Enviar pesquisa
Carregar
End User Conf. Mumbai (19.06.09)
•
Transferir como PPT, PDF
•
1 gostou
•
484 visualizações
Jasbir Singh
Seguir
Denunciar
Compartilhar
Denunciar
Compartilhar
1 de 41
Baixar agora
Recomendados
PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.
SURJEET PANDEY
KEC International Corporate Presentation
KEC International Corporate Presentation
AICL Communications
Cii 29.12.08
Cii 29.12.08
Jasbir Singh
Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)
Vicor Corporation
Iso layers
Iso layers
Sathish kumar
Principles of scaling & root planing dr alaa attia
Principles of scaling & root planing dr alaa attia
Alaa Atia
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
menonroopesh
MRP,MRP-II,JIT
MRP,MRP-II,JIT
Kevin Pereira
Recomendados
PROJECT REPORT MECH. ENG.
PROJECT REPORT MECH. ENG.
SURJEET PANDEY
KEC International Corporate Presentation
KEC International Corporate Presentation
AICL Communications
Cii 29.12.08
Cii 29.12.08
Jasbir Singh
Controlled Bus Architecture (CBA)
Controlled Bus Architecture (CBA)
Vicor Corporation
Iso layers
Iso layers
Sathish kumar
Principles of scaling & root planing dr alaa attia
Principles of scaling & root planing dr alaa attia
Alaa Atia
Mrp 2 Manufact Resou Plannin
Mrp 2 Manufact Resou Plannin
menonroopesh
MRP,MRP-II,JIT
MRP,MRP-II,JIT
Kevin Pereira
Mrp ii
Mrp ii
jetromarquez
MRP II
MRP II
logisticaformandos
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
Sidnei Reis
manufacturing resource planning
manufacturing resource planning
Dinesh Nikam
MRP I and MRP II
MRP I and MRP II
Sugandha Vidge
Making social media monitoring and analytics work for your brand
Making social media monitoring and analytics work for your brand
Marketwired
LegalShield
LegalShield
rickyholloway
Marketing Yourself In A Market Free Fall
Marketing Yourself In A Market Free Fall
fordhamx4
7.4.5
7.4.5
Talia Carbis
Press Release Headline Optimization Marketwire Widmann Mrs2009
Press Release Headline Optimization Marketwire Widmann Mrs2009
Marketwired
Spb Grow
Spb Grow
Alexandr Kramer
Menighedsudvikling 4 - lytterunde
Menighedsudvikling 4 - lytterunde
Mogens Mogensen
Super Bowl XLVII Twitter Mention Report
Super Bowl XLVII Twitter Mention Report
Marketwired
2.3.4identification
2.3.4identification
Talia Carbis
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
Dean Bubley
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Mogens Mogensen
Techcrunch application
Techcrunch application
Ben Johnson
Paul Hurly's Portfolio
Paul Hurly's Portfolio
Paul
7.3.4
7.3.4
Talia Carbis
emission reduction benefit
emission reduction benefit
Rajneesh Kumar
End User Conf. Japan
End User Conf. Japan
Jasbir Singh
E+PC Power & Energy Capability
E+PC Power & Energy Capability
BCreaven
Mais conteúdo relacionado
Destaque
Mrp ii
Mrp ii
jetromarquez
MRP II
MRP II
logisticaformandos
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
Sidnei Reis
manufacturing resource planning
manufacturing resource planning
Dinesh Nikam
MRP I and MRP II
MRP I and MRP II
Sugandha Vidge
Making social media monitoring and analytics work for your brand
Making social media monitoring and analytics work for your brand
Marketwired
LegalShield
LegalShield
rickyholloway
Marketing Yourself In A Market Free Fall
Marketing Yourself In A Market Free Fall
fordhamx4
7.4.5
7.4.5
Talia Carbis
Press Release Headline Optimization Marketwire Widmann Mrs2009
