SlideShare a Scribd company logo
1 of 73
G. S. Dikondawar
GM – Innovation & Technology
The Supreme Industries Ltd.
•
Introduction
•
Disadvantages of conventional products
•
Septic system
•
Existing system
•
Problems associated with existing system
•
Changing factors demanding new solution
•
Safegard septic tank
a) Vertical design
b) Modular design
•
Components of septic tank
•
Product range
•
Features and benefits
Contents
An Introduction
•
Sanitation has direct link with the health and the environment
•
People suffer serious health consequences and millions of people die as a
result of lack of effective sanitation
•
Use of inefficient drainage systems and sewer products are the main
reasons.
•
Advance products/sewerage system has the potential to change the
scenario. Developed countries have switched over to advance products.
•
Plastic Drainage/ Sewer Pipe systems minimize Sanitation risks and improve
health and environmental aspects.
Future India….
Three aspects of our current budget focus on:
-
Total Sanitation is expected to be achieved through Swatchh Bharat
Abhiyan by 2019 at a cost of 1000 Cr Rupees.
-
Allocation of 7060 Cr for the development of 100 Smart Cities which will
include Road, Electricity, Water supply and Sanitation.
-
All Schools to have Toilet facility
Disadvantages of conventional drainage products
1. Heavy weight – 12 times the weight of plastics. Need of heavy equipments,
more manpower- more installed cost
2. Cumbersome and time consuming installation
3. Poor resistance to Corrosion
4. Rough internal surface leads to blocks, solid depositions, encrustation and
consequent reduction in internal dia and flow
5. Rough bore also leads to more friction, lesser flow or needs higher slope
(means more earthwork, costs)
6. Poor resistance to soil movement due to lack of flexibility
7. Cracks and leaks lead to root penetration into the pipe system
Septic System
Septic Tankain field /Soak Pit
Septic system
•
Definition
A septic system is a highly efficient, self-contained, underground wastewater
treatment system. As septic systems treat and dispose of household
wastewater onsite, they are often more economical than centralized sewer
systems in rural areas where plot sizes are larger and houses are spaced widely
apart. And by using natural processes to treat the wastewater onsite, usually in
a homeowner's backyard, septic systems don't require the installation of miles
of sewer lines, making them less disruptive to the environment.
•
Features
-
Natural waste water treatment
-
Simple design
-
Less expensive
-
Easy for installation & maintenance
Septic system
The septic tank is basically a watertight underground tank, the purpose of which
is the collection, storage, and to some extent treatment of sewage/effluents.
Septic tanks are usually made of concrete or masonry, with an inlet and outlet
pipe. Wastewater flows from the home to the septic tank through the sewer
pipe. The septic tank treats the wastewater naturally by holding it in the tank
long enough for solids and liquids to separate. The wastewater forms three
layers inside the tank. Solids lighter than water (such as greases and oils) float to
the top forming a layer of scum. Solids heavier than water settle at the bottom of
the tank forming a layer of sludge. This leaves a middle layer of partially clarified
wastewater.
Septic Tank
-
Collection of waste water
-
Retention / holding
-
Sedimentation / settlement
-
Anaerobic digestion
-
Flocculation
-
Clarification
-
Discharge
Working of Septic Tank
Typical layout of septic system
•
Effluent - The supernatant liquid discharge from a septic tank.
•
Invert - The lowest point of the interior of a sewer or drain at any cross-
section.
•
Scum - The greasy and other substances floating on the surface of sewage.
•
Septic Tank - A water-tight single storied tank in which sewage is retained
sufficiently long to permit sedimentation.
•
Sewage - The liquid waste of a household or community including human
excreta.
•
Sludge - Sludge is the settled solid matter in semi-solid condition.
Terminology
Function of septic tank
a) Drain field
The drain field is a network of perforated pipes (or "laterals"). These are laid in gravel-
filled trenches or beds. After solids settle in the septic tank, the liquid wastewater or
effluent is discharged. This is done either by gravity or pressure, to an absorption field,
also known as a drain field or leach field.
b) Soak Pit
The effluent discharge from the septic tank may contain disease causing germs and pollutants
which must be treated to protect human health and environment. Hence these effluents
should be carefully and safely disposed either in the drain field or soak pit to facilitate
disintegration through bacterial action.
Disposal of septic tank effluents
Inner perforated pipe
External perforated pipe
Septic tank
Inlet pipe
Outlet pipe
Distribution box
Gravel filled trench
Typical diagram showing drain field
Video for drain field
A soak pit is a covered, porous-
walled chamber that allows water
to slowly soak into the ground.
Effluent from septic tank is
discharged to the underground
chamber from where it infiltrates
into the surrounding soil.
Soak Pit
Brick masonry
Conventional septic tank
RCC / Hume pipe
Existing system
•
Leakages
•
Infiltration
•
Ex-filtration
•
Root penetration
•
Breakages - Insufficient resistance to earth, traffic loads
•
Corrosion
•
Insufficient resistance to acids & chemicals
•
Rough interior surface - deposition & incrustation
•
Laborious and time consuming installation
•
Frequent maintenance requirements
Diff. problems in conventional septic tanks
•
Excess load on septic tank
•
Improper digestion (decomposition) of solid wastes
•
Pollution of underground water
•
Contamination of soil
•
Unhygienic & harmful for environment
•
Water born disease & serious health problems
•
Uncertain & short life span
•
Fatal accidents
•
Dryness of septic tank
Consequences
•
Standard of living/Health consciousness
•
Nature of sewage
•
Space constraints
•
Time constraints
•
To overcome problems with existing system
Factors demanding advance solution
1. Sufficient area for sludge digestion
2. Holding capacity of waste water (minimum 24 hrs.)
3. Water tight structure
4. Sufficient volume to collect retain & digest solid waste
5. Long cleaning period
6. Easy for maintenance
7. Easy for transportation, handling & installation
8. Excellent performance
9. Better effluent quality (exceeds the standard parameters)
10. Sufficiently strong to sustain different loading condition
Design consideration of Safegard septic tank
The surface area of the tank required should be O-92 m² for every 10 liters
per minute of peak flow rate at a temperature of 25°.
A minimum depth of sedimentation shall be 250 to 300 mm.
Sludge digestion per capita suspended solids entering the tank may be
taken as 70 g/day.
The capacity required for sludge digestion is 0.033 m³ per capita at 25°C.
Volume of digested sludge is normally O-000 21 m³ per capita per day.
Detention Time provides a detention period of 24 to 48 hours based on an
average daily flow of sewage.
Requirement of BIS
•
Unique Design – Rototationally moulded, one piece seamless
construction with two chamber patented design
•
Great Strength - Highly durable
•
Light in weight - Simple and quick Installation
•
Excellent Chemical Resistance - free from concrete corrosion and ill
effects of H2S
•
Minimum space and excavation requirements
•
Free from infiltration, ex-filtration and root penetration
•
Long life with economy
•
Hygienic and safe
•
Eco-friendly
•
Conforms to National and International standards
•
Maintenance free
Safegard septic tanks - Unique features
•
Available in 1000, 1500, 2000, 3000, 5500 liters and large size up to
29500 liters in modular design.
•
EN 12566, IS:2470
Available sizes and applicable standards
Vertical design Modular design
Diff. designs of Safegard septic tanks
