O slideshow foi denunciado.
Seu SlideShare está sendo baixado. ×

PVD Prefabricated Vertical Drain.ppt

Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Anúncio
Próximos SlideShares
Vacuum dewatered flooring
Vacuum dewatered flooring
Carregando em…3
×

Confira estes a seguir

1 de 20 Anúncio

Mais Conteúdo rRelacionado

Semelhante a PVD Prefabricated Vertical Drain.ppt (20)

Mais de تعلم هندسة السكك الحديدية (10)

Anúncio

Mais recentes (20)

PVD Prefabricated Vertical Drain.ppt

  1. 1. PVD Prefabricated Vertical Drain
  2. 2. PVD takes the lead in soil consolidation • Drain developed with more than 30 years of experience in soil consolidation • Approx. 300 mio linear metres of PVD installed worldwide • PVDwork backed-up by extensive studies and testing by renowned institutes (e.g. Delft Geotechnics, Geosytec)
  3. 3. Functions • Forms a path for excess pore-water created by the overburden, water is drained off to the surface resulting in a stale subgrade on which construction can take place. • Reduces consolidation time of soft soils significantly, which result in substantial cost savings
  4. 4. PVD • 10 cm wide with a solid polymer core covered on both sides with a strong & permeable filter fabric • Outer filter fabricate bonded to the core over its entire surface to form a homogeneous geocomposite product • Unique patented hydraulically-designed core for maximum water flow capacity
  5. 5. PVD Fully bonded composite: Unique combination of patented, hydraulically designed core structure bonded to nonwoven filter layers over the entire surface
  6. 6. • ` Reduction of Consolidation Time Reduction of consolidation time from more than 15 years to about 1 year
  7. 7. PVD Benefits High performance Easy to handle Durable
  8. 8. High Performance High performance • Nonwoven layers deliver – Optimal filtration – Permeability – Strength • PVD tensile strength increased by 25% • Suitable for use in all soil types
  9. 9. Easy To Handle • Roll length increase to 300 meters reduces number of connections on site • 30% Volume reduction resulting in less storage spaced on site • New pachaging allows faster unloading of container
  10. 10. Durable • Thermal bonding of filter to the entire surface of core structure ensures that the filter is kept taut across the flow channels • Filter cannot tear or become separated from the core when passing over the pulleys at the rig top or during soil consolidation
  11. 11. INSTALLATION • A purpose-built installation rig mounted on a hydraulic excavator is usually used to install PVD. • The Height of rig is equal to the istallation depth of PVD.
  12. 12. PVD INSTALLATION • PVD Install into the mandrel • Mandrel section have oval shape
  13. 13. INSTALLATION METHODS • Water Jetting • Ramming • Hydraulic Pushing • Hydraulic Pushing + vibration • Hydraulic Pushing+ water jetting
  14. 14. INSTALLATION
  15. 15. CONSTRUCTED PROJECTS
  16. 16. Japan
  17. 17. Airport - Singapore Changi Depth: 50 m
  18. 18. Sewage Refinery – Urmia Iran
  19. 19. Seymare Dam - Lorestan Iran

×