Press Release Headline Optimization Marketwire Widmann Mrs2009
Marketwired
Spb Grow
Spb Grow
Alexandr Kramer
Menighedsudvikling 4 - lytterunde
Menighedsudvikling 4 - lytterunde
Mogens Mogensen
Super Bowl XLVII Twitter Mention Report
Super Bowl XLVII Twitter Mention Report
Marketwired
2.3.4identification
2.3.4identification
Talia Carbis
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
Dean Bubley
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Mogens Mogensen
Techcrunch application
Techcrunch application
Ben Johnson
Paul Hurly's Portfolio
Paul Hurly's Portfolio
Paul
7.3.4
7.3.4
Talia Carbis
emission reduction benefit
emission reduction benefit
Rajneesh Kumar
Destaque
(20)
Mrp ii
Mrp ii
MRP II
MRP II
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
manufacturing resource planning
manufacturing resource planning
MRP I and MRP II
MRP I and MRP II
Making social media monitoring and analytics work for your brand
Making social media monitoring and analytics work for your brand
LegalShield
LegalShield
Marketing Yourself In A Market Free Fall
Marketing Yourself In A Market Free Fall
7.4.5
7.4.5
Press Release Headline Optimization Marketwire Widmann Mrs2009
Press Release Headline Optimization Marketwire Widmann Mrs2009
Spb Grow
Spb Grow
Menighedsudvikling 4 - lytterunde
Menighedsudvikling 4 - lytterunde
Super Bowl XLVII Twitter Mention Report
Super Bowl XLVII Twitter Mention Report
2.3.4identification
2.3.4identification
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
ITU Telecom 2013 Workshop: New Telecom Opportunities in Voice and Messaging
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Harald Hegstad, Menihgedsudvikling i Den norske Kirke
Techcrunch application
Techcrunch application
Paul Hurly's Portfolio
Paul Hurly's Portfolio
7.3.4
7.3.4
emission reduction benefit
emission reduction benefit
Semelhante a End User Conf. Mumbai (19.06.09)
End User Conf. Japan
End User Conf. Japan
Jasbir Singh
E+PC Power & Energy Capability
E+PC Power & Energy Capability
BCreaven
Uks resum 14.02.2014
Uks resum 14.02.2014
Utpal SenGupta
Essar grop
Essar grop
NavPreet Maan
Industry Analysis-Steel Industry of India
Industry Analysis-Steel Industry of India
sandeep7162
Alstom india
Alstom india
Anshul Tripathi
Vedantaindiaoperationssitevisit aluminiumandpowerpresentation-25sep2012 final
Vedantaindiaoperationssitevisit aluminiumandpowerpresentation-25sep2012 final
Vedanta Group
final resume
final resume
siva kumar
Ibsf presentation-29-4-2011
Ibsf presentation-29-4-2011
MuradHassan
Erim Gurdal CV
Erim Gurdal CV
erimathome
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
Ratnakar Sortur
project report
project report
Akbar Mohammad
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
kahayami
Industrial Training report at Heavy Engineering Corporation, Ranchi Jharkhand
Industrial Training report at Heavy Engineering Corporation, Ranchi Jharkhand
Vansh Vardhan Jha
Financing and Appraisal of a Power Project
Financing and Appraisal of a Power Project
Shaurya Vikram Singh
AL FARRAJ GROUP JORDAN ROGEENA 2016...
AL FARRAJ GROUP JORDAN ROGEENA 2016...
United Plastic Co. United Plastic Co.
BEML LIMITED FILE
BEML LIMITED FILE
Keshavarao R V
'Abu Dhabi 2030: Masdar’s role in bringing the vision to reality' - Dr Nawal ...
'Abu Dhabi 2030: Masdar’s role in bringing the vision to reality' - Dr Nawal ...
