The Journey towards Asset Management
24 July 2014
 Strategic alignment
 Shared vision
 Strategic partnerships
 Balanced scorecard
 BIMS
 ISO 55000
The Destination
Definition
 “A set of coordinated activities that an organisation uses to realise value from
assets in the delivery of its outcomes or objectives. Realisation of value requires
the achievement of a balance of costs, risks and benefits over different time
scales.”
(Draft ISO 55000 - Asset Management)
Drivers behind rising Asset Management
awareness
 The rising profile of whole of life costs e.g. PPPs
 Statutory obligations – obligations for government bodies to have an asset
management plan
 The rising cost and scarcity of money
 Risk management
 Value for money principals
 PAS55/ ISO55000
 Industry benchmarks e.g. TEFMA
Asset Management Benefits
 Optimised financial performance
 Managed risk
 Improved services and outputs
 Corporate / social responsibility
 Demonstrated compliance
 Enhanced reputation
 Improved organisational stability
Regressive
Reactive
Planned
Proactive
Don’t fix it
Fix it after it
breaks
Fix it before it
breaks
Don’t just fix it,
improve it
• Minimise Defects
• Improve Precision
• Redesign
• Value Focus
• Reliability Centred
Maintenance
• 3-5 Year Fixed
Price Contracts
• Asset Management
Plans
• Capital Works
Handover Processes
• Forward Works Plans
• Cmms
• Predict/Plan
• Condition Monitoring
• Critical Spares
• Centralised Control
• Kpis
• Fixed Prices &
Schedule Of Rates
Contracts
Efficiency
Excellence
Capability
• BIMs
• ISO 55000
• Strategic Alignment
• Shared Vision
• Balanced Scorecard
• Strategic Partnerships
• Asset Management Excellence Audit
Sample.Pdf
• XXXX Audit Report July 2014.Pdf
• Respond To
Unusual Energy
Consumption
• Tri- Certification
• Compliance
• Run To Fail
• Approved Lists
• Schedule Of Rates
Contracts
The Asset Management Excellence Journey
The Other End of The Spectrum
The Other End of The Spectrum
The Other End of The Spectrum
The Other End of The Spectrum
The Other End of The Spectrum
EFFECTIVE LIFE
REPLACE
PROGRESSIVE (ACCRUED)
COST OF FACILITY
CASH FLOW
OF ASSETS
CREATE MAINTAIN DISPOSALREFURBISH
0 100%
VALUE/COSTS
(REALTERMS)
Comparison of gas fired heating versus electric
heating for student accommodation on ‘brown
field site’
Gas Item Electric
Capital cost of construction
Capital cost of life cycle works
Maintenance costs
Impact of utilities costs over time
Robustness
- Relatively High
- Medium
- Relatively Low
Funding Challenges for Planned Maintenance
and Lifecycle Replacement Works
 The consequences of under-spending is unlikely to be immediately apparent to the
customer.
 Non-core business requirements are valued less highly than core business needs.
 If the assets appear to be performing within the parameters that the customer expects
of them, it can be difficult for these customers to perceive a need for major
expenditure.
 Assets that are performing inefficiently, either due to inadequate maintenance or from
having been retained in service beyond their economic life, often deteriorate
gradually.
Common approaches to Lifecycle Estimating
 Fixed % of value per annum
 Squeaky wheel
 What did we spend last year?
Advantages
 Predictable budgets
 Transparent calculation methodology
 Fully auditable
 Consistent approach
Disadvantages
Availability of funds = Backlog maintenance issues =
Reliability of assets + Responsive repair costs +
Unscheduled service interruptions +
VALUE FOR MONEY!!!
Incidences of premature asset failure =
Does not reflect reality =
 No direct link between estimated lifecycle costs and actual performance of assets.
 Estimated lifecycle costs assume external factors do not impact lifecycle.
Disadvantages
6TH MARCH 2010
… the world is changing …
… the world is changing…
… the world is changing…
… the world is changing…
… the world is changing…
… the world is changing…
… the world is changing…
… the world is changing…
… the world is changing…
Typical 25-year Life Cycle Cost Model
0
2
4
6
8
10
12
14
16
0
0.5
1
1.5
2
2.5
3
3.5
4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
$(m)$(m)
Year
Typical Lifecycle Cost Model - 25 Year
Annual
Lifecycle
Cumulative
Cost of Service
Quality
Condition
Optimal Life Cycle Costs
EXCELLENT
POOR TIME
ORIGINAL DECAY OPTIMAL
CONDITION
BAND
OPTIMAL RENEWAL
STRATEGY
Asset Condition Survey Methodology
Case Study One
Supported State Housing Department
 > 500 properties supported living units
 Located throughout Victoria
 Lifecycle & maintenance funding = $7,000 p.a. / property
 Substantial back log maintenance issues
 Establishing business case for asset replacement was challenging
Typical Life Cycle Cost Model- 60 Years
$-
$-
$-
$-
$-
$7,613.98
$6,077.37
$-
$-
$3,257.17
$-
$8,530.08
$-
$7,694.25
$46,963.86
$-
$7,613.98
$6,686.92
$-
$70,559.61
$6,077.37
$-
$7,613.98
$916.10
$767.72
$-
$-
$15,308.22
$-
$131,891.34
$-
$-
$-
$7,613.98
$92,189.22
$916.10
$-
$1,693.50
$-
$96,869.83
$-
$7,694.25
$-
$-
$54,577.83
$-
$-
$916.10
$6,077.37
$145,834.64
$7,613.98
$-
$-
$-
$-
$112.32
$-
$-
$-
$82,626.41
$-
$20,000.00
$40,000.00
$60,000.00
$80,000.00
$100,000.00
$120,000.00
$140,000.00
$160,000.00
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59
Years
Dollars$(AUD)
Annual spend in $ (AUD)
Supported State Housing Department (cont’d)
 Typical lifecycle profile for all properties identified
