1.0 Background:
The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in
the recent year and at present country has about 5500 such installations contributing 40MW of
renewable energy to the national grid.
In view of enhancing the renewable energy portfolio in the electricity generation in Sri
Lanka, the Government of Sri Lanka (GOSL) has launched “Soorya Bala Sangramaya”
to promote roof top solar installations in the country. The objectives of the above
program is to reach an installed capacity of roof top solar to 200MW by 2020.
In order to support the GOSL’s renewable energy promotional drive, the Net Metering
Concept was further enhanced by introducing following three schemes.
2.0 SCHEME 01 - NET METERING
This scheme which is existing at present allows any electricity consumer to install a
renewable energy based electricity generating facility and connect it to the CEB’s
electricity network. The electricity network connection scheme shall be approved by
CEB.
The utility energy meter will be replaced with an Import/Export meter. The electrical
energy consumed from the grid is considered as import energy and electrical energy
generated and supplied to the grid is considered as export energy.
At the end of each billing period (typically one month), CEB will read the consumer’s
export energy meter reading and the import meter reading. The electricity bill will be
prepared giving credit to the export, and charging the consumer for the difference
between the import and the export. If the export is more than the import in any billing
period, the Consumer will receive an export credit, and will be credited towards his next
month’s consumption. Such credits may be carried-over to subsequent months, as long as
there is no change in the legal consumer for the premises.
The key factor in this process is that there will be no financial compensation for the
excess energy exported by the consumer. All exports will be set-off against the
3
consumer’s own consumption, either in the current billing period or future billing
periods. Accordingly, consumers will be compelled to select the capacity of the
renewable energy equipment to reasonably match his requirements.
The installed capacity of the Generating Facility shall not exceed the Contract Demand of
the Producer. The contract period for the scheme is 20 years.
Typical connection arrangement for the Scheme 1 is given in the Annexure 01.
3.0 SCHEME 02 - NET ACCOUNTING
This Scheme has introduced an additional element to the Scheme 01 where an export tariff for
the net energy exported (if any) was introduced. If the generated units of electricity using the
solar panels fixed in the roof are greater than the units consumed, the customer will be paid Rs
22.0 per unit during the first 07 yrs and from the 08th
year to 20th
year he will be paid Rs 15.50
per unit. If the consumption is greater than the energy generated form the solar panels,
consumer has to pay to the CEB at the existing electricity tariff for the excess energy
consumed. This Scheme is limited only for the Solar.
4
The installed capacity of the Generating Facility shall not exceed the Contract Demand of the
Producer. The contract period is 20 yrs.
Typical connection arrangement for the Scheme 2 is given in the Annexure 01.
4.0 SCHEME 03 – NET PLUS
Total generation of electricity from the solar PV power plant will be exported directly through
a dedicated meter for which the customer will be paid. The energy import will be measured
through a separate import meter and will be billed as per the existing electricity tariff.
CEB shall read the meter to read the solar power plant output and the other meter to read the
import energy. Total generation of electricity from the solar PV power plant will be exported
directly through a dedicated meter for which the customer will be paid Rs 22.0 per unit during
the first 07 yrs and from the 08th
year to 20th
year the customer will be paid Rs 15.50 per unit. .
The energy import will be measured through a separate import meter and will be billed as per
the existing electricity tariff CEB.
The installed capacity of the Generating Facility shall not exceed the Contract Demand of the
Producer. The contract period is 20 yrs.
5
Typical connection arrangement for the Scheme 3 is given in the Annexure 02.
In Net Plus Scheme, the solar PV electricity generation facility shall be metered
separately. The solar PV inverter output (generation facility output) should be brought to
the metering point where both import and export energy meters are located in a separate
meter cubical. The meter cubicle should be sealed properly to avoid tampering. If the
space of the existing meter location is not sufficient to install another meter for energy
export, the consumer should make necessary arrangements to shift the metering point to a
suitable location in consultation with relevant Area Chief Electrical Engineer/ Area
Engineer/Provincial Commercial Engineer. The cost associated for shifting the meter to a
new location should be charged at the prevailing rate from the consumer.
5.0 PROCEDURE & APPLICATION PROCESS
5.1 Potential Applicant initiates contact with the respective CEB Area Engineer. Upon request
CEB will provide Application and Agreement and Interconnection Standard including
technical information, initial review information, metering requirement etc to a potential
Producer.
5.2 Applicant initiates contact with Sri Lanka Sustainable Energy Authority (SEA) and
commence the process of securing energy permit if the Applicant’s Generating Facility is
based on a renewable energy technology other than solar power. If the Applicant’s
Generating Facility is based solar power, energy permit is not required.
6
5.3 Applicant completes the Application and files Application and supply any relevant
additional information requested by CEB Area Engineer. Initial review fee is paid at the
time of handing over the Application for processing.
5.4 CEB Area Engineer performs an Initial Review and develops preliminary cost estimates
and interconnection requirements.
5.5 The applicant should purchase equipment as per the technical details given in the Net
Energy Metering Agreement and IEC 61727 (2004 -12), IEEE 1547 – 2003 or latest
available equivalent Standards.
5.6 Applicant and CEB enter into an Interconnection Agreement.
5.7 Producer arranges for and completes commissioning testing of generating facility and
Producers interconnection facilities by a Consulting Chartered Electrical Engineer as per
IEC 61727 (2004 -12), IEEE 1547 – 2003, IEE 17th
Edition Wiring Regulations or latest
available equivalent Standards at Producers cost and the same is witnessed by the Area
Engineer of the CEB. Before commissioning testing, Producers shall develop a written
testing plan Certified by a Consulting Chartered Electrical Engineer to be submitted to
CEB for its review and acceptance. Where applicable the test plan shall include the
installation test procedures published by the manufacturer of the generation or
interconnection equipment. Facility testing shall be conducted at a mutually agreeable time.
5.8 CEB authorizes parallel operation, after successful commissioning testing by the Area
Engineer and execution of Agreement.
Flow chart on the procedure and application process is given in the Annexure 03.
7
6.0 GENERAL RULES, RIGHTS AND OBLIGATIONS
6.1 The Generating Facility shall use one or any combination of the approved
types of renewable sources of energy to generate electricity at the Producer’s
premises in respect of Scheme 01. Generating facility shall be solar for
Schemes 02 and 03.
6.2 The entire Generating Facility and equipment such as solar panels, turbines
and associated accessories such as inverters and protective circuits shall be
located within the Producer’s premises and shall be owned by the Producer.
6.3 A Producer must comply with the conditions imposed by the CEB which is
depicted in Sections 3.0, 5.0, 6.0, 7.0 of the Agreement and Interconnection
Standard and receive CEB written permission before parallel operation of its
Generating Facility with the CEB distribution system
6.4 The Generating Facility shall be intended to meet all or a part of the
Producer’s electricity demand (maximum allowable limit is contract demand
of the Producer) and electrical energy requirements. It shall be the
responsibility of the Producer to decide on the capacity of Generating Facility
with due consideration to the amount of renewable energy available,
investment and operating costs of equipment, the Producer’s Contract
Demand with CEB and the average electrical energy requirements of the
Producer.
6.5 Interconnection with CEB distribution system under this agreement does not
