head,
Asst. School
Head, Teachers,
Alumni,
Php. 500.00 PTA/MOOE
Give Recognitions
to the Project
Team and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation
Sheets
May 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
46School Improvement Plan
Project Work Plan and Budget
Project Title: 13. OH (Our Health) My Gulay
Problem Statement: The school does not meet the requirements of the Gulayan sa
Paaralan Program.
Project Objective Statement: To comply the requirements of the Gulayan sa Paaralan
Program
Root Cause: The school’s Gulayan sa Paaralan Program does not meet the required
standards.
Activity Output
Date of
Implementation
Person Responsible Budget Budget Source
Pre-
Implementation
Assess Current
Situation
Assessment
Report
January 2020
School Head, Asst.
School Head
Php.
100.00
PTA/MOOE
Identify gaps and
needs
List of gaps and
needs
January 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
Php.
100.00
PTA/MOOE
Make a plan and
budget
Project Plan and
Budget
January 2020
School Head, School
Head, GP
Coordinator, PTA
Php.
100.00
PTA/MOOE
Organize
Committee
List of
Committees
February 2020 School Head, SDS
Php
100.00
PTA/MOOE
Coordinate with
DA and City
Agriculture Office
Letter Request April 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
Php.
100.00
PTA/MOOE
Conduct General
PTA Meeting
Minutes of the
Meeting
June 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
Php
500.00
PTA/MOOE
Discuss the
importance of
Gulayan sa
Paaralan
Minutes of the
Meeting
June 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
Present Plans and
budgets
Budget Plan June 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
Solicit report and
commitment
Accomplished
Commitment
Forms
July 2020
School Head,
Assistant School
Head, Teachers, GP
Coordinator, PTA
During
Implementation
Follow up request
from DA and City
Agriculture Office
Approved
Request
July 2020
School Head, Asst.
School Head,
Php
100.00
PTA/MOOE
Procure needed
materials
Official receipts July 2020
Gulayan sa Paaralan
Coordinator
Php 5
000.00
PTA/MOOE
Start the project Documentation July 2020
Gulayan sa Paaralan
Coordinator
None None
Monitor the
progress of the
project
Monitoring Form
July to December
2020
Gulayan sa Paaralan
Coordinator
None None
47School Improvement Plan
Participate in the
Gulayan sa
Paaralan higher
level contest
Required
Documents for
the Contest
October 2020
Gulayan sa Paaralan
Coordinator
Php 1
000.00
PTA/MOOE
Gather result Result October 2020
Gulayan sa Paaralan
Coordinator
Php
100.00
PTA/MOOE
Post
Implementation
Report
Accomplishments
Accomplishment
Report
December 2020
School Head, Asst.
School Head,
Teachers, Gulayan
sa Paaralan
Coordinator
Php
100.00
PTA/MOOE
Give Feedbacks Minutes
July to December
2020
School Head, Asst.
School Head,
Teachers, Gulayan
sa Paaralan
Coordinator
Php
100.00
PTA/MOOE
Account Expenses
Summary of
Expenses
Give awards and
recognition
Certificates of
Awards
March
2021
School Head, Asst.
School Head,
Teachers, Gulayan
sa Paaralan
Coordinator
Php
500.00
PTA/MOOE
Asses results for
continuous
improvement
Analysis of
Results
April 2021
School Head, Asst.
School Head,
Teachers, Gulayan
sa Paaralan
Coordinator
Php.
100.00
PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
48School Improvement Plan
Project Work Plan and Budget
Project Title: 14. SAFETY FOR ONE, SAFETY FOR ALL
Problem Statement: The School DRRM is not fully functional
Project Objective Statement: To make SDRRM 100 % fully functional
Root Cause: SDRRM programs and projects are not fully implemented
Activity Output
Date of
Implementation
Person
Responsible
Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
January 2020
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php. 100.00 MOOE/ PTA
Identify a Project
Team thru
Selection of
SDRRM Team
List of SDRRM
Team
February 2020
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Meet with the
SDRRM Team
Newly designated
SDRRM Team
March 2020
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA,
Php. 3000.00 MOOE/ PTA
Create an Action
Plan for the whole
year
Action Plan for
the whole year
March 2020
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php1,000.00 MOOE/ PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for SDRRM
projects/activities
April 2020
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php
30,000.00
MOOE/ PTA
Implement
projects and
programs of
SDRRM Starting
from Brigada to
EOSY Closing
Ceremony
Projects and
programs
May 2020-March
2021
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Ph10,000.00 MOOE/ PTA
Document Projects
Pictures before
during and after
project
May 2020-March
2021
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php 1000.oo MOOE/ PTA
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
May 2020 to
March 2021
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php 500.00 PTA/MOOE
49School Improvement Plan
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
April 2021
School Head,
Asst. School
Head, SDRRM
Coordinator,
PTA
Php. 500.00 PTA/MOOE
Give Recognitions
to the Project
Team and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator Php. 5000.00 PTA/MOOE
Monitor and
Evaluate of the
project for
continuous
improvement
Evaluation Sheets October 2021
School Head and
Monitoring
Committee
Php1,000 PTA/MOOE
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
50School Improvement Plan
Project Work Plan and Budget
Project Title: 15.EAT RIGHT, STAY BRIGHT
Problem Statement: The School has no canteen that supplies nutritious food from credible
suppliers with sanitary permits
Project Objective Statement: To create a credible supplier of nutritious food for learners
Root Cause: Lack of space and plan
Activity Output
Date of
Implementation
Person Responsible Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
January 2020
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php. 100.00
MOOE/
PTA
Identify a Project
Team thru School
Canteen
Coordinator
List of Canteen
Personnel
February 2020
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Meet with the
CanteenTeam
Newly designated
Canteen Team
March 2020
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php.
3000.00
MOOE/
PTA
Create an Action
Plan for the whole
year
Action Plan for
the whole year
March 2020
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php1,000.00
MOOE/
PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for the Canteen
May 2020
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php
5,000.00
Teachers
Canteen
Fund
Start Canteen
operations
beginning from
Brigada to EOSY
Closing
Ceremony
School
supplies/materials
for the canteen
May 2020-
March 2021
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Ph5,000.00
Teachers
Canteen
Fund
Document
Projects
Pictures before
during and after
project
May 2020-
March 2021
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php 100.oo
Teachers
Canteen
Fund
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
May 2020 to
March 2021
School Head,
Asst. School Head,
School Canteen
Coordinator PTA,
Php 500.00
Teachers
Canteen
Fund
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
April 2021
School Head,
Asst. School Head,
School Canteen
Coordinator PTA
Php. 500.00
Teachers
Canteen
Fund
51School Improvement Plan
Give
Recognitions to
the Project Team
and their
stakeholders
List of Project
Team and
stakeholders
printed in a
tarpaulin
April 2021 ICT Coordinator
Php.
5000.00
Teachers
Canteen
Fund
Monitor and
Evaluate the
project for
continuous
improvement
Evaluation Sheets October 2021
School Head and
Monitoring
Committee
Php1,000
Teachers
Canteen
Fund
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
52School Improvement Plan
Project Work Plan and Budget
Project Title: 16. ECCTV FOR SECURITY
Problem Statement: The School has no CCTV
Project Objective Statement: To install CCTV in strategic areas for security purposes
Root Cause: No technical knowledge on how to install and the perception that it has a
high cost.
Activity Output
Date of
Implementation
Person Responsible Budget
Budget
Source
Pre-
Implementation
Make Assessment
of Needs
List of School
Needs
January 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php. 100.00
MOOE/
PTA
Identify a
Suppliers of
CCTV
List suppliers of
cctv
February 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Canvass CCTV
Canvassed prices
for cctv
March 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php.
3000.00
MOOE/
PTA
Create an Action
Plan for the whole
year
Action Plan for
the whole year
March 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php1,000.00
MOOE/
PTA
During
Implementation
Acquire /Procure
Materials needed
Materials needed
for the cctv
installation
May 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php
5,000.00
MOOE/
PTA
Install CCTV in
different areas
Installed cctv
May 2020-
December 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,
SDRRM
Coordinator, ,PTA
Ph20,000.00
MOOE/
PTA
Document
Projects
Pictures before
during and after
project
May 2020-
December 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php 100.oo
MOOE/
PTA
Post
Implementation
Account Funds
and utilization
Documents of the
Accounting of
Funds and
Expenses
May 2020 to
December 2020
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA,
Php 500.00
MOOE/
PTA
Report the
Accomplishment
of Works
Report of the
Accomplishment
of Works
March 2021
School Head,
Asst. School Head,
School Facilities
Coordinator ,PTA
Php. 500.00
MOOE/
PTA
Give
Recognitions to
List of Project
Team and
March 2021 ICT Coordinator
Php.
5000.00
MOOE/
PTA
53School Improvement Plan
the Project Team
and their
stakeholders
stakeholders
printed in a
tarpaulin
Monitor and
Evaluate the
project for
continuous
improvement
Evaluation
Sheets
March 2021
School Head and
Monitoring
Committee
Php1,000
MOOE/
PTA
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
54School Improvement Plan
ANNUAL IMPLEMENTATION PLAN
SCHOOL YEAR 2019-2020
Instruction: List down the activities that are required in each school year to implement the
school improvement projects. Indicated for every activity are the schedule and venue,
budget, and the person(s) responsible.
SCHOOL
IMPROVE
MENT
PROJECT
TITLE
PROJECT
OBJECT
IVE
OUTPUT
FOR THE
YEAR
ACTIVITIES PERSON(S)
RESPONSIBLE
SCHEDULE/
VENUE
BUDGET
PER
ACTIVIT
Y
BUDGE
T
SOURC
E
3. I-
KONEK
MO
To
subscrib
e to a
high
speed
internet
connecti
on
Internet
Connecti
on
Pre-
Implementa
tion
Assess the
Needs
School Head, ICT
Coordinator
January
2020
Php.
200.00
PTA
Prepare the
Budget Plan
School Head, Asst.
School Head, PTA
January
2020
Php
100.00
PTA
Tap Possible
Donors
School Head, Asst.
School Head,
Teachers, PTA
January
2020
Php.
500.00
PTA
Implementation
Account the
proceeds
School Head, Asst.
School Head,
Teachers, PTA ,
January
2020
Php.
500.00
PTA
Procure
materials for
antenna
School Head, Asst.
School Head,
Teachers
February
2020
Php 20
000.00
MOOE
/PTAs
Install
internet
connection
ICT
Coordinator/School
Head, Physical
Facilities
February
2020
Php 100
000.00
PTA, ,
MOOE
Monitoring
the Progress
of the Work
ICT
Coordinator/School
Head, Physical
Facilities
January202
0-March
2021
Php.
100.00
PTA
Post Implementation
Account
Funds and
Expenses
School Head, Asst.
School Head,
Teachers, PTA
President
Feb. 2020
Php
1000.00
MOOE
Report the
Accomplish
ment of
Works
School Head, Asst.
School Head,
Teachers, Alumni,
LGU, NGOs,
Parents
April 2020
Php. 1
000.00
PTA
Give
Recognitions
to Donors
ICT Coordinator April 2020
Php. 1
000.00
PTA
4. WATER
IS LIFE
To regain
water
Pre- Implementation
55School Improvement Plan
connecti
on from
HelpMat
e
Abundant
Water
supply
Make
Assessment
of Needs
School Head, Asst.
School Head
PTA
Feb. 2020
Php.
100.00
PTA
Prepare a
Budget Plan
School Head, Asst.
School Head,
Physical Facilities
PTA
Feb. 2020
Php.
100.00
PTA
Organize
committees
School Head, Asst.
School Head,
Physical Facilities
PTA
Feb. 2020
Php.
500.00
PTA
Approval of
the Project
School Head, SDS Feb. 2020
Php
100.00
PTA
During Implementation
Account
Proceeds and
Expenses
School Head, Asst.
School Head,
Physical Facilities
PTA
February
2020 to
October
2020
Php
60,000.
00
PTA/
MOOE
Monitoring
the account
School Head, Asst.
School Head,
Physical Facilities
PTA
October
2020
Php.
100.00
PTA
Secure
reinstallation
of water
School Head, Asst.
School Head,
Physical Facilities
PTA
October
2020
Php 2
000.00
PTA,
MOOE
Post Implementation
Account
Funds
School Head, Asst.
School Head,
Teachers, PTA
President
October
2020
Php
500.00
PTA,
MOOE
Report the
Accomplish
ment of
Works
School Head, Asst.
School Head,
Teachers, Alumni,
LGU
October
2020
Php.
500.00
PTA,
MOOE
11.
LITTLE
GOVERNO
RS
To Make
SPG
fully
function
al
Fully
Functiona
l SPG
Pre- Implementation
Make
assessment of
needs
School Head, Asst.
School Head, SPG,
SPG Adviser
January
2020
Php.
500.00
PTA
Identify a
project Team
thru SPG
Election
School Head, Asst.
School Head, SPG,
SPG Adviser
February
2020
Php.
500.00
SPG
Fund
Induct new
SPG officers
School Head, Asst.
School Head, SPG,
SPG Adviser
February
2020
SPG
Fund
Create and
action plan
for the whole
year
School Head, Asst.
School Head, SPG,
SPG Adviser
February
2020
Php.
100.00
SPG
Fund
Implementation
Acquire
/Procure
School Head, Asst.
School Head, SPG,
SPG Adviser
May 2020
Php. 1
000.00
PTA
56School Improvement Plan
Materials
Needed
Implement
projects and
programs of
SPG from
BOSY to
EOSY
School Head, Asst.
School Head, SPG,
SPG Adviser
May 2020-
March
2021
Php
30,000.
00
MOOE
/PTA
Document
Project
School Head, Asst.
School Head, SPG,
SPG Adviser
May 2020-
March
2021
Php1,00
0.00
MOOE
/PTA
Post Implementation
Account
Funds and
Utilization
School Head, Asst.
School Head, SPG,
SPG Adviser
May 2020-
March
2021
Php
200.00
MOOE
/PTA
Report the
accomplishm
ent of works
School Head, Asst.
School Head, SPG,
SPG Adviser
May 2020-
March
2021
Php
200.00
MOOE
/PTA
Give
recognition
of
Stakeholders
School Head, Asst.
School Head, SPG,
SPG Adviser
March
2021
Php5,00
0.00
MOOE
/PTA
12.
UKULELE
FOR
LITTLE
HANDS
To
provide
avenue
for
learning
in Music
and Arts
in
preparati
on for
Regional
Festival
of
Talents
Ukulele
Ensemble
Pre- Implementation
Make an
assessment
of needs
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
March
2020
Php
200.00
MOOE
/PTA
Identify an
project team
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
March
2020
Php
200.00
MOOE
/PTA
Write a
letter request
for training
School Head, SDS April 2020
Php
200.00
MOOE
/PTA
Send
coaches to
training
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
April 2020
10,000.
00
MOOE
/PTA
Meet and
Orient
Ukulele
Team and
their parents
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
April 2020
Php
200.00
MOOE
/PTA
During Implementation
Acquire /
Procure
Materials
needed
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
June 2020
to
December
2020
Php
50,000.
00
MOOE
/PTA
Train
Ukulele
Players
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
June to
December,
2020
Php
20,000.
00
MOOE
/PTA
Send to
Division/Reg
ional
Contests
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
October
2020-
December
2020
Php
100.00
MOOE
/PTA
Post Implementation
Asses results
School Head, Asst.
School Head,
January
2021
Php.
100.00
MOOE
/PTA
57School Improvement Plan
Learners, MAPEH
Coordinator
Report
Accomplish
ments
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
January
2021
Php
100.00
MOOE
/PTA
Give
Feedbacks
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
January
2021
Php
100.00
MOOE
/PTA
Account
Expenses
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
January
2021
Php
100.00
MOOE
/PTA
Give awards
and
recognition
School Head, Asst.
School Head,
Learners, MAPEH
Coordinator
March to
April 2021
Php
5000.00
MOOE
/PTA
13. OH
(Our
Health) MY
GULAY
To
comply
the
requirem
ent s fo
the
Gulayan
Sa
Paralan
Functiona
l Gulayan
Sa
Paaralan
Pre- Implementation
Assess
Current
Situation
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
January
2020
Php.
500.00
MOOE
/PTA
Identify
Gaps
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
January
2020
Php.
500.00
MOOE
/PTA
Make a plan
and budget
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
January
2020
Php.
100.00
MOOE
/PTA
Organize
Committee
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
January
2020
Php. 1
000.00
MOOE
/PTA
Coordinate
with DA and
City
Agriculture
office
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
January
2020
Php.
500.00
MOOE
/PTA
Conduct
General PTA
Meeting
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
June 2020
Php.
500.00
MOOE
/PTA
Discuss the
importance
of Gulayan
sa Paaralan
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
June 2020
Php.
500.00
MOOE
/PTA
Present Plans
and Budget
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
June 2020
Php.
500.00
MOOE
/PTA
Solicit
Reports and
Commitment
s
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
July 2020
Php.
500.00
MOOE
/PTA
Implementation
58School Improvement Plan
Follow Up
request from
DA
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
July 2020
Php.
500.00
MOOE
/PTA
Procure
needed
Materials
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
July 2020
Php.
5000.00
MOOE
/PTA
Start the
Project
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
July 2020
Php.
500.00
MOOE
/PTA
Participate in
the Gulayan
Sa Paaralan
Contest
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
October
2020
Php.
500.00
MOOE
/PTA
Gather
Result
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
October
2020
Php.
500.00
MOOE
/PTA
Post Implementation
Report
Accomplish
ment
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
December
2020
Php.
500.00
MOOE
/PTA
Account the
expenses
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
July to
December
2020
Php.
500.00
MOOE
/PTA
Give awards
and
recognition
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
March
2021
Php.
5000.00
MOOE
/PTA
Evaluate for
Continuous
Improvement
School Head, Asst.
School Head, PTA
Gulayan Sa Paaralan
Coordinator
April 2021
Php.
500.00
MOOE
/PTA
14.
SAFETY
FOR ONE,
SAFETY
FOR ALL
To Make
SDRRM
100%
fully
functiona
l
100%
Fully
Functiona
SDRRM
Pre- Implementation
Make
Assessment
of Needs
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
January
2020
Php.
500.00
MOOE
/PTA
Identify a
Project Team
Thru
Selection of
SDRRM
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
February
2020
Php.
500.00
MOOE
/PTA
Meet with
the SDRRM
Team
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