Components of vertical septic tanks
Typical section of vertical septic tank
Functioning of septic tank
1) EXCAVATION
Excavate a pit approximately 600 mm larger than the
size of septic tank. Depth of the pit should be decided
based on position of inlet and outlet with required
gradient and disposal point plus 150 mm extra for
bedding.
2) BED PREPARATION
Ensure that the base of the pit is even, flat and
sufficiently hard to form a strong foundation for the
septic tank. Prepare a 150 mm (6”) thick bed of
granular material and compact it properly. Ensure that
no sharp object/stone etc should protrude which can
puncture the tank.
Installation of septic tank
3) POSITIONING THE TANK
Lower the tank and position in the pit ensuring that it is
vertical, centrally positioned, correctly aligned and
leveled using spirit level and the outlet pipe faces the
soak pit and inlet pipe swivels, ensuring a straight
connection.
4) FILL THE WATER IN THE TANK
Fill up the tank with water up to 1/3rd capacity using
tap.
5) BACKFILLING
Start the backfilling. Backfilling and water filling should
be carried out simultaneously ensuring that the
backfilling level never exceeds the rising level of water
within the tank until the water overflows through the
outlet pipe, thus indicating the tank is full. The width of
the backfilling should be minimum 300 mm (12”) around
the tank. Excavated soil can be used if it is silt, sand or
soft murum but in case of black cotton, loomy or marshy
soil only selected inert granular material i.e. sand /stone
dust /gravels (max. size 10 mm) should be used as
backfill material. Backfill material should be placed in
250 mm thick layers and compacted to 90% proctor
density. It is particularly important to note that
excavated material consisting of rock, peat or clay is not
used as backfill material.
6) MAKE THE PIPE CONNECTIONS
When the level of the backfill reaches the underside
of the outlet pipe invert, inlet and outlet
connections should be made. It is recommended to
maintain 1:40 to 1:60 fall between drain head and
inlet of the septic tank.
7) FINAL BACKFILLING
After making pipe connections, complete the
backfilling up to the top level of the tank. In case of
non traffic conditions, normal flooring like PCC /
paver blocks etc. can meet the requirements.
8) PROVIDING COVER / LID
Select the appropriate cover as per the site loading
conditions and place it on the top of tank. In case of
pedestrian movement where vehicular loads are not
expected, plastic light weight cover is recommended.
This plastic cover should filled with concrete after
placing it on the septic tank. For vehicular traffic
movement GRP cover of appropriate load class is
recommended. For GRP covers 150 mm thick PCC
(min. M150 grade) beneath the cover frame for full
width of tank is recommended. After embedding the
frame, place the cover as shown in the figures.
Components of modular septic tanks
Components of modular septic tanks
Typical diagram of modular tanks for
different capacities
Installation of modular tanks
1) Excavation of the pit
Excavate a pit approximately 600 mm larger than the size of septic tank. Depth of the pit should
be decided based on the position of inlet and outlet with required gradient and disposal point
plus 150 mm extra for bedding.
2) Bed preparation
Prepare a 150 mm (6”) thick bed of granular material and compact it properly. Ensure that
the base of the pit is smooth and flat. It should be sufficiently hard to form a strong
foundation for the septic tank. There should not be any sharp objects/stones etc. which could
protrude and puncture the tank. In case of soft strata or loose soil like black cotton, marshy
or loamy soil, it is recommended to provide a flat cast in-situ 150 mm thick concrete slab.
3) Positioning the first component
Lower and position the first modular tank component in the pit. Ensure that it is vertical and
centrally positioned. Align it correctly and level using spirit level. While positioning ensure that
outlet side (having dome end) faces the soak pit or drain field.
Cut the hole(s) at provided slot(s) to fit inter connecting pipes as per the requirement and set
guidelines given in the following chart. Fix the rubber seals on the holes.
Backfill carefully with recommended backfilling material. Ensure that no voids remain especially
under and between the legs of the tank to a depth of 400 mm above the bed or cast in situ
concrete slab.
4) Intermediate pipe connections
Apply rubber lubricant on the rubber seal(s)
provided on the holes cut on the flat portion
and insert inter connecting pipes as per the
requirements / set guidelines.
5) Push the pipes
Push the inter connecting pipes fully inside
the first component.
6) Positioning the second component
Lower the second component and align it properly.
Cut the slots and place the rubber seal on this
second component for connecting it with the first
component using connecting pipes. Bring it close to
the already positioned first component and match
the slots.
7) Alignment of two components
Align the holes of two adjoining components, push
and insert the connecting pipes from inside the
first component as shown in the above figure.
Repeat the backfilling as shown in step 3.
8) Positioning the last component
Place the last component in the pit and repeat
the same procedure for connecting it with the
adjoining middle component.
Procedure explained herewith should be
repeated for additional intermediate
components for increased capacity.
9) Fixing and alignment of last component
Align the last component and match with the
earlier installed middle component and connect
each other using connecting pipes as per the
earlier explained procedure.
10) Fill the tank with water
Fill up the tank with water up to 1/3rd capacity using tap before backfilling.
The width of the backfilling should be minimum 300 mm (12”) around the tank. Excavated soil
can be used if it is silt, sand or soft murum but in case of black cotton, loomy or marshy soils
only selected inert granular material i.e. sand /stone dust /gravels (max. size 10mm) should be
used as backfill material. Backfill material should be placed in 250 mm thick layers and
compacted to 90% proctor density. It is particularly important to note that excavated material
consisting of rock, peat or clay is not used as backfill material.
Note - for installation in water logged areas or where the water table is shallower, it is
recommended to refer the installation procedure for abnormal condition.
11) Backfilling and compaction
Start the backfilling. Backfilling and water filling
should be carried out simultaneously ensuring that
the backfilling level never exceeds the rising level of
water within the tank until the water overflows
through the outlet pipe thus indicating the tank is
full.
12) Make the inlet and outlet connections
Make the connections of inlet and outlet including
hopper.
13) Cast the concrete slab (Optional) and place the cover
Complete the backfilling above outlet pipe. Select the
appropriate cover solution as per the site loading
conditions and place it on the top of tank.
In case of pedestrian movement where vehicular loads
are not expected, plastic light weight cover is
recommended. This plastic cover should filled with
concrete after placing it on the septic tank. For vehicular
traffic movement GRP cover of appropriate load class is
recommended. For GRP covers 150 mm thick PCC (min.
M150 grade) beneath the cover frame for full width of
tank is recommended. After embedding the frame, place
the cover as shown in the figures.
Note : If required height of the manhole can be raised using height riser(s).
Cover Solutions for modular septic tanks
Typical diagrams should be referred for installation of appropriate covers.
Installation procedure
Installation procedure
Guidelines for abnormal conditions
• In case of marshy/black cotton and loose soil, or where the water table is a problem,
