SlideShare uma empresa Scribd logo
1 de 12
Introduction to
Construction Industry
--
An Interview with a
Quantity Surveyor
MR. SIA
CHENG SENG
FNBE AUG 14| Issue 13
SIA CHENG SENG
47 YEARS OLD
GRADUATED AT UNIVERSITY OF
GREENWICH
DEGREE IN QUANTITY SURVEYING @ UK
20 YEARS OF WORKING EXPERIENCES
IN THREE DIFFERENT COMPANIES
BIODATA
Why did youchoose QS as your career? Are youhappy
with being an QS?
My father is a builder and I’m often exposed to
constructionssince youngand then I eventually grew
interested in QS. Well, yes, I enjoy and feel rather
satisfied when I get to see the end productof my efforts.
How long have youbeenworking in this line?
After my diplomain BuildingSurveying, Iworked asan
assistant QS at my dad’scompany for about a year plus
before furtheringmy studiesat UK taking degree in QS
for a year. After graduating from UK, I worked asa
consultantQS for 10 years and then joined a Design and
BuiltContractor company whichis also the company I’m
workingwith for 12 yearsnow. I obtained the qualified
and registered QS of ISM and RICSin my early thirties,
with that, I formed two of my own companies.
Who do youusually workwith?
I usually go for site meetings and meet clients,
subcontractor and architect. ButI work mostly with
contractors as I need to make surethe work meet the
budget and expectations of clients.
Is it hard to cope as a QS?
Not really, I enjoy calculations and most of the things
are back to the basics, like how to foresee and estimate
materials used as wellas dealingwith clients.
Tell us more about your company.
I have two companies, I was a
consultantin a developer company
belong to my father and then decided
to form another contract company with
my elder brother to make projects a lot
moreconvenient. My brother has now
taken over that developer company and
I am taking care of this four-year-old
contracts company, WeiSheng Builders
Sdn. Bhd.
Wei Sheng Builders Sdn. Bhd
(905863-K)
905863-K
No. 1, Ground Floor
Jalan Perwira1,
Taman Perwira, BukitBakri,
84200 Muar, Johor
Date of registration: 25th June2010
Certified by: NoorlidaHanim Binti Ahmad
(Assistant Registrar of Companies, Malaysia)
Authorized capital: RM 500,000.00
Paid-up capital: RM250,000.00
Natureof Business: Construction Project
“We plan to achieve mutual satisfaction and
to reach bigger goals in the construction
industry, we are fully committed to complete all
construction project undertaken on time, within
reasonable price and with the excellence
quality.”
Organizational chart
Projects
Slightly brief us about two projectsyouwould like to
share with us and tell us why.
1) Two projects?
Hmm, a 10 unitsof
semi-d and 2 units
of bungalow
project in Ampang
Jaya, Selangor
which is not yet
awarded so we
cannot proceed. I
chose to share the
AmpangJaya
project with you is because I am really looking
forward to work with the contractors involved in
this particular project because I have never worked
with them before.
“I was actually invited by a client to tender the
Ampang project, which meansI have to arrangethe
tender documentssuchas drawings, plansetc. and if the
drawingsare lump sum (notstated specific), this is
where I become important. I have to estimate, foresee
and to also visit the site so the estimations are more
accurate. Choosing typesof cement and tiles such as the
marble ones, china onesand so on are also part of my
responsibilities as well. Once everything is settled, I’ll
check the drawingsonelast time and then summitthem
to the contractors (yes, the oneI’m looking forward to
work with) duringmeetingand procurementquestions
concerningmy documents, supplier or anythingrelated.
Now, we’re justwaiting for our tender to be awarded so
that we can proceed.”
2) The second one is 15 units of double storey in
Muar, Johor, that cost about 3 million, which is
already completed
for about half a
year now. While
for Muar, I am
proud and satisfied
with my work and
achievement as
both my company
and my brother’s
company worked
hard together.
“I took over this Muar project from my brother’s
company so I had lesser responsibilities here. I only
have to take photos, measurementsand to also
calculate the amountand total cost of materials
needed to be used.
MR SIA’S ADVICE
FOR STUDENTS
“Makesure to brush up
your generalknowledge
because as a QS, we learn
things dependingon our
surroundings and also
about IT and technology
because the world now
can solve mostly anything
with a computer.
AutoCAD isone of the
most importantsoftware
used as it shows every
single detail of the
interior housesuch as the
water pipesand
windows.”
Jalan Taylors,
Subang Jaya,
47500 Subang Jaya,
Selangor
Author:
Cynthia Fong
Interviewed by:
Hau Hui Yee
Cynthia Fong
Ee Yun Shan
Lim Zia Huei
Gabriel Chin
Lim Zia Huei