March
2020 Php.
500.00
MOOE
/PTA
Create an
Action Plan
for the whole
year
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
March
2020 Php.
500.00
MOOE
/PTA
During Implementation
Procure
Materials
Materials needed for
SDRRM projects /
activities
April 2020
Php
30,000.
00
MOOE
/PTA
59School Improvement Plan
Implement
projects and
programs of
SDRRM
from BOSY
till EOSY
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
May 2020-
March
2021
Php
10,000.
00
MOOE
/PTA
Document
Projects
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
May 2020
– March
2021
Php
1,000.0
0
MOOE
/PTA
Post Implementation
Account
funds
utilization
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
May 2020
to March
2021
Php
1,000.0
0
MOOE
/PTA
Report the
Accomplish
ment of
Works
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
April 2021
Php
1,000.0
0
MOOE
/PTA
Give
recognition
to the
stakeholders
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
April 2021
Php
1,000.0
0
MOOE
/PTA
Monitor and
Evaluate for
Continuous
Improvement
School Head, Asst.
School Head,
SDRRM
Coordinator, PTA
October202
1
Php
5,000.0
0
MOOE
/PTA
16.iCCTVF
OR
SECURITY
To
install
CCTV
in
strategic
areas for
security
purpose
Achievin
g a Target
of one
CCTV
per
school
Pre- Implementation
Make an
assessment
of needs
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
January
2020
Php
5,000.0
0
MOOE
/PTA
Canvass
CCTV
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
February
2020
Php
5,000.0
0
MOOE
/PTA
Identify a
CCTV
Supplier
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
March
2020
Php
5,000.0
0
MOOE
/PTA
Create and
action Plan
for the whole
year in
connection
to SDRRM
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
March
2020
Php
5,000.0
0
MOOE
/PTA
Implementation
Acquire/Proc
ure Materials
Needed
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
May 2020
Php20,0
00.00
MOOE
/PTA
Install
CCTV in
different
Areas
School Head, Asst.
School Head,
Physical Facilities,
May 2020
Php5,00
0.00
MOOE
/PTA
60School Improvement Plan
SDRRM
Coordinator
Document
Project
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
May 2020
Post Implementation
Account
funds
utilization
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
March
2021
Report the
accomplishm
ent of work
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
March
2021
Monitor and
Evaluation
project for
Continuous
Improvement
School Head, Asst.
School Head,
Physical Facilities,
SDRRM
Coordinator
March
2021
Prepared by:
LINDY M. PUJANTE, Ed.D.
School Head
Reviewed by:
EDGAR J. GONZAGA
Education Program Supervisor
Head, Cluster 2
Recommending Approval:
LORENZO M. DIZON, Ed.D., CESO VI
Assistant Schools Division Superintendent
Approved by:
ROSALIE M. PASAOL, Ed.D., CESO V
Schools Division Superintendent
61School Improvement Plan
CHAPTER 4
Monitoring and Evaluation
The Project Monitoring and Evaluation Teams will monitor progress in the middle
and end of project implementation period depending on the timelines set by the
Project Teams. In longer projects, the SPT will have to monitor more than twice.
Project Title: 1.CLEAN HANDS, HEALTHY BODY
Period of Implementation: May 2020- April 2021
Project Monitoring and Evaluation Team
Chairman : Leizle L. Alcudia- Faculty Member
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start May 2020
Middle May 2021
End March 2022
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
1.CLEA
N
HANDS,
HEALT
HY
BODY
To build
additional
four (4)
handwashing
facilities to
meet the
standard
pupil-
handwashing
facility ratio
Start
May 2020
Middle
May 2021
End
March
2022
C
H
A
P
T
E
R
4
62School Improvement Plan
Project Title: 2. SILID KAALAMAN
Period of Implementation: January 2021- April 2022
Project Monitoring and Evaluation Team
Chairman : Joan Z. Sotero- Asst. School Head
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start January 2021
Middle December 2021
End April 2022
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
2. SILID
KAALA
MAN
To build
additional 2
classrooms
and repair
classrooms
that need
repair
Start
January
2021
Middle
December
2021
End
April 2022
63School Improvement Plan
Project Title: 3. I-KONEK MO
Period of Implementation: January 2020-December 2020
Project Monitoring and Evaluation Team
Chairman : Lilymier G. Roma- Faculty Member, ICT Coordinator
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start January 2020
Middle June 2020
End December 2020
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
3. I-
KONEK
MO
To acquire
high speed
internet
connectivity
in school
Start
January
2020
Middle
June 2020
End
December
2020
64School Improvement Plan
Project Title: 4. WATER IS LIFE
Period of Implementation: March 2020- March 2021
Project Monitoring and Evaluation Team
Chairman : Mercedes S. Dayangco- Teacher 3
Co-Chairman : Glenn O. Jalil, Teacher 2
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start March 2020
Middle June 2020
End March 2021
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
4.
WATER
IS LIFE
To regain
water
connection
from
Helpmate
and to
rehabilitate
the water
pipes to
support other
programs and
projects of
the school
Start
March
2020
Middle
June 2020
End
March
2021
65School Improvement Plan
Project Title: 5. SILID KARUNUNGAN
Period of Implementation: March 2020- March 2021
Project Monitoring and Evaluation Team
Chairman : Genevieve A. Francisco- Teacher 1, School Guidance Coordinator
Co-Chairman : Adelaida S. Espanillo- Teacher 3
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start March 2021
Middle October 2021
End March 2022
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
5. SILID
KARUN
UNGAN
To build or
allocate a
space to be
utilized as
Learning
Resource
Center
Start
March
2020
Middle
June 2020
End
March
2021
66School Improvement Plan
Project Title: 6. A HOME IN SCHOOL
Period of Implementation: April 2020- March 2021
Project Monitoring and Evaluation Team
Chairman : Juanita Tiongko- Teacher 3
Co-Chairman
Co-Chairman : Estelita S. Ubay – Master Teacher 2
Members:
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start April 2020
Middle October 2020
End March 2021
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
6. A
HOME
IN
SCHOOL
To build or
repair a
space to be
utilized as
Home
Economics
Laboratory
Start
April 2020
Middle
October
2020
End
March
2021
67School Improvement Plan
Project Title: 7. DAGDAG KAALAMAN DAPAT MATUKLASAN
Period of Implementation: April 2021- March 2022
Project Monitoring and Evaluation Team
Chairman : Estelita S. Ubay-Master Teacher 2
Co-Chairman : Jerezamae L. Liarta, Teacher 1
Co-Chairman : Aida Espanillo, Teacher 3
Members :
1. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start April 2021
Middle October 2021
End March 2022
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
7.
DAGDA
G
KAALA
MAN
DAPAT
MATUK
LASAN
To create a
functional
Action
Research
Team
Start
April 2021
Middle
October
2021
End
March
2022
68School Improvement Plan
Project Title: 8. WIKI LITTLE EINSTEINS
Period of Implementation: April 2021- March 2022
Project Monitoring and Evaluation Team
Chairman : Janice S. Ouano-Teacher 3, School Science Coordinator
Co-Chairman : Genevieve A. Francisco, Teacher 1, School Guidance Coordinator
Co-Chairman : Joan Z. Sotero, Teacher 3, Assistant School Head
Members:
1. Lindy M. Pujante – School Head
2. Marissa V. Bacus – School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start April 2021
Middle October 2021
End March 2022
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
8. WIKI
LITTLE
EINSTEI
NS
To create
one Science
Investigator
y Project
Start
April 2021
Middle
October
2021
End
March
2022
69School Improvement Plan
Project Title: 9. TALENTO MO, IBAHAGI MO
Period of Implementation: April 2020- March 2021
Project Monitoring and Evaluation Team
Chairman : Ma. Janice R. Cabigas -Teacher, MAPEH Coordinator
Co-Chairman : Marissa V. Bacus – MAPEH Teacher
Co-Chairman : Lilymier G. Roma – EPP/TLE Teacher
Members:
1. Janice S. Ouano – Teacher
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
S4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Start April 2020
Middle October 2020
End March 2021
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
9.
TALENT
O MO,
IBAHAG
I MO
To create
group of
learners
with
potential
talents for
the Regional
Festival of
Talents
Start
April 2020
Middle
October
2020
End
March
2021
70School Improvement Plan
Project Title: 10. ROBOT TICKS YOUNG MINDS
Period of Implementation: April 2020- March 2021
Project Monitoring and Evaluation Team
Chairman : Janice S. Ouano - Teacher, Science Coordinator
Co-Chairman : Estelita Ubay – Master Teacher II
Members:
1. Marissa V. Bacus – Teacher, Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
10.
ROBOT
TICKS
YOUNG
MINDS
To create
group of
learners
with
potential
and train
them for the
Robotics
Competition
Start
April 2020
Middle
October
2020
End
March
2021
Start April 2020
Middle October 2020
End March 2021
71School Improvement Plan
Project Title: 11. LITTLE GOVERNORS
Period of Implementation: April 2020- March 2022
Project Monitoring and Evaluation Team
Chairman : Jessica A. Bartido – Teacher 1, SPG Co-Adviser
Members:
1. Marissa V. Bacus – Teacher, Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
11.
LITTLE
GOVER
NORS
To make
Supreme
Pupil
Government
fully
functional
Start
April 2020
Middle
April 2021
End
March
2022
Start April 2020
Middle April 2021
End March 2022
72School Improvement Plan
Project Title: 12. UKELELE FOR LITTLE HANDS
Period of Implementation: April 2020-March 2022
Project Monitoring and Evaluation Team
Chairman : Ma. Janice R. Cabigas – Teacher 3, MAPEH Coordinator
Co-Chairman : Raquel L. Cogtas – Teacher 2
Members:
1. Marissa V. Bacus – Teacher, Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
12.
UKELEL
E FOR
LITTLE
HANDS
To create
group of
learners
with
potential
and train
them for the
Ukulele
Ensemble
Start
April 2020
Middle
April 2021
End
March
2022
Start April 2020
Middle April 2021
End March 2022
73School Improvement Plan
Project Title: 13 . OH (Our Health) MY GULAY
Period of Implementation: Februay 2020-March 2021
Project Monitoring and Evaluation Team
Chairman : Nelia A. Tanucan – Teacher 1
Co-Chairman : Marissa V. Bacus – Teacher 2
Co- Chairman : Estelita S. Ubay – Master Teacher II
Members:
1. Lilymier G. Roma – Teacher 1, School ICT Coordinator
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
13 . OH
(Our
Health)
MY
GULAY
To make the
school’s
Gulayan sa
Paaralan
compliant to
the
standards of
a functional
Gulayan sa
Paaralan
Start
February
2020
Middle
October
2020
End
March
2021
Start February 2020
Middle October 2020
End March 2021
74School Improvement Plan
Project Title: 14 . SAFETY FOR ONE, SAFETY FOR ALL
Period of Implementation: Februay 2020-March 2021
Project Monitoring and Evaluation Team
Chairman : Glenn O. Jalil, Teacher 2 SDRRM Coordinator
Co-Chairman : Marissa V. Bacus – Teacher 2
Co- Chairman : Estelita S. Ubay – Master Teacher II
Members:
1. Lilymier G. Roma – Teacher 1, School ICT Coordinator
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
14 .
SAFETY
FOR
ONE,
SAFETY
FOR
ALL
To make
School
Disaster
Risk
Reduction
Managemen
t fully
functional
Start
February
2020
Middle
October
2020
End
March
2021
Start February 2020
Middle October 2020
End March 2021
75School Improvement Plan
Project Title: 15 . EAT RIGHT, STAY BRIGHT
Period of Implementation: May 2020-March 2021
Project Monitoring and Evaluation Team
Chairman : Miriam S. Alquizar,Teacher 2
Co-Chairman : Juanita Tiongco – Teacher 3
Co- Chairman : Estelita S. Ubay – Master Teacher II
Members:
1. Marissa V. Bacus – Teacher 1, School Property Custodian
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
15 . EAT
RIGHT,
STAY
BRIGHT
To create a
school
canteen with
credible
suppliers of
nutritious
food.
Start
May 2020
Middle
October
2020
End
March
2021
Start May 2020
Middle October 2020
End March 2021
76School Improvement Plan
Project Title: 16 . ECCTV FOR SECURITY
Period of Implementation: May 2020-March 2021
Project Monitoring and Evaluation Team
Chairman : Marissa V. Bacus,Teacher 2, School Property Custodian
Co-Chairman : Lilymier G. Roma – Teacher 1, School ICT Coordinator
Members:
1. Estelita S. Ubay – Master Teacher II
2. Jasmin Panilag – SPG President
3. Hon. Antonio Delantar – Brgy. Councilor
4. Janet M. Alguno – PTA Treasurer
Monitoring Schedules
Project Monitoring Report Form
(1)
Name of
Project
(2)
Project
Objectives
and Targets
(3)
Date of
Monitoring
(4)
Accomplishme
nt/Status to
Date
(5)
Issues/Pro
blems/Cha
llenges
(6)
Recomm
endation
s/Action
Points
(7)
Signature of
SPT and Project
Team Leader
16 .
ECCTV
FOR
SECURI
TY
To install
CCTV for
designated
areas
security of
the school
Start
May 2020
Middle
October
2020
End
March
2021
Start May 2020
Middle October 2020
End March 2021
77School Improvement Plan
NAALAD ELEMENTARY SCHOOL
119508
Naalad, City of Naga, Cebu
ANNEXES
OF THE
ENHANCED
SCHOOL
IMPROVEMENT
PLAN
School Year 2019-2022
78School Improvement Plan
School ID: 119508 Name of School: NAALAD ELEMENTARY SCHOOL
Address: NAALAD, CITY OF NAGA, CEBU Barangay: NAALAD
A.1 Location of the School. Check the appropriate description.
A.2 Relative Distance of the School
A.3 Incidence of crimes and other human-induced hazards
A.3.1 Check if there have been incidences of the following in the last 3 years.
A.3.2 What are the 3 most frequent crimes/human-induced hazards?
1st most frequent: __________________
2nd most frequent: __________________
3rd most frequent: ____________________
A.4 Incidence of natural hazards
A.4.1 Check if there have been incidences of the following in the last 3 years.
A.4.2 What are the 3 most frequent natural hazards?
1st most frequent: _____Tropical Cyclones (Storm)______
2nd most frequent: _____Earthquake___________________
3rd most frequent: _____Landslide_________________________
A.5 Result of disaster incidents
Municipality: CITY OF NAGA
Region: VII
ANNEX 1A School-Community Data Template
Tricycle or Jeepney
2.5 Km
2.5 Km Tricycle or Jeepney
Tricycle or Jeepney
2.5 Km
Tricycle or Jeepney
b. From the nearest public elementary school
Tricycle or Jeepney2.5 Km
2.5 Km
I. SCHOOL PROFILE/DATA
IDENTIFYING INFORMATION
c. From the nearest private elementary school
d. From the nearest public secondary school
e. From the nearest private secondary school
a. From the poblacion
District: NAGA I
Division: CITY OF NAGA
A. GEOGRAPHY
Mode of
Transportation
Instruction: Please input required data/information in unshaded cells. Fill-in only the grade levels that are applicable to your school. This
template aims to organize existing school and community data from different sources. If you find it useful to lift data from other
templates and transfer it here, you may do so. Otherwise, you can just attach the other data templates to this form.
2.5 Km
2.5 Km
Distance in km
Tricycle or Jeepney
Tricycle or Jeepney
f. From the District Office
g. From the Division Office
Along the highway
Near the coastline
Near a river or waterway
By the hillside
On top of a mountain
Armed conflict as a result of organized crime (terrorism, siege, etc.)
Crime against school head/s (murder/homicide, physicalinjury, rape, sexualharassment, etc.)
Crime against school property (theft, robbery,arson)
Crime against student/s (murder/homicide, physical injury, rape, sexualharassment, etc.)
Crime against teacher/s (murder/homicide, physical injury, rape, sexualharassment, etc.)
Fire (Electrical wiring failure, etc.)
Health Threat (i.e. Dengue, Malaria, Measles, food poisoning, disease outbreak)
Oil Spill
Security threat as a result of civilian violence (bomb threats, kidnapping threats, hostage taking, shooting, etc.)
Structuralcollapse (as a result of engineering failures)
Others. Pls. Specify: ______________
Drought
Earthquake
Flood
Landslide
Storm surge
Tropical Cyclones (Storm, Typhoon, Tropical Depression, etc.)
Oil Spill
Tsunami
Volcanic eruption
Others. Pls. specify: ______________
School used as an evacuation center in the last 3 years
Fire (includes forest fires and fires due to naturaldisasters)
79School Improvement Plan
B.1 Classrooms and seats
B.1.1 Classroom quantity [SRC.15.]
Total
Kindergarten 2
Grade 1 3
Grade 2 3
Grade 3 3
Grade 4 3
Grade 5 3
Grade 6 3
Grade 7
Grade 8
Grade 9
Grade 10
Grade 11
Grade 12
TOTAL 20
1
Learner:classroom ratio = Total enrollment divided by the total number of classrooms
B.1.2 Classroom seat quantity [SRC.17.] Indicate the total number of seats in all classrooms.
Number
634
2
Learner:seat ratio = Total enrollment divided by the total number of seats
B.2 Water, Sanitation and Hygiene (WASH) facilities
B.2.1 Water supply/source. Check as appropriate.
Is the main source of water functional at present?
Pls. cite reasons why: ______________________________________________
B.2.2 Handwashing. Is there space for handwashing?
If YES:
B.2.3 Functional toilets [SRC.16.] B.2.4 Toilet bowls
Number Ratio 3
Number Ratio 3
Number Ratio 4
Number Ratio 4
15 23.6:1 15 18.67:1 15 23.6:1 15 18.67:1
3
Learner:toilet ratio = Total enrollment divided by number of toilets
4
Learner:toilet bowl ratio = Total enrollment divided by number of toilet bowls
B.3 Textbooks. Indicate number of textbooks per grade level and subject [SRC.3.]
Number Ratio Number Ratio Number Ratio Number Ratio Number Ratio
Kindergarten
Grade 1 100 0.79:1 110 0.72:1 100 0.79:1
Grade 2 110 0.78:1 110 0.78:1 80 1.08:1
Grade 3 100 0.9:1 100 0.9:1 100 0.9:1 100 0.9:1
Grade 4 35 2.57:1 120 0.75:1 120 0.75:1 120 0.75:1 120 0.75:1
Grade 5 108 0.87:1 120 0.78:1 108 0.87:1 108 0.87:1
Grade 6 100 1.1:1
Grade 7
Grade 8
Grade 9
Grade 10
Grade 11
Grade 12
TOTAL 453 1.4:1 660 0.96:1 220 2.88:1 508 1.25:1 228 2.78:1
B.4 Library:
No. of books: ____0_____
No. of tables: ____0_____
No. of chairs: ____0_____
For Repair/
Rehabilitation
No. of Classrooms
1 30:12
1
1
8
1
2
31.7:1
Subject: EPP K-12Subject: FILIPINO K-12
1
30:1
12634
Subject: SCIENCE K-12
Male Female
Learner:classroom ratio 1
Subject: ENGLISH K-12 Subject: MATHEMATICS K-12
Learner:seat ratio 2
B. LEARNING ENVIRONMENT
1:1
86
2
2
94
85
In Good Condition
31.33:1
2
1
1
42.5:1
90
2 28.67:1
Level
Male Female
36.67:1110 1
90
26.33:179
Level
Total Enrollment,
Current SY
Local piped water
Water well/deep well
Rainwater catchments
Naturalsource
Without available water supply
YES NO
YES
NO
with soap without soap
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022