excavated soil is not recommended for backfilling, a cement-stabilized backfill mix of 5%
cement and 95% inert granular material must be compacted in 250 mm layers to 90%
proctor density and 6" thick R.C.C. with nominal steel enforcement is recommended at the
top.
• In case of soft murrum, it can be used as backfilling material with proper compaction (90 %
of proctor density), in 150 mm layers.
• Care should be taken to avoid direct contact of sharp edges, objects with the tank.
• In case of high water table areas, septic tanks should be anchored in concrete as per the
guidelines of engineer in charge.
• Safegard Septic Tanks are not designed to be buried more than 0.5 m below ground level. If
depths are greater than 0.5 m, please refer to site engineer/architect.
• If the abnormal soil conditions occur like vehicular traffic, rocks, black cotton soil, or when
the high water table is anticipated or when the backfill above the lid may exceeds 0.5 m,
then the final design rests with the engineer or architect on the project. However
guidelines given herewith must be strictly followed for best satisfactory performance.
Manufacturing – as per EN 12566
Manufacturing standards and
test requirements of septic tanks
Test Requirements
Sr. No. Test Requirement
1 Dimensions Inlets, outlets, and connections Accessibility
2 Load bearing capacity
a. Backfill load For vertical - hx18 kN/m² h= height, specific weight of soil 18 kN/m3
b. Hydrostatic load For vertical - Hw x 10 kN/m² specific load of soil / specific mass of water 10
kN/m3
c. Dynamic load
i) Pedestrian Load For less than 1m = 2.5kN/m²
ii) Vehicle Load
3 Water tightness
a. Water test No leakage
b. Air permeability vacuum
test
0.1 bar for 60 sec,
0.2 bar for 30 sec,
0.3 bar for 15 sec
c. Pneumatic pressure test 0.3 bar for 3 min
4 Volume / Nominal
Capacity test
Septic tank capacity recorded in liters
5 Structural behaviour
a. Dry conditions Vertical load test - hx18 KN/m² h= height, specific weight of soil 18 KN/m3
Determination of mechanical characteristics of test samples used for
calculations (flexural modulus)
Pit Test
Determination of mechanical characteristics of test samples used for
calculations (flexural modulus)
Pit Test
Volume of tank = Volume for sludge + Volume for retained water + freeboard
For example,
a) Volume of sludge / person / year = 27 liters.
b) Water supply / person / day = 80 liters.
c) Average population of a household = 5 nos.
d) Cleaning period = 5 years.
e) Volume required for sludge = (a x c x d)
= (27x5x5)
= 675 liters
a) Volume of water retained in the tank in 24 h = ((b x 0.8) x 5) = ((80 x 0.8) x 5)
= 320 liters.
= (e + f) = 675 + 320 = 995 liters say 1000 liters.
Summary – for 80 lpcd, 5 people & 5 years use 1000 liters septic tank is required.
In addition to 1000 liters capacity a freeboard of 250 mm is required.
Capacity calculations
Comparison with Hume pipe construction
Comparison with Safegard septic tank
Manufactures claim
• Total capacity - 2800 ltrs.
• Capacity up to liquid level - 2490 ltrs.
• Recommended no of users – 50
Suitable for
• Sludge volume per users / year - 27 ltrs.
• Sludge volume for 50 users / year - 1350 ltrs.
• Volume for waste water to be retained - 4800 ltrs.
• Free board required - 310 ltrs. min.
• Total volume for 50 Users for one year - 6460 ltrs.
• Available capacity is - 2800 ltrs.
Summary
• Thus this tanks is suitable only for 20 users for one year it means Safegard 3000 liters tank is
suitable.
• Cost of this tank is Rs.18000 against Rs. 36000/-
Life cycle cost analysis
Description RCC Septic Tank Safegard Septic Tank
Life
Product Cost
Maintenance Cost
Total Cost with
Conventional Product
15 - 20 Years
Rs.18,000/-
Rs.12,000/- (20 Yrs.) @ Rs.600/year
18,000 + 12,000 = Rs.30,000/-
30,000/20 = 1,500 Rs./Year
80 Years
Rs.36,000/-
Rs.32,000/- (80 Yrs.) @ Rs.400/year
36,000 + 32,000 = Rs.68,000/-
68,000/80 = 850 Rs./Year
Comparison Summary
Sr.
No.
RCC Hume pipe Suggested
size of
Safegard
in L
Cleaning
time
(1 year)
Cost Life cycle cost
per yearTank
size
in L
Recommend
ed for no of
user / tank
Actually
suitable
for 1 year RCC Safegard RCC Safegard
1 1600 25 12 users 1500 9000 18000 650 225
2 2800 50 22 users 3000 18000 36000 1194 450
3 6300 100 48 users 5500 35000 66000 2155 825
Advantages of Vertical v/s Horizontal design
•
Minimum space requirement
•
Minimum external loads
•
Better settlement and decomposition of soil waste
•
Better quality of effluent discharge
•
Economical design
Different Tests on Septic tanks
•
Material properties
•
Vacuum test
•
Structural behavior - Collapse
load
•
Dynamic load test
•
Water tightness test
•
Pneumatic pressure test
•
Hydraulic efficiency test
Water storage solution . . . Total water storage solution provider
•
SILTANK overhead water storage and loft tanks in different capacities from
100 to 5000 liters
•
Amrutam underground water storage tanks in different capacities from
Overhead Water Tanks
… Strong, Sturdy and Long Lasting tanks
Unique features of Overhead water tank
•
100% virgin raw material
•
Strong and Durable
•
Thermal Insulation with foam layer (four layered)
•
Excellent chemical resistance
•
Meets and exceed all quality parameters as specified in IS standard
•
BIS marked two layer tanks are also available
•
UV Stability
•
Full capacity guaranteed
•
Most suitable for drinking water
•
Easy and quick installation
•
Available in 500, 750, 1000, 1500, 2000, 3000 and 5000 liters
•
Two cover options – one with simple rotate and lock type and other with
threaded type covers
Overhead water tank sizes with dimensions
CAPACITY Available Layers Diameter Height Manhole ID
500 liters 2/3/4 868 1060 390
750 liters 2/3/4 1000 1168 390
1000 liters 2/3/4 1071 1325 390
1500 Liters 2/3/4 1267 1454 390
2000 Liters 2/3/4 1434 1503 460
3000 Liters 2/3 1611 1733 460
5000 Liters 2/3 1936 2047 460
All dimensions are in mm
Loft Tanks
… Strong, Sturdy and Long Lasting tanks
•
100% virgin raw material
•
Food grade material
•
Strong and Durable
•
Full capacity guaranteed
•
Most suitable for drinking water
•
Net storage capacity exceeds the mentioned capacity
•
Easy and quick installation
•
Available in 100, 150, 200, 300, 400 and 500 liters
Unique features of loft tanks
CAPACITY Length Width Height Manhole ID
100 liters 585 585 373.0 300
150 liters 715 715 371.0 300
200 liters 900 500 475.0 300
• Liters 965 705 385.0 300
300 Liters 1205 825 378 300
400 Liters (Option 1) 1195 920 450 300
400 Liters (Option 2) 1290 1004 390 300
500 Liters (Option 1)* 1415 870 490 300
500 Liters (Option 2)* 1505 996 408 300
* Two openings with lid , all dimensions are in mm
Dimensional details of loft tanks
Underground Water Tanks
Available in 1000, 1500, 2000,3000 liters in vertical design and 6000 and bigger capacities up
to 30000 liters in modular design
Unique features of Amrutam underground water
tank•
Rotational moulded single piece construction up to 3000 liters
•
Great strength – Robustly designed with unique rib structure
•
Simple and quick installation
•
100% water tight – free from root penetration
•
Provided with air tight threaded cover
•
Hygienic and safe – free from corrosion and biological growth
•
Minimum maintenance requirements
•
100% virgin raw material
•
Full capacity guaranteed
•
Long life – minimum 50 years of service life
•
Available in 1000 to 30000 liters capacity in vertical and modular design
Amrutam vertical tank sizes with dimensions
CAPACITY Diameter Height Manhole ID
1000 Liters 1200 1321 390
1500 Liters 1200 1692 390
1800 Liters 1200 2052 390
2000 Liters 1700 1301 390
3000 Liters 1700 1748 390
All dimensions are in mm
Amrutam modular tank sizes with dimensions
CAPACITY Diameter Length
6000 Liters 2200 2400
10000 Liters 2200 3800
14000 Liters 2200 5200
18000 Liters 2200 6600
22000 Liters 2200 8000
26000 Liters 2200 9400
30000 Liters 2200 10800
All dimensions are in mm
Thank you…