 Point at which assets were ‘technically dilapidated’ identified
 Lifecycle & maintenance funding increased to $24,000 p.a./ property
 Business case for asset replacement established
Supported State Housing Department (cont’d)
Case Study Two
Country Base Hospital
 Decision taken to consolidate services at two hospitals
 Management of hospital to be transferred between two state health departments
 Initial period - 5 years
 Lifecycle liability of infrastructure & biomedical assets to be agreed at the point of
transfer
 Basis of joint funding for lifecycle liability to be agreed
 Lifecycle liability of infrastructure and biomedical assets for next five years was
established
 All assets scheduled for replacement were risk ranked
 Both parties agreed sum for lifecycle replacement works for extreme and high risk
assets
 Tool provided a robust, transparent and equitable basis for mutually agreeing funding
levels
Country Base Hospital (cont’d)
The Asset Management Process
BIMS
The risk profile varies from organisation to
organisation…
Low Accuracy of Asset Lists High
Risk ranking of assetsLow High
Reliability Centered MaintenanceLow High
ISO: 55000 alignmentLow High
Benchmarking/ Trend AnalysisLow High
Whole of life cost managementLow High
Reliability
Strategic AlignmentLow High
- Outside Toilet
- Core business equipment
Tailoring Asset Management to Your Business Needs
Strategic Asset Management
• Formulate Business Plan for Board Sign Off
• Commercial Planning and Outcomes
• Determine Stakeholder Needs and Engagement
• Analyse and Benchmark Assets
• Undertake Due Diligence
• Value Engineering
• Service Level Agreement Design
• Re-procurement of Service
• Shape Economies of Scale
• Supplier Development Plan
• Manage Operations
• Audit and Reporting
• Measure and Improvement Program
• Customer Satisfaction Evaluation
Operational
Tactical
Strategic
Key to an effective asset list
 A standardised approach to naming conventions
 Standardised naming conventions applied to all assets
 Naming convention typically follow published naming principles e.g. BCIS
 QA controlled master list of assets
 A ‘single source of truth’
 Standardised approach to asset list inclusions e.g. > $1,000 in value and/ or requiring
planned maintenance interventions
 Assets <$1,000 in value are typically bundled e.g. RCD’s, fire equipment etc.
 Include replacement value and date of installation
 Sub- divide entire portfolio into logical and appropriate areas
Asset Hierarchy Development (BL 23-04-14).xlsx
CMMS
The Asset Management Process
CMMS Features
Reliability Centred Maintenance (RCM)
Reliability Centred Maintenance
 Identify major asset with unusual failure patterns (e.g. desalination pump)
 Sub- divide asset into composite assets (e.g. impellers, electric motor, etc.)
 Identify nature and consequences of composite asset failures
 Undertake a root cause analysis of each failure
 Identify remedial works required (e.g. repairs and modifications)
 Undertake a Cost Benefit Analysis re: remedial works required and implement as
appropriate
 Budget for and implement a planned maintenance regime to mitigate issues going
forward
 Identify training needs and implement
 Identify documentation needs and implement
Root Cause Analysis
0
500
1000
1500
2000
2500
3000
3500
Site 1 Site 2 Site 3 Site 4 Site 5
MTBF
(hr)
Location
Mean Time Between Failure - Pumps - Site Comparison
Average
0
500
1000
1500
2000
2500
3000
3500
4000
4500
0 1 2 3 4 5 6 7 8 9 10
No of Pumps
(8284)
Annual Failures
Annual No of Failures by Pump - Frequency Analysis
Root Cause Analysis
0%
5%
10%
15%
20%
25%
30%
35%
5 10 15 20 25 30
% of Pump
Population
Years in Service
Pump - Residual Life Analysis
Design Life
Root Cause Analysis
Pump Failure - Root Cause Breakdown
Lack of Lubrication
Operator Error
Dilapidated
Blocked
Wear and tear
Corrosion
Utility supply
Vandalism
 Revise Planned Maintenance – Increase Lubrication Frequency
 Training Program to Educate Site Operators
 Review Capital Expenditure Program and Undertake Lifecycle Analysis
Root Cause Analysis
ISO 55000 - Background
 A new International Standard released in early 2014
 Based on PAS 55
 Consultation with > 30 countries including Australia
 Government clients are mandating this Standard e.g. QLD Health & Federal
Government
 Incentivises a risk based, standardised and consistent approach to asset
management
ISO 55000 - Features and Benefits
 Asset management policy encourages strategic alignment with core business
 Risk based approach
 By focusing on critical assets, expenditure is prioritised
 Introduces best practice
 Facilitates a proactive approach to asset management
 Facilitates effective benchmarking
 Supports probity and transparency
Begin with the end in mind
 Future proof by design
 Source locally where possible
 Ensure key components, systems and sub- systems are backed by guarantees and
warrantees
 Maximise local skills and materials
 Avoid locating plant on roof
 Construct plant rooms before plant has been installed
 Consider maintenance access to high level architectural features e.g. glazed atriums.
 Ensure metering supports future flexible usage of spaces
 Always ensure service access to plant
 “Black Start” test entire facility prior to handover
 Make receipt of O&M manuals a ‘condition precedent’ of practical completion
Questions

