Koti (assistant manager mech)

Working

N. KOTESWARA RAO
Contact: +91-9959566266/7022005461 TOSHIBA POWER,
Email: rao.koti.n@gmail.com NTPC KUDGI - KARNATAKA
Assistant Manager (Mechanical) – Toshiba Power, NTPC, Kudgi, Karnataka
A competent professional with over 8 years of experience in Construction Management, vast knowledge in Erection,
Commissioning of Steam Turbine, Generator and Auxiliaries. Skilled in planning, executing and spread heading
construction projects with a flair of adopting modern methodologies in compliance with company standards.
The daily routine includes providing assistance and direction to other plant personnel in proper plant procedures and
manufacturing methods. Part of this involves conducting regular tests to ensure that designs fall within the expected
specifications, providing guidance for preventive and repair methods to ensure that plant construction is able to meet
output quotas and deadlines in order to increase plant production efficiency and quality.
Other daily tasks can include designing manufacturing layouts, coordinating equipment selections, interacting with
clients and contractors, evaluating quotes and providing support to ensure that plant erection meet environmental and
safety protocols in a cost-effective manner.
WORK EXPERIENCE:
1. Organization: TOSHIBA POWER [TPSC (I) PVT LTD, HYDERABAD]
Project 03: NTPC 3X800 MW Super Thermal Power Plant at Kudgi, Karnataka
Designation: Assistant Manager
Duration: Sep’2013 to Till Date
Nature of Job: Erection and Commissioning of (NTPC 3x800 MW), Super Critical Thermal Power Plant, Steam
Turbine, Generator, Condenser and Auxiliaries
Job Profile:
• Responsible for the overall planning, execution and success of engineering project and also the in charge of
managing the engineering team and overseeing mechanical staff who install, test, diagnose, repair and
commission the mechanical equipment
• Coordinating with all engineering staff and Scheduling staff assignments
• Providing technical assistance to the Project Manager in contract matters, change orders and site
superintendence
• Governing all the mechanical activities (erection / installation / commissioning)
at site with regards to progress, compliance with the Contract,
applicable codes & standards, quality, safety and environmental acceptance
• Scheduling 3 weeks, 3 months rolling plans and contributing to the Daily, Weekly and
Monthly Progress Reports and Project completion status report
• Active participation in Daily, Weekly and Monthly meetings at site with client
(incl. assistance for MOM to the Project Manager)
• Review and approve Contractor’s mechanical work method statements,
Site related mechanical design and engineering matters
• Keeping track of any modification with respect to the final design, application drawings, punch list, non-
conformities and assure incorporation in the asbuilt drawings
• Ascertaining and witnessing mechanical inspections and reviewing the related reports
• Giving assistance to client (NTPC) during performance tests and trail run
workout of mechanical quantities for progress survey
• Advising and guiding the Employer’s mechanical counterpart engineer
• Managing the project documentation archive,
checking and approving the ‘As Built Drawings’ [for own competence area]
• Examine and confirm that O&M Manuals are adequate Erection & Commissioning of Steam Turbine,
Generator and Auxiliaries.
• Handling Client and assigning job to Sub-contractors. Work administration with future work schedule
2. Organization: SOKEO POWER [Hyderabad]
Designation: Sr. Engineer
Nature of Job: Erection and Commissioning of 2X350 MW Thermal Power Plant, Steam Turbine, Generator,
Condenser and Auxiliaries
Project 02: 2X350 MW Ind-Bharat Thermal Power Project at Jharsuguda, Odisha
Designation: Sr. Engineer
Duration: Jan 2012 to Aug 2013
Project 01: Lanco Infratech Ltd, 2X600 MW coal based Thermal Power Plant,
Udupi Power Corp. Ltd, Mangalore, Dec (China)
Designation: Engineer
Duration: Apr 2008 to Dec 2011
Job Profile:
• Managing all the Mechanical Site activities starting from Drawing Implementation/ Site Installation/
Inspection/ Site testing/ Commissioning with Client
• Coordinating with Client and sub contractor on daily and weekly basis
• Preparing the outstanding list to Client, subcontractor and interoffice and follow up for clarification
• Maintaining the safety measures at working area
• Preparing the protocol’s as per FQP
ACADEMICS:
DEGREE & UNIVERSITY COURSE DURATION PASSED OUT AGGREGATE
B. Tech, Mechanical
Avanthi Institute of Engg &
Tech
- Vizag
2005-2008 April, 2008 69.83%
Diploma, Mechanical
AANM & VVRSR Polytechnic
- Gudlavalleru
2001-2005 March, 2005 57.12%
SOFT SKILLS:
(1) MS OFFICE
(2) MS PROJECT
(3) AUTO CAD
PERSONAL DETAILS:
FULL NAME : N. KOTESWARA RAO
FATHER’S NAME : N. RAMA RAO
SEX : MALE
MARITAL STATUS : MARRIED
LANGUAGES KNOWN : ENGLISH, HINDI, TELUGU AND TAMIL
PASS PORT : K5503353
PERMANENT ADDRESS : N. KOTESWARA RAO,
PHIRANGIPURAM MANDAL,
GUNTUR (DT) A.P-522529
DECLARATION:
I hereby declare that the above furnished details are true to the best of my knowledge & belief.
Place:
Date: (N. Koteswara Rao)

