Assistant Manager - Mechanical

Currently working for NTPC 3X800 MW Super Critical Thermal Power Plant at Kudgi, Karnataka.

N. KOTESWARA RAO
Contact: +91-9959566266/7022005461 TOSHIBA POWER,
Email: rao.koti.n@gmail.com NTPC KUDGI - KARNATAKA
Assistant Manager (Mechanical) – Toshiba Power, NTPC, Kudgi, Karnataka
A competent professional with over 8 years of experience in Construction Management, vast knowledge in Erection,
Commissioning of Steam Turbine, Generator and Auxiliaries. Skilled in planning, executing and spread heading
construction projects with a flair of adopting modern methodologies in compliance with company standards.
The daily routine includes providing assistance and direction to other plant personnel in proper plant procedures and
manufacturing methods. Part of this involves conducting regular tests to ensure that designs fall within the expected
specifications, providing guidance for preventive and repair methods to ensure that plant construction is able to meet
output quotas and deadlines in order to increase plant production efficiency and quality.
Other daily tasks can include designing manufacturing layouts, coordinating equipment selections, interacting with
clients and contractors, evaluating quotes and providing support to ensure that plant erection meet environmental and
safety protocols in a cost-effective manner.
WORK EXPERIENCE:
1. Organization: TOSHIBA POWER [TPSC (I) PVT LTD, HYDERABAD]
Project 03: NTPC 3X800 MW Super Thermal Power Plant at Kudgi, Karnataka
Designation: Assistant Manager
Duration: Sep’2013 to Till Date
Nature of Job: Erection and Commissioning of (NTPC 3x800 MW), Super Critical Thermal Power Plant, Steam
Turbine, Generator, Condenser and Auxiliaries
Job Profile:
• Responsible for the overall planning, execution and success of engineering project and also the in charge of
managing the engineering team and overseeing mechanical staff who install, test, diagnose, repair and
commission the mechanical equipment
• Coordinating with all engineering staff and Scheduling staff assignments
• Providing technical assistance to the Project Manager in contract matters, change orders and site
superintendence
• Governing all the mechanical activities (erection / installation / commissioning)
at site with regards to progress, compliance with the Contract,
applicable codes & standards, quality, safety and environmental acceptance
• Scheduling 3 weeks, 3 months rolling plans and contributing to the Daily, Weekly and
Monthly Progress Reports and Project completion status report
• Active participation in Daily, Weekly and Monthly meetings at site with client
(incl. assistance for MOM to the Project Manager)
• Review and approve Contractor’s mechanical work method statements,
Site related mechanical design and engineering matters
• Keeping track of any modification with respect to the final design, application drawings, punch list, non-
conformities and assure incorporation in the asbuilt drawings
• Ascertaining and witnessing mechanical inspections and reviewing the related reports
• Giving assistance to client (NTPC) during performance tests and trail run
workout of mechanical quantities for progress survey
• Advising and guiding the Employer’s mechanical counterpart engineer
• Managing the project documentation archive,
checking and approving the ‘As Built Drawings’ [for own competence area]
• Examine and confirm that O&M Manuals are adequate Erection & Commissioning of Steam Turbine,
Generator and Auxiliaries.
• Handling Client and assigning job to Sub-contractors. Work administration with future work schedule
2. Organization: SOKEO POWER [Hyderabad]
Designation: Sr. Engineer
Nature of Job: Erection and Commissioning of 2X350 MW Thermal Power Plant, Steam Turbine, Generator,
Condenser and Auxiliaries
Project 02: 2X350 MW Ind-Bharat Thermal Power Project at Jharsuguda, Odisha
Designation: Sr. Engineer
Duration: Jan 2012 to Aug 2013
Project 01: Lanco Infratech Ltd, 2X600 MW coal based Thermal Power Plant,
Udupi Power Corp. Ltd, Mangalore, Dec (China)
Designation: Engineer
Duration: Apr 2008 to Dec 2011
Job Profile:
• Managing all the Mechanical Site activities starting from Drawing Implementation/ Site Installation/
Inspection/ Site testing/ Commissioning with Client
• Coordinating with Client and sub contractor on daily and weekly basis
• Preparing the outstanding list to Client, subcontractor and interoffice and follow up for clarification
• Maintaining the safety measures at working area
• Preparing the protocol’s as per FQP
ACADEMICS:
DEGREE & UNIVERSITY COURSE DURATION PASSED OUT AGGREGATE
B. Tech, Mechanical
Avanthi Institute of Engg &
Tech
- Vizag
2005-2008 April, 2008 69.83%
Diploma, Mechanical
AANM & VVRSR Polytechnic
- Gudlavalleru
2001-2005 March, 2005 57.12%
SOFT SKILLS:
(1) MS OFFICE
(2) MS PROJECT
(3) AUTO CAD
PERSONAL DETAILS:
FULL NAME : N. KOTESWARA RAO
FATHER’S NAME : N. RAMA RAO
SEX : MALE
MARITAL STATUS : MARRIED
LANGUAGES KNOWN : ENGLISH, HINDI, TELUGU AND TAMIL
PASS PORT : K5503353
PERMANENT ADDRESS : N. KOTESWARA RAO,
PHIRANGIPURAM MANDAL,
GUNTUR (DT) A.P-522529
DECLARATION:
I hereby declare that the above furnished details are true to the best of my knowledge & belief.
Place:
Date: (N. Koteswara Rao)

