SlideShare uma empresa Scribd logo
1 de 6
Baixar para ler offline
KOKO WASKO
Address :
Perumahan Gramapuri
Tamansari B5 No.28
RT. 002 RW. 037 Wanasari
Cibitung Bekasi
Phone Number : 0821-252-333-79
Email : koko.wasko160479@gmail.com
Place & DOB : Kuningan, 16th April 1979
Status : Married with 3 child
Religion : Islam
SUMMARY PROFILE
Since 2002, I've worked in the field of PPC (Production Planning & Control), Assembly
Production Control, Manufacturing (Zinc Die Casting, Plastic Injection, Machining &
Key Cutting), Painting and New Model Development. Familiar with MS Office (such
as MS Word, MS Excel, MS Power Point), Internet & E-mail. Mature with good
communication and interpersonal skill, has a strong leadership, analytical thinking,
and highly motivated.
PROFESSIONAL EXPERIENCES
6 MEI 2002 -
PRESENT
PT HONDA LOCK
INDONESIA
NEW MODEL, PPC & ASSEMBLY
SENIOR MANAGER
Japanese
Automotive Parts
Manufacture
Company
2 Wheel Product :
Key Set & Starter
Magnetic
4 Wheel Product :
Set Key Cylinder,
Door Mirror, Outer
Handle, Door
Latch, Wheel
Sensor
■As New Model, PPC & Assembly Senior Manager
【Oct 2015 – current】
- Responsible for Control Project Development
- Responsible for Production Planning & Delivery Control
- Responsible for Production Assembly (2W : Key Set &
Starter Magnetic and 4W : Door Mirror, Outer Handle &
Set Key Cylinder, Door Latch and Wheel Sensor)
- Control of Business Plan (TQM)
Direct report to Advisor, Director and President Director
■As Manufacturing (Plastic Injection, Key Molding &
Painting) Manager
【Mar 2014 – Feb 2015】
- Production Control of Plastic Injection, Key Molding &
Painting Process
- Control of quality part (quality in process and ensure
quality part before send to next process)
- Quality Improvement
- Productivity Up
- Investment & Man Power Need calculation
- Control of Business Plan (TQM)
Direct report to Advisor, Director and President Director
■As New Model Development & 4 Wheel Assembly
Production Manager
【Mar 2012 – Feb 2014】
 New Model Development :
- Responsible for control project development (such as
Master Schedule, New Part, New Dies, Man Power
Training, Document Control Process : Work Standard,
Check Sheet, Control Plan, FMEA, etc)
- Responsible for control Spec / Drawing from customer
and internal R&D
- Evaluation project and ensure the project runs according
to schedule and spec requirement.
- Project coordination with all relevant sections
- Provide direction and decisions on problems that occur
and what actions to take.
- Report to Top Management of project implementation.
- Control of Business Plan (TQM)
 4 Wheel Assembly Production :
- Responsible for the smooth running of the production
process in accordance with schedule.
- Periodic review on loading capacity (such as man power
need, shift, cycle time, cap/man and plan of investment
or improvement for capacity up).
- Man power competency evaluation and training plan.
- Provide direction and decisions on problems that occur
and what actions to take.
- Control of Business Plan (TQM)
Direct report to Advisor, Director and President Director
■As Production Planning and Control (PPC) & New Model
Development Manager
【Mar 2011 – Feb 2012】
 Production Planning and Control (PPC) :
- Ordering Control from customer (Yearly, Monthly, Daily)
- Production Plan for Assembly (Monthly, Daily) by AS400
system
- Delivery Control to customer (Daily)
- Control of Loading Capacity & Man Power Need
(Monthly, Yearly, 3 Years)
- Investment & Man Power Need calculation by EDP system
- Control of Business Plan (TQM)
 New Model Development :
- Responsible for control project development (such as
Master Schedule, New Part, New Dies, Man Power
Training, Document Control Process : Work Standard,
Check Sheet, Control Plan, FMEA, etc)
- Responsible for control Spec / Drawing from customer
and internal R&D
- Evaluation project and ensure the project runs according
to schedule and spec requirement.
- Project coordination with all relevant sections
- Provide direction and decisions on problems that occur
and what actions to take.
- Report to Top Management of project implementation.
- Control of Business Plan (TQM)
Direct report to Advisor, Director and President Director
■As Manufacture Assistant Manager
【Feb 2010 – Feb 2011】