provide the Producer any rights to utilize CEB HV/LV distribution system for
the transmission, distribution or wheeling of electric power to a third party.
6.6 A Producer shall ascertain and comply with applicable rules, regulations
imposed by the Ministry of Power and Energy / CEB / Public Utilities
Commission of Sri Lanka (PUCSL)/ Sri Lanka Sustainable Energy Authority
(SEA) and any law or standard that applies to the design, construction,
installation, operation or any other aspect of the Producers Generating Facility
and interconnection facilities.
6.7 CEB shall have the right to review the design of Producer’s generating and
interconnection facilities and to inspect such faculties prior to the
commencement of Parallel Operation with CEB distribution system. CEB
may require a Producer to make modification as necessary to comply with the
requirements. CEB review and authorization for parallel operation shall not
8
be construed as conforming or endorsing the Producers design or as
warranting the Generating and or interconnection facility’s safety, durability
or reliability. CEB shall not, by reason of such review or lack of review, be
responsible for the strength, adequacy or capability of such equipment.
6.8 The installed capacity of the Generating Facility shall not exceed the Contract
Demand of the existing installation if the Producer so wishes to increase or
decrease his Contract Demand, he shall first apply to change his Contract
Demand as a Consumer, and after fulfilling the requirements specified by
CEB, request an amendment to this Agreement. In any event, the Term of this
Agreement shall be limited to twenty years from the date of execution.
6.9 The Generating Facility shall be built and operated according to the relevant
standards and other guidelines stipulated in the Agreement.
6.10 The Producer shall install all the necessary protective equipment required to
ensure safe and reliable operation of the Generating Facility and the
Producer shall meet all the expenses of installing such equipment and other
associated accessories.
6.11 The Producer shall maintain all the equipment downstream of the metering
equipment in good operating condition.
6.12 The Producer shall allow CEB to enter his premises for the inspection of the
metering equipment and the Generating Facility, and would promptly attend
to and implement any written recommendations or instructions with regard
to the Generating Facility.
6.13 Any information pertaining to Generating and/or interconnection facilities
provided to CEB by a Producer shall be treated by CEB in a confidential
manner.
6.14 A Producer shall operate and maintain its Generating Facility and
Interconnection Facilities in accordance with Prudent Electrical Practices.
6.15 CEB may limit the operation or disconnect or require the disconnection of a
Producer’s Generating Facility from CEB’s distribution system at any time
with or without notice, in the event of an emergency or to correct unsafe
operating conditions. CEB may also limit the operation or disconnect or
require the disconnection of a Producers Generating facility from CEB
distribution system upon the provision of reasonable notice.
9
(a) to allow for routine maintenance, repairs or modifications to CEB
distribution system.
(b) Upon CEB determination that a Producer’s Generating Facility is not in
compliance with the conditions stipulated in the Agreement
(c) Upon termination of Interconnection Agreement.
6.16 Prior to signing the agreement, the Producer shall provide technical literature
including Type Test certificates of the protective equipment for Net Energy Metering
to the CEB and shall obtain the concurrence of the CEB to procure the same.
6.17 CEB shall promptly install the meters and metering equipment to implement Net
Energy Metering, the initial cost of which shall be paid by the Producer.
6.18 CEB shall maintain the distribution network and the metering equipment to supply
and meter the electricity requirements of the Producer, and to accept the electricity
generated by the Producer, up to the capacity stated in the supply agreement and this
Agreement, respectively.
6.19 CEB shall promptly attend to Producer’s requests for testing the meters or metering
equipment for their accuracy, the fees for which shall be payable by the Producer.
6.20 CEB shall promptly read the Producer's meter at the end of each Billing Period, bill
the Consumer for his net energy consumption in the Billing Period after giving due
consideration to the credits from the previous Billing Period, and credit the energy
exported to the Consumer’s account to be carried over to the next Billing Period.
CEB’s monthly invoice shall show the export energy credit carried over from the
previous Billing Period, consumption and export in the present Billing Period, and
the energy credit carried over to the subsequent Billing Period (all figures in
kilowatt hours).
7.0 GENERATING FACILITY DESIGN AND OPERATING REQUIREMENTS
7.1 The protective function and requirements defined here are designed to protect CEB
distribution system and not the Generating Facility. A Producer shall be solely
10
responsible for providing adequate protection for its Generating Facility and
interconnection facilities. The Producer’s protective functions shall not impact the
operation of other protective functions utilized on CEB’s distribution system in a
manner that would affect CEB capability of providing reliable service to its
customers.
7.2 Generating facilities operating in parallel with CEB distribution system shall be
equipped with the following protective functions to sense abnormal conditions on
CEB distribution system and cause generating facility to be automatically
disconnected from CEB distribution system or to prevent the generating facility from
being connected to CEB distribution system inappropriately.
7.2.1 CEB Distribution System Parameters are as follows;
a. Nominal Voltage 33 kV 11kV 400 V
b. System Highest Voltage 36 kV 12 kV 440 V
c. Rated fault current 25 kA 20 kA 20 kA
d. No. of Phases 3 3 3ph& Neutral
e. System Frequency 50Hz 50Hz 50Hz
f. Method of Earthing Non Effectively Solidly Solidly
Earthed Earthed Earthed
7.2.2 Over and Under Voltage trip functions and over and under frequency trip
functions.
7.2.3 A voltage and frequency sensing and time delay function to prevent the
generating facility from energizing a deenergized distribution system circuit
and to prevent the generating facility from reconnecting with CEB
distribution system unless CEB distribution system service voltage is within
06% of the nominal supply voltage and frequency is within 47 Hz to 52 Hz
and are stable for at least 3 minutes.
7.2.4 A function to prevent the generating facility from contributing to the
formation of an Unintended Island and cease to energize the CEB system
within half a second (0.5 second) of the formation of an unintended island.
7.2.5 The generating facility shall cease to energize CEB distribution system for
faults on CEB distribution system circuit to which it is connected. (IEEE
1547 – 4.2.1). The generating facility shall cease to energize CEB distribution
circuit prior to reclosure by CEB distribution system equipment. (IEEE 1547-
4.2.2).
11
7.2.6 The generating facility shall be automatically disconnected from the CEB
distribution network within half a second (0.5 second) when the CEB supply is
intentionally or automatically switched off.
7.2.7 The Producer should not change any of the settings stated above without the
written permission from the CEB.
7.3 Suitable equipment required.
Circuit breakers or other interrupting devices located at the point of common
coupling must be certified by CEB as suitable for their intended operation. This
includes being capable of interrupting the maximum available fault current expected
at their location. Producer’s generating facility and interconnection facilities shall be
designed so that the failure of any one device shall not potentially compromise the
safety and reliability of CEB distribution system.
The generating facility paralleling device shall be capable of with standing 220% of
the interconnection facility rated voltage (IEEE 1547 – 4.1.8.3). The interconnection
facility shall have the capability to withstand voltage and current surges in
accordance with the environments defined in IEEE 1547 – 4.1.8.2
7.4 Visible disconnect required
The producer shall furnish and install a ganged manually operated isolating switch
near the point of common coupling (PCC) to isolate the generating facility from CEB
distribution system. The device does not have to be rated for load break nor provide
over current protection.
The device must:
