1. Technical and Economic Feasibility Study. Eng. Adnan Bahjat Jalil koprlo1@gmail.com2019
بخارية قدرة محطة إلنشاء واإلقتصادية الفنية الجدوى دراسة
Technical and Economic Feasibility Study for the
Establishment of a Steam Power Plant
إعداد
جليل بهجت عدنان المهندس
15. 14
جدول( الجديدة للمحطة اإلنشائية التكاليف110)عامة منظومات + (معدات )ميكاواط
Item
A
B
B1
B2
B3
C
C1
C2
C3
D
D1
E
E1
E2
E3
E4
E5
E6
E7
E8
E9
F
F1
F2
100,000,000.00GRAN TOTAL
1.5
0.5
2
100
Design Engineering (Basic + Detail)
Commissioning
Total Price for design engineering ,Commissioning &
Engineering Consulting
1,500,000.00
500,000.00
2,000,000.00
MECHANICAL EQUIPMENT AND WORKS PRICE SUMMARY
ELECTRICAL AND I&C EQUIPMENT AND WORKS PRICE SUMMARY
CIVIL ENGINEERING WORKS PRICE SUMMARY
DISASSEMBLING & REMOVING ALL THE COMPONENTS OF THE OLD 4 UNITS &
TRANSFERRING TO THE SITE OF SCRAP INSIDE THE STATION
UTILITIES BUILDINGS, EQUIPMENTS AND ERECTION WORKS PRICE SUMMARY
OTHERS
0.5
0.5
0.5
0.75
0.4
10.985
13
4.25
1.545
2
0.54
13.0245
3.952
0.1805
17.157
13
Percentage %
4
40.432
11.9795
500,000.00
500,000.00
750,000.00
400,000.00
10,985,000.00
4,250,000.00
1,545,000.00
2,000,000.00
540,000.00
500,000.00
transport and lifting machinery and equipment
Exhaust gas treatment system(environmental pollution)
Fire extinguishing system
Communications system including the SCADA system
TOTAL UTILITIES BUILDINGS, EQUIPMENTS AND
ERECTION WORKS PRICE SUMMARY
Water treatment system
Fuel system including fuel treatment unit
Cooling water cycle including Cooling Towers
75 MVA/ 2 Unit Transformers
buildings & technical workshops
0.4465
52.858
TOTAL CIVIL ENGINEERING WORKS PRICE
SUMMARY
13,000,000.00
Spare Parts as per Contract 180,500.00
TOTAL ELECTRICAL AND I&C EQUIPMENT AND
WORKS PRICE SUMMARY
17,157,000.00
Civil Engineering Works 13,000,000.00
TOTAL MECHANICAL EQUIPMENT AND
WORKS PRICE SUMMARY
52,858,000.00
Equipment 13,024,500.00
Erection Works 3,952,000.00
Equipment 40,432,000.00
Erection Works 11,979,500.00
Spare Parts as per Contract 446,500.00
DESCRIPTION Price (USD)
Total Disassembling , Removing & Transferring
Works
4,000,000.00