Dubai Quality Group
PowerBrochure
PowerBrochure
Saurabh Shekhar
AMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun Presentation
Joel Johnson
Semelhante a End User Conf. Mumbai (19.06.09)
(20)
End User Conf. Japan
End User Conf. Japan
E+PC Power & Energy Capability
E+PC Power & Energy Capability
Uks resum 14.02.2014
Uks resum 14.02.2014
Essar grop
Essar grop
Industry Analysis-Steel Industry of India
Industry Analysis-Steel Industry of India
Alstom india
Alstom india
Vedantaindiaoperationssitevisit aluminiumandpowerpresentation-25sep2012 final
Vedantaindiaoperationssitevisit aluminiumandpowerpresentation-25sep2012 final
final resume
final resume
Ibsf presentation-29-4-2011
Ibsf presentation-29-4-2011
Erim Gurdal CV
Erim Gurdal CV
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
project report
project report
A-Babtain Corporate-Email.ppt
A-Babtain Corporate-Email.ppt
Industrial Training report at Heavy Engineering Corporation, Ranchi Jharkhand
Industrial Training report at Heavy Engineering Corporation, Ranchi Jharkhand
Financing and Appraisal of a Power Project
Financing and Appraisal of a Power Project
AL FARRAJ GROUP JORDAN ROGEENA 2016...
AL FARRAJ GROUP JORDAN ROGEENA 2016...
BEML LIMITED FILE
BEML LIMITED FILE
'Abu Dhabi 2030: Masdar’s role in bringing the vision to reality' - Dr Nawal ...
'Abu Dhabi 2030: Masdar’s role in bringing the vision to reality' - Dr Nawal ...
PowerBrochure
PowerBrochure
AMM 5th Annual Pipe Conference Welspun Presentation
AMM 5th Annual Pipe Conference Welspun Presentation
End User Conf. Mumbai (19.06.09)
1.
Field Bus Foundation
: State-of-the-art Technology, Feasibility and Practicability Jasbir Singh Essar Oil Jamnagar jasbirsingh@essar.com 2009 FFIEUC-Mumbai Conference 1 © 2009 Fieldbus Foundation
2.
Essar Group -
Mission To create enduring value for customers and stakeholders in core manufacturing and service businesses, through world-class operating standards, state-of-the-art technology and the ‘positive attitude’ of our people 2009 FFIEUC-Mumbai Conference 2 © 2009 Fieldbus Foundation
3.
Businesses
Essar Group Shipping Ports Steel Energy Power Communications Projects & Logistics Essar Steel Ltd Essar Oil Essar Power / Vodafone Essar Essar Shipping Essar Construction 4.6 MTPA integrated 12.5 MTPA refinery Bhander Power 60 million subscribers Fleet of 26 vessels, - Engineering steel plant complex 1,015 MW combined DWT of 1.49 mn - Fabrication cycle Essar Telecom - Construction Essar Steel (Hazira) Over 1,000 retail Infrastructure Vadinar Oil Terminal 4 MTPA integrated outlets Vadinar Power 3,500 telecom towers Terminal facility of 32 steel plant 125 MW co-generation; operational; 20,000 MTPA – Liquid Cargo Fully geared to execute (under implementation) Refinery expansion to expanding to 1250 MW planned by 2010 turnkey EPC jobs in 34 MTPA in two Bulk Terminal India and overseas Essar Steel Orissa phases Essar Power MP The MobileStore Dry bulk port facilities 6 MTPA pellet plant 1,200 MW coal based Over 1,300 outlets Essar Offshore (under implementation) Exploration & (under implementation) operational; 2,500 Essar Oilfields Subsea Production Assets planned by 2010 A drilling company with Expertise in marine Algoma Steel, Canada E&P rights in valuable Essar Power Gujarat 13 rigs construction 4.0 MTPA integrated oil & gas blocks in 1,200 MW coal based Aegis - BPO steel plant India and abroad (under implementation) 30,000 people in offices Essar Logistics Global Supplies in the Philippines, Costa Owns and operates (UAE) FZE Minnesota Steel Essar Power Rica, USA and India transshipment assets Global procurement 6 MTPA pellet plant Jharkhand company (planned) 1,200 MW coal based BPL Mobile (under implementation) More than 1.8 million 1.4 billion tonne iron subscribers Heavy Engineering ore reserves Services PT Essar Indonesia Project Management 0.4 MTPA cold rolling Consultants complex Asia’s largest equipment bank 200207 2009 FFIEUC-Mumbai Conference 3 © 2009 Fieldbus Foundation
4.