Recomendados

nazeemres por
nazeemresnazeemres
nazeemresnazeemuddin Mohammad
162 visualizações4 slides
Hariprasad K V R por
Hariprasad K V RHariprasad K V R
Hariprasad K V RHari Prasad K V R
156 visualizações4 slides
Aftab resume por
Aftab resumeAftab resume
Aftab resumeAftab Ozair
138 visualizações3 slides
Resume- Dinesh Borgaonkar por
Resume- Dinesh BorgaonkarResume- Dinesh Borgaonkar
Resume- Dinesh BorgaonkarDINESH BORGAONKAR
81 visualizações4 slides
Ravi CV 2016 por
Ravi CV 2016Ravi CV 2016
Ravi CV 2016K.M.V.K. Ravikumar
90 visualizações3 slides
Resume(1) por
Resume(1)Resume(1)
Resume(1)Gokul Krishnan
80 visualizações3 slides

Mais conteúdo relacionado

Mais procurados

Nitesh Hinduja CV por
Nitesh Hinduja CVNitesh Hinduja CV
Nitesh Hinduja CVNITESH HINDUJA
217 visualizações6 slides
RESUME - Rajesh por
RESUME - RajeshRESUME - Rajesh
RESUME - RajeshChandrasekar Rajesh
112 visualizações4 slides
Nitesh Hinduja _Mechanical Engineer CV por
Nitesh Hinduja _Mechanical   Engineer CVNitesh Hinduja _Mechanical   Engineer CV
Nitesh Hinduja _Mechanical Engineer CVNITESH HINDUJA
103 visualizações7 slides
Mechanical Engineer C.V por
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.VAslam Mohammed
207 visualizações5 slides
CV Pholapatra Latest Rev 05 por
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05Paula Intra Lohit
190 visualizações11 slides
David c brooks resume 06 2018 por
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018David Brooks
68 visualizações3 slides

Mais procurados(20)

Nitesh Hinduja CV por NITESH HINDUJA
Nitesh Hinduja CVNitesh Hinduja CV
Nitesh Hinduja CV
NITESH HINDUJA217 visualizações
Nitesh Hinduja _Mechanical Engineer CV por NITESH HINDUJA
Nitesh Hinduja _Mechanical   Engineer CVNitesh Hinduja _Mechanical   Engineer CV
Nitesh Hinduja _Mechanical Engineer CV
NITESH HINDUJA103 visualizações
Mechanical Engineer C.V por Aslam Mohammed
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.V
Aslam Mohammed207 visualizações
CV Pholapatra Latest Rev 05 por Paula Intra Lohit
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
Paula Intra Lohit190 visualizações
David c brooks resume 06 2018 por David Brooks
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018
David Brooks68 visualizações
SANTHOSH KUMAR UP RCV por SANTHOSH KUMAR
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR141 visualizações
Jeff Obrecht resume 2015 por Jeff Obrecht
Jeff Obrecht resume 2015Jeff Obrecht resume 2015
Jeff Obrecht resume 2015
Jeff Obrecht160 visualizações
sjtcv_2016 por Steve Townley
sjtcv_2016sjtcv_2016
sjtcv_2016
Steve Townley160 visualizações
Resume por MAYANK MISHRA
ResumeResume
Resume
MAYANK MISHRA293 visualizações
CV Updated 2 por yusuf khan
CV Updated 2CV Updated 2
CV Updated 2
yusuf khan263 visualizações
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM por Muhammad Awais
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Muhammad Awais254 visualizações
Waji Ul Hassan_original por waji waji
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
waji waji582 visualizações
Krishna kumar Resume por krishna kumar
Krishna kumar ResumeKrishna kumar Resume
Krishna kumar Resume
krishna kumar185 visualizações
Robert Cahill Resume Pump Up por Robert Cahill
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
Robert Cahill343 visualizações
SM (Site Manager - Steel Civil Structure) por PT. IRAWAN PRIMA UTAMA
SM (Site Manager - Steel Civil Structure)SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)
PT. IRAWAN PRIMA UTAMA351 visualizações
Manish_Sagar 4 Year por Manish Sagar
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
Manish Sagar169 visualizações