Mais conteúdo relacionado

Mais procurados

Best painter to paint all the michigan
Best painter to paint all the michiganBest painter to paint all the michigan
Best painter to paint all the michiganshantanu pramanik
 
cover letter
cover lettercover letter
cover letterSabik T S
 
Ben Darger letter of recommendation
Ben Darger letter of recommendationBen Darger letter of recommendation
Ben Darger letter of recommendationBen Darger
 
Facility manager cover letter
Facility manager cover letterFacility manager cover letter
Facility manager cover letterwilsonfrank584
 
Mraduvendra Singh (1)
Mraduvendra Singh (1)Mraduvendra Singh (1)
Mraduvendra Singh (1)Mradu Singh
 
Memo shifting of headquater
Memo shifting of headquaterMemo shifting of headquater
Memo shifting of headquaterHarsh Kumar
 
Tom Hind Wathco Recom Letter
Tom Hind Wathco Recom LetterTom Hind Wathco Recom Letter
Tom Hind Wathco Recom LetterTom Hind
 
How To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsHow To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsDarioGimenezd
 
How To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsHow To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsDarioGimenezd
 
Arana Craftsman Painters
Arana Craftsman PaintersArana Craftsman Painters
Arana Craftsman PaintersDon Bury
 

Mais procurados (15)

Best painter to paint all the michigan
Best painter to paint all the michiganBest painter to paint all the michigan
Best painter to paint all the michigan
 
LACECO Recommandation
LACECO RecommandationLACECO Recommandation
LACECO Recommandation
 
cover letter
cover lettercover letter
cover letter
 
steel buildings gymnasiums
steel buildings gymnasiumssteel buildings gymnasiums
steel buildings gymnasiums
 
paving companies NJ
paving companies NJpaving companies NJ
paving companies NJ
 
Ben Darger letter of recommendation
Ben Darger letter of recommendationBen Darger letter of recommendation
Ben Darger letter of recommendation
 
Facility manager cover letter
Facility manager cover letterFacility manager cover letter
Facility manager cover letter
 
Mraduvendra Singh (1)
Mraduvendra Singh (1)Mraduvendra Singh (1)
Mraduvendra Singh (1)
 
Jonjo updated CV
Jonjo updated CVJonjo updated CV
Jonjo updated CV
 
Memo shifting of headquater
Memo shifting of headquaterMemo shifting of headquater
Memo shifting of headquater
 
Tom Hind Wathco Recom Letter
Tom Hind Wathco Recom LetterTom Hind Wathco Recom Letter
Tom Hind Wathco Recom Letter
 
How To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsHow To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement Contractors
 
How To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement ContractorsHow To Remodel A House - Home Improvement Contractors
How To Remodel A House - Home Improvement Contractors
 
Arana Craftsman Painters
Arana Craftsman PaintersArana Craftsman Painters
Arana Craftsman Painters
 
Commercial Cleaning Services
Commercial Cleaning ServicesCommercial Cleaning Services
Commercial Cleaning Services
 

Destaque

Presentation1 (1)
Presentation1 (1)Presentation1 (1)
Presentation1 (1)limziahuei
 
Essay question august2014
Essay question august2014Essay question august2014
Essay question august2014limziahuei
 
The life of robert
The life of robertThe life of robert
The life of robertlimziahuei
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdflimziahuei
 
Math final project
Math final projectMath final project
Math final projectlimziahuei
 
Presentation1 (2)
Presentation1 (2)Presentation1 (2)
Presentation1 (2)limziahuei
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)limziahuei
 
Oral presentation assignment
Oral presentation assignmentOral presentation assignment
Oral presentation assignmentlimziahuei
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updatedlimziahuei
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdflimziahuei
 
Chproject2 report
Chproject2 reportChproject2 report
Chproject2 reportlimziahuei
 
Englishfinal.docx
Englishfinal.docxEnglishfinal.docx
Englishfinal.docxlimziahuei
 
Prism presentation
Prism presentationPrism presentation
Prism presentationlimziahuei
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysialimziahuei
 

Destaque (19)

CNC FINAL.pdf
CNC FINAL.pdfCNC FINAL.pdf
CNC FINAL.pdf
 
Presentation1 (1)
Presentation1 (1)Presentation1 (1)
Presentation1 (1)
 
Essay question august2014
Essay question august2014Essay question august2014
Essay question august2014
 
The life of robert
The life of robertThe life of robert
The life of robert
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdf
 