More Related Content

What's hot

Sample Annual Implementation Plan
Sample Annual Implementation PlanSample Annual Implementation Plan
Sample Annual Implementation PlanDivine Dizon
 
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion Report
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion ReportSchool Monitoring, Evaluation and Adjustment (SMEA): Activity Completion Report
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion ReportDr. Joy Kenneth Sala Biasong
 
action plan in reading.docx
action plan in reading.docxaction plan in reading.docx
action plan in reading.docxJenniferSayong1
 
Action-Plan-Template-NLC-Orientation_TCES.docx
Action-Plan-Template-NLC-Orientation_TCES.docxAction-Plan-Template-NLC-Orientation_TCES.docx
Action-Plan-Template-NLC-Orientation_TCES.docxMary Seal Cabrales-Pejo
 
Action plan on child protection
Action plan on child protectionAction plan on child protection
Action plan on child protectionRobert Abellera
 
Sciemath lac-plan-2021-2022
Sciemath lac-plan-2021-2022Sciemath lac-plan-2021-2022
Sciemath lac-plan-2021-2022TeodyGumabat
 
List of prioritized topics for school based leanrning action cell (slac0
List of prioritized topics for school based leanrning action cell (slac0List of prioritized topics for school based leanrning action cell (slac0
List of prioritized topics for school based leanrning action cell (slac0lormieabrao
 
Narrative report-virtual-brigada2021-kick-off
Narrative report-virtual-brigada2021-kick-offNarrative report-virtual-brigada2021-kick-off
Narrative report-virtual-brigada2021-kick-offDyanAiraPanganibanCa
 
IPCRF-DEVELOPMENT PLAN.docx
IPCRF-DEVELOPMENT PLAN.docxIPCRF-DEVELOPMENT PLAN.docx
IPCRF-DEVELOPMENT PLAN.docxTeacherDang
 
ACTION PLAN READING AND NUMERACY PROGRAM.docx
ACTION PLAN READING AND NUMERACY PROGRAM.docxACTION PLAN READING AND NUMERACY PROGRAM.docx
ACTION PLAN READING AND NUMERACY PROGRAM.docxLovilynEncarnacion1
 
HOMEROOM PTA MEETING- 1ST
HOMEROOM PTA MEETING- 1STHOMEROOM PTA MEETING- 1ST
HOMEROOM PTA MEETING- 1STWinkelyn Sioson
 
Accomplishment report
Accomplishment reportAccomplishment report
Accomplishment reportEmilyn Mapalo
 
Performance indicators definition_of_terms_and_formula
Performance indicators definition_of_terms_and_formulaPerformance indicators definition_of_terms_and_formula
Performance indicators definition_of_terms_and_formulaHush Ameen
 
5 classroom program (sfes) grade v sy 2013 2014
5 classroom program (sfes) grade v sy 2013 20145 classroom program (sfes) grade v sy 2013 2014
5 classroom program (sfes) grade v sy 2013 2014Migz Fajardo
 
Strategies in teaching the least mastered skills
Strategies in teaching the least mastered skillsStrategies in teaching the least mastered skills
Strategies in teaching the least mastered skillsCarlo Magno
 

What's hot (20)

Sample Annual Implementation Plan
Sample Annual Implementation PlanSample Annual Implementation Plan
Sample Annual Implementation Plan
 
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion Report
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion ReportSchool Monitoring, Evaluation and Adjustment (SMEA): Activity Completion Report
School Monitoring, Evaluation and Adjustment (SMEA): Activity Completion Report
 
action plan in reading.docx
action plan in reading.docxaction plan in reading.docx
action plan in reading.docx
 
Action plan in math
Action plan in mathAction plan in math
Action plan in math
 
Action-Plan-Template-NLC-Orientation_TCES.docx
Action-Plan-Template-NLC-Orientation_TCES.docxAction-Plan-Template-NLC-Orientation_TCES.docx
Action-Plan-Template-NLC-Orientation_TCES.docx
 
Action plan on child protection
Action plan on child protectionAction plan on child protection
Action plan on child protection
 
Sciemath lac-plan-2021-2022
Sciemath lac-plan-2021-2022Sciemath lac-plan-2021-2022
Sciemath lac-plan-2021-2022
 
List of prioritized topics for school based leanrning action cell (slac0
List of prioritized topics for school based leanrning action cell (slac0List of prioritized topics for school based leanrning action cell (slac0
List of prioritized topics for school based leanrning action cell (slac0
 
Narrative report-virtual-brigada2021-kick-off
Narrative report-virtual-brigada2021-kick-offNarrative report-virtual-brigada2021-kick-off
Narrative report-virtual-brigada2021-kick-off
 
IPCRF-DEVELOPMENT PLAN.docx
IPCRF-DEVELOPMENT PLAN.docxIPCRF-DEVELOPMENT PLAN.docx
IPCRF-DEVELOPMENT PLAN.docx
 
Balik Eskwela Narrative report
Balik Eskwela Narrative report Balik Eskwela Narrative report
Balik Eskwela Narrative report
 
ACTION PLAN READING AND NUMERACY PROGRAM.docx
ACTION PLAN READING AND NUMERACY PROGRAM.docxACTION PLAN READING AND NUMERACY PROGRAM.docx
ACTION PLAN READING AND NUMERACY PROGRAM.docx
 
HOMEROOM PTA MEETING- 1ST
HOMEROOM PTA MEETING- 1STHOMEROOM PTA MEETING- 1ST
HOMEROOM PTA MEETING- 1ST
 
Dropout reduction program (dorp)
Dropout reduction program  (dorp)Dropout reduction program  (dorp)
Dropout reduction program (dorp)
 
Accomplishment report
Accomplishment reportAccomplishment report
Accomplishment report
 
SMEA PLAN
SMEA PLANSMEA PLAN
SMEA PLAN
 
Performance indicators definition_of_terms_and_formula
Performance indicators definition_of_terms_and_formulaPerformance indicators definition_of_terms_and_formula
Performance indicators definition_of_terms_and_formula
 
5 classroom program (sfes) grade v sy 2013 2014
5 classroom program (sfes) grade v sy 2013 20145 classroom program (sfes) grade v sy 2013 2014
5 classroom program (sfes) grade v sy 2013 2014
 
Reading Camp Matrix
Reading Camp MatrixReading Camp Matrix
Reading Camp Matrix
 
Strategies in teaching the least mastered skills
Strategies in teaching the least mastered skillsStrategies in teaching the least mastered skills
Strategies in teaching the least mastered skills
 

Similar to NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022

E-SIP-SY-2023-2028-FORMAT.docx
E-SIP-SY-2023-2028-FORMAT.docxE-SIP-SY-2023-2028-FORMAT.docx
E-SIP-SY-2023-2028-FORMAT.docxdemartauditor2
 
Case study publlic elementary school
Case study publlic elementary schoolCase study publlic elementary school
Case study publlic elementary schoolPhilip Yanson
 
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOL
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOLSIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOL
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOLRioPilapil2
 
Seminar_Workshop on School Improvement Plan
Seminar_Workshop on School Improvement PlanSeminar_Workshop on School Improvement Plan
Seminar_Workshop on School Improvement PlanRichelleRMingoy
 
Project Flagship ESIP for Brigada Eskwela
Project Flagship ESIP for Brigada Eskwela Project Flagship ESIP for Brigada Eskwela
Project Flagship ESIP for Brigada Eskwela JollyMarkAgosto1
 
K12 District Counseling Plan 15-16 rev
K12 District Counseling Plan 15-16 revK12 District Counseling Plan 15-16 rev
K12 District Counseling Plan 15-16 revPierre LaRocco
 
Guidelines-on-Strategic-Plan-School-Updated.pptx
Guidelines-on-Strategic-Plan-School-Updated.pptxGuidelines-on-Strategic-Plan-School-Updated.pptx
Guidelines-on-Strategic-Plan-School-Updated.pptxRichardSPicaza
 
Nces school improvement plan s.y. 2016 2019
Nces school improvement plan s.y. 2016 2019Nces school improvement plan s.y. 2016 2019
Nces school improvement plan s.y. 2016 2019Lindy Pujante
 
CEEES Numeracy Program_ Action Plan.docx
CEEES Numeracy Program_ Action Plan.docxCEEES Numeracy Program_ Action Plan.docx
CEEES Numeracy Program_ Action Plan.docxPrincessJoyDenoyo1
 
Research Committee Action Plan SY 2020-2021 (January - July '21).docx
Research Committee Action Plan SY 2020-2021 (January - July '21).docxResearch Committee Action Plan SY 2020-2021 (January - July '21).docx
Research Committee Action Plan SY 2020-2021 (January - July '21).docxMD Tristan
 

Similar to NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022 (20)

E-SIP-SY-2023-2028-FORMAT.docx
E-SIP-SY-2023-2028-FORMAT.docxE-SIP-SY-2023-2028-FORMAT.docx
E-SIP-SY-2023-2028-FORMAT.docx
 
Case study publlic elementary school
Case study publlic elementary schoolCase study publlic elementary school
Case study publlic elementary school
 
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOL
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOLSIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOL
SIP-TEMPLATE-2023-NEW MAGSAYSAY INTEGRATED SCHOOL
 
Guidance Program AHS.docx
Guidance Program AHS.docxGuidance Program AHS.docx
Guidance Program AHS.docx
 
National grammar schools
National grammar schoolsNational grammar schools
National grammar schools
 
National grammar schools
National grammar schoolsNational grammar schools
National grammar schools
 
Project VILMA of Tinago NHS
Project VILMA of Tinago NHSProject VILMA of Tinago NHS
Project VILMA of Tinago NHS
 
Seminar_Workshop on School Improvement Plan
Seminar_Workshop on School Improvement PlanSeminar_Workshop on School Improvement Plan
Seminar_Workshop on School Improvement Plan
 
National grammar schools final
National grammar schools finalNational grammar schools final
National grammar schools final
 
Sunday Parents.ppt
Sunday Parents.pptSunday Parents.ppt
Sunday Parents.ppt
 
National grammar schools
National grammar schoolsNational grammar schools
National grammar schools
 
Project Flagship ESIP for Brigada Eskwela
Project Flagship ESIP for Brigada Eskwela Project Flagship ESIP for Brigada Eskwela
Project Flagship ESIP for Brigada Eskwela
 