a. Allow visible verification that separation has been accomplished. (This
requirement may be met by opening the enclosure to observe contact separation)
b. Include marking or signage that clearly open and closed positions.
c. Be capable of being reached quickly and conveniently 24 hours a day by CEB
personnel for construction, maintenance, inspection, testing or reading, without
obstacles or without requiring those seeking access to obtain keys, special
permission, or security clearance even when the isolating equipment is
consumer’s property.
d. Be secured in a weather-proof enclosure and capable of being locked in the open
position prevent unauthorized or accidental closing.
e. Be clearly marked on the submitted single line diagram and its type and location
approved by CEB prior to installation. If the device is not adjacent to the PCC,
12
permanent signage must be installed at a CEB approved location providing a clear
description of the location of the device
7.5 Drawings: Prior to parallel operation or momentary parallel operation of the
generating facility CEB shall approve the Producers protective function and
control diagrams. Generating facilities equipped with protective function and
control scheme previously approved by CEB may satisfy this requirement by
reference to previously approved drawings and diagrams certified by a Chartered
Engineer.
7.6 The output voltage wave form of the Generating Facility shall be of 50 Hz, with a
sinusoidal wave form.
7.7 The Total Harmonic Distortion (THD) for current and individual harmonic limit
should be as follows.
Individual harmonic
order h
h<11 11<h<17 17<h<23 23<h<35 35<h THD
Allowable Limit (%) 4 2 1.5 0.6 0.3 5
Table 1: Current Harmonic Limits
7.8 If the Generating Facility uses a direct current (dc) generator, it should use an
inverter to convert the dc to ac, complying with the THD for current and
individual harmonic limits as in table 1.
7.9 The inverters used for interconnection shall be only those which have received the
Type Approval by CEB.
7.10 The Producer should not change any of the settings stated in section 6.5 without
the written permission from the CEB.
7.11 The Power Quality at the Point of Common Coupling (PCC) shall be as follows;
Power quality measurement shall be complied with IEC 61400-21. Emission of inter-
harmonic currents from the power electronic converter up to 2 kHz and of current
distortions above 2 kHz up to 9 kHz during operations shall be stated. The individual
inter-harmonic currents below 2 kHz and the current distortions in the range 2 kHz up to
9 kHz shall be given as ten-minute average data for each frequency at the output power
giving the maximum individual inter-harmonic current or current distortion.
7.12 Flicker
Standard applicable: As per IEC 61000-3-7
13
8.0 ENERGY METERING AND BILLING
8.1 SCHEME 01 (NET METERING)
8.1.1 The Producers’ electricity service shall be metered with a two-way (import and
export) energy meter, and the cost of installation of such meter or metering equipment
for the first time, shall be borne by the Producer.
8.1.2 During any Billing Period, if the electrical energy supplied by CEB exceeds
the electricity exported by the Consumer plus any energy credits carried-over
from the previous Billing Period, the charges for the net energy (kWh)
consumed will be calculated using the Producer’s applicable tariff. The fixed
charge and/or the minimum charge applicable for the installation will also be
applicable
8.1.3 During any Billing Period, if the electricity exported by the Producer plus any
energy credits carried-over from the previous Billing Period exceeds the
electrical energy supplied by CEB, the Producer shall be billed only for the
applicable fixed charge and/or the minimum charge, and the balance of the
electricity generated shall be carried over to the next Billing Period and
appear as an energy credit, stated in kilowatt hours.
8.1.4 Energy credits may be carried over from one Billing Period to another, for so
long as the Consumer has a legal contract for the supply of electricity by CEB,
and during the Term of this Agreement.
8.1.5 In the event the Producer’s electricity supply account and/or the contract for
the premises is terminated for whatever reason, any accumulated energy
credits on the last day of such termination shall be granted to the CEB with no
financial compensation to the Producer. Energy credits shall not be
transferable to any other Producer who applies for a new contract for the
supply of electricity to the same premises. Energy credits shall not be
transferable to the same consumer applying for a contract to another premise.
8.2 SCHEME 2 (NET ACCOUNTING)
8.2.1 If the generated units of electricity using the solar panels fixed in the roof are greater
than the units consumed, the customer will be paid Rs 22.0 per unit during the first 07
yrs and from the 08th
year to 20th
year he will be paid Rs 15.50 per unit. If the
14
consumption is greater than the energy generated form the solar panels, consumer has
to pay to the CEB at the existing electricity tariff for the excess energy consumed.
8.2 SCHEME 03 (NET PLUS)
8.3.1 CEB shall read the meter to read the solar power plant output and the other meter to read
the import energy. Total generation of electricity from the solar PV power plant will be
exported directly through a dedicated meter for which the customer will be paid Rs 22.0
per unit during the first 07 yrs and from the 08th
year to 20th
year the customer will be
paid Rs 15.50 per unit. . The energy import will be measured through a separate import
meter and will be billed as per the existing electricity tariff CEB.
9.0 DEFINITIONS
Producer: A person or a company who owns a generating facility to produce and deliver
electrical energy to the distribution network of CEB and presently owns a valid account
receiving electricity from CEB distribution network.
Import of Electrical Energy: Receipt of Electrical Energy by the Producer from the
CEB system.
Export of Electrical Energy: Supply of Electrical Energy by the Producer to the CEB
system.
Net Energy Metering: Net Energy Metering means the measurement of the difference
between electrical energy supplied through the electricity distribution network of CEB to
the Producer and the amount of electrical energy generated by the Producer’s Generating
Facility delivered to the electricity distribution network of CEB.
Net Accounting: Net Accounting means the payment for the difference between
electrical energy supplied through the electricity distribution network of CEB to the
Producer and the amount of electrical energy generated by the Producer’s Generating
Facility through Solar PV delivered to the electricity distribution network of CEB.
15
Net Plus: Net Plus means the consumer generates electricity through Solar PV connected
to the National grid with no linkage in-between the electricity consumption of the
producer.
Generating Facility: Generating Facility means all of the Producer’s equipment and land
at a single site or parcel of land utilized to produce and deliver electrical energy, including
but not limited to, Producer’s generating, metering and protection equipment.
Contract Demand: The allocated capacity, as depicted in the electricity agreement, to the
Consumer by the CEB expressed in terms of kilovolt ampere.
Billing Period: The period for which the Producer’s electricity meter is read by CEB and
the Consumer is issued with an electricity bill, usually a period of one month (30 days).
Energy Credit: This shall be the amount of net electrical energy exported to the CEB
distribution network during a specified Billing Period, which amount, measured in
kilowatt hours, shall be credited to the Producer’s electricity account in the subsequent
Billing Period.
Parallel Operation: The operation of the Generating Facility and producing electrical
energy at the Consumer’s premises, while connected to the CEB distribution network.
ANNEXURE 01
ANNEXURE 02
FLOW CHART ON PROCEDURE AND APPLICATION PROCESS ON NET
METERING / NET ACCOUNTING / NET PLUS SCHEMES (ANNEXURE 3)
Submission of Application
& Documents to respective
Area Engineer after the
payment of initial review fee
Collect Application and
Agreement from respective
Area Office
Comply with
CEB
Standards
Net Metering / Net Accounting
/ Net Plus Estimate
Issued to the Customer by
Area Engineer
Estimate
Payment by the Applicant
Joint Inspection by Area
Engineer, Applicant and
Consulting Engineer after
installation
Comply with
CEB
Standards
Joint Testing,
Commissioning by Area
Engineer, Consulting
Engineer, and Customer
No
YES
Contact Applicant for
Clarifications and request
Applicant to comply with
standards
No
Corrections as per the CEB
Standards
YES

