Long Term Financial Planning
Status Update & Long Term Planning
March 26th , 2014
1896-1996: a vision towards 2046
 Strategic plan review
 Harbour project
 Remediation review
 Harbour status
 Fee proposal review
 Survey results
 Moving forward
 Questions & Feedback
Agenda
Quick review
 Why did we start looking at expanding the
harbour as our first big project?
 Why are harbour/infrastructure remediation's
NOW being talked about?
 March 2011, Town Hall Meeting ….
Strategic Plan Review
Protect our investment
Give the Board Direction
 We need to plan over a longer time cycle than
typical board cycles
Repair our aging infrastructure
Leave the club better they we found it
 Ensure the legacy of KYC
Why do we need a plan?
March 2011
 Membership size
 Harbour
 Club House
 Facilities and Services
Main areas of concern
March 2011
A phased approach:
1. Ongoing Membership Growth and Retention
2. Dock at Jemmett’s Landing (2012)
3. Fuel Dock (2012)
4. Expand and enhance our Harbour (Spring 201?)
5. Harbour Remediation (future)
6. Saint’s Rest Renovation (future)
7. Clubhouse Renovation (future)
Phased Approach
March 2011
 Will provide an immediate growth in high value members
 Make the club more competitive and a viable alternative to
new members
 Provide significantly improved facilities for existing
members
 Based on a self-sustaining financial model
 Resulting membership growth facilitates subsequent
phases in plan
Harbour Project
Existing Conditions Report
 Professional evaluation of conditions
Allow for properly engineered solution options
Determine costs for necessary alteration
Required for loan application
 Board requested it be done for the complete harbour, not
just for areas affected by harbour project.
Harbour Project
Remediation
 Which aspects relate to Harbour Redevelopment?
 Center Pier (Reach D)
 East End of Breakwater
(portions of Reach A & B)
yyy
Condition: East Breakwall
yyy
East Breakwall
yyy
Sheet Pile (South Club Foundation
Centre Pier
From the engineer:
“Overall, the centre pier is in very poor condition. Sections
of the crib have collapsed and a loss of stone fill was
observed. Portions of the concrete cap along the lakeside
edges are no longer supported on the stone fill or timber
crib”
“Overall, the steel sheet pile wall is in poor condition”
“The timber crib that extends along the north sides of the
clubhouse is in very poor condition. Portions of the crib
have collapsed resulting in loss of stone fill”
“Overall the north wall is in very poor condition”
Remediation Summary
Remaining (as of January)
 Loan application (submitted February)
 Geotechnical analysis
 Completed works appraisal
 Finalize remediation design & engineering
 Finalize electrical design
 Prepare & issue RFP (harbour & remediation)
 Work with membership to establish sustainable fee structure
Harbour Redevelopment Status
Loan application prepared for harbour & initial
remediation
 Budgets
 Financial Information
 Business Model
Lender Response
 Club needs to contribute significantly more capital than available
 Club ability to service debt not sufficient under their terms
 Completed works assessment possibly not sufficient
Harbour Redevelopment Status
Current Status
 Loan application (rejected)
 Geotechnical analysis (on hold)
 Completed works appraisal (in progress)
 Finalize remediation design & engineering (on hold)
 Finalize electrical design (on hold)
 Prepare & issue RFP (harbour & remediation) (on hold)
 Work with membership to establish sustainable fee structure
(tonight!)
Harbour Redevelopment Status
Current Activities
 Evaluation of financial models with respect to fee changes,
membership growth that would enable harbour project,
remediation and remaining capital projects in the future
 Using borrowing parameters from our preferred lender
 Initial Result
 Remediation & harbour could begin in 2 years based on the
proposed fee changes taking effect asap.
Harbour Redevelopment Status
Fee Proposal
 Increase membership fees
 25% for 2015