- Production Control of Zinc Die Casting, Plastic Injection &
Machining Process
- Control of quality part (quality in process and ensure
quality part before send to next process)
- Quality Improvement
- Productivity Up
- Investment & Man Power Need calculation
- Control of Business Plan (TQM)
Direct report to Manager, Advisor and Factory Manager
■As 4 Wheel & Starter Magnetic Assembly Production
Assistant Manager
【Jan 2008 – Jan 2010】
- Control of production achievement
- Skill Up Man Power / Training Plan
- Productivity Up
- Quality Improvement
- Investment & Man Power Need calculation
- Control of Business Plan (TQM)
Direct report to Manager, Advisor and Factory Manager
■As New Model Development Section Head
【Jun 2006 – Dec 2007】
- Control of New Model Development
- Create of Master Schedule
- Control of equipment, die, new part, man power, support
process & document control process
- Cordinate meeting & evaluation
- Prepare of QAV from customer
- Control of trial event & delivery sample to customer
Direct report to Manager, Advisor and Factory Manager
■As Production Planning and Control Staff
【Mei 2002 – May 2006】
- Create of Daily Production Plan
- Input of Daily Production Actual
- Monitoring stock finished good
- Delivery preparation (Document Delivery, part, setting
man power)
- PIC Stock Taking finished good
- Monthly Stock Report
Direct report to Section Head and Manager
OVERSEAS EXPERIENCE
Mar 2014
Project Meeting at Honda Lock Thailand
Transfer production of 2R Key Set from Honda Lock Thailand to
Honda Lock Indonesia (Honda Lock Group Policy)
Jun 2012
Study Visits of QSB (Quality System Basic) Implementation
at Honda Lock Thailand, Thailand
Related PM7 Project from Gerenal Motor Indonesia and starting
development ISO TS16949 at Honda Lock Indonesia
Mar 2012
Project Development for PM7 General Motor at Honda Lock
Japan in Miyazaki, Japan
Honda Lock Indonesia has received project from General Motor
Indonesia (PM7 Project – SPIN vehicle)
Oct 2008
Study Visits of 4 Wheel Production at Honda Lock Thailand,
Thailand
Starting of 4 Wheel Production at Honda Lock Indonesia
PROFESSIONAL ACHIEVEMENTS
2014 – current
Act as Leader of 5S Committee
Create implementation rule of 5S in factory
2013
Development ISO TS16949 in New Model Department
Create a new model’s procedure referred to ISO TS16949
2009 – 2013
Act as Leader of IDEA BOX Committee
Motivate all employees to make improvements to make the
proposal even though it is a simple improvement
In 2012, committee was able to collect ±7600 pieces of
proposed improvements.
2008
Build 4W Assembly Production System
In 2008, starting production of 4W assembly at Honda Lock
Indonesia (Door Mirror, Outer Handle, Door Latch)
2006
Build New Model Development System
Create procedure of new model development, document
control, spec or drawing control system.
In 2006, established a new department in Honda Lock Indonesia
for handling of New Model Development.
EDUCATION BACKGROUND
2002 Diploma III
Akademi Pimpinan Perusahaan Depperindag majoring in
Production Management with GPA 3.33
1997
Senior High
School
SMUN 1 Kuningan – Jawa Barat
1994
Junior High
School
SMPN 1 Cimara – Kuningan Jawa Barat
1991
Elementary
School
SDN Cimara II – Kuningan Jawa Barat
SEMINAR AND TRAINING ATTENDS
2016
HRGA (Internal) Managerial Mentality
HRGA (Internal) Total Quality Management (TQM)
2015 Central System Trainining for Trainer
2012 PQI Consultant Core Tools ISO/TS 16949 : 2009 (FMEA, APQP, & PPAP)
2010
PPM
Manajement
Effective Leadership
PPM
Manajement
Effective Supervisory Management
2009
PPM
Manajement
Problems Solving And Decision Making (Minout Indonesia)
Matsushita Gobel
Foundation
Horenso
Premysis
Consulting
Internal Quality Auditor ISO 9001 : 2008
2008
Premysis
Consulting
ISO 14001 Internal Environmental Auditor
2005
Premysis
Consulting
ISO 9001 : 2000 Internal Quality Auditor
COMPUTER SKILL
MS. Power Point Advance in making report and present it to Top Management
MS. Excel Advance in making report & analyze data
MS. Word Advance in making letter
AS400
(Production
System)
Advance in use data for making report, analyze and regristration
of spec (Bill Of Material)
CURRENT RENUMERATION PACKAGE
Current Salary : IDR 18,000,000
Allowance : THR, Bonus, Medical, Comunication and Transportation
Availability : 1 Month Notice