More Related Content

What's hot

Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Prakash Kumar Sekar
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingAyushi Agrawal
 
Brick Masonry and Stone Masonry
Brick Masonry and Stone MasonryBrick Masonry and Stone Masonry
Brick Masonry and Stone MasonryGAJA GOVIND BABU
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & propertieslalitha moorthy
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutRAMPRASAD KUMAWAT
 
Aggregates introduction, types and properties
Aggregates introduction, types and propertiesAggregates introduction, types and properties
Aggregates introduction, types and propertiesAyaz khan
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit IGAURAV. H .TANDON
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and PumpingGAURAV. H .TANDON
 
Construction Materials
Construction Materials Construction Materials
Construction Materials LOUIS WAYNE
 
A presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyA presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyAbdul Majid
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
Materials of Sewer ppt by Mayank oza on WWWE
Materials of Sewer ppt by Mayank oza on WWWEMaterials of Sewer ppt by Mayank oza on WWWE
Materials of Sewer ppt by Mayank oza on WWWEMayank Oza
 

What's hot (20)

3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
Grouting
GroutingGrouting
Grouting
 
Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]
 
Water supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvestingWater supply, sanitation and rainwater harvesting
Water supply, sanitation and rainwater harvesting
 
Grouting
GroutingGrouting
Grouting
 
L 5and l-6 sewer design
L 5and l-6 sewer designL 5and l-6 sewer design
L 5and l-6 sewer design
 
Brick Masonry and Stone Masonry
Brick Masonry and Stone MasonryBrick Masonry and Stone Masonry
Brick Masonry and Stone Masonry
 
Concrete- types, testing & properties
Concrete- types, testing & propertiesConcrete- types, testing & properties
Concrete- types, testing & properties
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Collection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & LayoutCollection of sewage, Types,Components & Layout
Collection of sewage, Types,Components & Layout
 
TYPES OF Foundation
TYPES OF FoundationTYPES OF Foundation
TYPES OF Foundation
 
Aggregates introduction, types and properties
Aggregates introduction, types and propertiesAggregates introduction, types and properties
Aggregates introduction, types and properties
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 
Construction Materials
Construction Materials Construction Materials
Construction Materials
 
A presentation on concrete-Concrete Technology
A presentation on concrete-Concrete TechnologyA presentation on concrete-Concrete Technology
A presentation on concrete-Concrete Technology
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Materials of Sewer ppt by Mayank oza on WWWE
Materials of Sewer ppt by Mayank oza on WWWEMaterials of Sewer ppt by Mayank oza on WWWE
Materials of Sewer ppt by Mayank oza on WWWE
 
Cast in situ Pile
Cast in situ PileCast in situ Pile
Cast in situ Pile
 

Viewers also liked

Choosing the right Filtration System for Koi Pond
Choosing the right Filtration System for Koi PondChoosing the right Filtration System for Koi Pond
Choosing the right Filtration System for Koi PondKcfibreglass Industry
 
Citations UCEM (Texte 5.I.2.4)
Citations UCEM (Texte 5.I.2.4)Citations UCEM (Texte 5.I.2.4)
Citations UCEM (Texte 5.I.2.4)Pierrot Caron
 
School Integration Research: Key Findings
School Integration Research: Key FindingsSchool Integration Research: Key Findings
School Integration Research: Key FindingsEmilie Linick
 
метод семинар учитель года
метод семинар учитель годаметод семинар учитель года
метод семинар учитель годаHanovaSveta
 
U4 daily routines
U4 daily routinesU4 daily routines
U4 daily routinesM CP
 
U3 at rooftops school
U3 at rooftops schoolU3 at rooftops school
U3 at rooftops schoolM CP
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewageBibhabasu Mohanty
 
Prot. 335 17 mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16
Prot. 335 17   mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16Prot. 335 17   mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16
Prot. 335 17 mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16Claudio Figueiredo
 
Prot. 988 17 pl autoriza em caráter precário e temporário a cessão para o u...
Prot. 988 17   pl autoriza em caráter precário e temporário a cessão para o u...Prot. 988 17   pl autoriza em caráter precário e temporário a cessão para o u...
Prot. 988 17 pl autoriza em caráter precário e temporário a cessão para o u...Claudio Figueiredo
 
07 fruto del espiritu
07 fruto del espiritu07 fruto del espiritu
07 fruto del espirituchucho1943
 

Viewers also liked (15)

Choosing the right Filtration System for Koi Pond
Choosing the right Filtration System for Koi PondChoosing the right Filtration System for Koi Pond
Choosing the right Filtration System for Koi Pond
 
Citations UCEM (Texte 5.I.2.4)
Citations UCEM (Texte 5.I.2.4)Citations UCEM (Texte 5.I.2.4)
Citations UCEM (Texte 5.I.2.4)
 
School Integration Research: Key Findings
School Integration Research: Key FindingsSchool Integration Research: Key Findings
School Integration Research: Key Findings
 
Create A Sales Culture That Delivers Sales - White Paper
Create A Sales Culture That Delivers Sales - White PaperCreate A Sales Culture That Delivers Sales - White Paper
Create A Sales Culture That Delivers Sales - White Paper
 
метод семинар учитель года
метод семинар учитель годаметод семинар учитель года
метод семинар учитель года
 
Quidam
Quidam Quidam
Quidam
 
U4 daily routines
U4 daily routinesU4 daily routines
U4 daily routines
 
U3 at rooftops school
U3 at rooftops schoolU3 at rooftops school
U3 at rooftops school
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
8 de marzo 2017
8 de marzo 20178 de marzo 2017
8 de marzo 2017
 
Amacing
AmacingAmacing
Amacing
 
Prot. 335 17 mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16
Prot. 335 17   mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16Prot. 335 17   mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16
Prot. 335 17 mensagem de veto 001 - integral ao autógrafo de lei nº 3.604-16
 
Prot. 988 17 pl autoriza em caráter precário e temporário a cessão para o u...
Prot. 988 17   pl autoriza em caráter precário e temporário a cessão para o u...Prot. 988 17   pl autoriza em caráter precário e temporário a cessão para o u...
Prot. 988 17 pl autoriza em caráter precário e temporário a cessão para o u...
 