Mais conteúdo relacionado

Mais procurados

ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightHimmelstern
 
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERING
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERINGTOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERING
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERINGPrasant Kumar
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costEklavya Sharma
 
Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch Hussain Ali
 
cricuit breaker report
cricuit breaker reportcricuit breaker report
cricuit breaker reportAnkit Vij
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoringash08031996
 
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...Prasant Kumar
 
Design & Building Smart Energy Meter
Design & Building Smart Energy MeterDesign & Building Smart Energy Meter
Design & Building Smart Energy MeterChetan Khatri
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601SARAVANAN A
 
Control of hvdc system
Control of hvdc systemControl of hvdc system
Control of hvdc systemAazim Rasool
 
Planning and modern trends in hvdc
Planning and modern trends in hvdcPlanning and modern trends in hvdc
Planning and modern trends in hvdcjawaharramaya
 
Sf6 circuit breakers
Sf6 circuit breakersSf6 circuit breakers
Sf6 circuit breakersjawaharramaya
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesYashwant Chaudhari
 
Energy Savings Potential of Hybrid Drivetrains
Energy Savings Potential of Hybrid DrivetrainsEnergy Savings Potential of Hybrid Drivetrains
Energy Savings Potential of Hybrid DrivetrainsAnkit Chaudhary
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordinationHimmelstern
 

Mais procurados (20)

ETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done RightETAP - Arc flash analysis done Right
ETAP - Arc flash analysis done Right
 
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERING
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERINGTOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERING
TOWNSEND'S CRITERION & LIMITATIONS|BREAKDOWN IN GAS|HIGH VOLTAGE ENGINEERING
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental cost
 
Economic dispatch
Economic dispatch  Economic dispatch
Economic dispatch
 
cricuit breaker report
cricuit breaker reportcricuit breaker report
cricuit breaker report
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoring
 
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...
TOWNSEND'S CURRENT GROWTH EQUATION DERIVATION IN HINDI|TOWNSEND'S THEORY|HIGH...
 
Design & Building Smart Energy Meter
Design & Building Smart Energy MeterDesign & Building Smart Energy Meter
Design & Building Smart Energy Meter
 
Eee ppt
Eee pptEee ppt
Eee ppt
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Control of hvdc system
Control of hvdc systemControl of hvdc system
Control of hvdc system
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Planning and modern trends in hvdc
Planning and modern trends in hvdcPlanning and modern trends in hvdc
Planning and modern trends in hvdc
 
Economic Dispatch
Economic DispatchEconomic Dispatch
Economic Dispatch
 
Sf6 circuit breakers
Sf6 circuit breakersSf6 circuit breakers
Sf6 circuit breakers
 
EHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniquesEHVAC transmission line maintenance techniques
EHVAC transmission line maintenance techniques
 
Energy Savings Potential of Hybrid Drivetrains
Energy Savings Potential of Hybrid DrivetrainsEnergy Savings Potential of Hybrid Drivetrains
Energy Savings Potential of Hybrid Drivetrains
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
Chapter 7.pptx
Chapter 7.pptxChapter 7.pptx
Chapter 7.pptx
 

Destaque

Solar power with Net Metering Technology
Solar power with Net Metering TechnologySolar power with Net Metering Technology
Solar power with Net Metering TechnologyManura Jithmal De Silva
 
Understand net metering
Understand net meteringUnderstand net metering
Understand net meteringWilfrred Anand
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusPrivate Consultants
 
Rooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringRooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringUday Doshi
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
Presentation on Low cost solutions for mass scale renewables
 Presentation on Low cost solutions for mass scale renewables Presentation on Low cost solutions for mass scale renewables
Presentation on Low cost solutions for mass scale renewablesPrivate Consultants
 
A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009Private Consultants
 
Copy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomeCopy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomePrivate Consultants
 
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?JLanka Technologies (Pvt) Limited
 
Implementation of Electricity Tariff Methodology in Sri Lanka
Implementation of Electricity Tariff Methodology in Sri LankaImplementation of Electricity Tariff Methodology in Sri Lanka
Implementation of Electricity Tariff Methodology in Sri LankaJLanka Technologies (Pvt) Limited
 
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...JLanka Technologies (Pvt) Limited
 
Database automated build and test - SQL In The City Cambridge
Database automated build and test - SQL In The City CambridgeDatabase automated build and test - SQL In The City Cambridge
Database automated build and test - SQL In The City CambridgeRed Gate Software
 

Destaque (20)

Net metering seminar
Net metering seminarNet metering seminar
Net metering seminar
 
Solar power with Net Metering Technology
Solar power with Net Metering TechnologySolar power with Net Metering Technology
Solar power with Net Metering Technology
 
Understand net metering
Understand net meteringUnderstand net metering
Understand net metering
 
Applicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri LankaApplicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri Lanka
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plus
 
Rooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringRooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net Metering
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
The Future of Net Metering
The Future of Net MeteringThe Future of Net Metering
The Future of Net Metering
 
Smart meterapp v01
Smart meterapp v01Smart meterapp v01
Smart meterapp v01
 
CEB Executive Team 1999
CEB Executive Team 1999CEB Executive Team 1999
CEB Executive Team 1999
 
Presentation on Low cost solutions for mass scale renewables
 Presentation on Low cost solutions for mass scale renewables Presentation on Low cost solutions for mass scale renewables
Presentation on Low cost solutions for mass scale renewables
 
A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009A Presentation made at the Sri Lanka Institution of Engineers in 2009
A Presentation made at the Sri Lanka Institution of Engineers in 2009
 
Copy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka HomeCopy Of Pv Calc For Sri Lanka Home
Copy Of Pv Calc For Sri Lanka Home
 
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
 
Implementation of Electricity Tariff Methodology in Sri Lanka
Implementation of Electricity Tariff Methodology in Sri LankaImplementation of Electricity Tariff Methodology in Sri Lanka
Implementation of Electricity Tariff Methodology in Sri Lanka
 