Matatag-2.pdf
Matatag-2.pdfMatatag-2.pdf
Matatag-2.pdf
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
K12 District Counseling Plan 15-16 rev
K12 District Counseling Plan 15-16 revK12 District Counseling Plan 15-16 rev
K12 District Counseling Plan 15-16 rev
 
sip
sipsip
sip
 
Guidelines-on-Strategic-Plan-School-Updated.pptx
Guidelines-on-Strategic-Plan-School-Updated.pptxGuidelines-on-Strategic-Plan-School-Updated.pptx
Guidelines-on-Strategic-Plan-School-Updated.pptx
 
Nces school improvement plan s.y. 2016 2019
Nces school improvement plan s.y. 2016 2019Nces school improvement plan s.y. 2016 2019
Nces school improvement plan s.y. 2016 2019
 
CEEES Numeracy Program_ Action Plan.docx
CEEES Numeracy Program_ Action Plan.docxCEEES Numeracy Program_ Action Plan.docx
CEEES Numeracy Program_ Action Plan.docx
 
Research Committee Action Plan SY 2020-2021 (January - July '21).docx
Research Committee Action Plan SY 2020-2021 (January - July '21).docxResearch Committee Action Plan SY 2020-2021 (January - July '21).docx
Research Committee Action Plan SY 2020-2021 (January - July '21).docx
 