 cost of living after that (~2.5%)
 Capital assessment
 of 16% of membership fees per year
 Grow membership
 Next 5 years:
 Associates by 10% per year
 Other categories by 2% per year
Proposed Fees
Type
Fees 2015
(2014 + 2.5%)
Fees 2015
(Required)
Capital
Assessment
(2015)
Family 831 1,000 160
Single 613 738 118
Corporate 1701 2,047 328
Associate 335 404 65
Assoc Nominee 125 151 24
Non Resident 202 243 0
Junior 85 102 0
What should fees look like in 2015?
Gauge membership response to Fee proposal
Try to engage as many members as possible
Calling campaign to target Associate members
to respond and participate
Help board develop proposals and make
informed decisions
Survey
155 Responses (42% response rate)
Continuing to collect data
Survey Results
0
20
40
60
80
100
120
140
160
180
Junior Non-Resident Associate Single Family Life
Total
Answered
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Survey Results (cont.)
Initiation Fees
Club
Membership Fees
(Family & Nominee)
Initiation Fees Percentage
PEYC $463.00 $1,200.00 259.18%
NSC $466.00 $200.00 42.92%
Cobourg YC $533.00
Brockville YC** $567.00 $500.00 88.18%
BQYC $585.00 $100.00 17.09%
EYC $605.00 $2,200.00 363.64%
BHYC $695.00 $750.00 107.91%
Clayton YC $700.00
OYS $710.00 $500.00 70.42%
KYC $810.00
Beaconsfield YC $820.00 $1,140.00 139.02%
Trident YC $944.00 $2,000.00 211.86%
Britannia YC $974.00
RHYC $1,120.00 $500.00 44.64%
MCC $1,256.00 $4,000.00 318.47%
ABYC $1,260.00 $1,500.00 119.05%
BCC $1,325.00 $3,000.00 226.42%
National YC $1,725.00 $2,500.00 144.93%
QCYC $1,855.00 $3,600.00 194.07%
PCYC $2,014.16 $2,500.00 124.12%
RCYC $3,986.94 $11,000.00 275.90%
IYC $4,553.00
80% of Lake Ontario
Club have Initiation
Fees.
Average:
157% of fees
Survey Results (cont.)
Survey Results (cont.)
0
5
10
15
20
25
30
35
Strongly
disagree
Disagree Neither
agree nor
disagree
Agree Strongly
agree
18-30
31-50
51-70
71+
Q16 The proposed fee increases will significantly deter
members from joining
(by Age)
Survey Results (cont.)
Survey Results (cont.)
0
5
10
15
20
25
30
35
No Unsure Yes
Associate
Family
Single
Survey Results (cont.)
Q18 If fees are raised as suggested, would you resign
your membership at KYC
(by Membership category)
Associates equally divided
 Associates are under-represented at meetings and in
survey
 Support for being proactive in capital planning
 Support for distributing cost across all members
 Proposed Fee?
 Evenly split on whether good value for money
 Price point may be too high or too risky
 Possible loss of members
 Associates more affected than Family or Single members
 No clear mandate from survey results
Conclusion?
We are already behind on past due capital investment
(~$4 Million, $8 Million if you include harbour and
clubhouse)
Current finances will not allow us to address harbour
project, current and future maintenance requirements
We will hit a crisis point in the near future where the
club viability will be on the line
What is the choice?
Membership Growth
Membership growth is crucial
 Distribute the costs over larger membership base
 Increased activity drives other revenue
Retention
 Ensure we are offering good value
Recruiting
What Happens Next?
Problem: Without an plan to increase our revenue, we will be unable to
tackle current and future infrastructure and capital requirements, and
we will not be able to move ahead with the Harbour project.
We need feedback from the membership.
 Survey to solicit feedback.
 2nd Town Hall Meeting: Present feedback and gather more input
 Survey Results Report & Financial Report for members
 3rd Town Hall Meeting: Round table format?
Goal: Membership approval for financial solution to maintain the long
term viability of the club and to be able to move forward with the
harbour project
Ongoing Feedback Options
• Survey to be made available shortly.
• E-mail: harbourquestions@kingstonyachtclub.ca
• Web: www.kingstonyachtclub.ca/newharbour
Getting your input
KYC - Long Term Financial Planing - Town Hall 2014-03-26

