CASE STUDY: ORGANIZATIONAL ASSESSMENT
PROLOGUE
Link’s confidentiality policies for current or recent clients prohibit us from releasing client-specific
information. The following Organizational Assessment case study should thus be considered
representative of services that could be provided to support a spectrum of client circumstances.
The Applications section at the end of this document addresses how Link’s Organizational
Assessment practice can be applied to alternative scenarios.
BACKGROUND
Link was engaged to perform an organizational assessment of a cogeneration facility that was
failing to meet performance expectations and in danger of defaulting on loans. The two primary
objectives were to 1) evaluate potential opportunities and risks, and 2) develop a Rejuvenation
Plan (transition plan) that would resolve current problems inhibiting performance, optimize
opportunities, and mitigate risks.
APPROACH
Link recognizes that the “change process” begins the very day that staff hear that an assessment
or audit is going to occur, since they understand that action items will likely be the result. If
communications are not well-managed, employees may react by exhibiting insecurity, negative
attitudes, retrenched behavior, and so forth. On the other hand, if messages are wellorchestrated, the employees can be made to understand that the intent of the assessment
process is to improve the conditions under which they are working, and that they will have input
into the process. It is therefore extremely important to ensure the entire process is well planned,
scripted, and executed.
Link designed the basic work elements to include:
a) meeting with senior management to obtain approach buy-in
b) meeting with plant manager off-site to obtain his/her buy-in
c) identification of pertinent information to have accessible during on-site effort
d) on-site assessment of operation and maintenance practices
e) written summary of findings
f) development of Rejuvenation Plan based on findings
g) presentation and discussion with senior management
While it was understood that facility performance improvement would inevitably be measured
over the long-term, Link recognized that employee buy-in and culture-change were critical to
success, and therefore decided to focus on:
• short term successes, clearly visible to management, labor, and the Alliance
• short term performance trends which validate long-term improvement, and
• raising the performance expectations of plant personnel.
AUDIT PROCESS
Each member of the Assessment Team was assigned specific responsibilities over the 5-day
assessment, with Team recap meetings conducted at the end of each day. The major categories
of issues addressed during the assessment were:

Page 1
CASE STUDY: ORGANIZATIONAL ASSESSMENT

I.

Employment Issues
A.
Compensation philosophy
B.
Benefit philosophy
C.
Policies & procedures and administrative processes
D.
Training concepts
E.
Culture
F.
Retention & turnover process
G.
Organizational Structure design re-organization design & implementation strategy
H.
Accountabilities & reporting relationships
I.
Labor union issues

II.

Organization
A.
Relationships between operations, maintenance, production, etc.
B.
Role definitions
C.
Management philosophy
D.
Management training/orientation strategy
E.
Communications & reporting

III.

Maintenance
A.
Conduct of maintenance philosophy
B.
Maintenance policy & procedure design
C.
Training
D.
CMMS system design, selection, configuration, input, utilization, proc edure
E.
Shift philosophy/management
F.
Emergency planning
G.
Outage management philosophy
H.
Planning & scheduling function

IV.

Operations
A.
Conduct of operations philosophy
B.
Training, cross-training philosophy
C.
Shift process
D.
MIS, information technology, trending processes
E.
Degree of automation

V.

Engineering
A.
Environmental management plan
B.
Compliance, monitoring, reporting
C.
Capital upgrades, improvement planning & execution
D.
Configuration management
E.
Key parameter trending
F.
Root cause analysis, lessons learned programs

VI.

General Condition Assessment
A.
Equipment system status
B.
Inventory analysis

VII.

General Infrastructure Assessment
A.
Analyze written policies versus actual practice
B.
Assess current culture, labor relations, organizational structure & accountability, communications &
reporting
C.
Emergency response process

VIII.

Safety & Security
A.
Policies & procedures strategy
B.
Design code compliance strategy
C.
Emergency response system
D.
Equipment & availability plan
E.
Safety & Security training

Page 2
CASE STUDY: ORGANIZATIONAL ASSESSMENT

IX.