Intercambio madrid
Intercambio madridIntercambio madrid
Intercambio madrid
 
07 fruto del espiritu
07 fruto del espiritu07 fruto del espiritu
07 fruto del espiritu
 

Similar to Presentation for safegard septic tank

On site Liquid waste disposal.pptx
On site Liquid waste disposal.pptxOn site Liquid waste disposal.pptx
On site Liquid waste disposal.pptxVinayKumar2893
 
ABC Waters Design Features Handout
ABC Waters Design Features Handout ABC Waters Design Features Handout
ABC Waters Design Features Handout Zhao Chin Tok
 
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tankvvsasane
 
Physical and biological treatment of sewage lecture 1 of 2
Physical and biological treatment of sewage lecture 1 of 2Physical and biological treatment of sewage lecture 1 of 2
Physical and biological treatment of sewage lecture 1 of 2John Chakamba
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxPRACHI DESSAI
 
Treatment of water
Treatment of waterTreatment of water
Treatment of waterdhavalsshah
 
2. Types of sanitation.ppt
2. Types of sanitation.ppt2. Types of sanitation.ppt
2. Types of sanitation.pptSamiNganga
 
Rooftop Rainwater Harvesting -Natural resource management
Rooftop Rainwater Harvesting -Natural resource managementRooftop Rainwater Harvesting -Natural resource management
Rooftop Rainwater Harvesting -Natural resource managementRevadhBalraj
 
Roll 16,17 and 18_System Evaluation and Selection.pptx
Roll 16,17 and 18_System Evaluation and Selection.pptxRoll 16,17 and 18_System Evaluation and Selection.pptx
Roll 16,17 and 18_System Evaluation and Selection.pptxsanjaylohani8
 
Solid waste and waste management
Solid waste and waste managementSolid waste and waste management
Solid waste and waste managementNTR UNIVERSITY
 
Rain water harvesting by Dr. Arun Kumar
Rain water harvesting by Dr. Arun KumarRain water harvesting by Dr. Arun Kumar
Rain water harvesting by Dr. Arun KumarArun Kumar
 
Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.AbhishekPal808015
 

Similar to Presentation for safegard septic tank (20)

On site Liquid waste disposal.pptx
On site Liquid waste disposal.pptxOn site Liquid waste disposal.pptx
On site Liquid waste disposal.pptx
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
Drainage System
Drainage SystemDrainage System
Drainage System
 
ABC Waters Design Features Handout
ABC Waters Design Features Handout ABC Waters Design Features Handout
ABC Waters Design Features Handout
 
Wastewater
WastewaterWastewater
Wastewater
 
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
 
Physical and biological treatment of sewage lecture 1 of 2
Physical and biological treatment of sewage lecture 1 of 2Physical and biological treatment of sewage lecture 1 of 2
Physical and biological treatment of sewage lecture 1 of 2
 
L14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptxL14 - ONSITE SANITATION.pptx
L14 - ONSITE SANITATION.pptx
 
anu
anuanu
anu
 
Treatment of water
Treatment of waterTreatment of water
Treatment of water
 
Disposal of excreta
Disposal of excretaDisposal of excreta
Disposal of excreta
 
2. Types of sanitation.ppt
2. Types of sanitation.ppt2. Types of sanitation.ppt
2. Types of sanitation.ppt
 
Disposal of excreta
Disposal of excretaDisposal of excreta
Disposal of excreta
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Rooftop Rainwater Harvesting -Natural resource management
Rooftop Rainwater Harvesting -Natural resource managementRooftop Rainwater Harvesting -Natural resource management
Rooftop Rainwater Harvesting -Natural resource management
 
Roll 16,17 and 18_System Evaluation and Selection.pptx
Roll 16,17 and 18_System Evaluation and Selection.pptxRoll 16,17 and 18_System Evaluation and Selection.pptx
Roll 16,17 and 18_System Evaluation and Selection.pptx
 
Solid waste and waste management
Solid waste and waste managementSolid waste and waste management
Solid waste and waste management
 
Rain water harvesting by Dr. Arun Kumar
Rain water harvesting by Dr. Arun KumarRain water harvesting by Dr. Arun Kumar
Rain water harvesting by Dr. Arun Kumar
 
Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.Rooftop rainwater harvesting system.
Rooftop rainwater harvesting system.
 

Recently uploaded

Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCR
Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCRReal Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCR
Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCRdollysharma2066
 
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...Amil Baba Dawood bangali
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...Amil baba
 
existing product research b2 Sunderland Culture
existing product research b2 Sunderland Cultureexisting product research b2 Sunderland Culture
existing product research b2 Sunderland CultureChloeMeadows1
 
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一ss ss
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxLeaMaePahinagGarciaV
 
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝soniya singh
 
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesVip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...Amil baba
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)861c7ca49a02
 
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作ss846v0c
 
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree z zzz
 
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...Amil baba
 
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls in Delhi
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...Amil Baba Dawood bangali
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作f3774p8b
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一C SSS
 
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一Fi sss
 

Recently uploaded (20)

Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCR
Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCRReal Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCR
Real Sure (Call Girl) in I.G.I. Airport 8377087607 Hot Call Girls In Delhi NCR
 
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
NO1 Certified Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot,...
 
9953330565 Low Rate Call Girls In Jahangirpuri Delhi NCR
9953330565 Low Rate Call Girls In Jahangirpuri  Delhi NCR9953330565 Low Rate Call Girls In Jahangirpuri  Delhi NCR
9953330565 Low Rate Call Girls In Jahangirpuri Delhi NCR
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
 
existing product research b2 Sunderland Culture
existing product research b2 Sunderland Cultureexisting product research b2 Sunderland Culture
existing product research b2 Sunderland Culture
 
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptx
 
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝
Call Girls in Dwarka Sub City 💯Call Us 🔝8264348440🔝
 
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesVip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
美国IUB学位证,印第安纳大学伯明顿分校毕业证书1:1制作
 
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree加拿大瑞尔森大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
NO1 Certified Vashikaran Specialist in Uk Black Magic Specialist in Uk Black ...
 