Math final project
Math final projectMath final project
Math final project
 
ESSAY WRITING
ESSAY WRITINGESSAY WRITING
ESSAY WRITING
 
Presentation1 (2)
Presentation1 (2)Presentation1 (2)
Presentation1 (2)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Oral presentation assignment
Oral presentation assignmentOral presentation assignment
Oral presentation assignment
 
1 bici updated
1 bici   updated1 bici   updated
1 bici updated
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdf
 
Chproject2 report
Chproject2 reportChproject2 report
Chproject2 report
 
Book cover
Book coverBook cover
Book cover
 
Enbe2
Enbe2Enbe2
Enbe2
 
Master slides
Master slidesMaster slides
Master slides
 
Englishfinal.docx
Englishfinal.docxEnglishfinal.docx
Englishfinal.docx
 
Prism presentation
Prism presentationPrism presentation
Prism presentation
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 

Semelhante a Magazine ---

magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 
Magazine __
Magazine  __Magazine  __
Magazine __rivenhau
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdfgabchin29
 
Content and everything
Content and everythingContent and everything
Content and everythingKenneth Tan
 
Content and everything
Content and everythingContent and everything
Content and everythingXying Lee
 
assignment 2
assignment 2assignment 2
assignment 2Roy Loon
 
Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...Eave0222
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers ProfileMansoor Chandio
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentKailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentShze Hwa Lee
 
Damden Infra Brochure
Damden Infra Brochure Damden Infra Brochure
Damden Infra Brochure Damla Mathew
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Backgroundguest470ea8
 

Semelhante a Magazine --- (20)

magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 
Magazine __
Magazine  __Magazine  __
Magazine __
 
Magazine __
Magazine  __Magazine  __
Magazine __
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 
magazine____.pdf
magazine____.pdfmagazine____.pdf
magazine____.pdf
 
Content and everything
Content and everythingContent and everything
Content and everything
 
Content and everything
Content and everythingContent and everything
Content and everything
 
assignment 2
assignment 2assignment 2
assignment 2
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Magazine
MagazineMagazine
Magazine
 
Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...Project 1B Profession in Construction Industry – Building Teams Identifying T...
Project 1B Profession in Construction Industry – Building Teams Identifying T...
 
Magazine of ICI Project 1B
Magazine of ICI Project 1BMagazine of ICI Project 1B
Magazine of ICI Project 1B
 
Rainbow Developers Profile
Rainbow Developers ProfileRainbow Developers Profile
Rainbow Developers Profile
 
Rainbow Developers
Rainbow  DevelopersRainbow  Developers
Rainbow Developers
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Damden Infra Brochure
Damden Infra Brochure Damden Infra Brochure
Damden Infra Brochure
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 

Mais de limziahuei

Building service project2
Building service project2Building service project2
Building service project2limziahuei
 
Math final project
Math final projectMath final project
Math final projectlimziahuei
 
Psy comic script
Psy comic scriptPsy comic script
Psy comic scriptlimziahuei
 
Project 3 (jan 2015)
Project 3 (jan 2015)Project 3 (jan 2015)
Project 3 (jan 2015)limziahuei
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdflimziahuei
 
itd exercise.pdf
itd exercise.pdfitd exercise.pdf
itd exercise.pdflimziahuei
 
Project 1 0115 brief with tgc
Project 1 0115 brief with tgcProject 1 0115 brief with tgc
Project 1 0115 brief with tgclimziahuei
 

Mais de limziahuei (17)

Building service project2
Building service project2Building service project2
Building service project2
 
Bcon draft
Bcon draftBcon draft
Bcon draft
 
Math final project
Math final projectMath final project
Math final project
 
Psycho final
Psycho finalPsycho final
Psycho final
 
Journals
JournalsJournals
Journals
 
Psy comic script
Psy comic scriptPsy comic script
Psy comic script
 
Project 3 (jan 2015)
Project 3 (jan 2015)Project 3 (jan 2015)
Project 3 (jan 2015)
 
Journals
JournalsJournals
Journals
 
Epc final
Epc finalEpc final
Epc final
 
Cnc final
Cnc finalCnc final
Cnc final
 
CNC FINAL.pdf
CNC FINAL.pdfCNC FINAL.pdf
CNC FINAL.pdf
 
dpjdp (1).pdf
dpjdp (1).pdfdpjdp (1).pdf
dpjdp (1).pdf
 
dpjdp (1).pdf
dpjdp (1).pdfdpjdp (1).pdf
dpjdp (1).pdf
 
itd.pdf
itd.pdfitd.pdf
itd.pdf
 
Design Project One - Brief.pdf
Design Project One - Brief.pdfDesign Project One - Brief.pdf
Design Project One - Brief.pdf
 
itd exercise.pdf
itd exercise.pdfitd exercise.pdf
itd exercise.pdf
 
Project 1 0115 brief with tgc
Project 1 0115 brief with tgcProject 1 0115 brief with tgc
Project 1 0115 brief with tgc
 