Similar a Assistant Manager - Mechanical

Sr.Mech.Design Engr. 30.03.15 por
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Ganeshkumar Kuwait
184 visualizações4 slides
cv piping(1) por
cv piping(1)cv piping(1)
cv piping(1)Equbal Ahmad
1.8K visualizações4 slides
Resume_rev.3 por
Resume_rev.3Resume_rev.3
Resume_rev.3Fikruddien YusoF
351 visualizações7 slides
CV_RBMerida por
CV_RBMeridaCV_RBMerida
CV_RBMeridaRodel Merida
119 visualizações8 slides
Afaq CV (April 17, 2016) por
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
110 visualizações6 slides
PankajKPrajapati por
PankajKPrajapatiPankajKPrajapati
PankajKPrajapatiPankaj Kumar Prajapati
116 visualizações4 slides

Similar a Assistant Manager - Mechanical(20)

Sr.Mech.Design Engr. 30.03.15 por Ganeshkumar Kuwait
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
Ganeshkumar Kuwait184 visualizações
cv piping(1) por Equbal Ahmad
cv piping(1)cv piping(1)
cv piping(1)
Equbal Ahmad1.8K visualizações
Resume_rev.3 por Fikruddien YusoF
Resume_rev.3Resume_rev.3
Resume_rev.3
Fikruddien YusoF351 visualizações
CV_RBMerida por Rodel Merida
CV_RBMeridaCV_RBMerida
CV_RBMerida
Rodel Merida119 visualizações
Afaq CV (April 17, 2016) por Afaq Ahmad
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad110 visualizações
Diosdado CV (updated)(1) por Diosdado Dolocanog
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog569 visualizações
Venkatesh narasimhan por Venkatesh N
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N26 visualizações
Resume Expediting & Inspection Engineer (Oil & Gas) por Sarim Mujtaba
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba3.5K visualizações
Vijai CV por Vijai Ram •
Vijai CVVijai CV
Vijai CV
Vijai Ram •54 visualizações
krishnajith_original por krishnajith cs
krishnajith_originalkrishnajith_original
krishnajith_original
krishnajith cs251 visualizações
Metri Plant With utility por chirag patel
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
chirag patel257 visualizações
KINGSLY M PIPING-PROJECT CV ABD por KINGSLY AROKIAM
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM119 visualizações
vijay cv por vijay prakash
vijay cvvijay cv
vijay cv
vijay prakash89 visualizações
Sayantan resume por Sayantan Dhar
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar41 visualizações
Engr Nuhu Solomon Updated CV v1 por Solomon Nuhu MNSE
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
Solomon Nuhu MNSE343 visualizações
CV _ Azhar Ansari por Azharuddin Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
Azharuddin Ansari218 visualizações