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall AvailableCall Girls In Munirka>༒9599632723 Incall_OutCall Available
Call Girls In Munirka>༒9599632723 Incall_OutCall Available
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uk England Northern ...
 
young call girls in Khanpur,🔝 9953056974 🔝 escort Service
young call girls in  Khanpur,🔝 9953056974 🔝 escort Serviceyoung call girls in  Khanpur,🔝 9953056974 🔝 escort Service
young call girls in Khanpur,🔝 9953056974 🔝 escort Service
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
 
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
 

Presentation for safegard septic tank

  • 1. G. S. Dikondawar GM – Innovation & Technology The Supreme Industries Ltd.
  • 2.
  • 3. • Introduction • Disadvantages of conventional products • Septic system • Existing system • Problems associated with existing system • Changing factors demanding new solution • Safegard septic tank a) Vertical design b) Modular design • Components of septic tank • Product range • Features and benefits Contents
  • 4. An Introduction • Sanitation has direct link with the health and the environment • People suffer serious health consequences and millions of people die as a result of lack of effective sanitation • Use of inefficient drainage systems and sewer products are the main reasons. • Advance products/sewerage system has the potential to change the scenario. Developed countries have switched over to advance products. • Plastic Drainage/ Sewer Pipe systems minimize Sanitation risks and improve health and environmental aspects.
  • 5. Future India…. Three aspects of our current budget focus on: - Total Sanitation is expected to be achieved through Swatchh Bharat Abhiyan by 2019 at a cost of 1000 Cr Rupees. - Allocation of 7060 Cr for the development of 100 Smart Cities which will include Road, Electricity, Water supply and Sanitation. - All Schools to have Toilet facility
  • 6. Disadvantages of conventional drainage products 1. Heavy weight – 12 times the weight of plastics. Need of heavy equipments, more manpower- more installed cost 2. Cumbersome and time consuming installation 3. Poor resistance to Corrosion 4. Rough internal surface leads to blocks, solid depositions, encrustation and consequent reduction in internal dia and flow 5. Rough bore also leads to more friction, lesser flow or needs higher slope (means more earthwork, costs) 6. Poor resistance to soil movement due to lack of flexibility 7. Cracks and leaks lead to root penetration into the pipe system
  • 7. Septic System Septic Tankain field /Soak Pit Septic system
  • 8. • Definition A septic system is a highly efficient, self-contained, underground wastewater treatment system. As septic systems treat and dispose of household wastewater onsite, they are often more economical than centralized sewer systems in rural areas where plot sizes are larger and houses are spaced widely apart. And by using natural processes to treat the wastewater onsite, usually in a homeowner's backyard, septic systems don't require the installation of miles of sewer lines, making them less disruptive to the environment. • Features - Natural waste water treatment - Simple design - Less expensive - Easy for installation & maintenance Septic system
  • 9. The septic tank is basically a watertight underground tank, the purpose of which is the collection, storage, and to some extent treatment of sewage/effluents. Septic tanks are usually made of concrete or masonry, with an inlet and outlet pipe. Wastewater flows from the home to the septic tank through the sewer pipe. The septic tank treats the wastewater naturally by holding it in the tank long enough for solids and liquids to separate. The wastewater forms three layers inside the tank. Solids lighter than water (such as greases and oils) float to the top forming a layer of scum. Solids heavier than water settle at the bottom of the tank forming a layer of sludge. This leaves a middle layer of partially clarified wastewater. Septic Tank
  • 10. - Collection of waste water - Retention / holding - Sedimentation / settlement - Anaerobic digestion - Flocculation - Clarification - Discharge Working of Septic Tank
  • 11. Typical layout of septic system
  • 12. • Effluent - The supernatant liquid discharge from a septic tank. • Invert - The lowest point of the interior of a sewer or drain at any cross- section. • Scum - The greasy and other substances floating on the surface of sewage. • Septic Tank - A water-tight single storied tank in which sewage is retained sufficiently long to permit sedimentation. • Sewage - The liquid waste of a household or community including human excreta. • Sludge - Sludge is the settled solid matter in semi-solid condition. Terminology
  • 14. a) Drain field The drain field is a network of perforated pipes (or "laterals"). These are laid in gravel- filled trenches or beds. After solids settle in the septic tank, the liquid wastewater or effluent is discharged. This is done either by gravity or pressure, to an absorption field, also known as a drain field or leach field. b) Soak Pit The effluent discharge from the septic tank may contain disease causing germs and pollutants which must be treated to protect human health and environment. Hence these effluents should be carefully and safely disposed either in the drain field or soak pit to facilitate disintegration through bacterial action. Disposal of septic tank effluents
  • 15. Inner perforated pipe External perforated pipe Septic tank Inlet pipe Outlet pipe Distribution box Gravel filled trench Typical diagram showing drain field
  • 17. A soak pit is a covered, porous- walled chamber that allows water to slowly soak into the ground. Effluent from septic tank is discharged to the underground chamber from where it infiltrates into the surrounding soil. Soak Pit
  • 19. RCC / Hume pipe Existing system
  • 20. • Leakages • Infiltration • Ex-filtration • Root penetration • Breakages - Insufficient resistance to earth, traffic loads • Corrosion • Insufficient resistance to acids & chemicals • Rough interior surface - deposition & incrustation • Laborious and time consuming installation • Frequent maintenance requirements Diff. problems in conventional septic tanks
  • 21. • Excess load on septic tank • Improper digestion (decomposition) of solid wastes • Pollution of underground water • Contamination of soil • Unhygienic & harmful for environment • Water born disease & serious health problems • Uncertain & short life span • Fatal accidents • Dryness of septic tank Consequences
  • 22. • Standard of living/Health consciousness • Nature of sewage • Space constraints • Time constraints • To overcome problems with existing system Factors demanding advance solution
  • 23. 1. Sufficient area for sludge digestion 2. Holding capacity of waste water (minimum 24 hrs.) 3. Water tight structure 4. Sufficient volume to collect retain & digest solid waste 5. Long cleaning period 6. Easy for maintenance 7. Easy for transportation, handling & installation 8. Excellent performance 9. Better effluent quality (exceeds the standard parameters) 10. Sufficiently strong to sustain different loading condition Design consideration of Safegard septic tank
  • 24. The surface area of the tank required should be O-92 m² for every 10 liters per minute of peak flow rate at a temperature of 25°. A minimum depth of sedimentation shall be 250 to 300 mm. Sludge digestion per capita suspended solids entering the tank may be taken as 70 g/day. The capacity required for sludge digestion is 0.033 m³ per capita at 25°C. Volume of digested sludge is normally O-000 21 m³ per capita per day. Detention Time provides a detention period of 24 to 48 hours based on an average daily flow of sewage. Requirement of BIS
  • 25. • Unique Design – Rototationally moulded, one piece seamless construction with two chamber patented design • Great Strength - Highly durable • Light in weight - Simple and quick Installation • Excellent Chemical Resistance - free from concrete corrosion and ill effects of H2S • Minimum space and excavation requirements • Free from infiltration, ex-filtration and root penetration • Long life with economy • Hygienic and safe • Eco-friendly • Conforms to National and International standards • Maintenance free Safegard septic tanks - Unique features