More Related Content

What's hot

EMS 14001:2015 Awareness and Auditor Training Presentation
EMS 14001:2015 Awareness and Auditor Training  PresentationEMS 14001:2015 Awareness and Auditor Training  Presentation
EMS 14001:2015 Awareness and Auditor Training PresentationCertification Consultant
 
How to build an integrated and actionable IT Service Catalog
How to build an integrated and actionable IT Service CatalogHow to build an integrated and actionable IT Service Catalog
How to build an integrated and actionable IT Service Catalogmboyle
 
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...himalya sharma
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyLife Cycle Engineering
 
Service Management PowerPoint Presentation Slides
Service Management PowerPoint Presentation SlidesService Management PowerPoint Presentation Slides
Service Management PowerPoint Presentation SlidesSlideTeam
 
Audit iso 9001-2015-checklist-
Audit iso 9001-2015-checklist-Audit iso 9001-2015-checklist-
Audit iso 9001-2015-checklist-Anand Vedpathak
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagmentRAKESH SINGH
 
Asset management
Asset managementAsset management
Asset managementrob coulson
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistCinthiia Akamii
 
Introduction - Supplier governance
Introduction - Supplier governance Introduction - Supplier governance
Introduction - Supplier governance Chetan Jain
 
The how, why and what of ITIL® certifications
The how, why and what of ITIL® certificationsThe how, why and what of ITIL® certifications
The how, why and what of ITIL® certificationsLora Beros
 
Developing an EMS and ISO 14001:2015 and Life Cycle Perspective
Developing an EMS and ISO 14001:2015 and Life Cycle PerspectiveDeveloping an EMS and ISO 14001:2015 and Life Cycle Perspective
Developing an EMS and ISO 14001:2015 and Life Cycle PerspectiveJames Charles, PE, CPG
 
More on ITIL 4. The Conversation Continues
More on ITIL 4. The Conversation ContinuesMore on ITIL 4. The Conversation Continues
More on ITIL 4. The Conversation ContinuesITSM Academy, Inc.
 