Último

9_DVD_Dynamic_logic_circuits.pdf por
9_DVD_Dynamic_logic_circuits.pdf9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdfUsha Mehta
21 visualizações32 slides
Informed search algorithms.pptx por
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptxDr.Shweta
12 visualizações19 slides
LFA-NPG-Paper.pdf por
LFA-NPG-Paper.pdfLFA-NPG-Paper.pdf
LFA-NPG-Paper.pdfharinsrikanth
40 visualizações13 slides
Codes and Conventions.pptx por
Codes and Conventions.pptxCodes and Conventions.pptx
Codes and Conventions.pptxIsabellaGraceAnkers
7 visualizações5 slides
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...Anowar Hossain
10 visualizações34 slides
Wire Rope por
Wire RopeWire Rope
Wire RopeIwiss Tools Co.,Ltd
8 visualizações5 slides

Último(20)

9_DVD_Dynamic_logic_circuits.pdf por Usha Mehta
9_DVD_Dynamic_logic_circuits.pdf9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdf
Usha Mehta21 visualizações
Informed search algorithms.pptx por Dr.Shweta
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptx
Dr.Shweta12 visualizações
LFA-NPG-Paper.pdf por harinsrikanth
LFA-NPG-Paper.pdfLFA-NPG-Paper.pdf
LFA-NPG-Paper.pdf
harinsrikanth40 visualizações
Codes and Conventions.pptx por IsabellaGraceAnkers
Codes and Conventions.pptxCodes and Conventions.pptx
Codes and Conventions.pptx
IsabellaGraceAnkers7 visualizações
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por Anowar Hossain
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
Anowar Hossain10 visualizações
SEMI CONDUCTORS por pavaniaalla2005
SEMI CONDUCTORSSEMI CONDUCTORS
SEMI CONDUCTORS
pavaniaalla200519 visualizações
Activated sludge process .pdf por 8832RafiyaAltaf
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf
8832RafiyaAltaf8 visualizações
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra812 visualizações
CHI-SQUARE ( χ2) TESTS.pptx por ssusera597c5
CHI-SQUARE ( χ2) TESTS.pptxCHI-SQUARE ( χ2) TESTS.pptx
CHI-SQUARE ( χ2) TESTS.pptx
ssusera597c520 visualizações
A multi-microcontroller-based hardware for deploying Tiny machine learning mo... por IJECEIAES
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
IJECEIAES10 visualizações
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome18 visualizações
SWM L1-L14_drhasan (Part 1).pdf por MahmudHasan747870
SWM L1-L14_drhasan (Part 1).pdfSWM L1-L14_drhasan (Part 1).pdf
SWM L1-L14_drhasan (Part 1).pdf
MahmudHasan74787048 visualizações
Machine Element II Course outline.pdf por odatadese1
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdf
odatadese16 visualizações
cloud computing-virtualization.pptx por RajaulKarim20
cloud computing-virtualization.pptxcloud computing-virtualization.pptx
cloud computing-virtualization.pptx
RajaulKarim2082 visualizações
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... por ahmedmesaiaoun
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
ahmedmesaiaoun12 visualizações
NEW SUPPLIERS SUPPLIES (copie).pdf por georgesradjou
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdf
georgesradjou7 visualizações
Saikat Chakraborty Java Oracle Certificate.pdf por SaikatChakraborty787148
Saikat Chakraborty Java Oracle Certificate.pdfSaikat Chakraborty Java Oracle Certificate.pdf
Saikat Chakraborty Java Oracle Certificate.pdf
SaikatChakraborty78714813 visualizações
SPICE PARK DEC2023 (6,625 SPICE Models) por Tsuyoshi Horigome
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models)
Tsuyoshi Horigome14 visualizações