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
 
Inspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code Compliance
 
Grupo de alimentos
Grupo de alimentosGrupo de alimentos
Grupo de alimentos
 
Database automated build and test - SQL In The City Cambridge
Database automated build and test - SQL In The City CambridgeDatabase automated build and test - SQL In The City Cambridge
Database automated build and test - SQL In The City Cambridge
 
nATACION
nATACIONnATACION
nATACION
 

Semelhante a Manual for connecting micro-scale renewable energy systems

Solar PV Net meetering explained
Solar PV Net meetering explainedSolar PV Net meetering explained
Solar PV Net meetering explainedAndy Varoshiotis
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Amitava Nag
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDecision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDo Tuan Phong
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
Forecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forForecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forJay Ranvir
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAbdul Haseeb
 
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftHeadway Solar
 
Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Headway Solar
 
Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policyJay Ranvir
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl finalPRIYANK JAIN
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016Budi Supomo
 
Renewable energy and grid integration energy transition
Renewable energy and grid integration   energy transitionRenewable energy and grid integration   energy transition
Renewable energy and grid integration energy transitionNarinporn Malasri
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureSALMAN SAEED
 
Protocol for submission of data to sldc for renewable energy certificate
Protocol for submission of data to sldc for renewable energy certificateProtocol for submission of data to sldc for renewable energy certificate
Protocol for submission of data to sldc for renewable energy certificateJay Ranvir
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 

Semelhante a Manual for connecting micro-scale renewable energy systems (20)

Solar PV Net meetering explained
Solar PV Net meetering explainedSolar PV Net meetering explained
Solar PV Net meetering explained
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDecision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
Forecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling forForecasting, scheduling and im balance handling for
Forecasting, scheduling and im balance handling for
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
 
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - DraftIndia's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
India's National Solar Mission Phase 2 Batch 1 Guidelines - Draft
 
Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011Bihar policy for promotion of new and renewable energy sources 2011
Bihar policy for promotion of new and renewable energy sources 2011
 
Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016
 
Renewable energy and grid integration energy transition
Renewable energy and grid integration   energy transitionRenewable energy and grid integration   energy transition
Renewable energy and grid integration energy transition
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
Protocol for submission of data to sldc for renewable energy certificate
Protocol for submission of data to sldc for renewable energy certificateProtocol for submission of data to sldc for renewable energy certificate
Protocol for submission of data to sldc for renewable energy certificate
 
Draft Feed-In Tariffs
Draft Feed-In TariffsDraft Feed-In Tariffs
Draft Feed-In Tariffs
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 

Mais de Private Consultants

GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...Private Consultants
 
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdf
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdfSri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdf
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdfPrivate Consultants
 
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...Private Consultants
 
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAPrivate Consultants
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Private Consultants
 
Report of the committee appointed to investigate the Electricity Supply Inter...
Report of the committee appointed to investigate the Electricity Supply Inter...Report of the committee appointed to investigate the Electricity Supply Inter...
Report of the committee appointed to investigate the Electricity Supply Inter...Private Consultants
 
Life Four Elements. New Year wish
Life Four Elements. New Year wish Life Four Elements. New Year wish
Life Four Elements. New Year wish Private Consultants
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Private Consultants
 
December 2016 bio gas+ newsletter
December 2016 bio gas+ newsletterDecember 2016 bio gas+ newsletter
December 2016 bio gas+ newsletterPrivate Consultants
 
Customer or Product? ownership and control of personal data
Customer or Product? ownership and control of personal dataCustomer or Product? ownership and control of personal data
Customer or Product? ownership and control of personal dataPrivate Consultants
 
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...Private Consultants
 
Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015Private Consultants
 
Toward a Sustainable Energy Future for All
Toward a Sustainable Energy Future for AllToward a Sustainable Energy Future for All
Toward a Sustainable Energy Future for AllPrivate Consultants
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuidePrivate Consultants
 
A renewables-based South African energy system?
A renewables-based South African energy system?A renewables-based South African energy system?
A renewables-based South African energy system?Private Consultants
 
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...Private Consultants
 

Mais de Private Consultants (20)

GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR  POWER PLANT CASE STUDY;...
GIS BASED SUITABLE SITE SELECTION FOR FLOATING SOLAR POWER PLANT CASE STUDY;...
 
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdf
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdfSri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdf
Sri-Lanka-Energy-Program-EPRI-Energy-Storage-Webinar-Series-Session-4.pdf
 
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...
Mobilizing Renewable Energy to Overcome the Energy and Financial Crisis: The ...
 
Beautiful.pps
Beautiful.ppsBeautiful.pps
Beautiful.pps
 
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKAACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
ACHIEVING THE VISION OF 80 PERCENT RENEWABLES BY 2030 SRILANKA
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
Report of the committee appointed to investigate the Electricity Supply Inter...
Report of the committee appointed to investigate the Electricity Supply Inter...Report of the committee appointed to investigate the Electricity Supply Inter...
Report of the committee appointed to investigate the Electricity Supply Inter...
 
Life Four Elements. New Year wish
Life Four Elements. New Year wish Life Four Elements. New Year wish
Life Four Elements. New Year wish
 
NDC of sri lanka
NDC of sri lankaNDC of sri lanka
NDC of sri lanka
 
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)Powering sri lanka towards sustainability (Cabraal 03 Apr17)
Powering sri lanka towards sustainability (Cabraal 03 Apr17)
 
December 2016 bio gas+ newsletter
December 2016 bio gas+ newsletterDecember 2016 bio gas+ newsletter
December 2016 bio gas+ newsletter
 
Customer or Product? ownership and control of personal data
Customer or Product? ownership and control of personal dataCustomer or Product? ownership and control of personal data
Customer or Product? ownership and control of personal data
 
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...
Conversion of Seawater and Carbon Dioxide into Biofuel/Food and Sweet Water, ...
 
Machine response
Machine responseMachine response
Machine response
 
Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015Ceylon Electricity Board Statistical Digest 2015
Ceylon Electricity Board Statistical Digest 2015
 
Toward a Sustainable Energy Future for All
Toward a Sustainable Energy Future for AllToward a Sustainable Energy Future for All
Toward a Sustainable Energy Future for All
 
Value of solar report
Value of solar reportValue of solar report
Value of solar report
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
A renewables-based South African energy system?
A renewables-based South African energy system?A renewables-based South African energy system?
A renewables-based South African energy system?
 
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
World Energy Resources Report 2016, E-storage: Shifting from cost to value 20...
 