Energy
From Rig to Retail Essar Oil is a fully-integrated oil company of international standard and scale 2009 FFIEUC-Mumbai Conference 4 © 2009 Fieldbus Foundation
5.
Aligning Performance Improvement
Opportunities with Business Objectives $$$ Field Bus Foundation provides the way to bridge the gap between business goals and specific Plant performance factors 2009 FFIEUC-Mumbai Conference 5 © 2009 Fieldbus Foundation
6.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Purchase Specification • Data Sheets • Technical note 2. Design Basis • Standard Specification • Design Guidelines • Design Notes • Simple Safety guidelines / documentations • FAT Guidelines • Error Measurement and control guidelines • Installation, commissioning procedure and Check Sheets 2009 FFIEUC-Mumbai Conference 6 © 2009 Fieldbus Foundation
7.
Support of Engineering
and Project Management Consultancy in Field Bus System: Capital Expenditure CAPEX Excellence (Lowest Cost of ownership): 1. Level of Redundancy 2. Selection of Segment components 3. Optimum FF Segment design 4. Error measurement and Control 5. Hardware selection for Installation 2009 FFIEUC-Mumbai Conference 7 © 2009 Fieldbus Foundation
8.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Level of Redundancy Probability of failure Recovery time Loss per failure Level of Confidence 2009 FFIEUC-Mumbai Conference 8 © 2009 Fieldbus Foundation
9.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Segment components Essential component selection and design for use • Remote I/O • Field barriers • Surge Protector • Repeaters Defines rules for Selecting and installing FISCO networks Rule for additional components to increase safety factor • Redundant FISCO Power supply • Free ports in Field barrier • Additional Empty segments Selection of devices based on requirement • LAS function • PID function • Local display 2009 FFIEUC-Mumbai Conference 9 © 2009 Fieldbus Foundation
10.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. FF Segment design Optimize number of Devices per segment (use of segment design software) Control loop devices in same segment (optimum loop performance) Use of multiple information (multivariable devices) Device selection proper to hazardous area classification only Use updated changes in standards and hazardous area practice Guidelines for selection between Explosion proof & Intrinsic safe System / Devices Use of Ex ic/FNICO (Fieldbus Non-Incendive Concept) for Zone 2 hazardous areas 2009 FFIEUC-Mumbai Conference 10 © 2009 Fieldbus Foundation
11.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Error Management (monitor and control) Design Development Implementation Maintenance 2009 FFIEUC-Mumbai Conference 11 © 2009 Fieldbus Foundation
12.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Hardware Selection & Installation Good Installation practices of Field barriers / Segment Protector Close to Main cable duct / tray Easy termination Hazardous area and weather protection Installation of device at ground level based on process requirement – should not be made as General Rule Use of optical fiber for long distance data transfer Revamping plant • Use of hybrid positioner with existing valve • Verify the interference issue and use of existing cables • Use of Hybrid concept for plant revamping 2009 FFIEUC-Mumbai Conference 12 © 2009 Fieldbus Foundation
13.
Support of Engineering
and Project Management Consultancy in Field Bus System: 1. Hardware Selection & Installation Cont.: Requirements: Solutions, Benefits: long distance (up to > 8000 m) remote I/O fiber optic hazardous locations remote I/O for Zone 2 with IS inputs/ outputs high amb temperature (>50 °C) special „cabinet“ design high availability redundancy fiber optic ring structure HART + FF connect remote I/O to DCS´s HART + FF management tool IS and non IS signals handled by remote I/O 2009 FFIEUC-Mumbai Conference 13 © 2009 Fieldbus Foundation
14.