Implementing Asset Management System with ISO 55001
Implementing Asset Management System with ISO 55001Implementing Asset Management System with ISO 55001
Implementing Asset Management System with ISO 55001PECB
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Interested party matrix - ISO 14001:2015
Interested party matrix - ISO 14001:2015Interested party matrix - ISO 14001:2015
Interested party matrix - ISO 14001:2015James Charles, PE, CPG
 

What's hot (20)

Managing ISO Certification Audits
Managing ISO Certification AuditsManaging ISO Certification Audits
Managing ISO Certification Audits
 
EMS 14001:2015 Awareness and Auditor Training Presentation
EMS 14001:2015 Awareness and Auditor Training  PresentationEMS 14001:2015 Awareness and Auditor Training  Presentation
EMS 14001:2015 Awareness and Auditor Training Presentation
 
How to build an integrated and actionable IT Service Catalog
How to build an integrated and actionable IT Service CatalogHow to build an integrated and actionable IT Service Catalog
How to build an integrated and actionable IT Service Catalog
 
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
IMS training | IMS internal auditor training | QHSE | QHSE INTERNAL AUDITOR T...
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
ISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management PolicyISO 55000 for Leaders: Developing an Asset Management Policy
ISO 55000 for Leaders: Developing an Asset Management Policy
 
Service Management PowerPoint Presentation Slides
Service Management PowerPoint Presentation SlidesService Management PowerPoint Presentation Slides
Service Management PowerPoint Presentation Slides
 
Audit iso 9001-2015-checklist-
Audit iso 9001-2015-checklist-Audit iso 9001-2015-checklist-
Audit iso 9001-2015-checklist-
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagment
 
Asset management
Asset managementAsset management
Asset management
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklist
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
Introduction - Supplier governance
Introduction - Supplier governance Introduction - Supplier governance
Introduction - Supplier governance
 
The how, why and what of ITIL® certifications
The how, why and what of ITIL® certificationsThe how, why and what of ITIL® certifications
The how, why and what of ITIL® certifications
 
Iso9001 2015
Iso9001 2015Iso9001 2015
Iso9001 2015
 
Developing an EMS and ISO 14001:2015 and Life Cycle Perspective
Developing an EMS and ISO 14001:2015 and Life Cycle PerspectiveDeveloping an EMS and ISO 14001:2015 and Life Cycle Perspective
Developing an EMS and ISO 14001:2015 and Life Cycle Perspective
 
More on ITIL 4. The Conversation Continues
More on ITIL 4. The Conversation ContinuesMore on ITIL 4. The Conversation Continues
More on ITIL 4. The Conversation Continues
 
Implementing Asset Management System with ISO 55001
Implementing Asset Management System with ISO 55001Implementing Asset Management System with ISO 55001
Implementing Asset Management System with ISO 55001
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Interested party matrix - ISO 14001:2015
Interested party matrix - ISO 14001:2015Interested party matrix - ISO 14001:2015
Interested party matrix - ISO 14001:2015
 

Viewers also liked (11)

Small Business Investment (Angel) Tax Credit
Small Business Investment (Angel) Tax CreditSmall Business Investment (Angel) Tax Credit
Small Business Investment (Angel) Tax Credit
 
Islam
IslamIslam
Islam
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry
 
Ethical Considerations for Christian Mental Health Clinicians
Ethical Considerations for Christian Mental Health CliniciansEthical Considerations for Christian Mental Health Clinicians
Ethical Considerations for Christian Mental Health Clinicians
 
Online Ethical Considerations for Mental Health Clinicians
Online Ethical Considerations for Mental Health CliniciansOnline Ethical Considerations for Mental Health Clinicians
Online Ethical Considerations for Mental Health Clinicians
 
Avoiding Common Security Breaches & HIPAA Violations
Avoiding Common Security Breaches & HIPAA ViolationsAvoiding Common Security Breaches & HIPAA Violations
Avoiding Common Security Breaches & HIPAA Violations
 
Mental health ppt.
Mental health ppt.Mental health ppt.
Mental health ppt.
 