Último

Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 

Último (20)

Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 

Manual for connecting micro-scale renewable energy systems

  • 1. 1 Manual for Interconnection of Micro Scale Renewable Energy Based Power Generating Facilities at Low Voltage Consumer Feeders of National Grid August 2016
  • 2. 2 1.0 Background: The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at present country has about 5500 such installations contributing 40MW of renewable energy to the national grid. In view of enhancing the renewable energy portfolio in the electricity generation in Sri Lanka, the Government of Sri Lanka (GOSL) has launched “Soorya Bala Sangramaya” to promote roof top solar installations in the country. The objectives of the above program is to reach an installed capacity of roof top solar to 200MW by 2020. In order to support the GOSL’s renewable energy promotional drive, the Net Metering Concept was further enhanced by introducing following three schemes. 2.0 SCHEME 01 - NET METERING This scheme which is existing at present allows any electricity consumer to install a renewable energy based electricity generating facility and connect it to the CEB’s electricity network. The electricity network connection scheme shall be approved by CEB. The utility energy meter will be replaced with an Import/Export meter. The electrical energy consumed from the grid is considered as import energy and electrical energy generated and supplied to the grid is considered as export energy. At the end of each billing period (typically one month), CEB will read the consumer’s export energy meter reading and the import meter reading. The electricity bill will be prepared giving credit to the export, and charging the consumer for the difference between the import and the export. If the export is more than the import in any billing period, the Consumer will receive an export credit, and will be credited towards his next month’s consumption. Such credits may be carried-over to subsequent months, as long as there is no change in the legal consumer for the premises. The key factor in this process is that there will be no financial compensation for the excess energy exported by the consumer. All exports will be set-off against the
  • 3. 3 consumer’s own consumption, either in the current billing period or future billing periods. Accordingly, consumers will be compelled to select the capacity of the renewable energy equipment to reasonably match his requirements. The installed capacity of the Generating Facility shall not exceed the Contract Demand of the Producer. The contract period for the scheme is 20 years. Typical connection arrangement for the Scheme 1 is given in the Annexure 01. 3.0 SCHEME 02 - NET ACCOUNTING This Scheme has introduced an additional element to the Scheme 01 where an export tariff for the net energy exported (if any) was introduced. If the generated units of electricity using the solar panels fixed in the roof are greater than the units consumed, the customer will be paid Rs 22.0 per unit during the first 07 yrs and from the 08th year to 20th year he will be paid Rs 15.50 per unit. If the consumption is greater than the energy generated form the solar panels, consumer has to pay to the CEB at the existing electricity tariff for the excess energy consumed. This Scheme is limited only for the Solar.
  • 4. 4 The installed capacity of the Generating Facility shall not exceed the Contract Demand of the Producer. The contract period is 20 yrs. Typical connection arrangement for the Scheme 2 is given in the Annexure 01. 4.0 SCHEME 03 – NET PLUS Total generation of electricity from the solar PV power plant will be exported directly through a dedicated meter for which the customer will be paid. The energy import will be measured through a separate import meter and will be billed as per the existing electricity tariff. CEB shall read the meter to read the solar power plant output and the other meter to read the import energy. Total generation of electricity from the solar PV power plant will be exported directly through a dedicated meter for which the customer will be paid Rs 22.0 per unit during the first 07 yrs and from the 08th year to 20th year the customer will be paid Rs 15.50 per unit. . The energy import will be measured through a separate import meter and will be billed as per the existing electricity tariff CEB. The installed capacity of the Generating Facility shall not exceed the Contract Demand of the Producer. The contract period is 20 yrs.
  • 5. 5 Typical connection arrangement for the Scheme 3 is given in the Annexure 02. In Net Plus Scheme, the solar PV electricity generation facility shall be metered separately. The solar PV inverter output (generation facility output) should be brought to the metering point where both import and export energy meters are located in a separate meter cubical. The meter cubicle should be sealed properly to avoid tampering. If the space of the existing meter location is not sufficient to install another meter for energy export, the consumer should make necessary arrangements to shift the metering point to a suitable location in consultation with relevant Area Chief Electrical Engineer/ Area Engineer/Provincial Commercial Engineer. The cost associated for shifting the meter to a new location should be charged at the prevailing rate from the consumer. 5.0 PROCEDURE & APPLICATION PROCESS 5.1 Potential Applicant initiates contact with the respective CEB Area Engineer. Upon request CEB will provide Application and Agreement and Interconnection Standard including technical information, initial review information, metering requirement etc to a potential Producer. 5.2 Applicant initiates contact with Sri Lanka Sustainable Energy Authority (SEA) and commence the process of securing energy permit if the Applicant’s Generating Facility is based on a renewable energy technology other than solar power. If the Applicant’s Generating Facility is based solar power, energy permit is not required.
  • 6. 6 5.3 Applicant completes the Application and files Application and supply any relevant additional information requested by CEB Area Engineer. Initial review fee is paid at the time of handing over the Application for processing. 5.4 CEB Area Engineer performs an Initial Review and develops preliminary cost estimates and interconnection requirements. 5.5 The applicant should purchase equipment as per the technical details given in the Net Energy Metering Agreement and IEC 61727 (2004 -12), IEEE 1547 – 2003 or latest available equivalent Standards. 5.6 Applicant and CEB enter into an Interconnection Agreement. 5.7 Producer arranges for and completes commissioning testing of generating facility and Producers interconnection facilities by a Consulting Chartered Electrical Engineer as per IEC 61727 (2004 -12), IEEE 1547 – 2003, IEE 17th Edition Wiring Regulations or latest available equivalent Standards at Producers cost and the same is witnessed by the Area Engineer of the CEB. Before commissioning testing, Producers shall develop a written testing plan Certified by a Consulting Chartered Electrical Engineer to be submitted to CEB for its review and acceptance. Where applicable the test plan shall include the installation test procedures published by the manufacturer of the generation or interconnection equipment. Facility testing shall be conducted at a mutually agreeable time. 5.8 CEB authorizes parallel operation, after successful commissioning testing by the Area Engineer and execution of Agreement. Flow chart on the procedure and application process is given in the Annexure 03.