Mais conteúdo relacionado

Destaque

Strategic Plan Presentation AGM 2011
Strategic Plan Presentation AGM 2011Strategic Plan Presentation AGM 2011
Strategic Plan Presentation AGM 2011kingstonyc
 
Ch03 - Organisation theory design and change gareth jones
Ch03 - Organisation theory design and change gareth jonesCh03 - Organisation theory design and change gareth jones
Ch03 - Organisation theory design and change gareth jonesAnkit Kesri
 
Ch02 - Organisation theory design and change gareth jones
Ch02 - Organisation theory design and change gareth jonesCh02 - Organisation theory design and change gareth jones
Ch02 - Organisation theory design and change gareth jonesAnkit Kesri
 
Ch01 - Organisation theory design and change gareth jones
Ch01 - Organisation theory design and change gareth jonesCh01 - Organisation theory design and change gareth jones
Ch01 - Organisation theory design and change gareth jonesAnkit Kesri
 
INTRODUCTION TO FINANCIAL PLANNING
INTRODUCTION TO FINANCIAL PLANNINGINTRODUCTION TO FINANCIAL PLANNING
INTRODUCTION TO FINANCIAL PLANNINGDIANN MOORMAN
 
Workplace Accountability: How Effective Managers Create a Culture of Ownership
Workplace Accountability: How Effective Managers Create a Culture of OwnershipWorkplace Accountability: How Effective Managers Create a Culture of Ownership
Workplace Accountability: How Effective Managers Create a Culture of OwnershipThe Business LockerRoom
 

Destaque (7)

Strategic Plan Presentation AGM 2011
Strategic Plan Presentation AGM 2011Strategic Plan Presentation AGM 2011
Strategic Plan Presentation AGM 2011
 
Financial Plan
Financial PlanFinancial Plan
Financial Plan
 
Ch03 - Organisation theory design and change gareth jones
Ch03 - Organisation theory design and change gareth jonesCh03 - Organisation theory design and change gareth jones
Ch03 - Organisation theory design and change gareth jones
 
Ch02 - Organisation theory design and change gareth jones
Ch02 - Organisation theory design and change gareth jonesCh02 - Organisation theory design and change gareth jones
Ch02 - Organisation theory design and change gareth jones
 
Ch01 - Organisation theory design and change gareth jones
Ch01 - Organisation theory design and change gareth jonesCh01 - Organisation theory design and change gareth jones
Ch01 - Organisation theory design and change gareth jones
 
INTRODUCTION TO FINANCIAL PLANNING
INTRODUCTION TO FINANCIAL PLANNINGINTRODUCTION TO FINANCIAL PLANNING
INTRODUCTION TO FINANCIAL PLANNING
 
Workplace Accountability: How Effective Managers Create a Culture of Ownership
Workplace Accountability: How Effective Managers Create a Culture of OwnershipWorkplace Accountability: How Effective Managers Create a Culture of Ownership
Workplace Accountability: How Effective Managers Create a Culture of Ownership
 

Semelhante a KYC - Long Term Financial Planing - Town Hall 2014-03-26

KYC Harbour Redevelopment - Town Hall No 2 Presentation
KYC	Harbour Redevelopment - Town Hall No 2 PresentationKYC	Harbour Redevelopment - Town Hall No 2 Presentation
KYC Harbour Redevelopment - Town Hall No 2 Presentationkingstonyc
 
KYC Harbour Redevelopment - Town Hall No 1 Presentation
KYC	Harbour Redevelopment - Town Hall No 1 PresentationKYC	Harbour Redevelopment - Town Hall No 1 Presentation
KYC Harbour Redevelopment - Town Hall No 1 Presentationkingstonyc
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Kyc strategic plan speaker series march 23 2011
Kyc strategic plan   speaker series march 23 2011Kyc strategic plan   speaker series march 23 2011
Kyc strategic plan speaker series march 23 2011kingstonyc
 
Diane rutter notts consortium presentation 30 june 2010 v2
Diane rutter notts consortium presentation 30 june 2010 v2Diane rutter notts consortium presentation 30 june 2010 v2
Diane rutter notts consortium presentation 30 june 2010 v2DianeRutter
 
Nov 4 2013 meeting
Nov 4 2013 meetingNov 4 2013 meeting
Nov 4 2013 meetingacclwv
 
Financial Sustainability at UC Davis
Financial Sustainability at UC DavisFinancial Sustainability at UC Davis
Financial Sustainability at UC Davisucdavisarm
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedSightlines
 
Fit for the future social groups 230215
Fit for the future social groups 230215Fit for the future social groups 230215
Fit for the future social groups 230215JessicaBBC
 
Helping DB member make better decisions
Helping DB member make better decisionsHelping DB member make better decisions
Helping DB member make better decisionsHenry Tapper
 
Action Items to Prepare for 2015 Proxy Season
Action Items to Prepare for 2015 Proxy SeasonAction Items to Prepare for 2015 Proxy Season
Action Items to Prepare for 2015 Proxy SeasonWinston & Strawn LLP
 