Recomendados

nazeemres por
nazeemresnazeemres
nazeemresnazeemuddin Mohammad
162 visualizações4 slides
Hariprasad K V R por
Hariprasad K V RHariprasad K V R
Hariprasad K V RHari Prasad K V R
156 visualizações4 slides
Aftab resume por
Aftab resumeAftab resume
Aftab resumeAftab Ozair
138 visualizações3 slides
Resume- Dinesh Borgaonkar por
Resume- Dinesh BorgaonkarResume- Dinesh Borgaonkar
Resume- Dinesh BorgaonkarDINESH BORGAONKAR
81 visualizações4 slides
Ravi CV 2016 por
Ravi CV 2016Ravi CV 2016
Ravi CV 2016K.M.V.K. Ravikumar
90 visualizações3 slides
Resume(1) por
Resume(1)Resume(1)
Resume(1)Gokul Krishnan
80 visualizações3 slides

Mais conteúdo relacionado

Mais procurados

Nitesh Hinduja CV por
Nitesh Hinduja CVNitesh Hinduja CV
Nitesh Hinduja CVNITESH HINDUJA
217 visualizações6 slides
RESUME - Rajesh por
RESUME - RajeshRESUME - Rajesh
RESUME - RajeshChandrasekar Rajesh
112 visualizações4 slides
Nitesh Hinduja _Mechanical Engineer CV por
Nitesh Hinduja _Mechanical   Engineer CVNitesh Hinduja _Mechanical   Engineer CV
Nitesh Hinduja _Mechanical Engineer CVNITESH HINDUJA
103 visualizações7 slides
Mechanical Engineer C.V por
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.VAslam Mohammed
207 visualizações5 slides
CV Pholapatra Latest Rev 05 por
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05Paula Intra Lohit
190 visualizações11 slides
David c brooks resume 06 2018 por
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018David Brooks
68 visualizações3 slides

Mais procurados(20)