Support of Engineering
and Licensers: Capital Expenditure CAPEX Excellence: 1. Loop identification: • Philosophy for Super critical, critical, semi critical and non critical loops of plant • Simple close loop • Open loop • Transmitters (devices) with indicator / without indicator • Local indicator with multiple parameters 2. Physical Location of devices in field 3. Physical Location field bus barrier in field 4. Use strength of other field bus such as ASi, devicenet or others 2009 FFIEUC-Mumbai Conference 14 © 2009 Fieldbus Foundation
15.
Support of Engineering
and Licensers: Identification of control loops that can be considered in FFB: Super Critical Control Loops: Fast response loops are considered in super critical loops eg. Anti surge loops, Drum level control etc causing safety concern and / or major equipment damage. • Critical Control Loops • Semi Critical Control Loops • Non Critical Control loops • Critical Control Loops: (Level 1) Failure of level 1 loops will result in a total system trip, causing a shutdown of the entire unit, or other unavoidable losses. Normal Valve failure mode is to be used for this classification. 2009 FFIEUC-Mumbai Conference 15 © 2009 Fieldbus Foundation
16.
Support of Engineering
and Licensers: • Semi Critical Control Loops (Level 2) Failure of a level 2 loops will result in a total system trip, causing a shutdown of the entire unit, or other unavoidable losses. However, the Level 2 valve’s process dynamics allows time for the quick recovery from the failure, either by quickly fixing a fault or by taking manual control. The material and energy capacity of associated vessels, geographic location, and elevation/accessibility of such a valves should be considered. The difference in Level 1 and Level 2 valves are dependent on operations ability to respond to single failure. • Non Critical Loops: (Level 3) Failure of this valve will not result in any short term risk of total unit shutdown or major operation loses. Level 3 valves can go to their fail position without requiring immediate operator action. 2009 FFIEUC-Mumbai Conference 16 © 2009 Fieldbus Foundation
17.
User’s perspective:
General Consideration for the use of FF in Essar: Field Bus is not used for Separator pressure control and reciprocating makeup gas pressure control loops, because of all the split ranges and signal selectors involved in those loops Field Bus is not used Steam FI, steam generator LIC and BFW FIC on steam generators Field Bus is not used for Anti-surge, etc. as those types of controllers may required faster response times. Field Bus is not used in shutdown systems or for complex control loops. 2009 FFIEUC-Mumbai Conference 17 © 2009 Fieldbus Foundation
18.
Fb
Type – 2 Type – 3 Type – 1 (Two device (Three device (One device per output) per output) per output) Fb Power Fb Conditioner T - ON Bulk Power Supply Safe Area Hazardous Area 2009 FFIEUC-Mumbai Conference Barrier-Fb Field18 © 2009 Fieldbus Foundation
19.
Device Manufacturer in
Field Bus systems: 1. Hardware design & Level of Redundancy 2. Software 3. Commissioning Tools 2009 FFIEUC-Mumbai Conference 19 © 2009 Fieldbus Foundation
20.
System & Device
Manufacture support: 1. Hardware design & Level of Redundancy Easy cable connection of H1 card with Field bus power supply and replacement on fault Rugged construction of FF components for easy cabinet mounting and resistance to shock and vibration Robust field-proven and reliable Field Bus components LEDs indicators to identify failed module, Hot swapping of components to allow replacement under power Support multiple LAS devices FF Basic-to-LM device wizard “Safe” way to enable/disable Backup LAS Provides wizard to step through sequence 2009 FFIEUC-Mumbai Conference 20 © 2009 Fieldbus Foundation
21.
Device Replacement
1. Software Device Replacement by Operator Quick Auto replacement From Operator Station or Engineering Station Support for: o like device, and, o like devices with revisions 2009 FFIEUC-Mumbai Conference 21 © 2009 Fieldbus Foundation
22.
DD file addition
& Device Configuration 1. Software Ability to Add DD Files Integrated into Engineering tool Easy tool for adding DD files Easy Parameter Data Entry tool to edit New DD file for similar devices should be possible to be used with existing devices Code Download Allows upgrading devices on-line Includes enhancements to current capability and file management Easy device Configuration Plug and play tool for device addition Device configuration wizard 2009 FFIEUC-Mumbai Conference 22 © 2009 Fieldbus Foundation
23.