Recently uploaded

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022

  • 1. 1School Improvement Plan NAALAD ELEMENTARY SCHOOL 119508 Naalad, City of Naga, Cebu ENHANCED SCHOOL IMPROVEMENT PLAN School Year 2019-2022
  • 2. 2School Improvement Plan TABLE OF CONTENTS List of Acronyms Certificate of Acceptance CHAPTER 1. Department of Education’s Vision, Mission, and Core Values Statement School Planning Team School Planning Time Table Page 4 Page 5 Page 6 Page 8 Page 10 CHAPTER 2. Narrative Report on School’s Current Situation List of GAPs Priority Improvement Area Prioritizing PIAs Page 11 Page 13 Page 16 Page 18 CHAPTER 3. School Improvement Planning Worksheet List of Possible Solutions Project Work Plan and Budget Matrix Annual Improvement Plan Page 19 Page 21 Page 22 Page 54 CHAPTER 4. Monitoring and Evaluation ANNEXES Annex 1A School Community Data Template Annex 1B Child Mapping Tool Annex 2A Child-Friendly School Survey Annex 2B Child Protection Policy Annex 2C Student -Led School Watching and Hazard Mapping Page 61 Page 78 Page 91 Page 111 Page 119 Page 122
  • 3. 3School Improvement Plan Annex 3 GAP Analysis Annex 4 Identifying Priority Improvement Areas Annex 5 Planning Worksheet Annex 6 Guidelines in Listening to Voice of Learners and Other Stakeholders Annex 7 Walk the Process Guidelines Annex 8 Root Cause Analysis Annex 9 Project Work Plan and Budget Annex 10 Annual Implementation Plan Annex 11 SRC Summary of Information Annex 12 School Report Card Page 123 Page 137 Page 138 Page 140 Page 142 Page 146 Page 155 Page 187 Page 192 Page 200
  • 4. 4School Improvement Plan LIST OF ACRONYMS DepEd – Department of Education SIP – School Improvement Program AIP – Annual Implementation Plan LGU- Local Government Unit MGB –Mines and GeoSciences Bureau DENR – Department of Environment and Natural Resources SDRRM – School Disaster Risk Reduction Management DPWH – Department of Public Works and Highways APP- Annual Procurement Plan NDRRMC –National Disaster Risk Reduction Management Council
  • 5. 5School Improvement Plan HAPTER 1 VII CITY OF NAGA NAALAD ELEMENTARY SCHOOL ROSALIE M. PASAOL, Ed.D., CESO V
  • 6. 6School Improvement Plan Department of Education Mission, Vision, and Core Values Statement The DepEd Vision We dream of Filipinos who passionately love their country and whose values and competencies enable them to realize their full potential and contribute meaningfully to building the nation. As a learner-centered public institution, the Department of Education continuously improves itself to better serve its stakeholders. The DepEd Mission To protect and promote the right of every Filipino to quality, equitable, culture- based, and complete basic education where: Students learn in a child-friendly, gender-sensitive, safe, and motivating environment. Teachers facilitate learning and constantly nurture every learner. Administrators and staff, as stewards of the institution, ensure an enabling and supportive environment for effective learning to happen. Family, community, and other stakeholders are actively engaged and share responsibility for developing life-long learners. Our Core Values Maka-Diyos Maka-tao Makakalikasan Maka-Bansa C H A P T E R 1
  • 7. 7School Improvement Plan Naalad Elementary School is a learner-centered and child-friendly government institution aligned to the Department of Education’s Mission and Vision. In the next three years, we aspire to provide a haven for holistic development to the learners by providing them a caring and nurturing environment that will enable them, empower them and encourage them to achieve their highest potential. The school’s dedicated and competent teachers will enable the learners with knowledge integrated with good values in different academic subjects and skills in the performance tasks in technology, music, arts and sports. The school administration aims to provide the best support it can give to propel a 21st century teaching and learning outcome. We commit through the school’s administration and teaching staff as we are geared towards working hand in hand to continually improve the school’s performance in the aspects of access, quality and in good governance through: • Full implementation and monitoring of the programs and projects of the school as mandated by the Department of Education. • Provide full support and training of teachers, coaches and athletes to attain their maximum potential. • Maintain a collaborative working relationship with the community by engaging the Barangay Officials, parents and stakeholders with the full functionality of the School Governing Council. • Attain one hundred percent curriculum implementation through generously exposing teachers to opportunities for professional development and through provision of technical support. • Provide a happy, safe and secure school environment wherein learners, teachers, parents and the community will coexist performing each role in molding young minds to become proactive and productive members of society in the generations to come. With the guidance and blessings of God almighty, these dreams and aspirations are crafted for Naalad Elementary School Improvement Plan for the next three years.
  • 8. 8School Improvement Plan School Planning Team Roles, Responsibilities and Commitment. We envision to provide quality education to each learner, in a learner-centered, friendly and value-driven learning environment with committed teachers and school head, adequate resources and facilities, and strong, supportive stakeholders, all geared towards helping each learner with special needs, out of school youth and adult to reach her/his full potential for lifelong learning. Stakeholders Roles Responsibilities Lindy M. Pujante School Head Team Leader • Convene the school Planning Team • Provides leadership and guidance in the development of the plan, clearly explain the SIP process to the planning workshop Joan Z. Soterio Assistant School Head • Provide needed information relative to teaching and learning process • Participate actively during the development of the SIP establishing priorities, setting goals and formulating implementation strategies for the plan • Assist in the implementation of the plan, monitoring and evaluation of the plan implantation • Participate in the preparation of the School Improvement Plan Nash Eleine Caro (SPG President) Student Representative • Share insights about learners’ difficulties in school • Provide technical and financial support towards the SIP implementation • Assist in the implementation of the plan, monitoring and evaluation of the plan implementation • Participate in the preparation of the School Improvement Plan
  • 9. 9School Improvement Plan • Assist the school in its advocacy effort of the SIP Edgar Torremocha (PTA President) Parent Representative • Share insights about what their children need to learn and the difficulties they face in school, their aspiration for the school and their children, present other areas of concerns; and participates in setting goals, strategies and priorities of the school • Assist in the implementation of the plan, monitoring and evaluation of the plan implementation • Participate in the preparation of the School Improvement Plan Sandra L. Cañalita (Barangay Captain) Barangay Representative • Participate in the preparation of the School Improvement Plan • Share valuable information on the interest of the community in school improvement and participate in setting goals, strategies and priorities of the school • Commit available resources in the implementation of the plan • Assists in the implementation of the plan implementation
  • 10. 10School Improvement Plan Table 1. SCHOOL PLANNING TEAM TIMETABLE The table below shows the activities of the School Planning Team in the preparation, implementation and monitoring of the School Improvement Plan and Annual Implementation Plan which serve as guide to all SPT members and the school-community. ACTIVITIES SCHEDULE PREPARATORY ACTIVITIES School Head with Team will gather and organize data using the School-Community Data Template January 7 – 11, 2020 Form and convene the SPT for orientation, vision sharing, and scheduling January 21 – 25, 2019 PHASE 1: ASSESS School Planning Team will present and discuss the information gather during the preparatory activities. Identify/Review the Priority Improvement Areas through Focus Group Discussion. February 4 – 8, 2019 SPT will discuss and set general objectives and targets/ organize the project teams/ listen to the voice of the learners and other stakeholders/ analyze the school process/ select area of focus/ do root cause analysis/ and present root cause to the SPT March 11 – 15, 2019 PHASE 2: PLAN SPT will review general objectives and targets/ formulate solutions/ develop project designs/ April 8 – 12, 2019 Write the SIP/ and prepare the AIP May 13 – 17, 2019 PHASE 3: ACT Project Team will test the solutions June – August 2019 Roll out the solutions September 2, 2019 SPT will check the progress of AIP April 2019 Monitoring and Evaluation October 28 – 31, 2019 April 13 – 17, 2019
  • 11. 11School Improvement Plan CHAPTER 2 Assess NARRATIVE REPORT ON SCHOOL’S CURRENT SITUATION Naalad Elementary School is geographically located at the foot of the hill northwest of the city proper about 2.5 kilometers away from the City of Naga Division Office and nearby public and private elementary and secondary schools. It can be reached by public utility vehicle or by motorcycle. Naalad Elementary School adapts its name of the barangay which is Naalad meaning “Fence”. This is so because the barangay is surrounded by towering heights of hills and mountains. It has a total land area of 4, 449 square meters and was established in 1958. The school site was acquired through donation, executed and entered into by and between City of Naga (formerly Municipality of Naga), Cebu duly represented by the late Mayor Ferdinand M. Chiong as the DONOR and the Department of Education (formerly Department of Education Culture and Sports), Naalad Elementary School, duly represented by the School Principal Dr. Dulcesima L. Valparaiso as the DONEE on April 23, 2001 at Naga, Cebu as shown in the Deed of Donation. Naalad Elementary School is a complete mono-grade school. The current eighteen (18) teaching and non-teaching staff of the school is composed of one Head Teacher 3 serving as the School Head, one duly designated Assistant School Head who is a Teacher 3, one Master Teacher 2, five Teacher 3, five Teacher 2 and the rest are Teacher 1. Out of these 17 teachers, only few are trained for ICT, while the rest are trained in Kto12, Journalism and other trainings. LAC system is also in place for teachers to gain insights on the methods from the best practices of fellow teachers that will enhance their teaching process. Currently, we have thirteen (13) classrooms being used and two (2) classrooms for demolition which makes us short of 2 classrooms. We also need a functional EPP/TLE Room, a Science Laboratory, a Learning Center, a canteen, a functional school DRRM, a plant nursery and material recovery facility to improve our Gulayan sa Paaralan. Fortunately, we have no shortage of seats and chairs but we have a number of textbook shortage particularly in Science 369 and EPP/TLE 365. These shortage in textbooks are composed mostly in higher grades of Grades IV to Grade VI. Most in lower Grades 1 to Grade 3 have enough textbooks. C H A P T E R 2
  • 12. 12School Improvement Plan Along with the challenges, the school has its triumphs to be proud of. These are: • 1st place winner in photo journalism division level • 1st place winner in pop quiz division level • 1st place winner in speech choir competition division level • 1st place winner in volleyball male category division level • 1st place winner in volleyball female category division level • Emerging school in the ECO-FRIENDLY Competition In the next three years, we hope to achieve the following: A) ACCESS • Construct 4 handwashing facilities to achieve the standard 1:100 handwashing facility to pupil ratio • Meet 100% standard classroom requirement • Acquire high speed and stable internet connectivity • Regain disconnected water from HelpMate • Create one learning resource center • Create one Home Economics area B) QUALITY AND RELEVANCE • Attain one action research • Attain 1 Science Investigatory Project • Progress to Regional Festival of Talents and win • Organize, train and win in Robotics competition • Attain 100% functionality of the Supreme Pupil Government • Organize, train and win in Ukulele competition C) GOVERNANCE • Enhance Gulayan sa Paaralan • Make the School Disaster Risk Reduction Management Team fully functional • To create a school canteen with nutritious food • To install CCTV in strategic area for security
  • 13. 13School Improvement Plan After performing GAP analysis, we come up with the following list of unaccomplished gaps. Division Targets/ Planning Standards Data Needed Current Situation Root Cause/s General Objectiv e/s TIME FRAME General Solution Accomp lished Gap SY 2019- 2020 SY 2020- 2021 SY 2021- 2022 A. Access 1:100 handwashin g facility - Pupil Ratio 634/2 4 No assigned area for handwas hing facilities and lack of ample water supply To build additiona l 4 handwas hing facilities 2 2 Allocate funds to build 4 addional hand washing facilities 100% Classrooms in good condition 12/15 3 Building is dilapidat ed and was due for demilitio n To build additiona l 3 classroo ms and repair rooms which needed repairs 1 1 1 To ask DepEd/LGU assistance Internet Connectivity per school 0/1 No internet connecti vity in the area To acquire the internet connecti vity of the school. 1 acquire for point to point internet access Water supply connection per school 0/1 1 Disconne jcted water supply from Helpmat e To acquire the connecti on of water supply in the school. 1 to regain water connection from helpmate 1 Learning Center per school 0/1 1 No enough area. To build a classroo m for learning center. 1 Ask help from the LGU or the school stakeholder.
  • 14. 14School Improvement Plan 1 H.E. Laboratory 0/1 1 Lack of classroo m. To look for a place and budget for construct ion of HE Laborato ry. 1 Ask help from the stakehloders. Fundraising campaign. B. Quality and Relevance 1 Action Research per school 0/2 1 No assigned teacher for research. To assign qualified teacher for research. 1 1 Allocate funding from school resources like PTA and MOOE Regional Festival of Talents 0 1 No winners progress ed to Regional level To win in the Regional Festival of Talents 100 Train coach and participants Robotics Contest 0 1 Lack of training for about robotics To organize a robotics team for competiti on 1 1 Conduct/participate trainings and seminars related to robotics. Functionality of SPG and SSG 30% 30% SPG is not 100% functiona l due to time constrain t. To attain 100% functiona lity of the SPG in school for the next years. 10% 10% 10% Organize and conduct meeting or conference with the SPG advisers . Creation of Rondalla/ Ukelele Ensemble 0/1 1 Non existing To organize Ukelele Ensembl e. To win in competit ons. 1 1 1 To train MAPEH teachers C. Governance
  • 15. 15School Improvement Plan Gulayan Sa Paaralan 0/1 No fully functiona l gulayan, with no plant nursery, no mrf To intensify the impleme ntation of the Gulayan sa Paaralan 100% 100% Require all pupils to have 1 containerized vegetable plant DRRM 0/1 1 No school continge ncy plan To create a fully funcitona l SDRRM 1 Create a contingency plan 1 Canteen per School 0/1 1 Canteen was demolish ed due to on- going construct ion of the building. To put up a canteen inside the school. 1 Tap stokeholders for funds. Conduct a fund raising campaign. 5 CCTV per school 0/5 1 No alloted budget for CCTV. To put a CCTV inside school premises . 1 Include CCTV purchase in crafting the APP.
  • 16. 16School Improvement Plan We further analyze these unaccomplished GAPS and identify the improvement areas that needs to be prioritized to wit: IDENTIFY PRIORITY IMPROVEMENT AREAS Improvement Areas Strategic Importance Urgency Magnitude Feasibility Average Interpr etation A. Access 5 5 5 5 5 very high priority 1 1:100 handwashing facility - Pupil Ratio 5 5 5 5 5 very high priority 2 100% Classrooms in good condition 5 5 5 5 5 very high priority 3 Internet Connectivity per school 5 5 5 5 5 very high priority 4 Water supply connection per school 5 5 5 5 5 very high priority 5 1 Learning Center per school 5 5 5 5 5 very high priority 6 1 H.E. Laboratory 5 5 5 5 5 very high priority B. Quality and Relevance 7 1 Action Research per school 5 5 5 5 5 very high priority 8 1 SIP (Science Investigatory Project) per school 5 5 5 5 5 very high priority 9 Regional Festival of Talents 5 5 5 5 5 very high priority 10 Robotics Contest 5 5 5 5 5 very high priority 11 Functionality of SPG 5 5 5 5 5 very high priority 12 Creation of Rondalla/ Ukelele Ensemble 5 5 5 5 5 very high priority
  • 17. 17School Improvement Plan C. Governance 13 Gulayan Sa Paaralan 5 5 5 5 5 very high priority 14 DRRM 5 5 5 5 5 very high priority 15 1 Canteen per School 5 5 5 5 5 very high priority 16 5 CCTV per school 5 5 5 5 5 very high priority
  • 18. 18School Improvement Plan Further, the list of GAPS will be prioritized for the next three years in the following manner: PRIORITIZING PIAs Improvement Areas VERY HIGH PRIORITY 40% 40% 20% A. Access 1 1:100 handwashing facility -Pupil Ratio  2 100% Classrooms in good condition  3 Internet Connectivity per school  4 Water supply connection per school  5 1 Learning Center per school  6 1 H.E. Laboratory  B. Quality and Relevance 7 1 Action Research per school  8 1 SIP (Science Investigatory Project) per school  9 Regional Festival of Talents  10 Robotics Contest  11 Functionality of SPG  12 Creation of Rondalla/ Ukelele Ensemble  C. Governance 13 Gulayan Sa Paaralan  14 DRRM  15 1 Canteen per School  16 5 CCTV per school 
  • 19. 19School Improvement Plan CHAPTER 3 Plan SCHOOL IMPROVEMENT PLANNING PLANNING WORKSHEET Priority Improvement Areas General Objective/s Root Cause/s Time Frame SY 2019- 2020 SY 2020- 2021 SY 2021- 2022 A. ACCESS 1:100 handwashing facility -Pupil Ratio To build additional 4 handwashing facilities to meet the standard pupil- handwashing facility ratio 1. No assigned area for handwashing facilities 2. lack of ample water supply  100% Classrooms in good condition To build additional 2 classrooms and repair rooms which needed repairs 3 Building is dilapidated and was due for demolition  Internet Connectivity per school To acquire high speed internet connectivity in the school. No internet connectivity in the area  Water supply connection per school To regain water connection from HelpMate in support of other programs and projects of the school Disconnected water supply from Helpmate since 2013  1 Learning Center per school To build and utilize a space for learning resource center. No classroom allocation  1 H.E. Laboratory To build or repair a room budget for construction of HE Laboratory. No classroom / space allocation.  B. QUALITY AND RELEVANCE 1 Action Research per school To create a functional action research team No assigned teacher for research.  1 Science Investigatory Project To create 1 Science Investigatory Project No trained teacher to lead the Project Team  Regional Festival of Talents To create teams, train and win for the Regional Festival of Talents No winners progressed to Regional 
  • 20. 20School Improvement Plan Robotics Contest To create and train robotics team to win competitions Lack of training for about robotics  Priority Improvement Areas General Objective/s Root Cause/s Time Frame SY 2019- 2020 SY 2020- 2021 SY 2021- 2022 Functionality of SPG and SSG To attain 100% functionality of the SPG SPG is not 100% functional due to time constraint.  Creation of Ukelele Ensemble To organize and train learners who are inclined to music to win in Ukelele contests. No existing ukulele ensemble  C. GOVERNANCE Gulayan Sa Paaralan To intensify the implementation of the Gulayan sa Paaralan No fully functional gulayan, with no plant nursery, no mrf  DRRM To make School Disaster Risk Reduction Management Fully Functional No planning, no empowerment, no proper delegation  1 Canteen per School To organize a canteen with credible source of nutritious food Canteen was demolished due to on-going construction of the building.  5 CCTV per school To install 4 cctv in the premises for security No existing CCTV 