Understanding Mental Health and Mental Illness
Understanding Mental Health and Mental IllnessUnderstanding Mental Health and Mental Illness
Understanding Mental Health and Mental Illness
 
Types of investment
Types of investmentTypes of investment
Types of investment
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
An introduction to investment
An introduction to investmentAn introduction to investment
An introduction to investment
 

Similar to The Journey Towards Asset Management Excellence

Revenue Resilience in Water & Sewer Industry
Revenue Resilience in Water & Sewer IndustryRevenue Resilience in Water & Sewer Industry
Revenue Resilience in Water & Sewer IndustryPublicFinanceTV
 
3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmtssusereb347d
 
Business value – the esg imperative
Business value – the esg imperativeBusiness value – the esg imperative
Business value – the esg imperativeNoel Purcell
 
Activity based management (theory)
Activity based management (theory)Activity based management (theory)
Activity based management (theory)Ivan Shamaev
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"ARMS Reliability
 
Savannah memorial rf success ap44
Savannah memorial rf success ap44Savannah memorial rf success ap44
Savannah memorial rf success ap44lponssa
 
Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesSlideTeam
 
Derisking energy efficiency project investment
Derisking energy efficiency project investmentDerisking energy efficiency project investment
Derisking energy efficiency project investmentSteven Fawkes
 
IAM conference: asset vs portfolio modelling
IAM conference: asset vs portfolio modelling IAM conference: asset vs portfolio modelling
IAM conference: asset vs portfolio modelling seamsltd
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteAssociation for Project Management
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to SavingsSwapnil Sharma
 
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLAN
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLANVALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLAN
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLANiQHub
 
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.DQS Inc.
 
Ethiopia-D2S1-cross-cutting-measurement-issues.pptx
Ethiopia-D2S1-cross-cutting-measurement-issues.pptxEthiopia-D2S1-cross-cutting-measurement-issues.pptx
Ethiopia-D2S1-cross-cutting-measurement-issues.pptxGereTassewN
 
Presentation .ISB Service Science Workshop on New Value Metrics
Presentation .ISB Service Science Workshop on New Value MetricsPresentation .ISB Service Science Workshop on New Value Metrics
Presentation .ISB Service Science Workshop on New Value MetricsHabeeb Mahaboob
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityDiana Nash
 
Features of Successful Inclining Block Water Conservation Rate Structures
Features of Successful Inclining Block Water Conservation Rate StructuresFeatures of Successful Inclining Block Water Conservation Rate Structures
Features of Successful Inclining Block Water Conservation Rate StructuresThe Texas Network, LLC
 

Similar to The Journey Towards Asset Management Excellence (20)

Life cycle costing
Life cycle costingLife cycle costing
Life cycle costing
 
Managing Generation Assets
Managing Generation AssetsManaging Generation Assets
Managing Generation Assets
 
Revenue Resilience in Water & Sewer Industry
Revenue Resilience in Water & Sewer IndustryRevenue Resilience in Water & Sewer Industry
Revenue Resilience in Water & Sewer Industry
 
3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt3. Process: ocp cfops lifecycle and financial mgmt
3. Process: ocp cfops lifecycle and financial mgmt
 
Business value – the esg imperative
Business value – the esg imperativeBusiness value – the esg imperative
Business value – the esg imperative
 
Activity based management (theory)
Activity based management (theory)Activity based management (theory)
Activity based management (theory)
 
How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"How to Instill a Culture of Reliability - "The Big Bang"
How to Instill a Culture of Reliability - "The Big Bang"
 
Savannah memorial rf success ap44
Savannah memorial rf success ap44Savannah memorial rf success ap44
Savannah memorial rf success ap44
 
Example Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation SlidesExample Of Business Operations Analysis Powerpoint Presentation Slides
Example Of Business Operations Analysis Powerpoint Presentation Slides
 