Purchasing & Accounting
A.
Policies & procedures structure/flowchart
B.
Integrated process analysis
C.
Conservatism & controls philosophy
D.
Checks & balances
E.
Labor time recording & processes
F.
Reporting process

RESULTS/RECOMMENDATIONS
Link’s assessment findings identified a number of potential opportunities for improvement, as well
as a number of risks that were not being addressed. These are depicted in the Risk/Opportunity
Map in Exhibit A, below.
Based on assessment findings, Link concluded that plant cultures as well as plant infrastructures,
systems, entitlement, definition or roles and responsibilities, training, and tools were inhibiting the
plant’s ability to achieve pro-forma expectations. Link recommended that a major initiative was
necessary to rejuvenate virtually all aspects of process and culture.
The objective, therefore, of Link’s Rejuvenation Plan was to provide a document that outlines
specific actions to be implemented over a defined period (Phase 1 was six months) which will
improve the performance and profitability of the plant, while optimizing opportunities and
minimizing risks. The Rejuvenation Plan addressed each category of the assessment, and
prioritized each so that any necessary investments could achieve maximum returns.
The Rejuvenation Plan defined the team that would be accountable for its execution, and
included plant staff, corporate management, and Link staff. This approach utilized the specialized
talents and perspectives of several individuals and organizations, thereby producing a more
effective team. This approach also optimized plant staff “buy-in”, and helped them become more
aware of how their plant compared with other facilities.
The Rejuvenation Plan contained a detailed format for implementation of action items, including
schedule, necessary resources, estimated costs, accountabilities and objectives. Sample
Rejuvenation Plan action items included:
• identification of specific policies and/or procedures that should be developed or revised,
and why
• training upgrade program for labor and management, both technical, operational, and
soft issues (such as on policies, procedures, roles and accountabilities); identification of
alternative resources to provide the training
• operations upgrade program
• conduct of operations training to address formality, procedure compliance,
emergency procedures, performance monitoring, trending, significant event
recording, etc.
• improved log-taking, with the possibility for automated log-taking by roving
operators, with input to a personal computer that tracks trends
• relationship interface improvement with maintenance, etc.
• maintenance upgrade program
• upgrade to a Computerized Managed Maintenance System (CMMS), with
modules for preventive and predictive maintenance, corrective work order
generation & tracking, etc. (Note: with little investment, basic portions of such
a system can be implemented quickly, with the net result being a clear signal
that it’s not business as usual.)

Page 3
CASE STUDY: ORGANIZATIONAL ASSESSMENT

• a basic predictive maintenance program, with critical equipment key parameter
trending
• conduct of maintenance training, including maintenance philosophy, the role of
operations in the maintenance, the maintenance process, etc.
• outage lessons learned program
• root cause analysis program

APPLICATIONS
Link is a results-oriented organization, dedicated to generating positive change within
organizations. Our overall approaches, processes, tools, and skill sets that are discussed in this
case study can be applied to a variety of scenarios across a range of client circumstances - - in
diverse industries. Applications have included small and large industrial firms, as well as general
technology and commercial enterprises.
If you are interested in discussing possible application to your situation please contact us.
770-919-7070
www.linksg.com

(Exhibit A follows)

Page 4
CASE STUDY: ORGANIZATIONAL ASSESSMENT

EXHIBIT A
Sample Risk/Opportunity Maps
DETAILED PLANT RISK PROFILE
(Sample Plant “A”)
100
Green: Organization People Risks
1.) Sabotage
2.) Complacency
3.) Poor Training
4.) Unskilled/ underskilled
5.) Working comp
6.) Productivity
7.) Understanding

Copyright, Nov 2000 Link Resources, Inc.

Cost Potential ($ million)

A1

10
A6

Red: Process Risks
1.) Safety
2.) Maintenance
3.) Accounting
4.) Operations
5.) Engineering/environmental
6.) Record Keeping
7.) Poor Procedures

A6

A2

A2

A3
A4
A3

A2

1

A4

Blue: Material/Equipment Risks
1.) obsolescence
2.) Lack of redundancy
3.) Design
4.) Poor Maintenance (past)

A4
A5
A1

A5

A3

A7

0
0

1

2

A7

3

4

A1

5

6

7

8

Probability

OPPORTUNITY MAPPING
O
P
P
O
High R
T
U
D
N
O
I
L
T
L
Y

A
R
S

Green: Process Improvement
Red: Capital Improvement
1000

IMPROVEMENT TYPE

L1
O7

100

N2

L7
O5

N5

F4
E3
L4

O3

L6 F 8

E4

L12

O6

O11

F3

10

O12

N4
O10

P
e
r

O9

E1

L9
L10

N1

F2

F5
L8

1

E
Low v
e
n
t

E:
F:
L:
N:
O:

F7

N3

.1

1

E2

10

Low

100

1000

High
EASE/COST OF IMPLEMENTATION

Page 5

Environmental
Redundancy
Maintainability
Safety
Production

9

10

Mais conteúdo relacionado

Mais procurados

Performance audit adding value
Performance audit adding valuePerformance audit adding value
Performance audit adding valueicgfmconference
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvementJatinder Singh
 
Introduction to RBM
Introduction to RBMIntroduction to RBM
Introduction to RBMBFCP
 
Mcs 2013 m1 - including key success variables
Mcs 2013   m1 - including key success variablesMcs 2013   m1 - including key success variables
Mcs 2013 m1 - including key success variablesVignesh RV
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recoveryKrutiShah114
 
Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...Filo Tubo
 
Using Earned Value Management Indexes
Using Earned Value Management IndexesUsing Earned Value Management Indexes
Using Earned Value Management IndexesRicardo Viana Vargas
 
Ppt on risk based internal audit
Ppt on risk based internal auditPpt on risk based internal audit
Ppt on risk based internal auditAmitaMistry2
 
Techniques and tools for continuous improvement processes
Techniques and tools for continuous improvement processesTechniques and tools for continuous improvement processes
Techniques and tools for continuous improvement processesrubiesperanzaparrado
 
Controlling
ControllingControlling
ControllingOnline
 
STRATEGY EVALUATION, REVIEW AND REDESIGN
STRATEGY EVALUATION, REVIEW AND REDESIGNSTRATEGY EVALUATION, REVIEW AND REDESIGN
STRATEGY EVALUATION, REVIEW AND REDESIGNTANKO AHMED fwc
 
RESULT BASED M&E in FFA-revised
RESULT BASED M&E in FFA-revisedRESULT BASED M&E in FFA-revised
RESULT BASED M&E in FFA-revisedStephen Musimba
 

Mais procurados (19)

Performance Audit
Performance AuditPerformance Audit
Performance Audit
 
Performance audit adding value
Performance audit adding valuePerformance audit adding value
Performance audit adding value
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvement
 
Introduction to RBM
Introduction to RBMIntroduction to RBM
Introduction to RBM
 
Mcs 2013 m1 - including key success variables
Mcs 2013   m1 - including key success variablesMcs 2013   m1 - including key success variables
Mcs 2013 m1 - including key success variables
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...
 
Using Earned Value Management Indexes
Using Earned Value Management IndexesUsing Earned Value Management Indexes
Using Earned Value Management Indexes
 
Unit 1 overview of management
Unit 1 overview of managementUnit 1 overview of management
Unit 1 overview of management
 
Ppt on risk based internal audit
Ppt on risk based internal auditPpt on risk based internal audit
Ppt on risk based internal audit
 
Bikash CV
Bikash CVBikash CV
Bikash CV
 
Daniel Sanches, The concept of performance audit and the experience of the Po...
Daniel Sanches, The concept of performance audit and the experience of the Po...Daniel Sanches, The concept of performance audit and the experience of the Po...
Daniel Sanches, The concept of performance audit and the experience of the Po...
 
Evgelle Resume 2016
Evgelle Resume 2016Evgelle Resume 2016
Evgelle Resume 2016
 
Techniques and tools for continuous improvement processes
Techniques and tools for continuous improvement processesTechniques and tools for continuous improvement processes
Techniques and tools for continuous improvement processes
 
Controlling
ControllingControlling
Controlling
 
STRATEGY EVALUATION, REVIEW AND REDESIGN
STRATEGY EVALUATION, REVIEW AND REDESIGNSTRATEGY EVALUATION, REVIEW AND REDESIGN
STRATEGY EVALUATION, REVIEW AND REDESIGN
 
RESULT BASED M&E in FFA-revised
RESULT BASED M&E in FFA-revisedRESULT BASED M&E in FFA-revised
RESULT BASED M&E in FFA-revised
 