2015 Gold & Silver Plate Committee Plan
2015 Gold & Silver Plate Committee Plan2015 Gold & Silver Plate Committee Plan
2015 Gold & Silver Plate Committee Planifmaworld
 
042608 Town Hall Meeting
042608 Town Hall Meeting042608 Town Hall Meeting
042608 Town Hall Meetingbcpoa
 
Funding our future community presentation
Funding our future community presentationFunding our future community presentation
Funding our future community presentationmaitlandyoursay
 
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Sightlines
 
Revitalizing CES Membership
Revitalizing CES Membership Revitalizing CES Membership
Revitalizing CES Membership CesToronto
 

Semelhante a KYC - Long Term Financial Planing - Town Hall 2014-03-26 (20)

KYC Harbour Redevelopment - Town Hall No 2 Presentation
KYC	Harbour Redevelopment - Town Hall No 2 PresentationKYC	Harbour Redevelopment - Town Hall No 2 Presentation
KYC Harbour Redevelopment - Town Hall No 2 Presentation
 
KYC Harbour Redevelopment - Town Hall No 1 Presentation
KYC	Harbour Redevelopment - Town Hall No 1 PresentationKYC	Harbour Redevelopment - Town Hall No 1 Presentation
KYC Harbour Redevelopment - Town Hall No 1 Presentation
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Kyc strategic plan speaker series march 23 2011
Kyc strategic plan   speaker series march 23 2011Kyc strategic plan   speaker series march 23 2011
Kyc strategic plan speaker series march 23 2011
 
Diane rutter notts consortium presentation 30 june 2010 v2
Diane rutter notts consortium presentation 30 june 2010 v2Diane rutter notts consortium presentation 30 june 2010 v2
Diane rutter notts consortium presentation 30 june 2010 v2
 
Nov 4 2013 meeting
Nov 4 2013 meetingNov 4 2013 meeting
Nov 4 2013 meeting
 
Financial Sustainability at UC Davis
Financial Sustainability at UC DavisFinancial Sustainability at UC Davis
Financial Sustainability at UC Davis
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be Managed
 
May 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forumMay 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forum
 
Fit for the future social groups 230215
Fit for the future social groups 230215Fit for the future social groups 230215
Fit for the future social groups 230215
 
Helping DB member make better decisions
Helping DB member make better decisionsHelping DB member make better decisions
Helping DB member make better decisions
 
Action Items to Prepare for 2015 Proxy Season
Action Items to Prepare for 2015 Proxy SeasonAction Items to Prepare for 2015 Proxy Season
Action Items to Prepare for 2015 Proxy Season
 
2015 Gold & Silver Plate Committee Plan
2015 Gold & Silver Plate Committee Plan2015 Gold & Silver Plate Committee Plan
2015 Gold & Silver Plate Committee Plan
 
Fy2008 Budget
Fy2008 BudgetFy2008 Budget
Fy2008 Budget
 
042608 Town Hall Meeting
042608 Town Hall Meeting042608 Town Hall Meeting
042608 Town Hall Meeting
 
IYRE Consultants Breakfast 14 September
IYRE Consultants Breakfast 14 SeptemberIYRE Consultants Breakfast 14 September
IYRE Consultants Breakfast 14 September
 
Funding our future community presentation
Funding our future community presentationFunding our future community presentation
Funding our future community presentation
 
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...
 
Revitalizing CES Membership
Revitalizing CES Membership Revitalizing CES Membership
Revitalizing CES Membership
 