  • 21. 21School Improvement Plan PIA’s Possible Solutions MOOE/ PS LGUs PTA Fund Raising Adopt a School Prizes Canteen Title of the Program/Project/ Activity 1:100 handwashing facility -Pupil Ratio 1. construct addional 4 handwashing facilities        1.Clean Hands, Healthy Body 100% classrooms in good condition Ask assistance from DepEd, LGU, Stakeholders     2.Silid Kaalaman Internet connectivity for the school Scout for high speed connectivity and subscribe  3.I-Konek Mo Water connection supply per school 1. Pay balance from HelpMate 2. Reconnect water supply to Helpmate      4.Water is Life 1 learning center per school Allocate one room to be used as learning resource center        5.Silid Karunungan HE laboratory per school Allocate one room for HE Laboratory       6. A Home in School Action Research Per school Train and assign the Master Teacher to take the lead    7.DagDag Kaalaman Dapat Matuklasan Science Investigatory Project Per school Train Science Coordinator and assigned learn to conduct a SIP    8.Little Wiki Einsteins Regional Festival of Talents Have an extensive training for the coach and for the contestants       9.Talento Mo Ibahagi Mo Robotics Contest Train teacher /Coach and contestant       10.Robot Ticks Young Minds Functionality of SPG Make SPG fully functional    11.Little Governors Creation of Ukulele Create a Ukelele Ensemble       12.Ukulele for Little Hands Gulayan sa Paaralan Create a plant nursery Enhance gardening methods Create a vermiculture       13.OH (Our Health) My Gulay DRRM Create a Contingency Plan Create a 7 Man Team       14.Safety for One, Safety for All Canteen Per School Organize a school canteen     15.Eat Right, Stay Bright 5 CCTV in School Purchase and install cctvs in strategic locations     16. ECCTV for Security List of Possible Solutions
  • 22. 22School Improvement Plan Project Work Plan and Budget Project Title: 1. CLEAN HANDS, HEALTHY BODY Problem Statement: The school lacks hand washing facilities to meet the requirement ratio of one hand washing facility per 100 learners Project Objective Statement: To build additional four (4) hand washing facilities to meet the standard pupil/hand washing ratio of 1:100 Root Cause: No area allocated for additional handwashing facility and no ample water supply Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Assess the Needs of the Project List of Needs August 2019 School Head, Asst. School Head, Teachers, PTA Php. 300.00 PTA Prepare Budget Plan Budget Plan August 2019 School Head, Asst. School Head, PTA Php 300.00 PTA Organize Committees List of Committees August 2019 School Head, Assistant School Head, Teachers, PTA Php. 300.00 PTA Tap Possible Donors List of Possible Donors August 2019 School Head, Asst. School Head, Teachers, PTA , LGU, NGOs, Alumni Php. 500.00 PTA Scout for donors List of Donors Sent with Solicitations August- September 2019 School Head, Asst. School Head, Teachers, PTA , LGU, NGOs, Alumni Php 100.00 PTA Implementation Accept donations Donated Fund August-January 2019 School Head, Asst. School Head, Teachers, PTA , LGU, NGOs, Alumni Php. 500.00 PTA Account Proceeds Accounting of Proceeds October 2019 School Head, Asst. School Head, Teachers, parents Php. 1 000.00 PTA Procure materials Purchase Official Receipts October 2019 School Head, Asst. School Head, Teachers Php 300 000.00 PTA, LGU, NGOs, Fund Raising, MOOE Monitor the progress of the Work Documentation January2020- March 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Post Implementation
  • 23. 23School Improvement Plan Account Generated Funds and Expenses Transparency board of the Generated Funds and Expenses of the hand washing facilities April 2020 School Head, Asst. School Head, Teachers, PTA President Php 1000.00 MOOE Report the Accomplishment of Works Report of the Accomplishment of Works April 2020 School Head, Asst. School Head, Teachers, Alumni, LGU, NGOs, Parents Php. 1 000.00 PTA Give Recognitions to Donors List of Donors printed in a tarpaulin April 2020 ICT Coordinator Php. 1 000.00 PTA Turn over the hand washing facilities Monitor and Evaluate the project for continuous improvement Evaluation sheets May 2020 School Head Php 1,000.00 PTA Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 24. 24School Improvement Plan Project Work Plan and Budget Project Title: 2. SILID KAALAMAN Problem Statement: The school lacks 2 standard classrooms Project Objective Statement: To build additional 2 classrooms to meet 100% classroom/learner ratio. Root Cause: Inaccurate EBEIS data encoding so lacking classrooms are not allocated funds. Activity Output Date of Implementation Person Responsible Budget Source of Budget Pre- Implementation Make Assessment of Needs List of School Needs January 2020 School Head, Asst. School Head Php. 100.00 PTA Write a letter request to the Schools Division Superintendent Letter Request January 2020 School Head, Asst. School Head, SDS, City Mayor Php. 100.00 PTA Make a follow-up of the letter request Follow up letter March 2020 School Head, School Head, PTA President, LGU, City Engineer Php. 500.00 PTA Clear rooms for demolition Rooms ready for demolition March 2020 School Head/Assist School Head/Teachers Php. 500.00 PTA/ MOOE Ask approval of the Project Approved Project Plan April 2020 School Head, SDS Php 100.00 PTA During Implementation Construct the School building On-going construction of the building September 2020 School Head, Asst. School Head Php 250 000.00 LGU/DepED Monitor the Progress of the 2Work Documentation September 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Turn – over the new building Program of the Turn-over Ceremony September 2021 School Head, Asst. School Head, Teachers, parents, pupils , LGU Php 5 000.00 PTA/MOOE Post Implementation Account of Funds Documents of the Accounting of Generated Funds and Expenses October 2021 School Head, Asst. School Head, Teachers, PTA President Php 1000.00 MOOE Report the Accomplishment of Works Report of the Accomplishment of Works October 2021 School Head, Asst. School Head, Teachers, Alumni, LGU Php. 500.00 MOOE Give Recognitions to Donors List of Donors printed in a tarpaulin October 2021 ICT Coordinator Php. 1 000.00 MOOE Evaluation sheets May 2020 School Head Php 1,000.00 PTA
  • 25. 25School Improvement Plan Monitor and Evaluate the project for continuous improvement Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 26. 26School Improvement Plan Project Work Plan and Budget Project Title: 3. I-KONEK MO Problem Statement: The school lacks high speed and stable internet connection Project Objective Statement: To subscribe to a high speed internet connection Root Cause: Low connectivity in the area Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Assess the Needs List of Needs January 2020 School Head, ICT Coordinator Php. 200.00 PTA Prepare Budget Plan Budget Plan January 2020 School Head, Asst. School Head, PTA Php 100.00 PTA Organize Committees List of Committees January 2020 School Head, Assistant School Head, Teachers, PTA Php. 300.00 PTA Tap Possible Donors List of Possible Donors January 2020 School Head, Asst. School Head, Teachers, PTA , LGU, NGOs, Alumni Php. 500.00 PTA Implementation Account Proceeds Accounting of Proceeds February 2020 School Head, Asst. School Head, Teachers, parents Php. 1 000.00 PTA Procure materials Purchase Official Receipts February 2020 School Head, Asst. School Head, Teachers Php 300 000.00 PTA, LGU, NGOs, Fund Raising, MOOE Install Internet connection Internet connection February 2020 School Head, Asst. School Head, Teachers, parents Php 100 000.00 PTA, LGU, NGOs, Fund Raising, MOOE Monitor Progress of the Work Documentation February 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Post Implementation Account Generated Funds and Expenses Transparency board of the Generated Funds and Expenses February 2020 School Head, Asst. School Head, Teachers, PTA President Php 1000.00 MOOE
  • 27. 27School Improvement Plan Report the Accomplishment of Works Report of the Accomplishment of Works February 2020 School Head, Asst. School Head, Teachers, Alumni, LGU, NGOs, Parents Php. 1 000.00 PTA Give Recognitions to Donors List of Donors printed in a tarpaulin February 2020 ICT Coordinator Php. 1 000.00 PTA Monitor and Evaluate project for continuous improvement Evaluation Sheets December 2021 School Head, Asst. School Head, Project Team Members Php 2,000.00 PTA Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 28. 28School Improvement Plan Project Work Plan and Budget Project Title: 4. WATER IS LIFE Problem Statement: The school lacks water connection from a reliable and steady source Project Objective Statement: To regain water connection from Help Mate and rehabilitate water pipes to support other programs and projects of the school. Root Cause: Water was disconnected due to non payment of dues since 2013 Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Assess the Needs of the project List of Needs January 2020 School Head, ICT Coordinator Php. 200.00 PTA Prepare Budget Plan Budget Plan January 2020 School Head, Asst. School Head, PTA Php 100.00 PTA Organize Committees List of Committees January 2020 School Head, Assistant School Head, Teachers, PTA Php. 300.00 PTA Tap Possible Donors List of Possible Donors January 2020 School Head, Asst. School Head, Teachers, PTA , LGU, NGOs, Alumni Php. 500.00 PTA Implementation Account Proceeds and expenses Accounting of Proceeds and expenses February 2020 School Head, Asst. School Head, Teachers, parents Php. 1 000.00 PTA Procure materials Payment of overdue amounts April 2020 School Head, Asst. School Head, Teachers Php 300 000.00 PTA, LGU, NGOs, Fund Raising, MOOE Secure reinstallation of water connection Water connection October 2020 School Head, Asst. School Head, Teachers, parents Php 100 000.00 PTA, LGU, NGOs, Fund Raising, MOOE Monitor the Progress of the Work Documentation December 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Post Implementation
  • 29. 29School Improvement Plan Account Generated Funds and Expenses Transparency board of the Generated Funds and Expenses January 2021 School Head, Asst. School Head, Teachers, PTA President Php 1000.00 MOOE Report the Accomplishment of Works Report of the Accomplishment of Works February 2021 School Head, Asst. School Head, Teachers, Alumni, LGU, NGOs, Parents Php. 1 000.00 PTA Give Recognitions to Donors List of Donors printed in a tarpaulin February 2021 ICT Coordinator Php. 1 000.00 PTA Monitor and Evaluate project for Continuous Improvement Evaluation sheets December 2021 School Head, Asst. School Head and Project Team Php2,000.00 PTA Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 30. 30School Improvement Plan Project Work Plan and Budget Project Title: 5.SILID KARUNUNGAN Problem Statement: The school does not have a learning resource center Project Objective Statement: To build and utilize a space for learning center. Root Cause: No existing learning resource center Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs May 2020 School Head, Asst. School Head Php. 100.00 PTA Write a letter request to stakeholders Letter Request May 2020 School Head, Asst. School Head Php. 100.00 PTA Make the Program of Works Program of Works May 2020 School Head, School Head, PTA President, Php. 500.00 PTA Approve the Project Approved Project Plan June 2020 School Head, SDS Php 100.00 PTA During Implementation Construct the School a learning resource center Functional Resource Center September 2020 School Head, Asst. School Head Php 250 000.00 LGU Monitor the Progress of the Work Documentation September 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Turn – over the Learning Resource Center Program of the Turn-over Ceremony January 2021 School Head, Asst. School Head, Teachers, parents, pupils , stakeholders Php 2 000.00 PTA, MOOE Post Implementation Account Generated Funds and expenses Documents of the Accounting of Generated Funds and Expenses February 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA Report the Accomplishment of Works Report of the Accomplishment of Works February 2021 School Head, Asst. School Head, Teachers, Alumni Php. 500.00 PTA Give Recognitions to Donors List of Donors printed in a tarpaulin February 2021 ICT Coordinator Php. 1 000.00 PTA
  • 31. 31School Improvement Plan Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 32. 32School Improvement Plan Project Work Plan and Budget Project Title: 6. A HOME IN SCHOOL Problem Statement: The school does not have a Home Economics Center Project Objective Statement: To build and utilize a space for Home Economics activities. Root Cause: No existing Home Economics Center Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs May 2020 School Head, Asst. School Head Php. 100.00 PTA Write a letter request to the City Mayor Letter Request May 2020 School Head, Asst. School Head, SDS, City Mayor Php. 100.00 PTA Make the Program of Works Program of Works May 2020 School Head, School Head, PTA President, LGU, City Engineer Php. 500.00 PTA Seek Approval of the Project Approved Project Plan June 2020 School Head, SDS Php 100.00 PTA During Implementation Procure materials Office Receipts July 2020 Rehabilitate /Repair the old room formerly used as bodega Repaired room September 2020 School Head, Asst. School Head Php 250 000.00 LGU Document Projects Pictures before during and after repair May to September 2020 School Head/ Project Team Php 500.oo MOOE Monitor the Progress of the Work Documentation September 2020 School Head, Asst. School Head, Teachers, parents Php. 100.00 PTA Turn – over the project Program of the Turn-over Ceremony January 2021 School Head, Asst. School Head, Teachers, parents, pupils , LGU Php 2 000.00 PTA, MOOE Post Implementation Account Generated Funds Documents of the Accounting of Generated Funds and Expenses February 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE
  • 33. 33School Improvement Plan Report the Accomplishment of Works Report of the Accomplishment of Works February 2021 School Head, Asst. School Head, Teachers, Alumni, LGU Php. 500.00 PTA/MOOE Give Recognitions to Donors List of Donors printed in a tarpaulin February 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets March 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 34. 34School Improvement Plan Project Work Plan and Budget Project Title: 7.DAGDAG KAALAMAN DAPAT MATUKLASAN Problem Statement: The school does not have Action Research Project Objective Statement: To create an Action Research Root Cause: No proper training Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs December 2020 School Head, Asst. School Head Php. 100.00 MOOE/ PTA Write a letter request to the Schools Division Superintendent about the proposed training to be attended Letter Request January 2021 School Head, Asst. School Head, SDS, Php. 100.00 MOOE/ PTA Make and submit the Research Title Title of Research January 2021 School Head, Project Team / Master Teacher, SDS Php. 500.00 MOOE/ PTA Secure approval of the Research Title Approved Research February 2021 School Head, SDS Php 100.00 MOOE/ PTA During Implementation Gather Data Data of the school March 2021 Tabulate Data Tabulation of Data May 2021 School Head, Asst. School Head Php 250 000.00 MOOE/ PTA Interpret Data Interpreted Data May 2021 Document progress of Project Pictures before during and after research May 2021 School Head/ Project Team Php 500.oo MOOE/ PTA Present the Action Research Action Research May 2021 School Head Research Panel/ SDS Research Team Php 10,000.00 MOOE/ PTA Revise and Finalize based on the recommendation Revised/Refined Action Research May 2021 School Head/Master Teacher Php1,000.00 PTA/MOOE Submit the Action research Submitted researched July 2021 School Head, Php 2 000.00 PTA, MOOE
  • 35. 35School Improvement Plan Master Teacher/ Research Team, PTA Post Implementation Account Generated Funds and utilization Documents of the Accounting of Generated Funds and Expenses August, 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works September 2021 School Head, Asst. School Head, Teachers, Alumni, Php. 500.00 PTA/MOOE Give Recognitions to the Research Team List of Research Team printed in a tarpaulin September 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 36. 36School Improvement Plan Project Work Plan and Budget Project Title: 8.WIKI LITTLE EINSTEINS Problem Statement: The school does not have a School Investigatory Project Project Objective Statement: To create a Science Investigatory Project Root Cause: No proper training Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs June 2020 School Head, Master Teacher/ Research Teacher, PTA Php. 100.00 MOOE/ PTA Identify a Project Team List of names for Project Team June 2020 School Head, Master Teacher/ Research Team, PTA Write a letter request to the Schools Division Superintendent about the proposed training to be attended Letter Request July 2020 School Head, Asst. School Head, SDS, Php. 100.00 MOOE/ PTA Make the School Project Investigatory Project Title School Investigatory Title July 2020 School Head, Project Team / Master Teacher, SDS Php. 500.00 MOOE/ PTA Make the Investigatory Project Title be approved Approved Investigatory Project July 2020 School Head, Project Team / Master Teacher, SDS Php 100.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the project August 2020 School Head, Project Team Php 5,000.00 MOOE/ PTA Gather Data Data of the school August 2020 Project Team Php 1,000.00 MOOE/ PTA Tabulate Data Tabulation of Data December 2020 Master Teacher/ Project Team Php 1250 000.00 MOOE/ PTA Interpret Data Interpreted Data December 2020 School Head Php 1,000.00 MOOE/ PTA Present the School Improvement Plan School Investigatory Project December 2020 School Head Research Panel/ SDS Research Team Php 10,000.00 MOOE/ PTA Revise Finalize School Investigatory Project Presentation Revised/Refined School Investigatory Project Presentation January 2021 School Head/Master Teacher /Project Team Php1,000.00 PTA/MOOE
  • 37. 37School Improvement Plan Document progress of the Project Pictures before during and after project February 2021 School Head/ Project Team Php 500.oo MOOE/ PTA Submit Project Project documentations March 2021 School Head, Master Teacher/ Research Team, PTA Php 2 000.00 PTA, MOOE Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses March 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works March 2021 School Head, Asst. School Head, Teachers, Alumni, LGU Php. 500.00 PTA/MOOE Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 38. 38School Improvement Plan Project Work Plan and Budget Project Title: 9. TALENTO MO, IBAHAGI MO Problem Statement: The school does not have winners in the Regional Festival of Talents Project Objective Statement: To create and train learners to win in the Regional Festival of Talents Root Cause: No existing poll of contestants and coaches and learners need extensive training Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs June 2020 School Head, Asst. School Head, MAPEH and TLE Coordinators, PTA Php. 100.00 MOOE/ PTA Identify a Project Team List of names for Project Team June 2020 School Head, Asst. School Head, MAPEH and TLE Coordinators, PTA Write a letter request to the Schools Division Superintendent about the proposed training to be attended Letter Request July 2020 School Head, Asst. School Head, SDS, Php. 100.00 MOOE/ PTA Create a Team for Ukulele Ensemble, Fruit and Vegetable Carving, Folk Dance Contestants Ukulele Ensemble, Folk Dance and Fruit and Vegetable Carving July 2020 School Head, Asst. School Head, MAPEH and TLE Coordinators, PTA Php20,000.00 MOOE/ PTA Send Coaches to Training Trained Coaches July 2020 School Head, , MAPEH and TLE Coordinators, MAPEH and TLE Coaches, PTA Php10,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the project August 2020 MAPEH and TLE Coordinators, MAPEH and TLE Coaches, PTA Php 50,000.00 MOOE/ PTA
  • 39. 39School Improvement Plan Train the contestants Trained contestants August 2020 MAPEH and TLE Coordinators, MAPEH and TLE Coaches, PTA Php 1,000.00 MOOE/ PTA Send to Division/Regional Contests Contestants/ participants August 2020 Master Teacher/ Project Team Php 20,000.00 MOOE/ PTA Document of Projects Pictures before during and after project August 2020 School Head/ Project Team Php 5000.oo MOOE/ PTA Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses September 2020 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works September 2020 School Head, Asst. School Head, Teachers, Alumni, Php. 500.00 PTA/MOOE Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 40. 40School Improvement Plan Project Work Plan and Budget Project Title: 10. ROBOT TICKS YOUNG MINDS Problem Statement: There is no existing School Robotics Team Project Objective Statement: To provide avenue for learning as additional item for Science subject Root Cause: No robotics tools and equipment due to its very high cost Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs June 2020 School Head, Asst. School Head, Science Coordinator PTA Php. 100.00 MOOE/ PTA Identify a Project Team List of names for Project Team June 2020 School Head, Asst. School Head, Science Coordinator PTA Write a letter request to the Schools Division Superintendent about the proposed training to be attended Letter Request July 2020 School Head, Head, SDS, Php. 100.00 MOOE/ PTA Send Coaches to Training Trained Coaches July 2020 School Head, Asst. School Head, Science Coordinator PTA Php10,000.00 MOOE/ PTA Create a Team for Robotics Contestants for Robotics July 2020 School Head, Asst. School Head, Science Coordinator PTA Php10,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the project August 2020 School Head, Asst. School Head, Science Coordinator PTA Php 50,000.00 MOOE/ PTA Train the contestants Trained contestants August 2020 School Head, Asst. School Head, Science Coordinator PTA Php20,000.00 MOOE/ PTA Send to Division/Regional Contests Contestants/ participants August 2020 School Head, Asst. School Head, Science Coordinator PTA Php 20,000.00 MOOE/ PTA Document of Projects Pictures before during and after project August 2020 School Head, Asst. School Head, Science Coordinator PTA Php 5000.oo MOOE/ PTA
