2. 2
On September 28th of 2012, a solid rain episode took
place in Puerto Lumbreras that poured 120 litres/m2 in
one hour
Watercourses of Béjar and Viznaga overflowed
A wide area was flooded and several roads were
completely closed. As a result part of the population
had to be evacuated and even rescued from the
rooftops
6 people deceased
5. 5
112 Emergency Center received 1.649 calls which have
led the emergency device presence in 1.463 incidents
releated to heavy rains.
Ø 456 balling actuations
Ø 152 rescues and lifesavings
Ø 64 actuations for falling debris and partial colapses
Ø 221 public safety actuations
Ø 570 attention and information actions to the citizens
7. 7
q INUNMUR Plan was activated in pre-emergency stage on September
27th, because of AEMET warning. (State Meteorological Agency)
q Emergency Stage Level 1 for INUNMUR, was activated at 12:45 on
September 28th, and became a Level 2 at 13:05 due to unfavorable
evolution of the meteorological conditions. Military Emergency Unit (UME)
intervention was requested.
11. 11
PUESTO DE MANDO
AVANZADO
MANDO DEL GRUPO DE
INTERVENCIÓN
COORDINADOR DEL
GRUPO DE DAÑOS
COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
COORDINADOR DEL
GRUPO SANITARIO
MANDO DEL GRUPO DE
ORDEN
COORDINADOR DEL
GRUPO LOGÍSTICO
COORDINADOR DEL
GRUPO ACCIÓN SOCIAL
Advanced
Command
Position
Intervention Team
Command
Damage evaluation team
Coordinator
Essential recovery
services group
Coordinator
Health group
Coordinator
Logistic group
Coordinator
Social action group
Coordinator
Order group Command
13. 13
MANDO DEL GRUPO DE
INTERVENCIÓN
EQUIPO DE BOMBEROS
EQUIPO DE BÚSQUEDA
Y RESCATE
EQUIPO DE
EVACUACIÓN
Firefighters
Team
Evacuation
Team
Search&Res
cue Team
Intervention
group
Command
14. 14
Primary actuations
• Evacuation of people on risk situation
• Main people rescues
• Lost people searching
• Dead animals management
• Roads opening, cleaning and balling
works
• Drinkable water supply for houses and
cattle tanks
15. 15
COORDINADOR DEL
GRUPO DE
RESTABLECIMIENTO DE
SERVICIOS ESENCIALES
EQUIPO DE
RESTABLECIMIENTO DE
AGUA POTABLE
EQUIPO DE
RESTABLECIMIENTO DE
GAS
EQUIPO DE
RESTABLECIMIENTO DE
ELECTRICIDAD
EQUIPO DE
RESTABLECIMIENTO DE
TELEFONÍA, RADIO Y TV
EQUIPO DE
RESTABLECIMIENTO DE
CARRETERAS
EQUIPO DE
RESTABLECIMIENTO DE
SANEAMIENTO
EQUIPO DE
RESTABLECIMIENTO DE
VÍAS URBANAS
Coordinator
Drinkable water Team
Gas recovery Team
Phone, radio, TV
recovery Team
Roads recovery Team
Streets & Lanes
recovery Team
Water&Sanitati
on recovery
Team
Electricity recovery Team
16. 16
ROADS affected:
– A-7 Puerto Lumbreras-Lorca, through Béjar watercourse, due to bridge collapse.
– A-7 Puerto Lumbreras-Almería, on km. 583.
– RM-D20 Garrobillo-Ramonete, close to city of Lorca.
– RM-621 Lorca-Purias, from km. 4 to km. 4,8.
– RM-517 , around Cehegín, from km. 2 to km. 4.
– RM-D10 around councils Campillo Purias.
– D-4 exit from Mazarrón direction Leiva y Morata.
– E-10 between Alhama y Costera road, around industrial area Las Salinas.
– RM-23 Km 0 to Km 0,25
– RM 303 Santomera- Alquerías Km 0,1 to 0,3
TRAIN: completely interrupted railway traffic on Lorca-Águilas & Lorca-La Hoya lines.
DRINKABLE WATER: Drinkable net serius damages around districts of Lorca and Puerto
Lumbreras: El Campillo, Almenara, Altobordo, La Escucha
PUERTO LUMBRERAS COMMUNITY HEALTH CENTER: it was moved to El Riscal Hotel, in the
same district.
PHONE: Interrupted in Puerto Lumbreras only 1 day (September 28th).