O slideshow foi denunciado.
Utilizamos seu perfil e dados de atividades no LinkedIn para personalizar e exibir anúncios mais relevantes. Altere suas preferências de anúncios quando desejar.

Tablet pc, pc and server assembly project report final

7.116 visualizações

Publicada em

Project plan to manufacture tablet personal computers, personal computers and servers in a Special Economic Zone (SEZ) taking into account the export obligations, capital expenditure, assembly plant lay-out and power consumption estimates with forecasted cash flow statement.

Publicada em: Negócios, Tecnologia
  • Entre para ver os comentários

Tablet pc, pc and server assembly project report final

  1. 1. 6/28/2017 Proposal | Sumit Jha SUMIT K JHA PROPOSAL FOR CREATING PROJECT REPORT FOR ESTABLISHING TABLET ASSEMBLY PLANT
  2. 2. Page 2 TABLE OF CONTENTS EXECUTIVE SUMMARY.....................................................................................................................................3 PROPOSED TABLE OF CONTENT FOR CREATING A TABLET ASSEMBLY PLAN ....................................................4 SAMPLE PROCESS FLOW FOR TABLET ASSEMBLY.............................................................................................5 CONTACT DETAILS ...........................................................................................................................................6
  3. 3. Page 3 Executive Summary We have extensive experience in creating project proposals for setting up assembly plants in India for Tablets, PCs and Servers. The growing demand, attractive opportunities, huge consumer base and policy support has made India a lucrative destination for investment in electronics manufacturing and assembly. Source: IBEF, June 2017 Source: IBEF, June 2017
  4. 4. Page 4 Proposed Table of Content for Creating a Tablet Assembly Plan  Preamble/Summary of the Project  Brief Background of the Company  Background of Promoters  Reasons to choose the site  Product Mix o Tablets o PoS  Present and Future Demand of the Products o Tablets o PoS  Proposed Capacity o Tablets o PoS  Details of Complete Process Cycle with Process Charts  Plant and Machinery Including Pollution Control Equipment  Phase wise Demand of Power  Other Subsidiary Requirements and Ancillary Facilities  Capital Costing  Manpower Planning  Cost of Project and Means of Finance  Layout of Factory Plant  Raw Material Storage and Handling  Expected/Forecasted Financials
  5. 5. Page 5 Sample Process Flow for Tablet Assembly SIS – Tablet Manufacturing Project Process Flow Import Transport, Insurance, Duty, Taxes & other expenses by Datawind Components PCB Touchscreen CPU Advance Payment Against Back to Back LC with Datawind Faulty PCB & Components SIS Warehouse Transport & Insurance by SIS PCB & Components 3rd Party PCB Assembly Touchscreen, CPU Inspection Assembled PCB No Faulty? Assembly No Faulty? Yes Parwanoo Facility Yes Transport, Insurance, Duty, Taxes & other expenses by Datawind Finished Products Market XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX
  6. 6. Page 6 Contact Details Please connect with Sumit K Jha for any consulting work related to assembly units for Tablets or other electronic items. Email ID- jhasumit@gmail.com Mobile Number- +91 810 5777 335

×