SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku
Omar, Perak.
Percentage of Assessment: 20%
Submission Date: 2nd July 2015
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements for the chosen building.
ļ‚· Pilecaps including excavations from reduce level.
ļ‚· Work below ground floor level including site clearance and excavation, ground floor slab etc.
ļ‚· All first floor to fourth floor slabs and beams
ļ‚· Roof slabs and beams
Notes:
ļ‚· Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.
ļ‚·
Assessment Criteria
Refer to matrix attached.
Teaching Objectives
ļ‚· To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
ļ‚· To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
ļ‚· To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
ļ‚· Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
ļ‚· Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
ļ‚· Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
ļ‚· Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission
Each section is to submit to the group leader in the following sequence:
ļ‚· Billing ( handwritten )
ļ‚· Query list
ļ‚· Taking off list
ļ‚· Dimension sheets
The Leader of each group is to collect from all the group members and attach the front cover page with the
names of group members. He is to compile every memberā€™s Billing in ONE Billing Paper only .and arranges
the rest in the following sequence:
ļ‚· Billing ( to insert in front of BQ and hand written )
ļ‚· Pilecaps including excavations from reduce level.
ļ‚· Work below ground floor level including site clearance and excavation, ground floor slab etc.
ļ‚· First floor slabs to fourth floor slabs and beams.
ļ‚· Roof slabs and beams

More Related Content

What's hot (9)

Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
Ā 
Cv with photo
Cv with photoCv with photo
Cv with photo
Ā 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
Ā 
nkp
nkpnkp
nkp
Ā 
New Resume for Hays
New Resume for HaysNew Resume for Hays
New Resume for Hays
Ā 
NAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CVNAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CV
Ā 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Ā 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-query
Ā 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)
Ā 

Similar to Assignment no.2

Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
KhangWei Chin
Ā 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
hitusp
Ā 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)
Arvindhan Balasingam
Ā 

Similar to Assignment no.2 (20)

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
Ā 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
Ā 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - Measurement
Ā 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
Ā 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degree
Ā 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEF
Ā 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
Ā 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
Ā 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
Ā 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
Ā 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notes
Ā 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
Ā 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
Ā 
muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
Ā 
estimating and costing introduction ppt.pptx
estimating and costing  introduction ppt.pptxestimating and costing  introduction ppt.pptx
estimating and costing introduction ppt.pptx
Ā 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
Ā 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)
Ā 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
Ā 
Ici & itd
Ici & itdIci & itd
Ici & itd
Ā 
Ici & itd
Ici & itdIci & itd
Ici & itd
Ā 

More from Jıa Yıı (19)

Ct
CtCt
Ct
Ā 
Site visit report
Site visit reportSite visit report
Site visit report
Ā 
Assignment brief for site report .pdf
Assignment brief for site report .pdfAssignment brief for site report .pdf
Assignment brief for site report .pdf
Ā 
Assignment brief for site report
Assignment brief for site report Assignment brief for site report
Assignment brief for site report
Ā 
Psy final (1)
Psy final (1)Psy final (1)
Psy final (1)
Ā 
Psy 2
Psy 2Psy 2
Psy 2
Ā 
Psy 1
Psy 1Psy 1
Psy 1
Ā 
Epc slides part 2
Epc slides part 2Epc slides part 2
Epc slides part 2
Ā 
Epc slides (part1)
Epc slides (part1)Epc slides (part1)
Epc slides (part1)
Ā 
Economics
EconomicsEconomics
Economics
Ā 
Acc
Acc Acc
Acc
Ā 
Statistics report
Statistics reportStatistics report
Statistics report
Ā 
Circle & sphere
Circle & sphereCircle & sphere
Circle & sphere
Ā 
Final slides
Final slidesFinal slides
Final slides
Ā 
English research report
English research reportEnglish research report
English research report
Ā 
James bond
James bondJames bond
James bond
Ā 
CL FINAL PROJECT REPORT
CL FINAL PROJECT REPORTCL FINAL PROJECT REPORT
CL FINAL PROJECT REPORT
Ā 
Ici final project report
Ici final project reportIci final project report
Ici final project report
Ā 
x town report
x town reportx town report
x town report
Ā 

Recently uploaded

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
Ā 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
Ā 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
Ā 

Recently uploaded (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
Ā 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
Ā 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
Ā 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
Ā 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
Ā 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
Ā 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
Ā 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
Ā 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
Ā 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
Ā 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
Ā 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
Ā 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
Ā 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
Ā 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
Ā 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
Ā 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
Ā 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
Ā 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Ā 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
Ā 

Assignment no.2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku Omar, Perak. Percentage of Assessment: 20% Submission Date: 2nd July 2015 Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building. ļ‚· Pilecaps including excavations from reduce level. ļ‚· Work below ground floor level including site clearance and excavation, ground floor slab etc. ļ‚· All first floor to fourth floor slabs and beams ļ‚· Roof slabs and beams Notes: ļ‚· Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick. ļ‚· Assessment Criteria Refer to matrix attached. Teaching Objectives ļ‚· To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.
  • 2. ļ‚· To develop an awareness of the nature, content, and significance of tendering and contractual documentation. ļ‚· To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to: ļ‚· Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works. ļ‚· Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works. ļ‚· Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works. ļ‚· Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each section is to submit to the group leader in the following sequence: ļ‚· Billing ( handwritten ) ļ‚· Query list ļ‚· Taking off list ļ‚· Dimension sheets The Leader of each group is to collect from all the group members and attach the front cover page with the names of group members. He is to compile every memberā€™s Billing in ONE Billing Paper only .and arranges the rest in the following sequence: ļ‚· Billing ( to insert in front of BQ and hand written ) ļ‚· Pilecaps including excavations from reduce level. ļ‚· Work below ground floor level including site clearance and excavation, ground floor slab etc. ļ‚· First floor slabs to fourth floor slabs and beams. ļ‚· Roof slabs and beams