  • 26. • Available in 1000, 1500, 2000, 3000, 5500 liters and large size up to 29500 liters in modular design. • EN 12566, IS:2470 Available sizes and applicable standards
  • 27. Vertical design Modular design Diff. designs of Safegard septic tanks
  • 28. Components of vertical septic tanks
  • 29. Typical section of vertical septic tank
  • 31. 1) EXCAVATION Excavate a pit approximately 600 mm larger than the size of septic tank. Depth of the pit should be decided based on position of inlet and outlet with required gradient and disposal point plus 150 mm extra for bedding. 2) BED PREPARATION Ensure that the base of the pit is even, flat and sufficiently hard to form a strong foundation for the septic tank. Prepare a 150 mm (6”) thick bed of granular material and compact it properly. Ensure that no sharp object/stone etc should protrude which can puncture the tank. Installation of septic tank
  • 32. 3) POSITIONING THE TANK Lower the tank and position in the pit ensuring that it is vertical, centrally positioned, correctly aligned and leveled using spirit level and the outlet pipe faces the soak pit and inlet pipe swivels, ensuring a straight connection. 4) FILL THE WATER IN THE TANK Fill up the tank with water up to 1/3rd capacity using tap.
  • 33. 5) BACKFILLING Start the backfilling. Backfilling and water filling should be carried out simultaneously ensuring that the backfilling level never exceeds the rising level of water within the tank until the water overflows through the outlet pipe, thus indicating the tank is full. The width of the backfilling should be minimum 300 mm (12”) around the tank. Excavated soil can be used if it is silt, sand or soft murum but in case of black cotton, loomy or marshy soil only selected inert granular material i.e. sand /stone dust /gravels (max. size 10 mm) should be used as backfill material. Backfill material should be placed in 250 mm thick layers and compacted to 90% proctor density. It is particularly important to note that excavated material consisting of rock, peat or clay is not used as backfill material.
  • 34. 6) MAKE THE PIPE CONNECTIONS When the level of the backfill reaches the underside of the outlet pipe invert, inlet and outlet connections should be made. It is recommended to maintain 1:40 to 1:60 fall between drain head and inlet of the septic tank. 7) FINAL BACKFILLING After making pipe connections, complete the backfilling up to the top level of the tank. In case of non traffic conditions, normal flooring like PCC / paver blocks etc. can meet the requirements.
  • 35. 8) PROVIDING COVER / LID Select the appropriate cover as per the site loading conditions and place it on the top of tank. In case of pedestrian movement where vehicular loads are not expected, plastic light weight cover is recommended. This plastic cover should filled with concrete after placing it on the septic tank. For vehicular traffic movement GRP cover of appropriate load class is recommended. For GRP covers 150 mm thick PCC (min. M150 grade) beneath the cover frame for full width of tank is recommended. After embedding the frame, place the cover as shown in the figures.
  • 36. Components of modular septic tanks
  • 37. Components of modular septic tanks
  • 38. Typical diagram of modular tanks for different capacities
  • 39. Installation of modular tanks 1) Excavation of the pit Excavate a pit approximately 600 mm larger than the size of septic tank. Depth of the pit should be decided based on the position of inlet and outlet with required gradient and disposal point plus 150 mm extra for bedding.
  • 40. 2) Bed preparation Prepare a 150 mm (6”) thick bed of granular material and compact it properly. Ensure that the base of the pit is smooth and flat. It should be sufficiently hard to form a strong foundation for the septic tank. There should not be any sharp objects/stones etc. which could protrude and puncture the tank. In case of soft strata or loose soil like black cotton, marshy or loamy soil, it is recommended to provide a flat cast in-situ 150 mm thick concrete slab.
  • 41. 3) Positioning the first component Lower and position the first modular tank component in the pit. Ensure that it is vertical and centrally positioned. Align it correctly and level using spirit level. While positioning ensure that outlet side (having dome end) faces the soak pit or drain field. Cut the hole(s) at provided slot(s) to fit inter connecting pipes as per the requirement and set guidelines given in the following chart. Fix the rubber seals on the holes. Backfill carefully with recommended backfilling material. Ensure that no voids remain especially under and between the legs of the tank to a depth of 400 mm above the bed or cast in situ concrete slab.
  • 42. 4) Intermediate pipe connections Apply rubber lubricant on the rubber seal(s) provided on the holes cut on the flat portion and insert inter connecting pipes as per the requirements / set guidelines. 5) Push the pipes Push the inter connecting pipes fully inside the first component.
  • 43. 6) Positioning the second component Lower the second component and align it properly. Cut the slots and place the rubber seal on this second component for connecting it with the first component using connecting pipes. Bring it close to the already positioned first component and match the slots. 7) Alignment of two components Align the holes of two adjoining components, push and insert the connecting pipes from inside the first component as shown in the above figure. Repeat the backfilling as shown in step 3.
  • 44. 8) Positioning the last component Place the last component in the pit and repeat the same procedure for connecting it with the adjoining middle component. Procedure explained herewith should be repeated for additional intermediate components for increased capacity. 9) Fixing and alignment of last component Align the last component and match with the earlier installed middle component and connect each other using connecting pipes as per the earlier explained procedure.
  • 45. 10) Fill the tank with water Fill up the tank with water up to 1/3rd capacity using tap before backfilling.
  • 46. The width of the backfilling should be minimum 300 mm (12”) around the tank. Excavated soil can be used if it is silt, sand or soft murum but in case of black cotton, loomy or marshy soils only selected inert granular material i.e. sand /stone dust /gravels (max. size 10mm) should be used as backfill material. Backfill material should be placed in 250 mm thick layers and compacted to 90% proctor density. It is particularly important to note that excavated material consisting of rock, peat or clay is not used as backfill material. Note - for installation in water logged areas or where the water table is shallower, it is recommended to refer the installation procedure for abnormal condition. 11) Backfilling and compaction Start the backfilling. Backfilling and water filling should be carried out simultaneously ensuring that the backfilling level never exceeds the rising level of water within the tank until the water overflows through the outlet pipe thus indicating the tank is full.
  • 47. 12) Make the inlet and outlet connections Make the connections of inlet and outlet including hopper. 13) Cast the concrete slab (Optional) and place the cover Complete the backfilling above outlet pipe. Select the appropriate cover solution as per the site loading conditions and place it on the top of tank. In case of pedestrian movement where vehicular loads are not expected, plastic light weight cover is recommended. This plastic cover should filled with concrete after placing it on the septic tank. For vehicular traffic movement GRP cover of appropriate load class is recommended. For GRP covers 150 mm thick PCC (min. M150 grade) beneath the cover frame for full width of tank is recommended. After embedding the frame, place the cover as shown in the figures. Note : If required height of the manhole can be raised using height riser(s).
  • 48. Cover Solutions for modular septic tanks Typical diagrams should be referred for installation of appropriate covers.