Mais conteúdo relacionado

Mais procurados

Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterYudha Pratama, PMP
 
Software programmer kpi
Software programmer kpiSoftware programmer kpi
Software programmer kpijomriges
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasksAnand Bobade
 
Software Project Management (lecture 2)
Software Project Management (lecture 2)Software Project Management (lecture 2)
Software Project Management (lecture 2)Syed Muhammad Hammad
 
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) ProjecteCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) ProjectDavid Niles
 
CVCSB16 English Resume
CVCSB16 English ResumeCVCSB16 English Resume
CVCSB16 English ResumeCesar Bass
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013John Cachat
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...Edward F. T. Charfauros
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsRory McKenna
 
Software Project Management lecture 9
Software Project Management lecture 9Software Project Management lecture 9
Software Project Management lecture 9Syed Muhammad Hammad
 
Iso27001leadauditor2020
Iso27001leadauditor2020Iso27001leadauditor2020
Iso27001leadauditor2020Anne Starr
 
Resume Operations MGT
Resume Operations MGTResume Operations MGT
Resume Operations MGTRui Monteiro
 
Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Highmark Health
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 

Mais procurados (20)

Pmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charterPmp – pmbok 5th edition develop project charter
Pmp – pmbok 5th edition develop project charter
 
Software programmer kpi
Software programmer kpiSoftware programmer kpi
Software programmer kpi
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasks
 
JENNIFER KLING Linkedin 2015
JENNIFER KLING Linkedin 2015JENNIFER KLING Linkedin 2015
JENNIFER KLING Linkedin 2015
 
Software Project Management (lecture 2)
Software Project Management (lecture 2)Software Project Management (lecture 2)
Software Project Management (lecture 2)
 
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) ProjecteCIO PPT Plan of Action for a Systems Integrations (SAP) Project
eCIO PPT Plan of Action for a Systems Integrations (SAP) Project
 
CVCSB16 English Resume
CVCSB16 English ResumeCVCSB16 English Resume
CVCSB16 English Resume
 
Engineering change management webinar april 2013
Engineering change management webinar april 2013Engineering change management webinar april 2013
Engineering change management webinar april 2013
 
Elliot Wojcik 1 2
Elliot Wojcik 1 2Elliot Wojcik 1 2
Elliot Wojcik 1 2
 
CV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linkeCV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linke
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...
Mgt498 lt c_week5class Copyright 2013 Edward F. T. Charfauros. Reference, www...
 
INAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications ProfessionalsINAAU Project Management for Telecommunications Professionals
INAAU Project Management for Telecommunications Professionals
 
Conprofile.DOC
Conprofile.DOCConprofile.DOC
Conprofile.DOC
 
Software Project Management lecture 9
Software Project Management lecture 9Software Project Management lecture 9
Software Project Management lecture 9
 
Iso27001leadauditor2020
Iso27001leadauditor2020Iso27001leadauditor2020
Iso27001leadauditor2020
 
Resume Operations MGT
Resume Operations MGTResume Operations MGT
Resume Operations MGT
 
osama cv 2015
osama cv 2015osama cv 2015
osama cv 2015
 
Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6Project Management Class ( based on PMBOK) - Day 6
Project Management Class ( based on PMBOK) - Day 6
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 

Destaque

páginas preliminares y post para una tesis
páginas preliminares y post para una tesispáginas preliminares y post para una tesis
páginas preliminares y post para una tesissamuel Cerron
 
Bradley Witham - Accounting, Finance & Computer services
Bradley Witham  - Accounting, Finance & Computer servicesBradley Witham  - Accounting, Finance & Computer services
Bradley Witham - Accounting, Finance & Computer servicesBradley Witham
 
Pitching Like a Boss - Startup Istanbul 2014
Pitching Like a Boss - Startup Istanbul 2014Pitching Like a Boss - Startup Istanbul 2014
Pitching Like a Boss - Startup Istanbul 2014Vitaly Golomb
 
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...Startup AddVenture by CCC Startups
 
Khaosan branch (looking for new office)
Khaosan branch (looking for new office) Khaosan branch (looking for new office)
Khaosan branch (looking for new office) s1o3m8p1ob2530
 