Derisking energy efficiency project investment
Derisking energy efficiency project investmentDerisking energy efficiency project investment
Derisking energy efficiency project investment
 
IAM conference: asset vs portfolio modelling
IAM conference: asset vs portfolio modelling IAM conference: asset vs portfolio modelling
IAM conference: asset vs portfolio modelling
 
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John HeathcoteWorkshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
Workshop E, Extending the benefits life cycle: ISO 55000 by John Heathcote
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Maintenance cost to Savings
Maintenance cost to SavingsMaintenance cost to Savings
Maintenance cost to Savings
 
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLAN
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLANVALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLAN
VALIDATING THE ROBUSTNESS OF AN OPTIMISED WATER INFRASTRUCTURE INVESTMENT PLAN
 
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.
 
Ethiopia-D2S1-cross-cutting-measurement-issues.pptx
Ethiopia-D2S1-cross-cutting-measurement-issues.pptxEthiopia-D2S1-cross-cutting-measurement-issues.pptx
Ethiopia-D2S1-cross-cutting-measurement-issues.pptx
 
Presentation .ISB Service Science Workshop on New Value Metrics
Presentation .ISB Service Science Workshop on New Value MetricsPresentation .ISB Service Science Workshop on New Value Metrics
Presentation .ISB Service Science Workshop on New Value Metrics
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
Features of Successful Inclining Block Water Conservation Rate Structures
Features of Successful Inclining Block Water Conservation Rate StructuresFeatures of Successful Inclining Block Water Conservation Rate Structures
Features of Successful Inclining Block Water Conservation Rate Structures
 

Recently uploaded

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptxnandhinijagan9867
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 

Recently uploaded (20)

Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 

The Journey Towards Asset Management Excellence

  • 1. The Journey towards Asset Management 24 July 2014
  • 2.  Strategic alignment  Shared vision  Strategic partnerships  Balanced scorecard  BIMS  ISO 55000 The Destination
  • 3. Definition  “A set of coordinated activities that an organisation uses to realise value from assets in the delivery of its outcomes or objectives. Realisation of value requires the achievement of a balance of costs, risks and benefits over different time scales.” (Draft ISO 55000 - Asset Management)
  • 4. Drivers behind rising Asset Management awareness  The rising profile of whole of life costs e.g. PPPs  Statutory obligations – obligations for government bodies to have an asset management plan  The rising cost and scarcity of money  Risk management  Value for money principals  PAS55/ ISO55000  Industry benchmarks e.g. TEFMA
  • 5. Asset Management Benefits  Optimised financial performance  Managed risk  Improved services and outputs  Corporate / social responsibility  Demonstrated compliance  Enhanced reputation  Improved organisational stability
  • 6. Regressive Reactive Planned Proactive Don’t fix it Fix it after it breaks Fix it before it breaks Don’t just fix it, improve it • Minimise Defects • Improve Precision • Redesign • Value Focus • Reliability Centred Maintenance • 3-5 Year Fixed Price Contracts • Asset Management Plans • Capital Works Handover Processes • Forward Works Plans • Cmms • Predict/Plan • Condition Monitoring • Critical Spares • Centralised Control • Kpis • Fixed Prices & Schedule Of Rates Contracts Efficiency Excellence Capability • BIMs • ISO 55000 • Strategic Alignment • Shared Vision • Balanced Scorecard • Strategic Partnerships • Asset Management Excellence Audit Sample.Pdf • XXXX Audit Report July 2014.Pdf • Respond To Unusual Energy Consumption • Tri- Certification • Compliance • Run To Fail • Approved Lists • Schedule Of Rates Contracts The Asset Management Excellence Journey
  • 7. The Other End of The Spectrum
  • 8. The Other End of The Spectrum
  • 9. The Other End of The Spectrum
  • 10. The Other End of The Spectrum
  • 11. The Other End of The Spectrum
  • 12. EFFECTIVE LIFE REPLACE PROGRESSIVE (ACCRUED) COST OF FACILITY CASH FLOW OF ASSETS CREATE MAINTAIN DISPOSALREFURBISH 0 100% VALUE/COSTS (REALTERMS)
  • 13. Comparison of gas fired heating versus electric heating for student accommodation on ‘brown field site’ Gas Item Electric Capital cost of construction Capital cost of life cycle works Maintenance costs Impact of utilities costs over time Robustness - Relatively High - Medium - Relatively Low
  • 14. Funding Challenges for Planned Maintenance and Lifecycle Replacement Works  The consequences of under-spending is unlikely to be immediately apparent to the customer.  Non-core business requirements are valued less highly than core business needs.  If the assets appear to be performing within the parameters that the customer expects of them, it can be difficult for these customers to perceive a need for major expenditure.  Assets that are performing inefficiently, either due to inadequate maintenance or from having been retained in service beyond their economic life, often deteriorate gradually.
  • 15. Common approaches to Lifecycle Estimating  Fixed % of value per annum  Squeaky wheel  What did we spend last year?
  • 16. Advantages  Predictable budgets  Transparent calculation methodology  Fully auditable  Consistent approach
  • 17. Disadvantages Availability of funds = Backlog maintenance issues = Reliability of assets + Responsive repair costs + Unscheduled service interruptions + VALUE FOR MONEY!!! Incidences of premature asset failure = Does not reflect reality =
  • 18.  No direct link between estimated lifecycle costs and actual performance of assets.  Estimated lifecycle costs assume external factors do not impact lifecycle. Disadvantages
  • 19. 6TH MARCH 2010 … the world is changing …
  • 20. … the world is changing…
  • 21. … the world is changing…
  • 22. … the world is changing…
  • 23. … the world is changing…
  • 24. … the world is changing…
  • 25. … the world is changing…
  • 26. … the world is changing…
  • 27. … the world is changing…
  • 28. Typical 25-year Life Cycle Cost Model 0 2 4 6 8 10 12 14 16 0 0.5 1 1.5 2 2.5 3 3.5 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 $(m)$(m) Year Typical Lifecycle Cost Model - 25 Year Annual Lifecycle Cumulative
  • 29. Cost of Service Quality Condition Optimal Life Cycle Costs EXCELLENT POOR TIME ORIGINAL DECAY OPTIMAL CONDITION BAND OPTIMAL RENEWAL STRATEGY
  • 30. Asset Condition Survey Methodology
  • 31.
  • 33. Supported State Housing Department  > 500 properties supported living units  Located throughout Victoria  Lifecycle & maintenance funding = $7,000 p.a. / property  Substantial back log maintenance issues  Establishing business case for asset replacement was challenging
  • 34. Typical Life Cycle Cost Model- 60 Years $- $- $- $- $- $7,613.98 $6,077.37 $- $- $3,257.17 $- $8,530.08 $- $7,694.25 $46,963.86 $- $7,613.98 $6,686.92 $- $70,559.61 $6,077.37 $- $7,613.98 $916.10 $767.72 $- $- $15,308.22 $- $131,891.34 $- $- $- $7,613.98 $92,189.22 $916.10 $- $1,693.50 $- $96,869.83 $- $7,694.25 $- $- $54,577.83 $- $- $916.10 $6,077.37 $145,834.64 $7,613.98 $- $- $- $- $112.32 $- $- $- $82,626.41 $- $20,000.00 $40,000.00 $60,000.00 $80,000.00 $100,000.00 $120,000.00 $140,000.00 $160,000.00 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Years Dollars$(AUD) Annual spend in $ (AUD) Supported State Housing Department (cont’d)