  • 41. 41School Improvement Plan Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses September 2020 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works September 2020 School Head, Asst. School Head, Teachers, Alumni, Php. 500.00 PTA/MOOE Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 42. 42School Improvement Plan Project Work Plan and Budget Project Title: 11. LITTLE GOVERNORS Problem Statement: Supreme Pupil Government is not 100% functional Project Objective Statement: To make Supreme Pupil Government fully functional Root Cause: No plan of action to make SPG fully functional Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs January 2020 School Head, Asst. School Head, SPG Adviser, PTA Php. 100.00 MOOE/ PTA Identify a Project Team thru SPG Election List of SPG Officers February School Head, Asst. School Head, SPG Adviser, PTA Induct new SPG Officers Newly elected SPG Officers March 2020 School Head, Asst. School Head, SPG Adviser, PTA, Php. 100.00 MOOE/ PTA Create an Action Plan for the whole year Action Plan for the whole year March 2020 School Head, Asst. School Head, SPG Adviser, PTA Php1,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for SPG projects/activities April 2020 School Head, Asst. School Head, SPG Adviser, PTA Php 10,000.00 MOOE/ PTA Implement projects and programs of SPG Starting from Brigada to EOSY Closing Ceremony Projects and programs May 2020-March 2021 School Head, Asst. School Head, SPG Adviser, SPG Officers, PTA Ph30,000.00 MOOE/ PTA Document of Projects Pictures before during and after project May 2020-March 2021 School Head, Asst. School Head, SPG Adviser, SPG Officers, PTA Php 5000.oo MOOE/ PTA Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses May 2020 to March 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works April 2021 School Head, Asst. School Php. 500.00 PTA/MOOE
  • 43. 43School Improvement Plan Head, Teachers, Alumni, Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 5000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 44. 44School Improvement Plan Project Work Plan and Budget Project Title: 12. UKULELE FOR LITTLE HANDS Problem Statement: There is no existing School Ukulele Ensemble Project Objective Statement: To provide avenue for learning as additional item for Music and Arts in preparation of Regional Festival of Talents Root Cause: No trained coach and trained learners for ukulele Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs March 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php. 100.00 MOOE/ PTA Identify a Project Team List of names of learners to form Ukulele Ensemble March 2020 School Head, Asst. School Head, Science Coordinator PTA Write a letter request to the Schools Division Superintendent about the proposed training to be attended Letter Request April 2020 School Head, Head, SDS, Php. 100.00 MOOE/ PTA Send Coaches to Training Trained Coaches April 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php10,000.00 MOOE/ PTA Meet and Orient Ukulele Team and their parents Oriented Ukulele Ensemble Team Members and parents April 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php1,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the project May 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php 10,000.00 MOOE/ PTA Train the Ukulele Ensemble Team Trained Ukulele Players June 2020 to December 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php40,000.00 MOOE/ PTA Send to Division/ Regional Contests Contestants/ participants August 2020 December 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php 20,000.00 MOOE/ PTA
  • 45. 45School Improvement Plan Document of Projects Pictures before during and after project June 2020 to December 2020 School Head, Asst. School Head, MAPEH Coordinator, PTA Php 5000.oo MOOE/ PTA Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses January 2021 School Head, Asst. School Head, Teachers, PTA President Php 500.00 PTA/MOOE Report the Accomplishment of Works Report of the Accomplishment of Works January 2021 School Head, Asst. School Head, Teachers, Alumni, Php. 500.00 PTA/MOOE Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 1 000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets May 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 46. 46School Improvement Plan Project Work Plan and Budget Project Title: 13. OH (Our Health) My Gulay Problem Statement: The school does not meet the requirements of the Gulayan sa Paaralan Program. Project Objective Statement: To comply the requirements of the Gulayan sa Paaralan Program Root Cause: The school’s Gulayan sa Paaralan Program does not meet the required standards. Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Assess Current Situation Assessment Report January 2020 School Head, Asst. School Head Php. 100.00 PTA/MOOE Identify gaps and needs List of gaps and needs January 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA Php. 100.00 PTA/MOOE Make a plan and budget Project Plan and Budget January 2020 School Head, School Head, GP Coordinator, PTA Php. 100.00 PTA/MOOE Organize Committee List of Committees February 2020 School Head, SDS Php 100.00 PTA/MOOE Coordinate with DA and City Agriculture Office Letter Request April 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA Php. 100.00 PTA/MOOE Conduct General PTA Meeting Minutes of the Meeting June 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA Php 500.00 PTA/MOOE Discuss the importance of Gulayan sa Paaralan Minutes of the Meeting June 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA Present Plans and budgets Budget Plan June 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA Solicit report and commitment Accomplished Commitment Forms July 2020 School Head, Assistant School Head, Teachers, GP Coordinator, PTA During Implementation Follow up request from DA and City Agriculture Office Approved Request July 2020 School Head, Asst. School Head, Php 100.00 PTA/MOOE Procure needed materials Official receipts July 2020 Gulayan sa Paaralan Coordinator Php 5 000.00 PTA/MOOE Start the project Documentation July 2020 Gulayan sa Paaralan Coordinator None None Monitor the progress of the project Monitoring Form July to December 2020 Gulayan sa Paaralan Coordinator None None
  • 47. 47School Improvement Plan Participate in the Gulayan sa Paaralan higher level contest Required Documents for the Contest October 2020 Gulayan sa Paaralan Coordinator Php 1 000.00 PTA/MOOE Gather result Result October 2020 Gulayan sa Paaralan Coordinator Php 100.00 PTA/MOOE Post Implementation Report Accomplishments Accomplishment Report December 2020 School Head, Asst. School Head, Teachers, Gulayan sa Paaralan Coordinator Php 100.00 PTA/MOOE Give Feedbacks Minutes July to December 2020 School Head, Asst. School Head, Teachers, Gulayan sa Paaralan Coordinator Php 100.00 PTA/MOOE Account Expenses Summary of Expenses Give awards and recognition Certificates of Awards March 2021 School Head, Asst. School Head, Teachers, Gulayan sa Paaralan Coordinator Php 500.00 PTA/MOOE Asses results for continuous improvement Analysis of Results April 2021 School Head, Asst. School Head, Teachers, Gulayan sa Paaralan Coordinator Php. 100.00 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 48. 48School Improvement Plan Project Work Plan and Budget Project Title: 14. SAFETY FOR ONE, SAFETY FOR ALL Problem Statement: The School DRRM is not fully functional Project Objective Statement: To make SDRRM 100 % fully functional Root Cause: SDRRM programs and projects are not fully implemented Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs January 2020 School Head, Asst. School Head, SDRRM Coordinator, PTA Php. 100.00 MOOE/ PTA Identify a Project Team thru Selection of SDRRM Team List of SDRRM Team February 2020 School Head, Asst. School Head, SDRRM Coordinator, PTA Meet with the SDRRM Team Newly designated SDRRM Team March 2020 School Head, Asst. School Head, SDRRM Coordinator, PTA, Php. 3000.00 MOOE/ PTA Create an Action Plan for the whole year Action Plan for the whole year March 2020 School Head, Asst. School Head, SDRRM Coordinator, PTA Php1,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for SDRRM projects/activities April 2020 School Head, Asst. School Head, SDRRM Coordinator, PTA Php 30,000.00 MOOE/ PTA Implement projects and programs of SDRRM Starting from Brigada to EOSY Closing Ceremony Projects and programs May 2020-March 2021 School Head, Asst. School Head, SDRRM Coordinator, PTA Ph10,000.00 MOOE/ PTA Document Projects Pictures before during and after project May 2020-March 2021 School Head, Asst. School Head, SDRRM Coordinator, PTA Php 1000.oo MOOE/ PTA Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses May 2020 to March 2021 School Head, Asst. School Head, SDRRM Coordinator, PTA Php 500.00 PTA/MOOE
  • 49. 49School Improvement Plan Report the Accomplishment of Works Report of the Accomplishment of Works April 2021 School Head, Asst. School Head, SDRRM Coordinator, PTA Php. 500.00 PTA/MOOE Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 5000.00 PTA/MOOE Monitor and Evaluate of the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 PTA/MOOE Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 50. 50School Improvement Plan Project Work Plan and Budget Project Title: 15.EAT RIGHT, STAY BRIGHT Problem Statement: The School has no canteen that supplies nutritious food from credible suppliers with sanitary permits Project Objective Statement: To create a credible supplier of nutritious food for learners Root Cause: Lack of space and plan Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs January 2020 School Head, Asst. School Head, School Canteen Coordinator PTA Php. 100.00 MOOE/ PTA Identify a Project Team thru School Canteen Coordinator List of Canteen Personnel February 2020 School Head, Asst. School Head, School Canteen Coordinator PTA Meet with the CanteenTeam Newly designated Canteen Team March 2020 School Head, Asst. School Head, School Canteen Coordinator PTA Php. 3000.00 MOOE/ PTA Create an Action Plan for the whole year Action Plan for the whole year March 2020 School Head, Asst. School Head, School Canteen Coordinator PTA Php1,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the Canteen May 2020 School Head, Asst. School Head, School Canteen Coordinator PTA Php 5,000.00 Teachers Canteen Fund Start Canteen operations beginning from Brigada to EOSY Closing Ceremony School supplies/materials for the canteen May 2020- March 2021 School Head, Asst. School Head, School Canteen Coordinator PTA Ph5,000.00 Teachers Canteen Fund Document Projects Pictures before during and after project May 2020- March 2021 School Head, Asst. School Head, School Canteen Coordinator PTA Php 100.oo Teachers Canteen Fund Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses May 2020 to March 2021 School Head, Asst. School Head, School Canteen Coordinator PTA, Php 500.00 Teachers Canteen Fund Report the Accomplishment of Works Report of the Accomplishment of Works April 2021 School Head, Asst. School Head, School Canteen Coordinator PTA Php. 500.00 Teachers Canteen Fund
  • 51. 51School Improvement Plan Give Recognitions to the Project Team and their stakeholders List of Project Team and stakeholders printed in a tarpaulin April 2021 ICT Coordinator Php. 5000.00 Teachers Canteen Fund Monitor and Evaluate the project for continuous improvement Evaluation Sheets October 2021 School Head and Monitoring Committee Php1,000 Teachers Canteen Fund Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 52. 52School Improvement Plan Project Work Plan and Budget Project Title: 16. ECCTV FOR SECURITY Problem Statement: The School has no CCTV Project Objective Statement: To install CCTV in strategic areas for security purposes Root Cause: No technical knowledge on how to install and the perception that it has a high cost. Activity Output Date of Implementation Person Responsible Budget Budget Source Pre- Implementation Make Assessment of Needs List of School Needs January 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php. 100.00 MOOE/ PTA Identify a Suppliers of CCTV List suppliers of cctv February 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Canvass CCTV Canvassed prices for cctv March 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php. 3000.00 MOOE/ PTA Create an Action Plan for the whole year Action Plan for the whole year March 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php1,000.00 MOOE/ PTA During Implementation Acquire /Procure Materials needed Materials needed for the cctv installation May 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php 5,000.00 MOOE/ PTA Install CCTV in different areas Installed cctv May 2020- December 2020 School Head, Asst. School Head, School Facilities Coordinator , SDRRM Coordinator, ,PTA Ph20,000.00 MOOE/ PTA Document Projects Pictures before during and after project May 2020- December 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php 100.oo MOOE/ PTA Post Implementation Account Funds and utilization Documents of the Accounting of Funds and Expenses May 2020 to December 2020 School Head, Asst. School Head, School Facilities Coordinator ,PTA, Php 500.00 MOOE/ PTA Report the Accomplishment of Works Report of the Accomplishment of Works March 2021 School Head, Asst. School Head, School Facilities Coordinator ,PTA Php. 500.00 MOOE/ PTA Give Recognitions to List of Project Team and March 2021 ICT Coordinator Php. 5000.00 MOOE/ PTA
  • 53. 53School Improvement Plan the Project Team and their stakeholders stakeholders printed in a tarpaulin Monitor and Evaluate the project for continuous improvement Evaluation Sheets March 2021 School Head and Monitoring Committee Php1,000 MOOE/ PTA Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 54. 54School Improvement Plan ANNUAL IMPLEMENTATION PLAN SCHOOL YEAR 2019-2020 Instruction: List down the activities that are required in each school year to implement the school improvement projects. Indicated for every activity are the schedule and venue, budget, and the person(s) responsible. SCHOOL IMPROVE MENT PROJECT TITLE PROJECT OBJECT IVE OUTPUT FOR THE YEAR ACTIVITIES PERSON(S) RESPONSIBLE SCHEDULE/ VENUE BUDGET PER ACTIVIT Y BUDGE T SOURC E 3. I- KONEK MO To subscrib e to a high speed internet connecti on Internet Connecti on Pre- Implementa tion Assess the Needs School Head, ICT Coordinator January 2020 Php. 200.00 PTA Prepare the Budget Plan School Head, Asst. School Head, PTA January 2020 Php 100.00 PTA Tap Possible Donors School Head, Asst. School Head, Teachers, PTA January 2020 Php. 500.00 PTA Implementation Account the proceeds School Head, Asst. School Head, Teachers, PTA , January 2020 Php. 500.00 PTA Procure materials for antenna School Head, Asst. School Head, Teachers February 2020 Php 20 000.00 MOOE /PTAs Install internet connection ICT Coordinator/School Head, Physical Facilities February 2020 Php 100 000.00 PTA, , MOOE Monitoring the Progress of the Work ICT Coordinator/School Head, Physical Facilities January202 0-March 2021 Php. 100.00 PTA Post Implementation Account Funds and Expenses School Head, Asst. School Head, Teachers, PTA President Feb. 2020 Php 1000.00 MOOE Report the Accomplish ment of Works School Head, Asst. School Head, Teachers, Alumni, LGU, NGOs, Parents April 2020 Php. 1 000.00 PTA Give Recognitions to Donors ICT Coordinator April 2020 Php. 1 000.00 PTA 4. WATER IS LIFE To regain water Pre- Implementation
  • 55. 55School Improvement Plan connecti on from HelpMat e Abundant Water supply Make Assessment of Needs School Head, Asst. School Head PTA Feb. 2020 Php. 100.00 PTA Prepare a Budget Plan School Head, Asst. School Head, Physical Facilities PTA Feb. 2020 Php. 100.00 PTA Organize committees School Head, Asst. School Head, Physical Facilities PTA Feb. 2020 Php. 500.00 PTA Approval of the Project School Head, SDS Feb. 2020 Php 100.00 PTA During Implementation Account Proceeds and Expenses School Head, Asst. School Head, Physical Facilities PTA February 2020 to October 2020 Php 60,000. 00 PTA/ MOOE Monitoring the account School Head, Asst. School Head, Physical Facilities PTA October 2020 Php. 100.00 PTA Secure reinstallation of water School Head, Asst. School Head, Physical Facilities PTA October 2020 Php 2 000.00 PTA, MOOE Post Implementation Account Funds School Head, Asst. School Head, Teachers, PTA President October 2020 Php 500.00 PTA, MOOE Report the Accomplish ment of Works School Head, Asst. School Head, Teachers, Alumni, LGU October 2020 Php. 500.00 PTA, MOOE 11. LITTLE GOVERNO RS To Make SPG fully function al Fully Functiona l SPG Pre- Implementation Make assessment of needs School Head, Asst. School Head, SPG, SPG Adviser January 2020 Php. 500.00 PTA Identify a project Team thru SPG Election School Head, Asst. School Head, SPG, SPG Adviser February 2020 Php. 500.00 SPG Fund Induct new SPG officers School Head, Asst. School Head, SPG, SPG Adviser February 2020 SPG Fund Create and action plan for the whole year School Head, Asst. School Head, SPG, SPG Adviser February 2020 Php. 100.00 SPG Fund Implementation Acquire /Procure School Head, Asst. School Head, SPG, SPG Adviser May 2020 Php. 1 000.00 PTA
  • 56. 56School Improvement Plan Materials Needed Implement projects and programs of SPG from BOSY to EOSY School Head, Asst. School Head, SPG, SPG Adviser May 2020- March 2021 Php 30,000. 00 MOOE /PTA Document Project School Head, Asst. School Head, SPG, SPG Adviser May 2020- March 2021 Php1,00 0.00 MOOE /PTA Post Implementation Account Funds and Utilization School Head, Asst. School Head, SPG, SPG Adviser May 2020- March 2021 Php 200.00 MOOE /PTA Report the accomplishm ent of works School Head, Asst. School Head, SPG, SPG Adviser May 2020- March 2021 Php 200.00 MOOE /PTA Give recognition of Stakeholders School Head, Asst. School Head, SPG, SPG Adviser March 2021 Php5,00 0.00 MOOE /PTA 12. UKULELE FOR LITTLE HANDS To provide avenue for learning in Music and Arts in preparati on for Regional Festival of Talents Ukulele Ensemble Pre- Implementation Make an assessment of needs School Head, Asst. School Head, Learners, MAPEH Coordinator March 2020 Php 200.00 MOOE /PTA Identify an project team School Head, Asst. School Head, Learners, MAPEH Coordinator March 2020 Php 200.00 MOOE /PTA Write a letter request for training School Head, SDS April 2020 Php 200.00 MOOE /PTA Send coaches to training School Head, Asst. School Head, Learners, MAPEH Coordinator April 2020 10,000. 00 MOOE /PTA Meet and Orient Ukulele Team and their parents School Head, Asst. School Head, Learners, MAPEH Coordinator April 2020 Php 200.00 MOOE /PTA During Implementation Acquire / Procure Materials needed School Head, Asst. School Head, Learners, MAPEH Coordinator June 2020 to December 2020 Php 50,000. 00 MOOE /PTA Train Ukulele Players School Head, Asst. School Head, Learners, MAPEH Coordinator June to December, 2020 Php 20,000. 00 MOOE /PTA Send to Division/Reg ional Contests School Head, Asst. School Head, Learners, MAPEH Coordinator October 2020- December 2020 Php 100.00 MOOE /PTA Post Implementation Asses results School Head, Asst. School Head, January 2021 Php. 100.00 MOOE /PTA
  • 57. 57School Improvement Plan Learners, MAPEH Coordinator Report Accomplish ments School Head, Asst. School Head, Learners, MAPEH Coordinator January 2021 Php 100.00 MOOE /PTA Give Feedbacks School Head, Asst. School Head, Learners, MAPEH Coordinator January 2021 Php 100.00 MOOE /PTA Account Expenses School Head, Asst. School Head, Learners, MAPEH Coordinator January 2021 Php 100.00 MOOE /PTA Give awards and recognition School Head, Asst. School Head, Learners, MAPEH Coordinator March to April 2021 Php 5000.00 MOOE /PTA 13. OH (Our Health) MY GULAY To comply the requirem ent s fo the Gulayan Sa Paralan Functiona l Gulayan Sa Paaralan Pre- Implementation Assess Current Situation School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator January 2020 Php. 500.00 MOOE /PTA Identify Gaps School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator January 2020 Php. 500.00 MOOE /PTA Make a plan and budget School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator January 2020 Php. 100.00 MOOE /PTA Organize Committee School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator January 2020 Php. 1 000.00 MOOE /PTA Coordinate with DA and City Agriculture office School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator January 2020 Php. 500.00 MOOE /PTA Conduct General PTA Meeting School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator June 2020 Php. 500.00 MOOE /PTA Discuss the importance of Gulayan sa Paaralan School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator June 2020 Php. 500.00 MOOE /PTA Present Plans and Budget School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator June 2020 Php. 500.00 MOOE /PTA Solicit Reports and Commitment s School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator July 2020 Php. 500.00 MOOE /PTA Implementation
