Bar Bending
Schedule
CONTENT
 Introduction
 B B S for different reinforced concrete structures
 Measurement of bending dimensions
 Do’s and Don'ts
 Typical bar bending schedule
 Codes , specifications and standards
Bar Bending Schedule
 Member identification
 Bar mark
 Type of steel
 Diameter of bar
 Length of each bar
 Number of members
 Number of bars in each member
 Total number of bars
 Total length
 Shape code
 Bending dimensions
BBS for RC Beams
BBS for RC Slabs
BBS for Columns and walls
Measurement of bending dimensions
Bent-up Bar
h
45o
h
h2
Additional Length = 0.414 h
Total Length = L + 0.414 h
L
Do’s and Don’ts
 Proper accuracy
 Provide cover to rein
 Location of holes
 Bars >36mm shall not
bundled
 Welding is not permitted
at bends
Typical BBS Calculation
Example: Prepare bar bending schedule for the given beam. Clear
cover = 40 mm
2-#20 +1-#15
4000
570 2-#20
2-#10
228
#10 @ 180 c/c
Longitudinal Section
1-# 15
Bar Bending Schedule (contd…)
Example: Prepare bar bending schedule for the given beam. Clear
cover = 40 mm
#10 @ 180 c/c
228
375
2-#10
1-# 15
2-#20
(M-2)
(M-1)
(S-1)
(H-1)
Cross Section
Bar Bending Schedule (contd…)
Example:
M-1
M-1 = 4000 + 2 x 228 – 2 x 40 + 2 x (18
x 20)
= 5096
M-2h = 375 – 2 x 40 – 2 x 10 – 2 (15/2) =
260
h
M-2 = 4000 + 2 x 228 – 2 x 40 + (0.414 x 260) x 2
= 5091
H-1
H-1 = 4000 + 2 x 228 – 2 x 40
= 4376
Bar Bending Schedule (contd…)
Example: Prepare bar bending schedule for the given beam. Clear
cover = 40 mm
Number of Bars = 4000 / 180 +1 = 24 Round-up
Shear stirrups
a
a = 375 – 2 x 40 – 10 = 285 mm
bb = 228– 2 x 40 – 10 =138 mm
Total length of S-1 = 2 (138 + 285 + 18 x 10) = 1206 mm
Bar Bending Schedule
Serial
#
Bar
Designation
Number
of Bars
Length
of one
Bar
(m)
Dia
of
bar
Weight of Steel
Bars
Shape of Bar
#10 #15 #20
1 M-1 2 5.096 20 24
2 M-2 1 4.591 15 7.2
3 H-1 2 4.376 10 6.9
4 S-1 24 1.206 10 22.7
1.05 Σ 31.1 7.6 25.2
Total Weight = 64 kg
4376
4376
4376
285138
CODES , SPECIFICATIONS & STANDARDS
 IS:2502-1963
 IS:1893-2000
 SP:34
 IS:456
 International standard
ISO:4066-1977
some websites which are proving Bar
Bending Schedule Software.
1. www.eigen-tech.com/cs.html
2. www.rgsrebar.com/rebar.aspx
3. www.ensoftindia.com/prod_barbeq
ue.htm
4. www.steelpac.co.uk/design/steelp
ac_rdm...
5. www.cadsglobal.com
6. www.supercivilcd.com
7. www.technocad.co.za
8. www.BendingSchedule.com
9. www.structural-
engineering.fsnet.co.uk...
10. www.continuousbeamanalysis.co
m
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)

More Related Content

What's hot

Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Railssrinivas2036
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGNNikul Gopani
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)MachenLink
 
Ppt bridges & types
Ppt bridges & typesPpt bridges & types
Ppt bridges & typespratik vanam
 
Aggregates types and test as per Indian Standard
Aggregates   types and test as per Indian StandardAggregates   types and test as per Indian Standard
Aggregates types and test as per Indian StandardPrabakaran Ellappan
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailingAli Ishaqi
 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Designmaylene san luis
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Bridge components
Bridge componentsBridge components
Bridge componentsAratiSavant
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...Rising Sher
 

What's hot (20)

IRC-6-2016.pdf
IRC-6-2016.pdfIRC-6-2016.pdf
IRC-6-2016.pdf
 
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of RailsRails, Types, Joints, Creep, Failure of Rails and Welding of Rails
Rails, Types, Joints, Creep, Failure of Rails and Welding of Rails
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGN
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)
 
Ppt bridges & types
Ppt bridges & typesPpt bridges & types
Ppt bridges & types
 
Aggregates types and test as per Indian Standard
Aggregates   types and test as per Indian StandardAggregates   types and test as per Indian Standard
Aggregates types and test as per Indian Standard
 
Reinforcement detailing
Reinforcement  detailingReinforcement  detailing
Reinforcement detailing
 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Design
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 
800
800800
800
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Bridge components
Bridge componentsBridge components
Bridge components
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Design of reinforced concrete beam
Design of reinforced concrete beamDesign of reinforced concrete beam
Design of reinforced concrete beam
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Beam design
Beam designBeam design
Beam design
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES    SUBMITTED IN THE PARTIA...
PROTECTION, REPAIR & MAINTENANCE OF RCC STRUCTURES SUBMITTED IN THE PARTIA...
 