  • 51. Guidelines for abnormal conditions • In case of marshy/black cotton and loose soil, or where the water table is a problem, excavated soil is not recommended for backfilling, a cement-stabilized backfill mix of 5% cement and 95% inert granular material must be compacted in 250 mm layers to 90% proctor density and 6" thick R.C.C. with nominal steel enforcement is recommended at the top. • In case of soft murrum, it can be used as backfilling material with proper compaction (90 % of proctor density), in 150 mm layers. • Care should be taken to avoid direct contact of sharp edges, objects with the tank. • In case of high water table areas, septic tanks should be anchored in concrete as per the guidelines of engineer in charge. • Safegard Septic Tanks are not designed to be buried more than 0.5 m below ground level. If depths are greater than 0.5 m, please refer to site engineer/architect. • If the abnormal soil conditions occur like vehicular traffic, rocks, black cotton soil, or when the high water table is anticipated or when the backfill above the lid may exceeds 0.5 m, then the final design rests with the engineer or architect on the project. However guidelines given herewith must be strictly followed for best satisfactory performance.
  • 52. Manufacturing – as per EN 12566 Manufacturing standards and test requirements of septic tanks Test Requirements Sr. No. Test Requirement 1 Dimensions Inlets, outlets, and connections Accessibility 2 Load bearing capacity a. Backfill load For vertical - hx18 kN/m² h= height, specific weight of soil 18 kN/m3 b. Hydrostatic load For vertical - Hw x 10 kN/m² specific load of soil / specific mass of water 10 kN/m3 c. Dynamic load i) Pedestrian Load For less than 1m = 2.5kN/m² ii) Vehicle Load 3 Water tightness a. Water test No leakage b. Air permeability vacuum test 0.1 bar for 60 sec, 0.2 bar for 30 sec, 0.3 bar for 15 sec c. Pneumatic pressure test 0.3 bar for 3 min
  • 53. 4 Volume / Nominal Capacity test Septic tank capacity recorded in liters 5 Structural behaviour a. Dry conditions Vertical load test - hx18 KN/m² h= height, specific weight of soil 18 KN/m3 Determination of mechanical characteristics of test samples used for calculations (flexural modulus) Pit Test Determination of mechanical characteristics of test samples used for calculations (flexural modulus) Pit Test
  • 54. Volume of tank = Volume for sludge + Volume for retained water + freeboard For example, a) Volume of sludge / person / year = 27 liters. b) Water supply / person / day = 80 liters. c) Average population of a household = 5 nos. d) Cleaning period = 5 years. e) Volume required for sludge = (a x c x d) = (27x5x5) = 675 liters a) Volume of water retained in the tank in 24 h = ((b x 0.8) x 5) = ((80 x 0.8) x 5) = 320 liters. = (e + f) = 675 + 320 = 995 liters say 1000 liters. Summary – for 80 lpcd, 5 people & 5 years use 1000 liters septic tank is required. In addition to 1000 liters capacity a freeboard of 250 mm is required. Capacity calculations
  • 55. Comparison with Hume pipe construction
  • 56. Comparison with Safegard septic tank Manufactures claim • Total capacity - 2800 ltrs. • Capacity up to liquid level - 2490 ltrs. • Recommended no of users – 50 Suitable for • Sludge volume per users / year - 27 ltrs. • Sludge volume for 50 users / year - 1350 ltrs. • Volume for waste water to be retained - 4800 ltrs. • Free board required - 310 ltrs. min. • Total volume for 50 Users for one year - 6460 ltrs. • Available capacity is - 2800 ltrs. Summary • Thus this tanks is suitable only for 20 users for one year it means Safegard 3000 liters tank is suitable. • Cost of this tank is Rs.18000 against Rs. 36000/-
  • 57. Life cycle cost analysis Description RCC Septic Tank Safegard Septic Tank Life Product Cost Maintenance Cost Total Cost with Conventional Product 15 - 20 Years Rs.18,000/- Rs.12,000/- (20 Yrs.) @ Rs.600/year 18,000 + 12,000 = Rs.30,000/- 30,000/20 = 1,500 Rs./Year 80 Years Rs.36,000/- Rs.32,000/- (80 Yrs.) @ Rs.400/year 36,000 + 32,000 = Rs.68,000/- 68,000/80 = 850 Rs./Year
  • 58. Comparison Summary Sr. No. RCC Hume pipe Suggested size of Safegard in L Cleaning time (1 year) Cost Life cycle cost per yearTank size in L Recommend ed for no of user / tank Actually suitable for 1 year RCC Safegard RCC Safegard 1 1600 25 12 users 1500 9000 18000 650 225 2 2800 50 22 users 3000 18000 36000 1194 450 3 6300 100 48 users 5500 35000 66000 2155 825
  • 59. Advantages of Vertical v/s Horizontal design • Minimum space requirement • Minimum external loads • Better settlement and decomposition of soil waste • Better quality of effluent discharge • Economical design
  • 60. Different Tests on Septic tanks • Material properties • Vacuum test • Structural behavior - Collapse load • Dynamic load test • Water tightness test • Pneumatic pressure test • Hydraulic efficiency test
  • 61.
  • 62. Water storage solution . . . Total water storage solution provider • SILTANK overhead water storage and loft tanks in different capacities from 100 to 5000 liters • Amrutam underground water storage tanks in different capacities from
  • 63. Overhead Water Tanks … Strong, Sturdy and Long Lasting tanks
  • 64. Unique features of Overhead water tank • 100% virgin raw material • Strong and Durable • Thermal Insulation with foam layer (four layered) • Excellent chemical resistance • Meets and exceed all quality parameters as specified in IS standard • BIS marked two layer tanks are also available • UV Stability • Full capacity guaranteed • Most suitable for drinking water • Easy and quick installation • Available in 500, 750, 1000, 1500, 2000, 3000 and 5000 liters • Two cover options – one with simple rotate and lock type and other with threaded type covers
  • 65. Overhead water tank sizes with dimensions CAPACITY Available Layers Diameter Height Manhole ID 500 liters 2/3/4 868 1060 390 750 liters 2/3/4 1000 1168 390 1000 liters 2/3/4 1071 1325 390 1500 Liters 2/3/4 1267 1454 390 2000 Liters 2/3/4 1434 1503 460 3000 Liters 2/3 1611 1733 460 5000 Liters 2/3 1936 2047 460 All dimensions are in mm
  • 66. Loft Tanks … Strong, Sturdy and Long Lasting tanks
  • 67. • 100% virgin raw material • Food grade material • Strong and Durable • Full capacity guaranteed • Most suitable for drinking water • Net storage capacity exceeds the mentioned capacity • Easy and quick installation • Available in 100, 150, 200, 300, 400 and 500 liters Unique features of loft tanks
  • 68. CAPACITY Length Width Height Manhole ID 100 liters 585 585 373.0 300 150 liters 715 715 371.0 300 200 liters 900 500 475.0 300 • Liters 965 705 385.0 300 300 Liters 1205 825 378 300 400 Liters (Option 1) 1195 920 450 300 400 Liters (Option 2) 1290 1004 390 300 500 Liters (Option 1)* 1415 870 490 300 500 Liters (Option 2)* 1505 996 408 300 * Two openings with lid , all dimensions are in mm Dimensional details of loft tanks
  • 69. Underground Water Tanks Available in 1000, 1500, 2000,3000 liters in vertical design and 6000 and bigger capacities up to 30000 liters in modular design
  • 70. Unique features of Amrutam underground water tank• Rotational moulded single piece construction up to 3000 liters • Great strength – Robustly designed with unique rib structure • Simple and quick installation • 100% water tight – free from root penetration • Provided with air tight threaded cover • Hygienic and safe – free from corrosion and biological growth • Minimum maintenance requirements • 100% virgin raw material • Full capacity guaranteed • Long life – minimum 50 years of service life • Available in 1000 to 30000 liters capacity in vertical and modular design
  • 71. Amrutam vertical tank sizes with dimensions CAPACITY Diameter Height Manhole ID 1000 Liters 1200 1321 390 1500 Liters 1200 1692 390 1800 Liters 1200 2052 390 2000 Liters 1700 1301 390 3000 Liters 1700 1748 390 All dimensions are in mm
  • 72. Amrutam modular tank sizes with dimensions CAPACITY Diameter Length 6000 Liters 2200 2400 10000 Liters 2200 3800 14000 Liters 2200 5200 18000 Liters 2200 6600 22000 Liters 2200 8000 26000 Liters 2200 9400 30000 Liters 2200 10800 All dimensions are in mm

Editor's Notes

  1. Innovation and Technology, TSIL, Gadegaon