KYC - Long Term Financial Planing - Town Hall 2014-03-26

  • 1. Long Term Financial Planning Status Update & Long Term Planning March 26th , 2014 1896-1996: a vision towards 2046
  • 2.  Strategic plan review  Harbour project  Remediation review  Harbour status  Fee proposal review  Survey results  Moving forward  Questions & Feedback Agenda
  • 3. Quick review  Why did we start looking at expanding the harbour as our first big project?  Why are harbour/infrastructure remediation's NOW being talked about?  March 2011, Town Hall Meeting …. Strategic Plan Review
  • 4. Protect our investment Give the Board Direction  We need to plan over a longer time cycle than typical board cycles Repair our aging infrastructure Leave the club better they we found it  Ensure the legacy of KYC Why do we need a plan? March 2011
  • 5.  Membership size  Harbour  Club House  Facilities and Services Main areas of concern March 2011
  • 6. A phased approach: 1. Ongoing Membership Growth and Retention 2. Dock at Jemmett’s Landing (2012) 3. Fuel Dock (2012) 4. Expand and enhance our Harbour (Spring 201?) 5. Harbour Remediation (future) 6. Saint’s Rest Renovation (future) 7. Clubhouse Renovation (future) Phased Approach March 2011
  • 7.  Will provide an immediate growth in high value members  Make the club more competitive and a viable alternative to new members  Provide significantly improved facilities for existing members  Based on a self-sustaining financial model  Resulting membership growth facilitates subsequent phases in plan Harbour Project
  • 8. Existing Conditions Report  Professional evaluation of conditions Allow for properly engineered solution options Determine costs for necessary alteration Required for loan application  Board requested it be done for the complete harbour, not just for areas affected by harbour project. Harbour Project
  • 9. Remediation  Which aspects relate to Harbour Redevelopment?  Center Pier (Reach D)  East End of Breakwater (portions of Reach A & B)
  • 12. yyy Sheet Pile (South Club Foundation
  • 14. From the engineer: “Overall, the centre pier is in very poor condition. Sections of the crib have collapsed and a loss of stone fill was observed. Portions of the concrete cap along the lakeside edges are no longer supported on the stone fill or timber crib” “Overall, the steel sheet pile wall is in poor condition” “The timber crib that extends along the north sides of the clubhouse is in very poor condition. Portions of the crib have collapsed resulting in loss of stone fill” “Overall the north wall is in very poor condition” Remediation Summary
  • 15. Remaining (as of January)  Loan application (submitted February)  Geotechnical analysis  Completed works appraisal  Finalize remediation design & engineering  Finalize electrical design  Prepare & issue RFP (harbour & remediation)  Work with membership to establish sustainable fee structure Harbour Redevelopment Status
  • 16. Loan application prepared for harbour & initial remediation  Budgets  Financial Information  Business Model Lender Response  Club needs to contribute significantly more capital than available  Club ability to service debt not sufficient under their terms  Completed works assessment possibly not sufficient Harbour Redevelopment Status
  • 17. Current Status  Loan application (rejected)  Geotechnical analysis (on hold)  Completed works appraisal (in progress)  Finalize remediation design & engineering (on hold)  Finalize electrical design (on hold)  Prepare & issue RFP (harbour & remediation) (on hold)  Work with membership to establish sustainable fee structure (tonight!) Harbour Redevelopment Status
  • 18. Current Activities  Evaluation of financial models with respect to fee changes, membership growth that would enable harbour project, remediation and remaining capital projects in the future  Using borrowing parameters from our preferred lender  Initial Result  Remediation & harbour could begin in 2 years based on the proposed fee changes taking effect asap. Harbour Redevelopment Status
  • 19. Fee Proposal  Increase membership fees  25% for 2015  cost of living after that (~2.5%)  Capital assessment  of 16% of membership fees per year  Grow membership  Next 5 years:  Associates by 10% per year  Other categories by 2% per year
  • 20. Proposed Fees Type Fees 2015 (2014 + 2.5%) Fees 2015 (Required) Capital Assessment (2015) Family 831 1,000 160 Single 613 738 118 Corporate 1701 2,047 328 Associate 335 404 65 Assoc Nominee 125 151 24 Non Resident 202 243 0 Junior 85 102 0 What should fees look like in 2015?
  • 21. Gauge membership response to Fee proposal Try to engage as many members as possible Calling campaign to target Associate members to respond and participate Help board develop proposals and make informed decisions Survey
  • 22. 155 Responses (42% response rate) Continuing to collect data Survey Results 0 20 40 60 80 100 120 140 160 180 Junior Non-Resident Associate Single Family Life Total Answered
  • 31. Initiation Fees Club Membership Fees (Family & Nominee) Initiation Fees Percentage PEYC $463.00 $1,200.00 259.18% NSC $466.00 $200.00 42.92% Cobourg YC $533.00 Brockville YC** $567.00 $500.00 88.18% BQYC $585.00 $100.00 17.09% EYC $605.00 $2,200.00 363.64% BHYC $695.00 $750.00 107.91% Clayton YC $700.00 OYS $710.00 $500.00 70.42% KYC $810.00 Beaconsfield YC $820.00 $1,140.00 139.02% Trident YC $944.00 $2,000.00 211.86% Britannia YC $974.00 RHYC $1,120.00 $500.00 44.64% MCC $1,256.00 $4,000.00 318.47% ABYC $1,260.00 $1,500.00 119.05% BCC $1,325.00 $3,000.00 226.42% National YC $1,725.00 $2,500.00 144.93% QCYC $1,855.00 $3,600.00 194.07% PCYC $2,014.16 $2,500.00 124.12% RCYC $3,986.94 $11,000.00 275.90% IYC $4,553.00 80% of Lake Ontario Club have Initiation Fees. Average: 157% of fees
  • 33. Survey Results (cont.) 0 5 10 15 20 25 30 35 Strongly disagree Disagree Neither agree nor disagree Agree Strongly agree 18-30 31-50 51-70 71+ Q16 The proposed fee increases will significantly deter members from joining (by Age)
  • 36. 0 5 10 15 20 25 30 35 No Unsure Yes Associate Family Single Survey Results (cont.) Q18 If fees are raised as suggested, would you resign your membership at KYC (by Membership category) Associates equally divided
  • 37.  Associates are under-represented at meetings and in survey  Support for being proactive in capital planning  Support for distributing cost across all members  Proposed Fee?  Evenly split on whether good value for money  Price point may be too high or too risky  Possible loss of members  Associates more affected than Family or Single members  No clear mandate from survey results Conclusion?
  • 38. We are already behind on past due capital investment (~$4 Million, $8 Million if you include harbour and clubhouse) Current finances will not allow us to address harbour project, current and future maintenance requirements We will hit a crisis point in the near future where the club viability will be on the line What is the choice?
  • 39. Membership Growth Membership growth is crucial  Distribute the costs over larger membership base  Increased activity drives other revenue Retention  Ensure we are offering good value Recruiting
  • 40. What Happens Next? Problem: Without an plan to increase our revenue, we will be unable to tackle current and future infrastructure and capital requirements, and we will not be able to move ahead with the Harbour project. We need feedback from the membership.  Survey to solicit feedback.  2nd Town Hall Meeting: Present feedback and gather more input  Survey Results Report & Financial Report for members  3rd Town Hall Meeting: Round table format? Goal: Membership approval for financial solution to maintain the long term viability of the club and to be able to move forward with the harbour project
  • 41. Ongoing Feedback Options • Survey to be made available shortly. • E-mail: harbourquestions@kingstonyachtclub.ca • Web: www.kingstonyachtclub.ca/newharbour Getting your input