Nitesh Hinduja CV por NITESH HINDUJA
Nitesh Hinduja CVNitesh Hinduja CV
Nitesh Hinduja CV
NITESH HINDUJA217 visualizações
Nitesh Hinduja _Mechanical Engineer CV por NITESH HINDUJA
Nitesh Hinduja _Mechanical   Engineer CVNitesh Hinduja _Mechanical   Engineer CV
Nitesh Hinduja _Mechanical Engineer CV
NITESH HINDUJA103 visualizações
Mechanical Engineer C.V por Aslam Mohammed
Mechanical Engineer C.VMechanical Engineer C.V
Mechanical Engineer C.V
Aslam Mohammed207 visualizações
CV Pholapatra Latest Rev 05 por Paula Intra Lohit
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
Paula Intra Lohit190 visualizações
David c brooks resume 06 2018 por David Brooks
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018
David Brooks68 visualizações
SANTHOSH KUMAR UP RCV por SANTHOSH KUMAR
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR143 visualizações
Jeff Obrecht resume 2015 por Jeff Obrecht
Jeff Obrecht resume 2015Jeff Obrecht resume 2015
Jeff Obrecht resume 2015
Jeff Obrecht160 visualizações
sjtcv_2016 por Steve Townley
sjtcv_2016sjtcv_2016
sjtcv_2016
Steve Townley160 visualizações
Resume por MAYANK MISHRA
ResumeResume
Resume
MAYANK MISHRA294 visualizações
CV Updated 2 por yusuf khan
CV Updated 2CV Updated 2
CV Updated 2
yusuf khan263 visualizações
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM por Muhammad Awais
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPMEngr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Engr Muhammad Awais Mech. Engg, BSTech, MSPM, PGD, CPM
Muhammad Awais254 visualizações
Waji Ul Hassan_original por waji waji
Waji Ul Hassan_originalWaji Ul Hassan_original
Waji Ul Hassan_original
waji waji582 visualizações
Krishna kumar Resume por krishna kumar
Krishna kumar ResumeKrishna kumar Resume
Krishna kumar Resume
krishna kumar185 visualizações
Robert Cahill Resume Pump Up por Robert Cahill
Robert Cahill Resume Pump UpRobert Cahill Resume Pump Up
Robert Cahill Resume Pump Up
Robert Cahill343 visualizações
SM (Site Manager - Steel Civil Structure) por PT. IRAWAN PRIMA UTAMA
SM (Site Manager - Steel Civil Structure)SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)
PT. IRAWAN PRIMA UTAMA351 visualizações
Manish_Sagar 4 Year por Manish Sagar
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
Manish Sagar169 visualizações

Destaque

Magento responsive them draco por
Magento responsive them  dracoMagento responsive them  draco
Magento responsive them dracoEmilyPhan21291
165 visualizações20 slides
Rpp sd por
Rpp sdRpp sd
Rpp sdOperator Warnet Vast Raha
363 visualizações36 slides
DiGITAL 3SiXTY :: October 2014 por
DiGITAL 3SiXTY :: October 2014DiGITAL 3SiXTY :: October 2014
DiGITAL 3SiXTY :: October 2014Neil Mavichak
346 visualizações5 slides
Props/Costumes/Settings por
Props/Costumes/SettingsProps/Costumes/Settings
Props/Costumes/SettingsTyrese_C
186 visualizações14 slides
Goyal SMR Vinay Galaxy Brochure - Zricks.com por
Goyal SMR Vinay Galaxy Brochure - Zricks.comGoyal SMR Vinay Galaxy Brochure - Zricks.com
Goyal SMR Vinay Galaxy Brochure - Zricks.comZricks.com
95 visualizações12 slides
Second news story eccles por
Second news story ecclesSecond news story eccles
Second news story ecclesChristianO96
97 visualizações1 slide

Destaque(13)

Magento responsive them draco por EmilyPhan21291
Magento responsive them  dracoMagento responsive them  draco
Magento responsive them draco
EmilyPhan21291165 visualizações
DiGITAL 3SiXTY :: October 2014 por Neil Mavichak
DiGITAL 3SiXTY :: October 2014DiGITAL 3SiXTY :: October 2014
DiGITAL 3SiXTY :: October 2014
Neil Mavichak346 visualizações
Props/Costumes/Settings por Tyrese_C
Props/Costumes/SettingsProps/Costumes/Settings
Props/Costumes/Settings
Tyrese_C186 visualizações
Goyal SMR Vinay Galaxy Brochure - Zricks.com por Zricks.com
Goyal SMR Vinay Galaxy Brochure - Zricks.comGoyal SMR Vinay Galaxy Brochure - Zricks.com
Goyal SMR Vinay Galaxy Brochure - Zricks.com
Zricks.com95 visualizações
Second news story eccles por ChristianO96
Second news story ecclesSecond news story eccles
Second news story eccles
ChristianO9697 visualizações
Knowledge management por bahamaz
Knowledge managementKnowledge management
Knowledge management
bahamaz183 visualizações
Findings por marinapriest
FindingsFindings
Findings
marinapriest1.5K visualizações
Handicapping the Predictions: What to Expect in Local 2017 por Localogy
Handicapping the Predictions: What to Expect in Local 2017Handicapping the Predictions: What to Expect in Local 2017
Handicapping the Predictions: What to Expect in Local 2017
Localogy95 visualizações
RESUME GOPAL PATIL por GOPAL PATIL
RESUME GOPAL PATILRESUME GOPAL PATIL
RESUME GOPAL PATIL
GOPAL PATIL374 visualizações
Data: 40% of SMBs Believe AdWords Not Effective por Localogy
Data: 40% of SMBs Believe AdWords Not EffectiveData: 40% of SMBs Believe AdWords Not Effective
Data: 40% of SMBs Believe AdWords Not Effective
Localogy2.5K visualizações
Presentación1 por RODRILOPE
Presentación1Presentación1
Presentación1
RODRILOPE16 visualizações

