Project Management
Review of the Project Management Body
of Knowledge (PMBOK) 5th edition

{

Joe DiFalco
PMP, PMI-ACP, CSPO, Systems Engineer
Owner CVShout™

Profile: CVShout.com/joedifalco
Contact: joe@cvshout.com
Day 5 Agenda


Day 4 review






Budget
Earned value management
Follow the Lifecycle – build a schedule

Knowledge Areas



Ethics topics
Stakeholder topics
From PMBOK
5th Edition

Note: the numbers in
the chart refer to the
chapter in the PMBOK
Review Cost Management Plan

•
•
•
•
•
•

Responsibilities
Approach
Measurement
Reporting
Variance response
Change control
Estimate Costs

Reserve analysis:
• Account for cost uncertainty
• Could be a fixed %, fixed number or some other calculation
• CONTINGENCY reserve
• Allocated for identified risks or “known-unknowns”
• Clearly documented
• Part of the cost baseline
• MANAGEMENT reserve
• Reserved for unforeseen work or “unknown-unknowns”
• NOT part of the cost baseline but ARE part of the budget and funding requirements
• Management reserves are added to cost baseline as they are approved/used
Determine Budget

•
•
•
•

Aggregation of the estimated costs of individual activities (work packages)
Authorized cost baseline
Use this baseline to monitor and control project performance
Project budget includes ALL of the funds authorized to execute the project
• Cost baseline is the time-phased budget excluding MANAGEMENT reserves
Project Budget Components
un-Known un-Knowns

This is the level of granularity to track measurement

Known un-Knowns
Project Budget Components
Contingency vs
Management reserves

Reserves
Project Budget Components
Funds required to start

Projected disbursement points

Anticipated
From PMBOK
5th Edition

Note: the numbers in
the chart refer to the
chapter in the PMBOK
Control Costs

• Monitor project status
• In relation to the value of work accomplished
• Update project costs
• Manage cost baseline
• Recognize variance – take corrective action

From PMBOK 5th Edition
Control Costs

From PMBOK 5th Edition
Control Costs
Question: what actions would you expect to take to manage costs?

• Follow the management plan
• Utilize OPAs that are available
• Manage change –
• Prevent unnecessary change
• Influence factors that cause cost to rise
• Communicate approved change requests
Exam tips:
• Control means measure
• Measurement reveals variance – variance is analyzed
• Cost management plan tells you what to do to control cost

From PMBOK 5th Edition
Earned Value Management (EVM)
• Assess project performance and progress
• Scope
• Schedule
• Resource measurements
• Progress rules
• 50/50 – activity is 50% when started
• 20/80 – activity is 20% when started
• 0/100 – activity is 100% when completed
• Integrates
• Scope baseline
• Cost baseline
• Schedule baseline
• Note: the Performance Measurement
Baseline (PMB) is the combination of these
From PMBOK 5th Edition
Planned Value (PV)
The approved budget for the work scheduled to be completed by a
specified date.
•
•
•
•

Scheduled work
Work for an activity (work breakdown component)
Defines the physical work that SHOULD have been accomplished
Total of all PV can be referred to as:
• Total PV is also: budget at completion (BAC)

From PMBOK 5th Edition
Earned Value (EV)
The approved budget for the work actually completed by the specified
date
• Measure of work performed
• Based on PV (authorized budget)
• Percent complete of a project
• EV cannot be greater than PV
• Monitored:
• Incrementally – for current status
• Cumulatively – performance trends

From PMBOK 5th Edition
Actual Cost (AC)
• Realized cost incurred
• Cost of work performed during a time period
• Specific to the work that the EV measured
• Corresponds to what was planned – PV
• Has no upper limit – it is what it is

From PMBOK 5th Edition
Earned Value

From PMBOK 5th Edition
Formulas to memorize
Schedule Variance (SV)

From PMBOK 5th Edition
Formulas to memorize
Cost Variance (CV)

From PMBOK 5th Edition
Formulas to memorize
Schedule Performance Index(SPI)

From PMBOK 5th Edition
Formulas to memorize
Cost Performance Index(CPI)

From PMBOK 5th Edition
Formulas to memorize
Estimate at Completion(EAC)

From PMBOK 5th Edition
Formulas to memorize
Estimate to Complete (ETC)

From PMBOK 5th Edition
Formulas to memorize
To Complete Performance Index(TCPI)

From PMBOK 5th Edition
Formulas to memorize
To Complete Performance Index(TCPI)

From PMBOK 5th Edition
Formulas to memorize
Variance at Completion(VAC)

From PMBOK 5th Edition
Earned Value Measurement

From PMBOK 5th Edition
Earned Value Measurement

From PMBOK 5th Edition
Earned Value Measurement

From PMBOK 5th Edition
Earned Value Measurement

From PMBOK 5th Edition
Develop Schedule

From PMBOK 5th Edition
Ethics

From PMBOK 5th Edition
Stakeholder Management

From PMBOK 5th Edition
Stakeholder Management

From PMBOK 5th Edition
Stakeholder Management

From PMBOK 5th Edition
Identify Stakeholders

From PMBOK 5th Edition
Identify Stakeholders
Stakeholder Analysis

From PMBOK 5th Edition
Identify Stakeholders

From PMBOK 5th Edition
Plan Stakeholder Management

From PMBOK 5th Edition
Plan Stakeholder Management

From PMBOK 5th Edition
Plan Stakeholder Management

From PMBOK 5th Edition
Manage Stakeholder Engagement

From PMBOK 5th Edition
Manage Stakeholder Engagement
Manage Stakeholder Engagement