Assistant Manager - Mechanical

  • 1. N. KOTESWARA RAO Contact: +91-9959566266/7022005461 TOSHIBA POWER, Email: rao.koti.n@gmail.com NTPC KUDGI - KARNATAKA Assistant Manager (Mechanical) – Toshiba Power, NTPC, Kudgi, Karnataka A competent professional with over 8 years of experience in Construction Management, vast knowledge in Erection, Commissioning of Steam Turbine, Generator and Auxiliaries. Skilled in planning, executing and spread heading construction projects with a flair of adopting modern methodologies in compliance with company standards. The daily routine includes providing assistance and direction to other plant personnel in proper plant procedures and manufacturing methods. Part of this involves conducting regular tests to ensure that designs fall within the expected specifications, providing guidance for preventive and repair methods to ensure that plant construction is able to meet output quotas and deadlines in order to increase plant production efficiency and quality. Other daily tasks can include designing manufacturing layouts, coordinating equipment selections, interacting with clients and contractors, evaluating quotes and providing support to ensure that plant erection meet environmental and safety protocols in a cost-effective manner. WORK EXPERIENCE: 1. Organization: TOSHIBA POWER [TPSC (I) PVT LTD, HYDERABAD] Project 03: NTPC 3X800 MW Super Thermal Power Plant at Kudgi, Karnataka Designation: Assistant Manager Duration: Sep’2013 to Till Date Nature of Job: Erection and Commissioning of (NTPC 3x800 MW), Super Critical Thermal Power Plant, Steam Turbine, Generator, Condenser and Auxiliaries Job Profile: • Responsible for the overall planning, execution and success of engineering project and also the in charge of managing the engineering team and overseeing mechanical staff who install, test, diagnose, repair and commission the mechanical equipment • Coordinating with all engineering staff and Scheduling staff assignments • Providing technical assistance to the Project Manager in contract matters, change orders and site superintendence • Governing all the mechanical activities (erection / installation / commissioning) at site with regards to progress, compliance with the Contract, applicable codes & standards, quality, safety and environmental acceptance • Scheduling 3 weeks, 3 months rolling plans and contributing to the Daily, Weekly and Monthly Progress Reports and Project completion status report • Active participation in Daily, Weekly and Monthly meetings at site with client (incl. assistance for MOM to the Project Manager) • Review and approve Contractor’s mechanical work method statements, Site related mechanical design and engineering matters
  • 2. • Keeping track of any modification with respect to the final design, application drawings, punch list, non- conformities and assure incorporation in the asbuilt drawings • Ascertaining and witnessing mechanical inspections and reviewing the related reports • Giving assistance to client (NTPC) during performance tests and trail run workout of mechanical quantities for progress survey • Advising and guiding the Employer’s mechanical counterpart engineer • Managing the project documentation archive, checking and approving the ‘As Built Drawings’ [for own competence area] • Examine and confirm that O&M Manuals are adequate Erection & Commissioning of Steam Turbine, Generator and Auxiliaries. • Handling Client and assigning job to Sub-contractors. Work administration with future work schedule 2. Organization: SOKEO POWER [Hyderabad] Designation: Sr. Engineer Nature of Job: Erection and Commissioning of 2X350 MW Thermal Power Plant, Steam Turbine, Generator, Condenser and Auxiliaries Project 02: 2X350 MW Ind-Bharat Thermal Power Project at Jharsuguda, Odisha Designation: Sr. Engineer Duration: Jan 2012 to Aug 2013 Project 01: Lanco Infratech Ltd, 2X600 MW coal based Thermal Power Plant, Udupi Power Corp. Ltd, Mangalore, Dec (China) Designation: Engineer Duration: Apr 2008 to Dec 2011 Job Profile: • Managing all the Mechanical Site activities starting from Drawing Implementation/ Site Installation/ Inspection/ Site testing/ Commissioning with Client • Coordinating with Client and sub contractor on daily and weekly basis • Preparing the outstanding list to Client, subcontractor and interoffice and follow up for clarification • Maintaining the safety measures at working area • Preparing the protocol’s as per FQP ACADEMICS: DEGREE & UNIVERSITY COURSE DURATION PASSED OUT AGGREGATE B. Tech, Mechanical Avanthi Institute of Engg & Tech - Vizag 2005-2008 April, 2008 69.83% Diploma, Mechanical AANM & VVRSR Polytechnic - Gudlavalleru 2001-2005 March, 2005 57.12% SOFT SKILLS: (1) MS OFFICE (2) MS PROJECT
  • 3. (3) AUTO CAD PERSONAL DETAILS: FULL NAME : N. KOTESWARA RAO FATHER’S NAME : N. RAMA RAO SEX : MALE MARITAL STATUS : MARRIED LANGUAGES KNOWN : ENGLISH, HINDI, TELUGU AND TAMIL PASS PORT : K5503353 PERMANENT ADDRESS : N. KOTESWARA RAO, PHIRANGIPURAM MANDAL, GUNTUR (DT) A.P-522529 DECLARATION: I hereby declare that the above furnished details are true to the best of my knowledge & belief. Place: Date: (N. Koteswara Rao)