Questionnaire analysis
Questionnaire analysisQuestionnaire analysis
Questionnaire analysisBenjamin Okema
 
2. NCAT _Marcia Nealy (1)
2. NCAT _Marcia Nealy (1)2. NCAT _Marcia Nealy (1)
2. NCAT _Marcia Nealy (1)Marcia Nealy
 
Resume_이력서NguyenThiThaoHuong
Resume_이력서NguyenThiThaoHuongResume_이력서NguyenThiThaoHuong
Resume_이력서NguyenThiThaoHuongthao huong
 
Resume for Application(Chanseok Yeo)
Resume for Application(Chanseok Yeo)Resume for Application(Chanseok Yeo)
Resume for Application(Chanseok Yeo)CHAN SEOK YEO
 

Destaque (18)

2010_kaitzB_003
2010_kaitzB_0032010_kaitzB_003
2010_kaitzB_003
 
páginas preliminares y post para una tesis
páginas preliminares y post para una tesispáginas preliminares y post para una tesis
páginas preliminares y post para una tesis
 
Bradley Witham - Accounting, Finance & Computer services
Bradley Witham  - Accounting, Finance & Computer servicesBradley Witham  - Accounting, Finance & Computer services
Bradley Witham - Accounting, Finance & Computer services
 
Pitching Like a Boss - Startup Istanbul 2014
Pitching Like a Boss - Startup Istanbul 2014Pitching Like a Boss - Startup Istanbul 2014
Pitching Like a Boss - Startup Istanbul 2014
 
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...
Vitaly M. Golomb - Pitching Like A Boss (abridged) - Startup AddVenture Easte...
 
Anxiety Disorder
Anxiety  DisorderAnxiety  Disorder
Anxiety Disorder
 
Cultura ciudadana
Cultura ciudadanaCultura ciudadana
Cultura ciudadana
 
Khaosan branch (looking for new office)
Khaosan branch (looking for new office) Khaosan branch (looking for new office)
Khaosan branch (looking for new office)
 
7 pointer - copy
7   pointer - copy7   pointer - copy
7 pointer - copy
 
EF_Apuntes_Voleibol_1
EF_Apuntes_Voleibol_1EF_Apuntes_Voleibol_1
EF_Apuntes_Voleibol_1
 
Questionnaire analysis
Questionnaire analysisQuestionnaire analysis
Questionnaire analysis
 
Diversidad cultural
Diversidad culturalDiversidad cultural
Diversidad cultural
 
these_altuve
these_altuvethese_altuve
these_altuve
 
2. NCAT _Marcia Nealy (1)
2. NCAT _Marcia Nealy (1)2. NCAT _Marcia Nealy (1)
2. NCAT _Marcia Nealy (1)
 
Resume_이력서NguyenThiThaoHuong
Resume_이력서NguyenThiThaoHuongResume_이력서NguyenThiThaoHuong
Resume_이력서NguyenThiThaoHuong
 
pda forensics
pda forensicspda forensics
pda forensics
 
Resume for Application(Chanseok Yeo)
Resume for Application(Chanseok Yeo)Resume for Application(Chanseok Yeo)
Resume for Application(Chanseok Yeo)
 
The age of Coworking Campuses
The age of Coworking Campuses The age of Coworking Campuses
The age of Coworking Campuses
 

Semelhante a Koko Wasko's Resume (20)

Saurabh Rathore
Saurabh RathoreSaurabh Rathore
Saurabh Rathore
 
MHCCV_02-08-16
MHCCV_02-08-16MHCCV_02-08-16
MHCCV_02-08-16
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
sanjay resume
sanjay resumesanjay resume
sanjay resume
 
Karthik Resume NPD
Karthik Resume  NPDKarthik Resume  NPD
Karthik Resume NPD
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015
 
SS_New_Resume_200816
SS_New_Resume_200816SS_New_Resume_200816
SS_New_Resume_200816
 
Sd
SdSd
Sd
 
Spm ksp
Spm kspSpm ksp
Spm ksp
 
Rameshwar Adhau (NPD engineer)
Rameshwar Adhau (NPD  engineer)Rameshwar Adhau (NPD  engineer)
Rameshwar Adhau (NPD engineer)
 
Professional Profile
Professional ProfileProfessional Profile
Professional Profile
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Mohan-PPC
Mohan-PPCMohan-PPC
Mohan-PPC
 