Unit 5 controlling
Unit 5 controllingUnit 5 controlling
Unit 5 controlling
 
Unit 2 planning
Unit 2 planningUnit 2 planning
Unit 2 planning
 

Destaque

Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceLink Resources
 
F78c6bf218db437eb78c532dbc81f355
F78c6bf218db437eb78c532dbc81f355F78c6bf218db437eb78c532dbc81f355
F78c6bf218db437eb78c532dbc81f355Fariba Ataie
 
Presentation curriculum
Presentation curriculumPresentation curriculum
Presentation curriculumFariba Ataie
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceLink Resources
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningLink Resources
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources
 
Presentation curriculum
Presentation curriculumPresentation curriculum
Presentation curriculumFariba Ataie
 
Bombardier commercial-aircraft-cseries-brochure
Bombardier commercial-aircraft-cseries-brochureBombardier commercial-aircraft-cseries-brochure
Bombardier commercial-aircraft-cseries-brochureJuan Carlos Hernández
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources
 
Relative atomic mass_&_mass_spectrometry[1][1]
Relative atomic mass_&_mass_spectrometry[1][1]Relative atomic mass_&_mass_spectrometry[1][1]
Relative atomic mass_&_mass_spectrometry[1][1]banyulenet
 
Presentación1[1]
Presentación1[1]Presentación1[1]
Presentación1[1]guge2011
 
Emprendimiento actividad 1
Emprendimiento actividad 1Emprendimiento actividad 1
Emprendimiento actividad 1danijllo
 
8. huong dan dtm nuoc thai do thi
8. huong dan dtm  nuoc thai do thi8. huong dan dtm  nuoc thai do thi
8. huong dan dtm nuoc thai do thiSơn Bùi Thanh
 

Destaque (15)

Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS Experience
 
F78c6bf218db437eb78c532dbc81f355
F78c6bf218db437eb78c532dbc81f355F78c6bf218db437eb78c532dbc81f355
F78c6bf218db437eb78c532dbc81f355
 
Presentation curriculum
Presentation curriculumPresentation curriculum
Presentation curriculum
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past Performance
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition Planning
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS Experience
 
Apostila 23 03-12
Apostila 23 03-12Apostila 23 03-12
Apostila 23 03-12
 
Beer Olympics
Beer OlympicsBeer Olympics
Beer Olympics
 
Presentation curriculum
Presentation curriculumPresentation curriculum
Presentation curriculum
 
Bombardier commercial-aircraft-cseries-brochure
Bombardier commercial-aircraft-cseries-brochureBombardier commercial-aircraft-cseries-brochure
Bombardier commercial-aircraft-cseries-brochure
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013
 
Relative atomic mass_&_mass_spectrometry[1][1]
Relative atomic mass_&_mass_spectrometry[1][1]Relative atomic mass_&_mass_spectrometry[1][1]
Relative atomic mass_&_mass_spectrometry[1][1]
 
Presentación1[1]
Presentación1[1]Presentación1[1]
Presentación1[1]
 
Emprendimiento actividad 1
Emprendimiento actividad 1Emprendimiento actividad 1
Emprendimiento actividad 1
 
8. huong dan dtm nuoc thai do thi
8. huong dan dtm  nuoc thai do thi8. huong dan dtm  nuoc thai do thi
8. huong dan dtm nuoc thai do thi
 

Semelhante a Energy Consulting SDVOSB Organizational Assessment

Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Wally Wilson
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptThushan9
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 
Managing the covid19 crisis 22 april 2020
Managing the covid19 crisis  22 april 2020Managing the covid19 crisis  22 april 2020
Managing the covid19 crisis 22 april 2020Peter Dale
 
Catalyft midstream experience case
Catalyft midstream experience caseCatalyft midstream experience case
Catalyft midstream experience caseTom Atwood
 
Lynes Diagrams
Lynes DiagramsLynes Diagrams
Lynes Diagramsrlynes
 
Blowplast kenya limited work, information flow analysis and design.
Blowplast kenya limited work, information flow analysis and design.Blowplast kenya limited work, information flow analysis and design.
Blowplast kenya limited work, information flow analysis and design.Alexander Decker
 
Project on performance_appraisal_330
Project on performance_appraisal_330Project on performance_appraisal_330
Project on performance_appraisal_330ashwinhitman
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsGeorge Dunn
 