Notas do Editor

  1. We are losing members because of facilitiesSome people wont come until the harbour is updated
  2. First time we know everythingPast repairs ad hoc with unknown lifespansNow, 50 year solutionsEngineer highly recommended partial remediation
  3. Informally, we knew work would be neededReport indicates that the work is needed sooner that laterSome work is highly recommended to be done with or before the harbour project
  4. 250+ Page submissionAssumption that fee structure change in place.$2.45M loan requestNeed significantly more cash to put into project
  5. Other lending opportunities available at less desirable rates/terms
  6. We have developed a model as a starting point for discussionThis would probably get us on a good footing to be able to manage both operations and sustainable infrastructure
  7. Capital assessment is at 16%Other club are facing similar problemsCould be paid monthly or quartly, - Could be phased in. but let’s start here
  8. Associate Straw pollOverall 42% response rateAssociate = 31%Single = 58%Family = 60%Life = 44%
  9. Associate Straw pollOverall 42% response rateAssociate = 31%Single = 58%Family = 60%Life = 44%
  10. Leave out?
  11. Have 26 names on our list of potential slip holdersOther includes some who are interested depending on conditionsAbility to fit boat, etc.
  12. Move Unsure to centre or make pie
  13. Move Unsure to centre or make pie
  14. Membership Growth Recruitment
  15. Harbour project is critical in our financial modelling Without the boost in membership this brings along, we have bigger financial challenges.Membership Growth Recruitment- Find membersEngage associates
  16. [Need to prepare people that we want to ask them to approve something so we can move ahead with Harbour and with a long term plan]We are looking at other avenues for money (grants, etc.)
  17. Straw Poll questions:- Do you feel you have enough sufficient information about what I’ve spoken about?If not, what are you interested in knowing more about?Financial status and models