Viewers also liked

Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient MethodYousuf Bin Aziz
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab designIvan Ferrer
 
Columns lecture#4
Columns lecture#4Columns lecture#4
Columns lecture#4Irfan Malik
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1Irfan Malik
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Columnমু সা
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slabsarani_reza
 
Engineering formula sheet
Engineering formula sheetEngineering formula sheet
Engineering formula sheetsankalptiwari
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)mbrsalman
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C BeamAr. Aakansha
 

Viewers also liked (11)

Moment Co-efficient Method
Moment Co-efficient MethodMoment Co-efficient Method
Moment Co-efficient Method
 
Placing column layout
Placing  column layoutPlacing  column layout
Placing column layout
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab design
 
Columns lecture#4
Columns lecture#4Columns lecture#4
Columns lecture#4
 
Columns lecture#1
Columns lecture#1Columns lecture#1
Columns lecture#1
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
Engineering formula sheet
Engineering formula sheetEngineering formula sheet
Engineering formula sheet
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 

Similar to Bar bending schedule(by akhil)

Barbendingschedulebyakhil 140512032242-phpapp01
Barbendingschedulebyakhil 140512032242-phpapp01Barbendingschedulebyakhil 140512032242-phpapp01
Barbendingschedulebyakhil 140512032242-phpapp01hlksd
 
Barbendingscheduleby shamshair ali
Barbendingscheduleby shamshair aliBarbendingscheduleby shamshair ali
Barbendingscheduleby shamshair aliShamshair Ali
 
BAR BENDING SCHEDULE.pptx
BAR BENDING SCHEDULE.pptxBAR BENDING SCHEDULE.pptx
BAR BENDING SCHEDULE.pptxAMALKRISHNA31
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentationKifayath Chowdhury
 
James Wight - ACI Building Code-01-54.pdf
James Wight - ACI Building Code-01-54.pdfJames Wight - ACI Building Code-01-54.pdf
James Wight - ACI Building Code-01-54.pdfsandipanpaul16
 
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETE
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETESTUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETE
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETEShoaib Wani
 
Lintech metric components_specheet
Lintech  metric  components_specheetLintech  metric  components_specheet
Lintech metric components_specheetElectromate
 
Design & Development of Rotating Work-piece Holding Mechanism for EDM Process
Design & Development of Rotating Work-piece Holding Mechanism for EDM ProcessDesign & Development of Rotating Work-piece Holding Mechanism for EDM Process
Design & Development of Rotating Work-piece Holding Mechanism for EDM ProcessSahil Dev
 
Final Steel Jury Neel Shah UCT20102.pdf
Final Steel Jury  Neel Shah UCT20102.pdfFinal Steel Jury  Neel Shah UCT20102.pdf
Final Steel Jury Neel Shah UCT20102.pdfNeelShah964739
 
Preparation of bar_bending_schedule
Preparation of bar_bending_schedulePreparation of bar_bending_schedule
Preparation of bar_bending_scheduleRetail365Cloud
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....IndraNathMishra2
 

Similar to Bar bending schedule(by akhil) (20)

Barbendingschedulebyakhil 140512032242-phpapp01
Barbendingschedulebyakhil 140512032242-phpapp01Barbendingschedulebyakhil 140512032242-phpapp01
Barbendingschedulebyakhil 140512032242-phpapp01
 
Barbendingscheduleby shamshair ali
Barbendingscheduleby shamshair aliBarbendingscheduleby shamshair ali
Barbendingscheduleby shamshair ali
 
BBS ppt.pptx
BBS ppt.pptxBBS ppt.pptx
BBS ppt.pptx
 
RCC beam Detail estimate
RCC beam Detail estimate RCC beam Detail estimate
RCC beam Detail estimate
 
Ch 8.pdf
Ch 8.pdfCh 8.pdf
Ch 8.pdf
 
BAR BENDING SCHEDULE.pptx
BAR BENDING SCHEDULE.pptxBAR BENDING SCHEDULE.pptx
BAR BENDING SCHEDULE.pptx
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentation
 
James Wight - ACI Building Code-01-54.pdf
James Wight - ACI Building Code-01-54.pdfJames Wight - ACI Building Code-01-54.pdf
James Wight - ACI Building Code-01-54.pdf
 
tps_cold rolled
tps_cold rolledtps_cold rolled
tps_cold rolled
 
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETE
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETESTUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETE
STUDY ON BOND MECHANISM OF PSWC BARS WITH CONCRETE
 
Lintech metric components_specheet
Lintech  metric  components_specheetLintech  metric  components_specheet
Lintech metric components_specheet
 