  • 7. 7 6.0 GENERAL RULES, RIGHTS AND OBLIGATIONS 6.1 The Generating Facility shall use one or any combination of the approved types of renewable sources of energy to generate electricity at the Producer’s premises in respect of Scheme 01. Generating facility shall be solar for Schemes 02 and 03. 6.2 The entire Generating Facility and equipment such as solar panels, turbines and associated accessories such as inverters and protective circuits shall be located within the Producer’s premises and shall be owned by the Producer. 6.3 A Producer must comply with the conditions imposed by the CEB which is depicted in Sections 3.0, 5.0, 6.0, 7.0 of the Agreement and Interconnection Standard and receive CEB written permission before parallel operation of its Generating Facility with the CEB distribution system 6.4 The Generating Facility shall be intended to meet all or a part of the Producer’s electricity demand (maximum allowable limit is contract demand of the Producer) and electrical energy requirements. It shall be the responsibility of the Producer to decide on the capacity of Generating Facility with due consideration to the amount of renewable energy available, investment and operating costs of equipment, the Producer’s Contract Demand with CEB and the average electrical energy requirements of the Producer. 6.5 Interconnection with CEB distribution system under this agreement does not provide the Producer any rights to utilize CEB HV/LV distribution system for the transmission, distribution or wheeling of electric power to a third party. 6.6 A Producer shall ascertain and comply with applicable rules, regulations imposed by the Ministry of Power and Energy / CEB / Public Utilities Commission of Sri Lanka (PUCSL)/ Sri Lanka Sustainable Energy Authority (SEA) and any law or standard that applies to the design, construction, installation, operation or any other aspect of the Producers Generating Facility and interconnection facilities. 6.7 CEB shall have the right to review the design of Producer’s generating and interconnection facilities and to inspect such faculties prior to the commencement of Parallel Operation with CEB distribution system. CEB may require a Producer to make modification as necessary to comply with the requirements. CEB review and authorization for parallel operation shall not
  • 8. 8 be construed as conforming or endorsing the Producers design or as warranting the Generating and or interconnection facility’s safety, durability or reliability. CEB shall not, by reason of such review or lack of review, be responsible for the strength, adequacy or capability of such equipment. 6.8 The installed capacity of the Generating Facility shall not exceed the Contract Demand of the existing installation if the Producer so wishes to increase or decrease his Contract Demand, he shall first apply to change his Contract Demand as a Consumer, and after fulfilling the requirements specified by CEB, request an amendment to this Agreement. In any event, the Term of this Agreement shall be limited to twenty years from the date of execution. 6.9 The Generating Facility shall be built and operated according to the relevant standards and other guidelines stipulated in the Agreement. 6.10 The Producer shall install all the necessary protective equipment required to ensure safe and reliable operation of the Generating Facility and the Producer shall meet all the expenses of installing such equipment and other associated accessories. 6.11 The Producer shall maintain all the equipment downstream of the metering equipment in good operating condition. 6.12 The Producer shall allow CEB to enter his premises for the inspection of the metering equipment and the Generating Facility, and would promptly attend to and implement any written recommendations or instructions with regard to the Generating Facility. 6.13 Any information pertaining to Generating and/or interconnection facilities provided to CEB by a Producer shall be treated by CEB in a confidential manner. 6.14 A Producer shall operate and maintain its Generating Facility and Interconnection Facilities in accordance with Prudent Electrical Practices. 6.15 CEB may limit the operation or disconnect or require the disconnection of a Producer’s Generating Facility from CEB’s distribution system at any time with or without notice, in the event of an emergency or to correct unsafe operating conditions. CEB may also limit the operation or disconnect or require the disconnection of a Producers Generating facility from CEB distribution system upon the provision of reasonable notice.
  • 9. 9 (a) to allow for routine maintenance, repairs or modifications to CEB distribution system. (b) Upon CEB determination that a Producer’s Generating Facility is not in compliance with the conditions stipulated in the Agreement (c) Upon termination of Interconnection Agreement. 6.16 Prior to signing the agreement, the Producer shall provide technical literature including Type Test certificates of the protective equipment for Net Energy Metering to the CEB and shall obtain the concurrence of the CEB to procure the same. 6.17 CEB shall promptly install the meters and metering equipment to implement Net Energy Metering, the initial cost of which shall be paid by the Producer. 6.18 CEB shall maintain the distribution network and the metering equipment to supply and meter the electricity requirements of the Producer, and to accept the electricity generated by the Producer, up to the capacity stated in the supply agreement and this Agreement, respectively. 6.19 CEB shall promptly attend to Producer’s requests for testing the meters or metering equipment for their accuracy, the fees for which shall be payable by the Producer. 6.20 CEB shall promptly read the Producer's meter at the end of each Billing Period, bill the Consumer for his net energy consumption in the Billing Period after giving due consideration to the credits from the previous Billing Period, and credit the energy exported to the Consumer’s account to be carried over to the next Billing Period. CEB’s monthly invoice shall show the export energy credit carried over from the previous Billing Period, consumption and export in the present Billing Period, and the energy credit carried over to the subsequent Billing Period (all figures in kilowatt hours). 7.0 GENERATING FACILITY DESIGN AND OPERATING REQUIREMENTS 7.1 The protective function and requirements defined here are designed to protect CEB distribution system and not the Generating Facility. A Producer shall be solely
  • 10. 10 responsible for providing adequate protection for its Generating Facility and interconnection facilities. The Producer’s protective functions shall not impact the operation of other protective functions utilized on CEB’s distribution system in a manner that would affect CEB capability of providing reliable service to its customers. 7.2 Generating facilities operating in parallel with CEB distribution system shall be equipped with the following protective functions to sense abnormal conditions on CEB distribution system and cause generating facility to be automatically disconnected from CEB distribution system or to prevent the generating facility from being connected to CEB distribution system inappropriately. 7.2.1 CEB Distribution System Parameters are as follows; a. Nominal Voltage 33 kV 11kV 400 V b. System Highest Voltage 36 kV 12 kV 440 V c. Rated fault current 25 kA 20 kA 20 kA d. No. of Phases 3 3 3ph& Neutral e. System Frequency 50Hz 50Hz 50Hz f. Method of Earthing Non Effectively Solidly Solidly Earthed Earthed Earthed 7.2.2 Over and Under Voltage trip functions and over and under frequency trip functions. 7.2.3 A voltage and frequency sensing and time delay function to prevent the generating facility from energizing a deenergized distribution system circuit and to prevent the generating facility from reconnecting with CEB distribution system unless CEB distribution system service voltage is within 06% of the nominal supply voltage and frequency is within 47 Hz to 52 Hz and are stable for at least 3 minutes. 7.2.4 A function to prevent the generating facility from contributing to the formation of an Unintended Island and cease to energize the CEB system within half a second (0.5 second) of the formation of an unintended island. 7.2.5 The generating facility shall cease to energize CEB distribution system for faults on CEB distribution system circuit to which it is connected. (IEEE 1547 – 4.2.1). The generating facility shall cease to energize CEB distribution circuit prior to reclosure by CEB distribution system equipment. (IEEE 1547- 4.2.2).
  • 11. 11 7.2.6 The generating facility shall be automatically disconnected from the CEB distribution network within half a second (0.5 second) when the CEB supply is intentionally or automatically switched off. 7.2.7 The Producer should not change any of the settings stated above without the written permission from the CEB. 7.3 Suitable equipment required. Circuit breakers or other interrupting devices located at the point of common coupling must be certified by CEB as suitable for their intended operation. This includes being capable of interrupting the maximum available fault current expected at their location. Producer’s generating facility and interconnection facilities shall be designed so that the failure of any one device shall not potentially compromise the safety and reliability of CEB distribution system. The generating facility paralleling device shall be capable of with standing 220% of the interconnection facility rated voltage (IEEE 1547 – 4.1.8.3). The interconnection facility shall have the capability to withstand voltage and current surges in accordance with the environments defined in IEEE 1547 – 4.1.8.2 7.4 Visible disconnect required The producer shall furnish and install a ganged manually operated isolating switch near the point of common coupling (PCC) to isolate the generating facility from CEB distribution system. The device does not have to be rated for load break nor provide over current protection. The device must: a. Allow visible verification that separation has been accomplished. (This requirement may be met by opening the enclosure to observe contact separation) b. Include marking or signage that clearly open and closed positions. c. Be capable of being reached quickly and conveniently 24 hours a day by CEB personnel for construction, maintenance, inspection, testing or reading, without obstacles or without requiring those seeking access to obtain keys, special permission, or security clearance even when the isolating equipment is consumer’s property. d. Be secured in a weather-proof enclosure and capable of being locked in the open position prevent unauthorized or accidental closing. e. Be clearly marked on the submitted single line diagram and its type and location approved by CEB prior to installation. If the device is not adjacent to the PCC,