Magazine ---

  • 1. Introduction to Construction Industry -- An Interview with a Quantity Surveyor MR. SIA CHENG SENG FNBE AUG 14| Issue 13
  • 2. SIA CHENG SENG 47 YEARS OLD GRADUATED AT UNIVERSITY OF GREENWICH DEGREE IN QUANTITY SURVEYING @ UK 20 YEARS OF WORKING EXPERIENCES IN THREE DIFFERENT COMPANIES BIODATA
  • 3. Why did youchoose QS as your career? Are youhappy with being an QS? My father is a builder and I’m often exposed to constructionssince youngand then I eventually grew interested in QS. Well, yes, I enjoy and feel rather satisfied when I get to see the end productof my efforts. How long have youbeenworking in this line? After my diplomain BuildingSurveying, Iworked asan assistant QS at my dad’scompany for about a year plus before furtheringmy studiesat UK taking degree in QS for a year. After graduating from UK, I worked asa consultantQS for 10 years and then joined a Design and BuiltContractor company whichis also the company I’m workingwith for 12 yearsnow. I obtained the qualified and registered QS of ISM and RICSin my early thirties, with that, I formed two of my own companies. Who do youusually workwith? I usually go for site meetings and meet clients, subcontractor and architect. ButI work mostly with contractors as I need to make surethe work meet the budget and expectations of clients. Is it hard to cope as a QS? Not really, I enjoy calculations and most of the things are back to the basics, like how to foresee and estimate materials used as wellas dealingwith clients.
  • 4. Tell us more about your company. I have two companies, I was a consultantin a developer company belong to my father and then decided to form another contract company with my elder brother to make projects a lot moreconvenient. My brother has now taken over that developer company and I am taking care of this four-year-old contracts company, WeiSheng Builders Sdn. Bhd. Wei Sheng Builders Sdn. Bhd (905863-K)
  • 5. 905863-K No. 1, Ground Floor Jalan Perwira1, Taman Perwira, BukitBakri, 84200 Muar, Johor Date of registration: 25th June2010 Certified by: NoorlidaHanim Binti Ahmad (Assistant Registrar of Companies, Malaysia) Authorized capital: RM 500,000.00 Paid-up capital: RM250,000.00 Natureof Business: Construction Project
  • 6. “We plan to achieve mutual satisfaction and to reach bigger goals in the construction industry, we are fully committed to complete all construction project undertaken on time, within reasonable price and with the excellence quality.” Organizational chart
  • 7. Projects Slightly brief us about two projectsyouwould like to share with us and tell us why. 1) Two projects? Hmm, a 10 unitsof semi-d and 2 units of bungalow project in Ampang Jaya, Selangor which is not yet awarded so we cannot proceed. I chose to share the AmpangJaya project with you is because I am really looking forward to work with the contractors involved in this particular project because I have never worked with them before.
  • 8. “I was actually invited by a client to tender the Ampang project, which meansI have to arrangethe tender documentssuchas drawings, plansetc. and if the drawingsare lump sum (notstated specific), this is where I become important. I have to estimate, foresee and to also visit the site so the estimations are more accurate. Choosing typesof cement and tiles such as the marble ones, china onesand so on are also part of my responsibilities as well. Once everything is settled, I’ll check the drawingsonelast time and then summitthem to the contractors (yes, the oneI’m looking forward to work with) duringmeetingand procurementquestions concerningmy documents, supplier or anythingrelated. Now, we’re justwaiting for our tender to be awarded so that we can proceed.”
  • 9. 2) The second one is 15 units of double storey in Muar, Johor, that cost about 3 million, which is already completed for about half a year now. While for Muar, I am proud and satisfied with my work and achievement as both my company and my brother’s company worked hard together.
  • 10. “I took over this Muar project from my brother’s company so I had lesser responsibilities here. I only have to take photos, measurementsand to also calculate the amountand total cost of materials needed to be used.
  • 11. MR SIA’S ADVICE FOR STUDENTS “Makesure to brush up your generalknowledge because as a QS, we learn things dependingon our surroundings and also about IT and technology because the world now can solve mostly anything with a computer. AutoCAD isone of the most importantsoftware used as it shows every single detail of the interior housesuch as the water pipesand windows.”
  • 12. Jalan Taylors, Subang Jaya, 47500 Subang Jaya, Selangor Author: Cynthia Fong Interviewed by: Hau Hui Yee Cynthia Fong Ee Yun Shan Lim Zia Huei Gabriel Chin Lim Zia Huei