Similar a Koti (assistant manager mech)

Sr.Mech.Design Engr. 30.03.15 por
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Ganeshkumar Kuwait
184 visualizações4 slides
cv piping(1) por
cv piping(1)cv piping(1)
cv piping(1)Equbal Ahmad
1.8K visualizações4 slides
Resume_rev.3 por
Resume_rev.3Resume_rev.3
Resume_rev.3Fikruddien YusoF
351 visualizações7 slides
CV_RBMerida por
CV_RBMeridaCV_RBMerida
CV_RBMeridaRodel Merida
119 visualizações8 slides
Afaq CV (April 17, 2016) por
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq Ahmad
110 visualizações6 slides
PankajKPrajapati por
PankajKPrajapatiPankajKPrajapati
PankajKPrajapatiPankaj Kumar Prajapati
116 visualizações4 slides

Similar a Koti (assistant manager mech)(20)

Sr.Mech.Design Engr. 30.03.15 por Ganeshkumar Kuwait
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
Ganeshkumar Kuwait184 visualizações
cv piping(1) por Equbal Ahmad
cv piping(1)cv piping(1)
cv piping(1)
Equbal Ahmad1.8K visualizações
Resume_rev.3 por Fikruddien YusoF
Resume_rev.3Resume_rev.3
Resume_rev.3
Fikruddien YusoF351 visualizações
CV_RBMerida por Rodel Merida
CV_RBMeridaCV_RBMerida
CV_RBMerida
Rodel Merida119 visualizações
Afaq CV (April 17, 2016) por Afaq Ahmad
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
Afaq Ahmad110 visualizações
Diosdado CV (updated)(1) por Diosdado Dolocanog
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog569 visualizações
Venkatesh narasimhan por Venkatesh N
Venkatesh narasimhan Venkatesh narasimhan
Venkatesh narasimhan
Venkatesh N26 visualizações
Resume Expediting & Inspection Engineer (Oil & Gas) por Sarim Mujtaba
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba3.5K visualizações
Vijai CV por Vijai Ram •
Vijai CVVijai CV
Vijai CV
Vijai Ram •54 visualizações
krishnajith_original por krishnajith cs
krishnajith_originalkrishnajith_original
krishnajith_original
krishnajith cs251 visualizações
Metri Plant With utility por chirag patel
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
chirag patel257 visualizações
KINGSLY M PIPING-PROJECT CV ABD por KINGSLY AROKIAM
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM119 visualizações
vijay cv por vijay prakash
vijay cvvijay cv
vijay cv
vijay prakash89 visualizações
Sayantan resume por Sayantan Dhar
Sayantan resumeSayantan resume
Sayantan resume
Sayantan Dhar41 visualizações
Engr Nuhu Solomon Updated CV v1 por Solomon Nuhu MNSE
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
Solomon Nuhu MNSE343 visualizações
CV _ Azhar Ansari por Azharuddin Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
Azharuddin Ansari221 visualizações