Administrative support system
Administrative support systemAdministrative support system
Administrative support systemJoyAnn7
 
Pem zhipeng xie engg 5812 change management presentation
Pem zhipeng xie  engg 5812  change management presentationPem zhipeng xie  engg 5812  change management presentation
Pem zhipeng xie engg 5812 change management presentationPem Zhipeng Xie
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxcarlt4
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxdebishakespeare
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 

Semelhante a Energy Consulting SDVOSB Organizational Assessment (20)

Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
Power Co-Op Improves Work Management Planning and Scheduling (DRAFT)
 
Axis Consulting Case Studies
Axis Consulting Case StudiesAxis Consulting Case Studies
Axis Consulting Case Studies
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
Case Studies
Case StudiesCase Studies
Case Studies
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Managing the covid19 crisis 22 april 2020
Managing the covid19 crisis  22 april 2020Managing the covid19 crisis  22 april 2020
Managing the covid19 crisis 22 april 2020
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
 
Catalyft midstream experience case
Catalyft midstream experience caseCatalyft midstream experience case
Catalyft midstream experience case
 
Lynes Diagrams
Lynes DiagramsLynes Diagrams
Lynes Diagrams
 
Blowplast kenya limited work, information flow analysis and design.
Blowplast kenya limited work, information flow analysis and design.Blowplast kenya limited work, information flow analysis and design.
Blowplast kenya limited work, information flow analysis and design.
 
Project on performance_appraisal_330
Project on performance_appraisal_330Project on performance_appraisal_330
Project on performance_appraisal_330
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law Firms
 
Administrative support system
Administrative support systemAdministrative support system
Administrative support system
 
Pem zhipeng xie engg 5812 change management presentation
Pem zhipeng xie  engg 5812  change management presentationPem zhipeng xie  engg 5812  change management presentation
Pem zhipeng xie engg 5812 change management presentation
 
Standard operating procedures
Standard operating proceduresStandard operating procedures
Standard operating procedures
 
LRAFB_Project Profile
LRAFB_Project ProfileLRAFB_Project Profile
LRAFB_Project Profile
 
1B project MS V2
1B project MS V21B project MS V2
1B project MS V2
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docx
 
Relocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docxRelocation of Us headquarters Technology firmJi Pete.docx
Relocation of Us headquarters Technology firmJi Pete.docx
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 

Mais de Link Resources

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementLink Resources
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityLink Resources
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryLink Resources
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsLink Resources
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearLink Resources
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementLink Resources
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceLink Resources
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateLink Resources
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceLink Resources
 
Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningLink Resources
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources
 

Mais de Link Resources (13)

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition Management
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain Utility
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain Industry
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB Nuclear
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital Management
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE Experience
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement Corporate
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experience
 
Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition Planning
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance Summaries
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear Energy
 

Último

WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Vladyslav Fliahin: Applications of Gen AI in CV (UA)
Vladyslav Fliahin: Applications of Gen AI in CV (UA)Vladyslav Fliahin: Applications of Gen AI in CV (UA)
Vladyslav Fliahin: Applications of Gen AI in CV (UA)Lviv Startup Club
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Lviv Startup Club
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
Ivey Leveraging Information Technology MBA 2024
Ivey Leveraging Information Technology MBA 2024Ivey Leveraging Information Technology MBA 2024
Ivey Leveraging Information Technology MBA 2024Nihal Nishadul
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIBGregory DeShields
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 

Último (20)

WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Vladyslav Fliahin: Applications of Gen AI in CV (UA)
Vladyslav Fliahin: Applications of Gen AI in CV (UA)Vladyslav Fliahin: Applications of Gen AI in CV (UA)
Vladyslav Fliahin: Applications of Gen AI in CV (UA)
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...Andrii Rodionov: What can go wrong in a distributed system – experience from ...
Andrii Rodionov: What can go wrong in a distributed system – experience from ...
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
Ivey Leveraging Information Technology MBA 2024
Ivey Leveraging Information Technology MBA 2024Ivey Leveraging Information Technology MBA 2024
Ivey Leveraging Information Technology MBA 2024
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIB
 
Authentically Social - presented by Corey Perlman
Authentically Social - presented by Corey PerlmanAuthentically Social - presented by Corey Perlman
Authentically Social - presented by Corey Perlman
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 