Taehyun Kim RESUME(D-1)
Taehyun Kim RESUME(D-1)Taehyun Kim RESUME(D-1)
Taehyun Kim RESUME(D-1)
 
Resume
ResumeResume
Resume
 
Denise van Rooyen
Denise van RooyenDenise van Rooyen
Denise van Rooyen
 
mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)mars_(1)_(1) (1) (1)
mars_(1)_(1) (1) (1)
 
Mars
Mars Mars
Mars
 
tondi_nababan
tondi_nababantondi_nababan
tondi_nababan
 

Koko Wasko's Resume

  • 1. KOKO WASKO Address : Perumahan Gramapuri Tamansari B5 No.28 RT. 002 RW. 037 Wanasari Cibitung Bekasi Phone Number : 0821-252-333-79 Email : koko.wasko160479@gmail.com Place & DOB : Kuningan, 16th April 1979 Status : Married with 3 child Religion : Islam SUMMARY PROFILE Since 2002, I've worked in the field of PPC (Production Planning & Control), Assembly Production Control, Manufacturing (Zinc Die Casting, Plastic Injection, Machining & Key Cutting), Painting and New Model Development. Familiar with MS Office (such as MS Word, MS Excel, MS Power Point), Internet & E-mail. Mature with good communication and interpersonal skill, has a strong leadership, analytical thinking, and highly motivated. PROFESSIONAL EXPERIENCES 6 MEI 2002 - PRESENT PT HONDA LOCK INDONESIA NEW MODEL, PPC & ASSEMBLY SENIOR MANAGER Japanese Automotive Parts Manufacture Company 2 Wheel Product : Key Set & Starter Magnetic 4 Wheel Product : Set Key Cylinder, Door Mirror, Outer Handle, Door Latch, Wheel Sensor ■As New Model, PPC & Assembly Senior Manager 【Oct 2015 – current】 - Responsible for Control Project Development - Responsible for Production Planning & Delivery Control - Responsible for Production Assembly (2W : Key Set & Starter Magnetic and 4W : Door Mirror, Outer Handle & Set Key Cylinder, Door Latch and Wheel Sensor) - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director
  • 2. ■As Manufacturing (Plastic Injection, Key Molding & Painting) Manager 【Mar 2014 – Feb 2015】 - Production Control of Plastic Injection, Key Molding & Painting Process - Control of quality part (quality in process and ensure quality part before send to next process) - Quality Improvement - Productivity Up - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As New Model Development & 4 Wheel Assembly Production Manager 【Mar 2012 – Feb 2014】  New Model Development : - Responsible for control project development (such as Master Schedule, New Part, New Dies, Man Power Training, Document Control Process : Work Standard, Check Sheet, Control Plan, FMEA, etc) - Responsible for control Spec / Drawing from customer and internal R&D - Evaluation project and ensure the project runs according to schedule and spec requirement. - Project coordination with all relevant sections - Provide direction and decisions on problems that occur and what actions to take. - Report to Top Management of project implementation. - Control of Business Plan (TQM)  4 Wheel Assembly Production : - Responsible for the smooth running of the production process in accordance with schedule. - Periodic review on loading capacity (such as man power need, shift, cycle time, cap/man and plan of investment or improvement for capacity up). - Man power competency evaluation and training plan. - Provide direction and decisions on problems that occur and what actions to take. - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As Production Planning and Control (PPC) & New Model Development Manager 【Mar 2011 – Feb 2012】
  • 3.  Production Planning and Control (PPC) : - Ordering Control from customer (Yearly, Monthly, Daily) - Production Plan for Assembly (Monthly, Daily) by AS400 system - Delivery Control to customer (Daily) - Control of Loading Capacity & Man Power Need (Monthly, Yearly, 3 Years) - Investment & Man Power Need calculation by EDP system - Control of Business Plan (TQM)  New Model Development : - Responsible for control project development (such as Master Schedule, New Part, New Dies, Man Power Training, Document Control Process : Work Standard, Check Sheet, Control Plan, FMEA, etc) - Responsible for control Spec / Drawing from customer and internal R&D - Evaluation project and ensure the project runs according to schedule and spec requirement. - Project coordination with all relevant sections - Provide direction and decisions on problems that occur and what actions to take. - Report to Top Management of project implementation. - Control of Business Plan (TQM) Direct report to