Design & Development of Rotating Work-piece Holding Mechanism for EDM Process
Design & Development of Rotating Work-piece Holding Mechanism for EDM ProcessDesign & Development of Rotating Work-piece Holding Mechanism for EDM Process
Design & Development of Rotating Work-piece Holding Mechanism for EDM Process
 
200832154 brosur-spun-pile-wika-2011
200832154 brosur-spun-pile-wika-2011200832154 brosur-spun-pile-wika-2011
200832154 brosur-spun-pile-wika-2011
 
Final Steel Jury Neel Shah UCT20102.pdf
Final Steel Jury  Neel Shah UCT20102.pdfFinal Steel Jury  Neel Shah UCT20102.pdf
Final Steel Jury Neel Shah UCT20102.pdf
 
Ste db swiss_cut_rgb_en
Ste db swiss_cut_rgb_enSte db swiss_cut_rgb_en
Ste db swiss_cut_rgb_en
 
Qp
QpQp
Qp
 
Gpp
GppGpp
Gpp
 
Presentation-10.pptx
Presentation-10.pptxPresentation-10.pptx
Presentation-10.pptx
 
Preparation of bar_bending_schedule
Preparation of bar_bending_schedulePreparation of bar_bending_schedule
Preparation of bar_bending_schedule
 
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
.   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro.....   Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
. Narmada Canal ExPresentation for Extradose Bridge for Gandhi Nagar Metro....
 

Recently uploaded

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Recently uploaded (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Bar bending schedule(by akhil)

  • 2. CONTENT  Introduction  B B S for different reinforced concrete structures  Measurement of bending dimensions  Do’s and Don'ts  Typical bar bending schedule  Codes , specifications and standards
  • 3. Bar Bending Schedule  Member identification  Bar mark  Type of steel  Diameter of bar  Length of each bar  Number of members  Number of bars in each member  Total number of bars  Total length  Shape code  Bending dimensions
  • 4. BBS for RC Beams
  • 5. BBS for RC Slabs
  • 6. BBS for Columns and walls
  • 7. Measurement of bending dimensions Bent-up Bar h 45o h h2 Additional Length = 0.414 h Total Length = L + 0.414 h L
  • 8. Do’s and Don’ts  Proper accuracy  Provide cover to rein  Location of holes  Bars >36mm shall not bundled  Welding is not permitted at bends
  • 9. Typical BBS Calculation Example: Prepare bar bending schedule for the given beam. Clear cover = 40 mm 2-#20 +1-#15 4000 570 2-#20 2-#10 228 #10 @ 180 c/c Longitudinal Section 1-# 15
  • 10. Bar Bending Schedule (contd…) Example: Prepare bar bending schedule for the given beam. Clear cover = 40 mm #10 @ 180 c/c 228 375 2-#10 1-# 15 2-#20 (M-2) (M-1) (S-1) (H-1) Cross Section
  • 11. Bar Bending Schedule (contd…) Example: M-1 M-1 = 4000 + 2 x 228 – 2 x 40 + 2 x (18 x 20) = 5096 M-2h = 375 – 2 x 40 – 2 x 10 – 2 (15/2) = 260 h M-2 = 4000 + 2 x 228 – 2 x 40 + (0.414 x 260) x 2 = 5091 H-1 H-1 = 4000 + 2 x 228 – 2 x 40 = 4376
  • 12. Bar Bending Schedule (contd…) Example: Prepare bar bending schedule for the given beam. Clear cover = 40 mm Number of Bars = 4000 / 180 +1 = 24 Round-up Shear stirrups a a = 375 – 2 x 40 – 10 = 285 mm bb = 228– 2 x 40 – 10 =138 mm Total length of S-1 = 2 (138 + 285 + 18 x 10) = 1206 mm
  • 13. Bar Bending Schedule Serial # Bar Designation Number of Bars Length of one Bar (m) Dia of bar Weight of Steel Bars Shape of Bar #10 #15 #20 1 M-1 2 5.096 20 24 2 M-2 1 4.591 15 7.2 3 H-1 2 4.376 10 6.9 4 S-1 24 1.206 10 22.7 1.05 Σ 31.1 7.6 25.2 Total Weight = 64 kg 4376 4376 4376 285138
  • 14. CODES , SPECIFICATIONS & STANDARDS  IS:2502-1963  IS:1893-2000  SP:34  IS:456  International standard ISO:4066-1977 some websites which are proving Bar Bending Schedule Software. 1. www.eigen-tech.com/cs.html 2. www.rgsrebar.com/rebar.aspx 3. www.ensoftindia.com/prod_barbeq ue.htm 4. www.steelpac.co.uk/design/steelp ac_rdm... 5. www.cadsglobal.com 6. www.supercivilcd.com 7. www.technocad.co.za 8. www.BendingSchedule.com 9. www.structural- engineering.fsnet.co.uk... 10. www.continuousbeamanalysis.co m