Energy Consulting SDVOSB Organizational Assessment

  • 1. CASE STUDY: ORGANIZATIONAL ASSESSMENT PROLOGUE Link’s confidentiality policies for current or recent clients prohibit us from releasing client-specific information. The following Organizational Assessment case study should thus be considered representative of services that could be provided to support a spectrum of client circumstances. The Applications section at the end of this document addresses how Link’s Organizational Assessment practice can be applied to alternative scenarios. BACKGROUND Link was engaged to perform an organizational assessment of a cogeneration facility that was failing to meet performance expectations and in danger of defaulting on loans. The two primary objectives were to 1) evaluate potential opportunities and risks, and 2) develop a Rejuvenation Plan (transition plan) that would resolve current problems inhibiting performance, optimize opportunities, and mitigate risks. APPROACH Link recognizes that the “change process” begins the very day that staff hear that an assessment or audit is going to occur, since they understand that action items will likely be the result. If communications are not well-managed, employees may react by exhibiting insecurity, negative attitudes, retrenched behavior, and so forth. On the other hand, if messages are wellorchestrated, the employees can be made to understand that the intent of the assessment process is to improve the conditions under which they are working, and that they will have input into the process. It is therefore extremely important to ensure the entire process is well planned, scripted, and executed. Link designed the basic work elements to include: a) meeting with senior management to obtain approach buy-in b) meeting with plant manager off-site to obtain his/her buy-in c) identification of pertinent information to have accessible during on-site effort d) on-site assessment of operation and maintenance practices e) written summary of findings f) development of Rejuvenation Plan based on findings g) presentation and discussion with senior management While it was understood that facility performance improvement would inevitably be measured over the long-term, Link recognized that employee buy-in and culture-change were critical to success, and therefore decided to focus on: • short term successes, clearly visible to management, labor, and the Alliance • short term performance trends which validate long-term improvement, and • raising the performance expectations of plant personnel. AUDIT PROCESS Each member of the Assessment Team was assigned specific responsibilities over the 5-day assessment, with Team recap meetings conducted at the end of each day. The major categories of issues addressed during the assessment were: Page 1
  • 2. CASE STUDY: ORGANIZATIONAL ASSESSMENT I. Employment Issues A. Compensation philosophy B. Benefit philosophy C. Policies & procedures and administrative processes D. Training concepts E. Culture F. Retention & turnover process G. Organizational Structure design re-organization design & implementation strategy H. Accountabilities & reporting relationships I. Labor union issues II. Organization A. Relationships between operations, maintenance, production, etc. B. Role definitions C. Management philosophy D. Management training/orientation strategy E. Communications & reporting III. Maintenance A. Conduct of maintenance philosophy B. Maintenance policy & procedure design C. Training D. CMMS system design, selection, configuration, input, utilization, proc edure E. Shift philosophy/management F. Emergency planning G. Outage management philosophy H. Planning & scheduling function IV. Operations A. Conduct of operations philosophy B. Training, cross-training philosophy C. Shift process D. MIS, information technology, trending processes E. Degree of automation V. Engineering A. Environmental management plan B. Compliance, monitoring, reporting C. Capital upgrades, improvement planning & execution D. Configuration management E. Key parameter trending F. Root cause analysis, lessons learned programs VI. General Condition Assessment A. Equipment system status B. Inventory analysis VII. General Infrastructure Assessment A. Analyze written policies versus actual practice B. Assess current culture, labor relations, organizational structure & accountability, communications & reporting C. Emergency response process VIII. Safety & Security A. Policies & procedures strategy B. Design code compliance strategy C. Emergency response system D. Equipment & availability plan E. Safety & Security training Page 2
