8. Consumption and cost reduction on both processes and flight Lean Painting: overspray, filtration, layer thickness, painter
cooperation
Reduced environmental footprint: methods, products
(nanotechnology, heavy metals, less waste)
Life Cycle Assessment vision. Ecodesign process and
operations.
Lean Repair on MRO 4ª gen Test & Learn engineering a on the machine.
Multioperator renting with Lead Time compression and
seasonal demand
Quick Smart Repair and Time To Market adapted to the job
needs with flexible & portable equipment (TROTTER line)
Shared responsibility in lifecycle and extended warranty linked
to the value chain
SMARTBOOTH CONNECTIVITY with contractual ties to lifecycle
cost and predictable maintenance (Trend: predictive). REMOTE
ASSISTANCE