  • 58. 58School Improvement Plan Follow Up request from DA School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator July 2020 Php. 500.00 MOOE /PTA Procure needed Materials School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator July 2020 Php. 5000.00 MOOE /PTA Start the Project School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator July 2020 Php. 500.00 MOOE /PTA Participate in the Gulayan Sa Paaralan Contest School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator October 2020 Php. 500.00 MOOE /PTA Gather Result School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator October 2020 Php. 500.00 MOOE /PTA Post Implementation Report Accomplish ment School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator December 2020 Php. 500.00 MOOE /PTA Account the expenses School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator July to December 2020 Php. 500.00 MOOE /PTA Give awards and recognition School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator March 2021 Php. 5000.00 MOOE /PTA Evaluate for Continuous Improvement School Head, Asst. School Head, PTA Gulayan Sa Paaralan Coordinator April 2021 Php. 500.00 MOOE /PTA 14. SAFETY FOR ONE, SAFETY FOR ALL To Make SDRRM 100% fully functiona l 100% Fully Functiona SDRRM Pre- Implementation Make Assessment of Needs School Head, Asst. School Head, SDRRM Coordinator, PTA January 2020 Php. 500.00 MOOE /PTA Identify a Project Team Thru Selection of SDRRM School Head, Asst. School Head, SDRRM Coordinator, PTA February 2020 Php. 500.00 MOOE /PTA Meet with the SDRRM Team School Head, Asst. School Head, SDRRM Coordinator, PTA March 2020 Php. 500.00 MOOE /PTA Create an Action Plan for the whole year School Head, Asst. School Head, SDRRM Coordinator, PTA March 2020 Php. 500.00 MOOE /PTA During Implementation Procure Materials Materials needed for SDRRM projects / activities April 2020 Php 30,000. 00 MOOE /PTA
  • 59. 59School Improvement Plan Implement projects and programs of SDRRM from BOSY till EOSY School Head, Asst. School Head, SDRRM Coordinator, PTA May 2020- March 2021 Php 10,000. 00 MOOE /PTA Document Projects School Head, Asst. School Head, SDRRM Coordinator, PTA May 2020 – March 2021 Php 1,000.0 0 MOOE /PTA Post Implementation Account funds utilization School Head, Asst. School Head, SDRRM Coordinator, PTA May 2020 to March 2021 Php 1,000.0 0 MOOE /PTA Report the Accomplish ment of Works School Head, Asst. School Head, SDRRM Coordinator, PTA April 2021 Php 1,000.0 0 MOOE /PTA Give recognition to the stakeholders School Head, Asst. School Head, SDRRM Coordinator, PTA April 2021 Php 1,000.0 0 MOOE /PTA Monitor and Evaluate for Continuous Improvement School Head, Asst. School Head, SDRRM Coordinator, PTA October202 1 Php 5,000.0 0 MOOE /PTA 16.iCCTVF OR SECURITY To install CCTV in strategic areas for security purpose Achievin g a Target of one CCTV per school Pre- Implementation Make an assessment of needs School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator January 2020 Php 5,000.0 0 MOOE /PTA Canvass CCTV School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator February 2020 Php 5,000.0 0 MOOE /PTA Identify a CCTV Supplier School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator March 2020 Php 5,000.0 0 MOOE /PTA Create and action Plan for the whole year in connection to SDRRM School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator March 2020 Php 5,000.0 0 MOOE /PTA Implementation Acquire/Proc ure Materials Needed School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator May 2020 Php20,0 00.00 MOOE /PTA Install CCTV in different Areas School Head, Asst. School Head, Physical Facilities, May 2020 Php5,00 0.00 MOOE /PTA
  • 60. 60School Improvement Plan SDRRM Coordinator Document Project School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator May 2020 Post Implementation Account funds utilization School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator March 2021 Report the accomplishm ent of work School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator March 2021 Monitor and Evaluation project for Continuous Improvement School Head, Asst. School Head, Physical Facilities, SDRRM Coordinator March 2021 Prepared by: LINDY M. PUJANTE, Ed.D. School Head Reviewed by: EDGAR J. GONZAGA Education Program Supervisor Head, Cluster 2 Recommending Approval: LORENZO M. DIZON, Ed.D., CESO VI Assistant Schools Division Superintendent Approved by: ROSALIE M. PASAOL, Ed.D., CESO V Schools Division Superintendent
  • 61. 61School Improvement Plan CHAPTER 4 Monitoring and Evaluation The Project Monitoring and Evaluation Teams will monitor progress in the middle and end of project implementation period depending on the timelines set by the Project Teams. In longer projects, the SPT will have to monitor more than twice. Project Title: 1.CLEAN HANDS, HEALTHY BODY Period of Implementation: May 2020- April 2021 Project Monitoring and Evaluation Team Chairman : Leizle L. Alcudia- Faculty Member Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start May 2020 Middle May 2021 End March 2022 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 1.CLEA N HANDS, HEALT HY BODY To build additional four (4) handwashing facilities to meet the standard pupil- handwashing facility ratio Start May 2020 Middle May 2021 End March 2022 C H A P T E R 4
  • 62. 62School Improvement Plan Project Title: 2. SILID KAALAMAN Period of Implementation: January 2021- April 2022 Project Monitoring and Evaluation Team Chairman : Joan Z. Sotero- Asst. School Head Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start January 2021 Middle December 2021 End April 2022 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 2. SILID KAALA MAN To build additional 2 classrooms and repair classrooms that need repair Start January 2021 Middle December 2021 End April 2022
  • 63. 63School Improvement Plan Project Title: 3. I-KONEK MO Period of Implementation: January 2020-December 2020 Project Monitoring and Evaluation Team Chairman : Lilymier G. Roma- Faculty Member, ICT Coordinator Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start January 2020 Middle June 2020 End December 2020 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 3. I- KONEK MO To acquire high speed internet connectivity in school Start January 2020 Middle June 2020 End December 2020
  • 64. 64School Improvement Plan Project Title: 4. WATER IS LIFE Period of Implementation: March 2020- March 2021 Project Monitoring and Evaluation Team Chairman : Mercedes S. Dayangco- Teacher 3 Co-Chairman : Glenn O. Jalil, Teacher 2 Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start March 2020 Middle June 2020 End March 2021 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 4. WATER IS LIFE To regain water connection from Helpmate and to rehabilitate the water pipes to support other programs and projects of the school Start March 2020 Middle June 2020 End March 2021
  • 65. 65School Improvement Plan Project Title: 5. SILID KARUNUNGAN Period of Implementation: March 2020- March 2021 Project Monitoring and Evaluation Team Chairman : Genevieve A. Francisco- Teacher 1, School Guidance Coordinator Co-Chairman : Adelaida S. Espanillo- Teacher 3 Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start March 2021 Middle October 2021 End March 2022 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 5. SILID KARUN UNGAN To build or allocate a space to be utilized as Learning Resource Center Start March 2020 Middle June 2020 End March 2021
  • 66. 66School Improvement Plan Project Title: 6. A HOME IN SCHOOL Period of Implementation: April 2020- March 2021 Project Monitoring and Evaluation Team Chairman : Juanita Tiongko- Teacher 3 Co-Chairman Co-Chairman : Estelita S. Ubay – Master Teacher 2 Members: 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start April 2020 Middle October 2020 End March 2021 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 6. A HOME IN SCHOOL To build or repair a space to be utilized as Home Economics Laboratory Start April 2020 Middle October 2020 End March 2021
  • 67. 67School Improvement Plan Project Title: 7. DAGDAG KAALAMAN DAPAT MATUKLASAN Period of Implementation: April 2021- March 2022 Project Monitoring and Evaluation Team Chairman : Estelita S. Ubay-Master Teacher 2 Co-Chairman : Jerezamae L. Liarta, Teacher 1 Co-Chairman : Aida Espanillo, Teacher 3 Members : 1. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start April 2021 Middle October 2021 End March 2022 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 7. DAGDA G KAALA MAN DAPAT MATUK LASAN To create a functional Action Research Team Start April 2021 Middle October 2021 End March 2022
  • 68. 68School Improvement Plan Project Title: 8. WIKI LITTLE EINSTEINS Period of Implementation: April 2021- March 2022 Project Monitoring and Evaluation Team Chairman : Janice S. Ouano-Teacher 3, School Science Coordinator Co-Chairman : Genevieve A. Francisco, Teacher 1, School Guidance Coordinator Co-Chairman : Joan Z. Sotero, Teacher 3, Assistant School Head Members: 1. Lindy M. Pujante – School Head 2. Marissa V. Bacus – School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start April 2021 Middle October 2021 End March 2022 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 8. WIKI LITTLE EINSTEI NS To create one Science Investigator y Project Start April 2021 Middle October 2021 End March 2022
  • 69. 69School Improvement Plan Project Title: 9. TALENTO MO, IBAHAGI MO Period of Implementation: April 2020- March 2021 Project Monitoring and Evaluation Team Chairman : Ma. Janice R. Cabigas -Teacher, MAPEH Coordinator Co-Chairman : Marissa V. Bacus – MAPEH Teacher Co-Chairman : Lilymier G. Roma – EPP/TLE Teacher Members: 1. Janice S. Ouano – Teacher 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor S4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Start April 2020 Middle October 2020 End March 2021 Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 9. TALENT O MO, IBAHAG I MO To create group of learners with potential talents for the Regional Festival of Talents Start April 2020 Middle October 2020 End March 2021
  • 70. 70School Improvement Plan Project Title: 10. ROBOT TICKS YOUNG MINDS Period of Implementation: April 2020- March 2021 Project Monitoring and Evaluation Team Chairman : Janice S. Ouano - Teacher, Science Coordinator Co-Chairman : Estelita Ubay – Master Teacher II Members: 1. Marissa V. Bacus – Teacher, Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 10. ROBOT TICKS YOUNG MINDS To create group of learners with potential and train them for the Robotics Competition Start April 2020 Middle October 2020 End March 2021 Start April 2020 Middle October 2020 End March 2021
  • 71. 71School Improvement Plan Project Title: 11. LITTLE GOVERNORS Period of Implementation: April 2020- March 2022 Project Monitoring and Evaluation Team Chairman : Jessica A. Bartido – Teacher 1, SPG Co-Adviser Members: 1. Marissa V. Bacus – Teacher, Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 11. LITTLE GOVER NORS To make Supreme Pupil Government fully functional Start April 2020 Middle April 2021 End March 2022 Start April 2020 Middle April 2021 End March 2022
  • 72. 72School Improvement Plan Project Title: 12. UKELELE FOR LITTLE HANDS Period of Implementation: April 2020-March 2022 Project Monitoring and Evaluation Team Chairman : Ma. Janice R. Cabigas – Teacher 3, MAPEH Coordinator Co-Chairman : Raquel L. Cogtas – Teacher 2 Members: 1. Marissa V. Bacus – Teacher, Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 12. UKELEL E FOR LITTLE HANDS To create group of learners with potential and train them for the Ukulele Ensemble Start April 2020 Middle April 2021 End March 2022 Start April 2020 Middle April 2021 End March 2022
  • 73. 73School Improvement Plan Project Title: 13 . OH (Our Health) MY GULAY Period of Implementation: Februay 2020-March 2021 Project Monitoring and Evaluation Team Chairman : Nelia A. Tanucan – Teacher 1 Co-Chairman : Marissa V. Bacus – Teacher 2 Co- Chairman : Estelita S. Ubay – Master Teacher II Members: 1. Lilymier G. Roma – Teacher 1, School ICT Coordinator 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 13 . OH (Our Health) MY GULAY To make the school’s Gulayan sa Paaralan compliant to the standards of a functional Gulayan sa Paaralan Start February 2020 Middle October 2020 End March 2021 Start February 2020 Middle October 2020 End March 2021
  • 74. 74School Improvement Plan Project Title: 14 . SAFETY FOR ONE, SAFETY FOR ALL Period of Implementation: Februay 2020-March 2021 Project Monitoring and Evaluation Team Chairman : Glenn O. Jalil, Teacher 2 SDRRM Coordinator Co-Chairman : Marissa V. Bacus – Teacher 2 Co- Chairman : Estelita S. Ubay – Master Teacher II Members: 1. Lilymier G. Roma – Teacher 1, School ICT Coordinator 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 14 . SAFETY FOR ONE, SAFETY FOR ALL To make School Disaster Risk Reduction Managemen t fully functional Start February 2020 Middle October 2020 End March 2021 Start February 2020 Middle October 2020 End March 2021
  • 75. 75School Improvement Plan Project Title: 15 . EAT RIGHT, STAY BRIGHT Period of Implementation: May 2020-March 2021 Project Monitoring and Evaluation Team Chairman : Miriam S. Alquizar,Teacher 2 Co-Chairman : Juanita Tiongco – Teacher 3 Co- Chairman : Estelita S. Ubay – Master Teacher II Members: 1. Marissa V. Bacus – Teacher 1, School Property Custodian 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 15 . EAT RIGHT, STAY BRIGHT To create a school canteen with credible suppliers of nutritious food. Start May 2020 Middle October 2020 End March 2021 Start May 2020 Middle October 2020 End March 2021
  • 76. 76School Improvement Plan Project Title: 16 . ECCTV FOR SECURITY Period of Implementation: May 2020-March 2021 Project Monitoring and Evaluation Team Chairman : Marissa V. Bacus,Teacher 2, School Property Custodian Co-Chairman : Lilymier G. Roma – Teacher 1, School ICT Coordinator Members: 1. Estelita S. Ubay – Master Teacher II 2. Jasmin Panilag – SPG President 3. Hon. Antonio Delantar – Brgy. Councilor 4. Janet M. Alguno – PTA Treasurer Monitoring Schedules Project Monitoring Report Form (1) Name of Project (2) Project Objectives and Targets (3) Date of Monitoring (4) Accomplishme nt/Status to Date (5) Issues/Pro blems/Cha llenges (6) Recomm endation s/Action Points (7) Signature of SPT and Project Team Leader 16 . ECCTV FOR SECURI TY To install CCTV for designated areas security of the school Start May 2020 Middle October 2020 End March 2021 Start May 2020 Middle October 2020 End March 2021
  • 77. 77School Improvement Plan NAALAD ELEMENTARY SCHOOL 119508 Naalad, City of Naga, Cebu ANNEXES OF THE ENHANCED SCHOOL IMPROVEMENT PLAN School Year 2019-2022
  • 78. 78School Improvement Plan School ID: 119508 Name of School: NAALAD ELEMENTARY SCHOOL Address: NAALAD, CITY OF NAGA, CEBU Barangay: NAALAD A.1 Location of the School. Check the appropriate description. A.2 Relative Distance of the School A.3 Incidence of crimes and other human-induced hazards A.3.1 Check if there have been incidences of the following in the last 3 years. A.3.2 What are the 3 most frequent crimes/human-induced hazards? 1st most frequent: __________________ 2nd most frequent: __________________ 3rd most frequent: ____________________ A.4 Incidence of natural hazards A.4.1 Check if there have been incidences of the following in the last 3 years. A.4.2 What are the 3 most frequent natural hazards? 1st most frequent: _____Tropical Cyclones (Storm)______ 2nd most frequent: _____Earthquake___________________ 3rd most frequent: _____Landslide_________________________ A.5 Result of disaster incidents Municipality: CITY OF NAGA Region: VII ANNEX 1A School-Community Data Template Tricycle or Jeepney 2.5 Km 2.5 Km Tricycle or Jeepney Tricycle or Jeepney 2.5 Km Tricycle or Jeepney b. From the nearest public elementary school Tricycle or Jeepney2.5 Km 2.5 Km I. SCHOOL PROFILE/DATA IDENTIFYING INFORMATION c. From the nearest private elementary school d. From the nearest public secondary school e. From the nearest private secondary school a. From the poblacion District: NAGA I Division: CITY OF NAGA A. GEOGRAPHY Mode of Transportation Instruction: Please input required data/information in unshaded cells. Fill-in only the grade levels that are applicable to your school. This template aims to organize existing school and community data from different sources. If you find it useful to lift data from other templates and transfer it here, you may do so. Otherwise, you can just attach the other data templates to this form. 2.5 Km 2.5 Km Distance in km Tricycle or Jeepney Tricycle or Jeepney f. From the District Office g. From the Division Office Along the highway Near the coastline Near a river or waterway By the hillside On top of a mountain Armed conflict as a result of organized crime (terrorism, siege, etc.) Crime against school head/s (murder/homicide, physicalinjury, rape, sexualharassment, etc.) Crime against school property (theft, robbery,arson) Crime against student/s (murder/homicide, physical injury, rape, sexualharassment, etc.) Crime against teacher/s (murder/homicide, physical injury, rape, sexualharassment, etc.) Fire (Electrical wiring failure, etc.) Health Threat (i.e. Dengue, Malaria, Measles, food poisoning, disease outbreak) Oil Spill Security threat as a result of civilian violence (bomb threats, kidnapping threats, hostage taking, shooting, etc.) Structuralcollapse (as a result of engineering failures) Others. Pls. Specify: ______________ Drought Earthquake Flood Landslide Storm surge Tropical Cyclones (Storm, Typhoon, Tropical Depression, etc.) Oil Spill Tsunami Volcanic eruption Others. Pls. specify: ______________ School used as an evacuation center in the last 3 years Fire (includes forest fires and fires due to naturaldisasters)
  • 79. 79School Improvement Plan B.1 Classrooms and seats B.1.1 Classroom quantity [SRC.15.] Total Kindergarten 2 Grade 1 3 Grade 2 3 Grade 3 3 Grade 4 3 Grade 5 3 Grade 6 3 Grade 7 Grade 8 Grade 9 Grade 10 Grade 11 Grade 12 TOTAL 20 1 Learner:classroom ratio = Total enrollment divided by the total number of classrooms B.1.2 Classroom seat quantity [SRC.17.] Indicate the total number of seats in all classrooms. Number 634 2 Learner:seat ratio = Total enrollment divided by the total number of seats B.2 Water, Sanitation and Hygiene (WASH) facilities B.2.1 Water supply/source. Check as appropriate. Is the main source of water functional at present? Pls. cite reasons why: ______________________________________________ B.2.2 Handwashing. Is there space for handwashing? If YES: B.2.3 Functional toilets [SRC.16.] B.2.4 Toilet bowls Number Ratio 3 Number Ratio 3 Number Ratio 4 Number Ratio 4 15 23.6:1 15 18.67:1 15 23.6:1 15 18.67:1 3 Learner:toilet ratio = Total enrollment divided by number of toilets 4 Learner:toilet bowl ratio = Total enrollment divided by number of toilet bowls B.3 Textbooks. Indicate number of textbooks per grade level and subject [SRC.3.] Number Ratio Number Ratio Number Ratio Number Ratio Number Ratio Kindergarten Grade 1 100 0.79:1 110 0.72:1 100 0.79:1 Grade 2 110 0.78:1 110 0.78:1 80 1.08:1 Grade 3 100 0.9:1 100 0.9:1 100 0.9:1 100 0.9:1 Grade 4 35 2.57:1 120 0.75:1 120 0.75:1 120 0.75:1 120 0.75:1 Grade 5 108 0.87:1 120 0.78:1 108 0.87:1 108 0.87:1 Grade 6 100 1.1:1 Grade 7 Grade 8 Grade 9 Grade 10 Grade 11 Grade 12 TOTAL 453 1.4:1 660 0.96:1 220 2.88:1 508 1.25:1 228 2.78:1 B.4 Library: No. of books: ____0_____ No. of tables: ____0_____ No. of chairs: ____0_____ For Repair/ Rehabilitation No. of Classrooms 1 30:12 1 1 8 1 2 31.7:1 Subject: EPP K-12Subject: FILIPINO K-12 1 30:1 12634 Subject: SCIENCE K-12 Male Female Learner:classroom ratio 1 Subject: ENGLISH K-12 Subject: MATHEMATICS K-12 Learner:seat ratio 2 B. LEARNING ENVIRONMENT 1:1 86 2 2 94 85 In Good Condition 31.33:1 2 1 1 42.5:1 90 2 28.67:1 Level Male Female 36.67:1110 1 90 26.33:179 Level Total Enrollment, Current SY Local piped water Water well/deep well Rainwater catchments Naturalsource Without available water supply YES NO YES NO with soap without soap