  • 35.  Typical lifecycle profile for all properties identified  Point at which assets were ‘technically dilapidated’ identified  Lifecycle & maintenance funding increased to $24,000 p.a./ property  Business case for asset replacement established Supported State Housing Department (cont’d)
  • 37. Country Base Hospital  Decision taken to consolidate services at two hospitals  Management of hospital to be transferred between two state health departments  Initial period - 5 years  Lifecycle liability of infrastructure & biomedical assets to be agreed at the point of transfer  Basis of joint funding for lifecycle liability to be agreed
  • 38.  Lifecycle liability of infrastructure and biomedical assets for next five years was established  All assets scheduled for replacement were risk ranked  Both parties agreed sum for lifecycle replacement works for extreme and high risk assets  Tool provided a robust, transparent and equitable basis for mutually agreeing funding levels Country Base Hospital (cont’d)
  • 39. The Asset Management Process BIMS
  • 40. The risk profile varies from organisation to organisation…
  • 41. Low Accuracy of Asset Lists High Risk ranking of assetsLow High Reliability Centered MaintenanceLow High ISO: 55000 alignmentLow High Benchmarking/ Trend AnalysisLow High Whole of life cost managementLow High Reliability Strategic AlignmentLow High - Outside Toilet - Core business equipment Tailoring Asset Management to Your Business Needs
  • 42. Strategic Asset Management • Formulate Business Plan for Board Sign Off • Commercial Planning and Outcomes • Determine Stakeholder Needs and Engagement • Analyse and Benchmark Assets • Undertake Due Diligence • Value Engineering • Service Level Agreement Design • Re-procurement of Service • Shape Economies of Scale • Supplier Development Plan • Manage Operations • Audit and Reporting • Measure and Improvement Program • Customer Satisfaction Evaluation Operational Tactical Strategic
  • 43. Key to an effective asset list  A standardised approach to naming conventions  Standardised naming conventions applied to all assets  Naming convention typically follow published naming principles e.g. BCIS  QA controlled master list of assets  A ‘single source of truth’  Standardised approach to asset list inclusions e.g. > $1,000 in value and/ or requiring planned maintenance interventions  Assets <$1,000 in value are typically bundled e.g. RCD’s, fire equipment etc.  Include replacement value and date of installation  Sub- divide entire portfolio into logical and appropriate areas Asset Hierarchy Development (BL 23-04-14).xlsx
  • 47. Reliability Centred Maintenance  Identify major asset with unusual failure patterns (e.g. desalination pump)  Sub- divide asset into composite assets (e.g. impellers, electric motor, etc.)  Identify nature and consequences of composite asset failures  Undertake a root cause analysis of each failure  Identify remedial works required (e.g. repairs and modifications)  Undertake a Cost Benefit Analysis re: remedial works required and implement as appropriate  Budget for and implement a planned maintenance regime to mitigate issues going forward  Identify training needs and implement  Identify documentation needs and implement
  • 48. Root Cause Analysis 0 500 1000 1500 2000 2500 3000 3500 Site 1 Site 2 Site 3 Site 4 Site 5 MTBF (hr) Location Mean Time Between Failure - Pumps - Site Comparison Average
  • 49. 0 500 1000 1500 2000 2500 3000 3500 4000 4500 0 1 2 3 4 5 6 7 8 9 10 No of Pumps (8284) Annual Failures Annual No of Failures by Pump - Frequency Analysis Root Cause Analysis
  • 50. 0% 5% 10% 15% 20% 25% 30% 35% 5 10 15 20 25 30 % of Pump Population Years in Service Pump - Residual Life Analysis Design Life Root Cause Analysis
  • 51. Pump Failure - Root Cause Breakdown Lack of Lubrication Operator Error Dilapidated Blocked Wear and tear Corrosion Utility supply Vandalism  Revise Planned Maintenance – Increase Lubrication Frequency  Training Program to Educate Site Operators  Review Capital Expenditure Program and Undertake Lifecycle Analysis Root Cause Analysis
  • 52. ISO 55000 - Background  A new International Standard released in early 2014  Based on PAS 55  Consultation with > 30 countries including Australia  Government clients are mandating this Standard e.g. QLD Health & Federal Government  Incentivises a risk based, standardised and consistent approach to asset management
  • 53. ISO 55000 - Features and Benefits  Asset management policy encourages strategic alignment with core business  Risk based approach  By focusing on critical assets, expenditure is prioritised  Introduces best practice  Facilitates a proactive approach to asset management  Facilitates effective benchmarking  Supports probity and transparency
  • 54. Begin with the end in mind  Future proof by design  Source locally where possible  Ensure key components, systems and sub- systems are backed by guarantees and warrantees  Maximise local skills and materials  Avoid locating plant on roof  Construct plant rooms before plant has been installed  Consider maintenance access to high level architectural features e.g. glazed atriums.  Ensure metering supports future flexible usage of spaces  Always ensure service access to plant  “Black Start” test entire facility prior to handover  Make receipt of O&M manuals a ‘condition precedent’ of practical completion