  • 12. 12 permanent signage must be installed at a CEB approved location providing a clear description of the location of the device 7.5 Drawings: Prior to parallel operation or momentary parallel operation of the generating facility CEB shall approve the Producers protective function and control diagrams. Generating facilities equipped with protective function and control scheme previously approved by CEB may satisfy this requirement by reference to previously approved drawings and diagrams certified by a Chartered Engineer. 7.6 The output voltage wave form of the Generating Facility shall be of 50 Hz, with a sinusoidal wave form. 7.7 The Total Harmonic Distortion (THD) for current and individual harmonic limit should be as follows. Individual harmonic order h h<11 11<h<17 17<h<23 23<h<35 35<h THD Allowable Limit (%) 4 2 1.5 0.6 0.3 5 Table 1: Current Harmonic Limits 7.8 If the Generating Facility uses a direct current (dc) generator, it should use an inverter to convert the dc to ac, complying with the THD for current and individual harmonic limits as in table 1. 7.9 The inverters used for interconnection shall be only those which have received the Type Approval by CEB. 7.10 The Producer should not change any of the settings stated in section 6.5 without the written permission from the CEB. 7.11 The Power Quality at the Point of Common Coupling (PCC) shall be as follows; Power quality measurement shall be complied with IEC 61400-21. Emission of inter- harmonic currents from the power electronic converter up to 2 kHz and of current distortions above 2 kHz up to 9 kHz during operations shall be stated. The individual inter-harmonic currents below 2 kHz and the current distortions in the range 2 kHz up to 9 kHz shall be given as ten-minute average data for each frequency at the output power giving the maximum individual inter-harmonic current or current distortion. 7.12 Flicker Standard applicable: As per IEC 61000-3-7
  • 13. 13 8.0 ENERGY METERING AND BILLING 8.1 SCHEME 01 (NET METERING) 8.1.1 The Producers’ electricity service shall be metered with a two-way (import and export) energy meter, and the cost of installation of such meter or metering equipment for the first time, shall be borne by the Producer. 8.1.2 During any Billing Period, if the electrical energy supplied by CEB exceeds the electricity exported by the Consumer plus any energy credits carried-over from the previous Billing Period, the charges for the net energy (kWh) consumed will be calculated using the Producer’s applicable tariff. The fixed charge and/or the minimum charge applicable for the installation will also be applicable 8.1.3 During any Billing Period, if the electricity exported by the Producer plus any energy credits carried-over from the previous Billing Period exceeds the electrical energy supplied by CEB, the Producer shall be billed only for the applicable fixed charge and/or the minimum charge, and the balance of the electricity generated shall be carried over to the next Billing Period and appear as an energy credit, stated in kilowatt hours. 8.1.4 Energy credits may be carried over from one Billing Period to another, for so long as the Consumer has a legal contract for the supply of electricity by CEB, and during the Term of this Agreement. 8.1.5 In the event the Producer’s electricity supply account and/or the contract for the premises is terminated for whatever reason, any accumulated energy credits on the last day of such termination shall be granted to the CEB with no financial compensation to the Producer. Energy credits shall not be transferable to any other Producer who applies for a new contract for the supply of electricity to the same premises. Energy credits shall not be transferable to the same consumer applying for a contract to another premise. 8.2 SCHEME 2 (NET ACCOUNTING) 8.2.1 If the generated units of electricity using the solar panels fixed in the roof are greater than the units consumed, the customer will be paid Rs 22.0 per unit during the first 07 yrs and from the 08th year to 20th year he will be paid Rs 15.50 per unit. If the
  • 14. 14 consumption is greater than the energy generated form the solar panels, consumer has to pay to the CEB at the existing electricity tariff for the excess energy consumed. 8.2 SCHEME 03 (NET PLUS) 8.3.1 CEB shall read the meter to read the solar power plant output and the other meter to read the import energy. Total generation of electricity from the solar PV power plant will be exported directly through a dedicated meter for which the customer will be paid Rs 22.0 per unit during the first 07 yrs and from the 08th year to 20th year the customer will be paid Rs 15.50 per unit. . The energy import will be measured through a separate import meter and will be billed as per the existing electricity tariff CEB. 9.0 DEFINITIONS Producer: A person or a company who owns a generating facility to produce and deliver electrical energy to the distribution network of CEB and presently owns a valid account receiving electricity from CEB distribution network. Import of Electrical Energy: Receipt of Electrical Energy by the Producer from the CEB system. Export of Electrical Energy: Supply of Electrical Energy by the Producer to the CEB system. Net Energy Metering: Net Energy Metering means the measurement of the difference between electrical energy supplied through the electricity distribution network of CEB to the Producer and the amount of electrical energy generated by the Producer’s Generating Facility delivered to the electricity distribution network of CEB. Net Accounting: Net Accounting means the payment for the difference between electrical energy supplied through the electricity distribution network of CEB to the Producer and the amount of electrical energy generated by the Producer’s Generating Facility through Solar PV delivered to the electricity distribution network of CEB.
  • 15. 15 Net Plus: Net Plus means the consumer generates electricity through Solar PV connected to the National grid with no linkage in-between the electricity consumption of the producer. Generating Facility: Generating Facility means all of the Producer’s equipment and land at a single site or parcel of land utilized to produce and deliver electrical energy, including but not limited to, Producer’s generating, metering and protection equipment. Contract Demand: The allocated capacity, as depicted in the electricity agreement, to the Consumer by the CEB expressed in terms of kilovolt ampere. Billing Period: The period for which the Producer’s electricity meter is read by CEB and the Consumer is issued with an electricity bill, usually a period of one month (30 days). Energy Credit: This shall be the amount of net electrical energy exported to the CEB distribution network during a specified Billing Period, which amount, measured in kilowatt hours, shall be credited to the Producer’s electricity account in the subsequent Billing Period. Parallel Operation: The operation of the Generating Facility and producing electrical energy at the Consumer’s premises, while connected to the CEB distribution network.
  • 18. FLOW CHART ON PROCEDURE AND APPLICATION PROCESS ON NET METERING / NET ACCOUNTING / NET PLUS SCHEMES (ANNEXURE 3) Submission of Application & Documents to respective Area Engineer after the payment of initial review fee Collect Application and Agreement from respective Area Office Comply with CEB Standards Net Metering / Net Accounting / Net Plus Estimate Issued to the Customer by Area Engineer Estimate Payment by the Applicant Joint Inspection by Area Engineer, Applicant and Consulting Engineer after installation Comply with CEB Standards Joint Testing, Commissioning by Area Engineer, Consulting Engineer, and Customer No YES Contact Applicant for Clarifications and request Applicant to comply with standards No Corrections as per the CEB Standards YES