From PMBOK 5th Edition
Manage Stakeholder Engagement
Control Stakeholder Engagement

From PMBOK 5th Edition

More Related Content

What's hot

Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
Nur Azwin
 
Project management
Project managementProject management
Project management
Sameer Kumar
 

What's hot (20)

Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
Project implementation
Project implementationProject implementation
Project implementation
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
 
PMP preparation and PMI Framework
PMP preparation and PMI FrameworkPMP preparation and PMI Framework
PMP preparation and PMI Framework
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Pmp slide share
Pmp slide sharePmp slide share
Pmp slide share
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Project Cost Management - PMP preparation course
Project Cost Management - PMP preparation courseProject Cost Management - PMP preparation course
Project Cost Management - PMP preparation course
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Earned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMPEarned value management with Examples | Control Cost | PMBOK | PMP
Earned value management with Examples | Control Cost | PMBOK | PMP
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery Scheduling
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
2. traditional project management -ch2
2. traditional project management -ch22. traditional project management -ch2
2. traditional project management -ch2
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Project management
Project managementProject management
Project management
 
Knowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartKnowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes Chart
 

Similar to Project Management Class ( based on PMBOK) - Day 5

Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems ppt
p6academy
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptx
ssusercf695b
 

Similar to Project Management Class ( based on PMBOK) - Day 5 (20)

7.4 Control Costs
7.4 Control Costs7.4 Control Costs
7.4 Control Costs
 
Chapter 09 Monitoring and control
Chapter 09 Monitoring and controlChapter 09 Monitoring and control
Chapter 09 Monitoring and control
 
Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4Project Management Class ( based on PMBOK) - Day 4
Project Management Class ( based on PMBOK) - Day 4
 
Project Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdfProject Management Day 4 Cost ٌ R02.pdf
Project Management Day 4 Cost ٌ R02.pdf
 
Intergrated baseline reviews as a tool in assurance
Intergrated baseline reviews as a tool in assurance Intergrated baseline reviews as a tool in assurance
Intergrated baseline reviews as a tool in assurance
 
Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems ppt
 
Using Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project PerformanceUsing Earned Value Management Concepts to Improve Commercial Project Performance
Using Earned Value Management Concepts to Improve Commercial Project Performance
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptx
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Earned value
Earned valueEarned value
Earned value
 
11.7 Monitor Risks
11.7 Monitor Risks11.7 Monitor Risks
11.7 Monitor Risks
 
An introduction to project accounting
An introduction to project accountingAn introduction to project accounting
An introduction to project accounting
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management Overview
 
PMP Exam Prep_sample slides
PMP Exam Prep_sample slidesPMP Exam Prep_sample slides
PMP Exam Prep_sample slides
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Unit 5_Controlling.pptx
Unit 5_Controlling.pptxUnit 5_Controlling.pptx
Unit 5_Controlling.pptx
 
Be chap4 the production process and costs
Be chap4 the production process and costsBe chap4 the production process and costs
Be chap4 the production process and costs
 
Tpm 02
Tpm 02Tpm 02
Tpm 02
 
Sameer Mitter - What is Project Management and How to Handle it
Sameer Mitter - What is Project Management and How to Handle itSameer Mitter - What is Project Management and How to Handle it
Sameer Mitter - What is Project Management and How to Handle it
 

More from Highmark Health (6)

Duquesne Presentation
Duquesne PresentationDuquesne Presentation
Duquesne Presentation
 
The Challenge
The ChallengeThe Challenge
The Challenge
 
Pmi club 20140407(1)
Pmi club 20140407(1)Pmi club 20140407(1)
Pmi club 20140407(1)
 
A One Slide Picture of SCRUM
A One Slide Picture of SCRUMA One Slide Picture of SCRUM
A One Slide Picture of SCRUM
 
PMI global Pittsburgh presentation - revised - 20131201
PMI global Pittsburgh presentation - revised - 20131201PMI global Pittsburgh presentation - revised - 20131201
PMI global Pittsburgh presentation - revised - 20131201
 
Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1
 

Recently uploaded

MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
Krashi Coaching
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 

Recently uploaded (20)

Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptx
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).
 
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
How to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 InventoryHow to Manage Closest Location in Odoo 17 Inventory
How to Manage Closest Location in Odoo 17 Inventory
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 

Project Management Class ( based on PMBOK) - Day 5

Editor's Notes

  1. Joe: Local entrepreneur with several successful startups under my belt. My first job out of college was with EDS – a big 5, at the time, consulting company. I focused my career on software development and over the years I have worked for large corporations, small, medium and start-up companies (as well as being involved in several successful start ups, most notably co-founding a marketing company). All of that experience is culminating with CVShout - dedicated to helping talented, motivated individuals create a brand for themselves that showcases the talents, expertise and experience to stand out from the crowd so they can go after that dream job.