Último

MK__Cert.pdf por
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdfHassan Khan
11 visualizações1 slide
Pull down shoulder press final report docx (1).pdf por
Pull down shoulder press final report docx (1).pdfPull down shoulder press final report docx (1).pdf
Pull down shoulder press final report docx (1).pdfComsat Universal Islamabad Wah Campus
17 visualizações25 slides
Instrumentation & Control Lab Manual.pdf por
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdfNTU Faisalabad
6 visualizações63 slides
START Newsletter 3 por
START Newsletter 3START Newsletter 3
START Newsletter 3Start Project
5 visualizações25 slides
K8S Roadmap.pdf por
K8S Roadmap.pdfK8S Roadmap.pdf
K8S Roadmap.pdfMaryamTavakkoli2
8 visualizações1 slide
Searching in Data Structure por
Searching in Data StructureSearching in Data Structure
Searching in Data Structureraghavbirla63
7 visualizações8 slides

Último(20)

MK__Cert.pdf por Hassan Khan
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdf
Hassan Khan11 visualizações
Instrumentation & Control Lab Manual.pdf por NTU Faisalabad
Instrumentation & Control Lab Manual.pdfInstrumentation & Control Lab Manual.pdf
Instrumentation & Control Lab Manual.pdf
NTU Faisalabad 6 visualizações
START Newsletter 3 por Start Project
START Newsletter 3START Newsletter 3
START Newsletter 3
Start Project5 visualizações
K8S Roadmap.pdf por MaryamTavakkoli2
K8S Roadmap.pdfK8S Roadmap.pdf
K8S Roadmap.pdf
MaryamTavakkoli28 visualizações
Searching in Data Structure por raghavbirla63
Searching in Data StructureSearching in Data Structure
Searching in Data Structure
raghavbirla637 visualizações
CHEMICAL KINETICS.pdf por AguedaGutirrez
CHEMICAL KINETICS.pdfCHEMICAL KINETICS.pdf
CHEMICAL KINETICS.pdf
AguedaGutirrez13 visualizações
Effect of deep chemical mixing columns on properties of surrounding soft clay... por AltinKaradagli
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...
AltinKaradagli9 visualizações
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra815 visualizações
MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla76 visualizações
sam_software_eng_cv.pdf por sammyigbinovia
sam_software_eng_cv.pdfsam_software_eng_cv.pdf
sam_software_eng_cv.pdf
sammyigbinovia5 visualizações
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth632 visualizações
SUMIT SQL PROJECT SUPERSTORE 1.pptx por Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 15 visualizações
What is Unit Testing por Sadaaki Emura
What is Unit TestingWhat is Unit Testing
What is Unit Testing
Sadaaki Emura24 visualizações
DevOps-ITverse-2023-IIT-DU.pptx por Anowar Hossain
DevOps-ITverse-2023-IIT-DU.pptxDevOps-ITverse-2023-IIT-DU.pptx
DevOps-ITverse-2023-IIT-DU.pptx
Anowar Hossain12 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn5 visualizações
Introduction to CAD-CAM.pptx por suyogpatil49
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptx
suyogpatil495 visualizações
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome33 visualizações

Koti (assistant manager mech)