  • 3. CASE STUDY: ORGANIZATIONAL ASSESSMENT IX. Purchasing & Accounting A. Policies & procedures structure/flowchart B. Integrated process analysis C. Conservatism & controls philosophy D. Checks & balances E. Labor time recording & processes F. Reporting process RESULTS/RECOMMENDATIONS Link’s assessment findings identified a number of potential opportunities for improvement, as well as a number of risks that were not being addressed. These are depicted in the Risk/Opportunity Map in Exhibit A, below. Based on assessment findings, Link concluded that plant cultures as well as plant infrastructures, systems, entitlement, definition or roles and responsibilities, training, and tools were inhibiting the plant’s ability to achieve pro-forma expectations. Link recommended that a major initiative was necessary to rejuvenate virtually all aspects of process and culture. The objective, therefore, of Link’s Rejuvenation Plan was to provide a document that outlines specific actions to be implemented over a defined period (Phase 1 was six months) which will improve the performance and profitability of the plant, while optimizing opportunities and minimizing risks. The Rejuvenation Plan addressed each category of the assessment, and prioritized each so that any necessary investments could achieve maximum returns. The Rejuvenation Plan defined the team that would be accountable for its execution, and included plant staff, corporate management, and Link staff. This approach utilized the specialized talents and perspectives of several individuals and organizations, thereby producing a more effective team. This approach also optimized plant staff “buy-in”, and helped them become more aware of how their plant compared with other facilities. The Rejuvenation Plan contained a detailed format for implementation of action items, including schedule, necessary resources, estimated costs, accountabilities and objectives. Sample Rejuvenation Plan action items included: • identification of specific policies and/or procedures that should be developed or revised, and why • training upgrade program for labor and management, both technical, operational, and soft issues (such as on policies, procedures, roles and accountabilities); identification of alternative resources to provide the training • operations upgrade program • conduct of operations training to address formality, procedure compliance, emergency procedures, performance monitoring, trending, significant event recording, etc. • improved log-taking, with the possibility for automated log-taking by roving operators, with input to a personal computer that tracks trends • relationship interface improvement with maintenance, etc. • maintenance upgrade program • upgrade to a Computerized Managed Maintenance System (CMMS), with modules for preventive and predictive maintenance, corrective work order generation & tracking, etc. (Note: with little investment, basic portions of such a system can be implemented quickly, with the net result being a clear signal that it’s not business as usual.) Page 3
  • 4. CASE STUDY: ORGANIZATIONAL ASSESSMENT • a basic predictive maintenance program, with critical equipment key parameter trending • conduct of maintenance training, including maintenance philosophy, the role of operations in the maintenance, the maintenance process, etc. • outage lessons learned program • root cause analysis program APPLICATIONS Link is a results-oriented organization, dedicated to generating positive change within organizations. Our overall approaches, processes, tools, and skill sets that are discussed in this case study can be applied to a variety of scenarios across a range of client circumstances - - in diverse industries. Applications have included small and large industrial firms, as well as general technology and commercial enterprises. If you are interested in discussing possible application to your situation please contact us. 770-919-7070 www.linksg.com (Exhibit A follows) Page 4
  • 5. CASE STUDY: ORGANIZATIONAL ASSESSMENT EXHIBIT A Sample Risk/Opportunity Maps DETAILED PLANT RISK PROFILE (Sample Plant “A”) 100 Green: Organization People Risks 1.) Sabotage 2.) Complacency 3.) Poor Training 4.) Unskilled/ underskilled 5.) Working comp 6.) Productivity 7.) Understanding Copyright, Nov 2000 Link Resources, Inc. Cost Potential ($ million) A1 10 A6 Red: Process Risks 1.) Safety 2.) Maintenance 3.) Accounting 4.) Operations 5.) Engineering/environmental 6.) Record Keeping 7.) Poor Procedures A6 A2 A2 A3 A4 A3 A2 1 A4 Blue: Material/Equipment Risks 1.) obsolescence 2.) Lack of redundancy 3.) Design 4.) Poor Maintenance (past) A4 A5 A1 A5 A3 A7 0 0 1 2 A7 3 4 A1 5 6 7 8 Probability OPPORTUNITY MAPPING O P P O High R T U D N O I L T L Y A R S Green: Process Improvement Red: Capital Improvement 1000 IMPROVEMENT TYPE L1 O7 100 N2 L7 O5 N5 F4 E3 L4 O3 L6 F 8 E4 L12 O6 O11 F3 10 O12 N4 O10 P e r O9 E1 L9 L10 N1 F2 F5 L8 1 E Low v e n t E: F: L: N: O: F7 N3 .1 1 E2 10 Low 100 1000 High EASE/COST OF IMPLEMENTATION Page 5 Environmental Redundancy Maintainability Safety Production 9 10