Advisor, Director and President Director ■As Manufacture Assistant Manager 【Feb 2010 – Feb 2011】 - Production Control of Zinc Die Casting, Plastic Injection & Machining Process - Control of quality part (quality in process and ensure quality part before send to next process) - Quality Improvement - Productivity Up - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Manager, Advisor and Factory Manager ■As 4 Wheel & Starter Magnetic Assembly Production Assistant Manager 【Jan 2008 – Jan 2010】 - Control of production achievement - Skill Up Man Power / Training Plan - Productivity Up - Quality Improvement - Investment & Man Power Need calculation - Control of Business Plan (TQM) Direct report to Manager, Advisor and Factory Manager
  • 4. ■As New Model Development Section Head 【Jun 2006 – Dec 2007】 - Control of New Model Development - Create of Master Schedule - Control of equipment, die, new part, man power, support process & document control process - Cordinate meeting & evaluation - Prepare of QAV from customer - Control of trial event & delivery sample to customer Direct report to Manager, Advisor and Factory Manager ■As Production Planning and Control Staff 【Mei 2002 – May 2006】 - Create of Daily Production Plan - Input of Daily Production Actual - Monitoring stock finished good - Delivery preparation (Document Delivery, part, setting man power) - PIC Stock Taking finished good - Monthly Stock Report Direct report to Section Head and Manager OVERSEAS EXPERIENCE Mar 2014 Project Meeting at Honda Lock Thailand Transfer production of 2R Key Set from Honda Lock Thailand to Honda Lock Indonesia (Honda Lock Group Policy) Jun 2012 Study Visits of QSB (Quality System Basic) Implementation at Honda Lock Thailand, Thailand Related PM7 Project from Gerenal Motor Indonesia and starting development ISO TS16949 at Honda Lock Indonesia Mar 2012 Project Development for PM7 General Motor at Honda Lock Japan in Miyazaki, Japan Honda Lock Indonesia has received project from General Motor Indonesia (PM7 Project – SPIN vehicle) Oct 2008 Study Visits of 4 Wheel Production at Honda Lock Thailand, Thailand Starting of 4 Wheel Production at Honda Lock Indonesia PROFESSIONAL ACHIEVEMENTS 2014 – current Act as Leader of 5S Committee Create implementation rule of 5S in factory 2013 Development ISO TS16949 in New Model Department Create a new model’s procedure referred to ISO TS16949
  • 5. 2009 – 2013 Act as Leader of IDEA BOX Committee Motivate all employees to make improvements to make the proposal even though it is a simple improvement In 2012, committee was able to collect ±7600 pieces of proposed improvements. 2008 Build 4W Assembly Production System In 2008, starting production of 4W assembly at Honda Lock Indonesia (Door Mirror, Outer Handle, Door Latch) 2006 Build New Model Development System Create procedure of new model development, document control, spec or drawing control system. In 2006, established a new department in Honda Lock Indonesia for handling of New Model Development. EDUCATION BACKGROUND 2002 Diploma III Akademi Pimpinan Perusahaan Depperindag majoring in Production Management with GPA 3.33 1997 Senior High School SMUN 1 Kuningan – Jawa Barat 1994 Junior High School SMPN 1 Cimara – Kuningan Jawa Barat 1991 Elementary School SDN Cimara II – Kuningan Jawa Barat SEMINAR AND TRAINING ATTENDS 2016 HRGA (Internal) Managerial Mentality HRGA (Internal) Total Quality Management (TQM) 2015 Central System Trainining for Trainer 2012 PQI Consultant Core Tools ISO/TS 16949 : 2009 (FMEA, APQP, & PPAP) 2010 PPM Manajement Effective Leadership PPM Manajement Effective Supervisory Management 2009 PPM Manajement Problems Solving And Decision Making (Minout Indonesia) Matsushita Gobel Foundation Horenso Premysis Consulting Internal Quality Auditor ISO 9001 : 2008 2008 Premysis Consulting ISO 14001 Internal Environmental Auditor 2005 Premysis Consulting ISO 9001 : 2000 Internal Quality Auditor
  • 6. COMPUTER SKILL MS. Power Point Advance in making report and present it to Top Management MS. Excel Advance in making report & analyze data MS. Word Advance in making letter AS400 (Production System) Advance in use data for making report, analyze and regristration of spec (Bill Of Material) CURRENT RENUMERATION PACKAGE Current Salary : IDR 18,000,000 Allowance : THR, Bonus, Medical, Comunication and Transportation Availability : 1 Month Notice