  • 1. N. KOTESWARA RAO Contact: +91-9959566266/7022005461 TOSHIBA POWER, Email: rao.koti.n@gmail.com NTPC KUDGI - KARNATAKA Assistant Manager (Mechanical) – Toshiba Power, NTPC, Kudgi, Karnataka A competent professional with over 8 years of experience in Construction Management, vast knowledge in Erection, Commissioning of Steam Turbine, Generator and Auxiliaries. Skilled in planning, executing and spread heading construction projects with a flair of adopting modern methodologies in compliance with company standards. The daily routine includes providing assistance and direction to other plant personnel in proper plant procedures and manufacturing methods. Part of this involves conducting regular tests to ensure that designs fall within the expected specifications, providing guidance for preventive and repair methods to ensure that plant construction is able to meet output quotas and deadlines in order to increase plant production efficiency and quality. Other daily tasks can include designing manufacturing layouts, coordinating equipment selections, interacting with clients and contractors, evaluating quotes and providing support to ensure that plant erection meet environmental and safety protocols in a cost-effective manner. WORK EXPERIENCE: 1. Organization: TOSHIBA POWER [TPSC (I) PVT LTD, HYDERABAD] Project 03: NTPC 3X800 MW Super Thermal Power Plant at Kudgi, Karnataka Designation: Assistant Manager Duration: Sep’2013 to Till Date Nature of Job: Erection and Commissioning of (NTPC 3x800 MW), Super Critical Thermal Power Plant, Steam Turbine, Generator, Condenser and Auxiliaries Job Profile: • Responsible for the overall planning, execution and success of engineering project and also the in charge of managing the engineering team and overseeing mechanical staff who install, test, diagnose, repair and commission the mechanical equipment • Coordinating with all engineering staff and Scheduling staff assignments • Providing technical assistance to the Project Manager in contract matters, change orders and site superintendence • Governing all the mechanical activities (erection / installation / commissioning) at site with regards to progress, compliance with the Contract, applicable codes & standards, quality, safety and environmental acceptance • Scheduling 3 weeks, 3 months rolling plans and contributing to the Daily, Weekly and Monthly Progress Reports and Project completion status report • Active participation in Daily, Weekly and Monthly meetings at site with client (incl. assistance for MOM to the Project Manager) • Review and approve Contractor’s mechanical work method statements, Site related mechanical design and engineering matters
  • 2. • Keeping track of any modification with respect to the final design, application drawings, punch list, non- conformities and assure incorporation in the asbuilt drawings • Ascertaining and witnessing mechanical inspections and reviewing the related reports • Giving assistance to client (NTPC) during performance tests and trail run workout of mechanical quantities for progress survey • Advising and guiding the Employer’s mechanical counterpart engineer • Managing the project documentation archive, checking and approving the ‘As Built Drawings’ [for own competence area] • Examine and confirm that O&M Manuals are adequate Erection & Commissioning of Steam Turbine, Generator and Auxiliaries. • Handling Client and assigning job to Sub-contractors. Work administration with future work schedule 2. Organization: SOKEO POWER [Hyderabad] Designation: Sr. Engineer Nature of Job: Erection and Commissioning of 2X350 MW Thermal Power Plant, Steam Turbine, Generator, Condenser and Auxiliaries Project 02: 2X350 MW Ind-Bharat Thermal Power Project at Jharsuguda, Odisha Designation: Sr. Engineer Duration: Jan 2012 to Aug 2013 Project 01: Lanco Infratech Ltd, 2X600 MW coal based Thermal Power Plant, Udupi Power Corp. Ltd, Mangalore, Dec (China) Designation: Engineer Duration: Apr 2008 to Dec 2011 Job Profile: • Managing all the Mechanical Site activities starting from Drawing Implementation/ Site Installation/ Inspection/ Site testing/ Commissioning with Client • Coordinating with Client and sub contractor on daily and weekly basis • Preparing the outstanding list to Client, subcontractor and interoffice and follow up for clarification • Maintaining the safety measures at working area • Preparing the protocol’s as per FQP ACADEMICS: DEGREE & UNIVERSITY COURSE DURATION PASSED OUT AGGREGATE B. Tech, Mechanical Avanthi Institute of Engg & Tech - Vizag 2005-2008 April, 2008 69.83% Diploma, Mechanical AANM & VVRSR Polytechnic - Gudlavalleru 2001-2005 March, 2005 57.12% SOFT SKILLS: (1) MS OFFICE (2) MS PROJECT
  • 3. (3) AUTO CAD PERSONAL DETAILS: FULL NAME : N. KOTESWARA RAO FATHER’S NAME : N. RAMA RAO SEX : MALE MARITAL STATUS : MARRIED LANGUAGES KNOWN : ENGLISH, HINDI, TELUGU AND TAMIL PASS PORT : K5503353 PERMANENT ADDRESS : N. KOTESWARA RAO, PHIRANGIPURAM MANDAL, GUNTUR (DT) A.P-522529 DECLARATION: I hereby declare that the above furnished details are true to the best of my knowledge & belief. Place: Date: (N. Koteswara Rao)