Device management in
Field Bus: 1. Commissioning Tools • Device Checking software (Maintenance / Management Tool) • Configuration changes from DCS • Calibration from DCS • Maintain Audit trail of devices • Taking device signature at the time of initial startup • Workshop tools for FF 2009 FFIEUC-Mumbai Conference 23 © 2009 Fieldbus Foundation
24.
Easy Commissioning and
Help 1. Commissioning Tools Commission device without pre-configuration Easy way to add a device in an existing installation Directly from Uncommissioned Device tab Easy to Build and loads device System Comprehensive Help option Dynamic and comprehensive help at every step During adding devices, help information from the manufacturer should be possible to add into system From any parameter in a device, hit F1 to get help information! 2009 FFIEUC-Mumbai Conference 24 © 2009 Fieldbus Foundation
25.
Device Management: TAF
Device on FF-H1 Bus Information Basic Information Detail Information FCS 1001 Device Tag Name: PT 2002 NODE 01 Device ID:594543000CJ000856 MANUFAC_ID: Device Class: BASIC DEV TYPE:0X0 Update Time: Friday, September 22,2006 10:00:00 AM DEV_REV:0X0 ALF 111 240 PT 2002 Friday, September 22,2006 10:00:00 AMDevice Tag Name: CV 4001 ALF 111-1 1ALF111-1 Device ID:5945430001J009185 MANUFAC_ID: Device Class: BASIC DEV TYPE:0 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 DEV_REV:0X0 241 CV 4001 CV 4001 Friday, September 22,2006 10:00:00 AM CV 4002 Device Tag Name: CV 4002 Device ID:5945430001J008277 MANUFAC_ID: 0 Device Class: BASIC DEV TYPE:0X07 L 6001 Update Time: Friday, September 22,2006 10:00:00 AM DEV_REV:0X03 242 TE1001 CV 4002 Friday, September 22,2006 10:00:00 AM Device Tag Name: L 6001 MANUFAC_ID: 0 Device ID:56474B0770 DEV TYPE:0 Device Class: BASIC DEV_REV:0X030 ALF 111-2 243 Update Time: Friday, September 22,2006 10:00:00 AM L 6001 ALF 111-3 Friday, September 22,2006 10:00:00 AM Device Tag Name: TE1001 MANUFAC_ID: 0 ALF 111-4 Device ID:594543000550011361 DEV TYPE:0X07 244 TE1001 Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM 245 2009 FFIEUC-Mumbai Conference © 2009 Fieldbus Foundation
26.
Device Management: Device on
FF-H1 Bus Information Basic Information Detail Information MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Tag Name: PT 2002 Device ID:594543000CJ000856 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 240 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 Friday, September 22,2006 10:00:00 AM 1ALF111-1 Device Tag Name: CV 4001 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J009185 DEV TYPE:0X001() Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM 241 CV 4001 Friday, September 22,2006 10:00:00 AM Device Tag Name: CV 4002 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J008277 DEV TYPE:0X002() Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM 242 CV 4002 Friday, September 22,2006 10:00:00 AM MANUFAC_ID: 0X0056474B(VEGA) Device Tag Name: L 6001 Device ID:56474B0770 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM 243 L 6001 Friday, September 22,2006 10:00:00 AM MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Tag Name: TE1001 DEV TYPE:0X001() Device ID:594543000550011361 DEV_REV:0X03 Device Class: BASIC 244 Update Time: Friday, September 22,2006 10:00:00 AM TE1001 Friday, September 22,2006 10:00:00 AM 245 2009 FFIEUC-Mumbai Conference 26 © 2009 Fieldbus Foundation
27.
Device Management: Device on
FF-H1 Bus Information Basic Information Detail Information MANUFAC_ID:0X00594543(Yokogawa Electric) Device Tag Name: PT 2002 Device ID:594543000CJ000856 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 240 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 Friday, September 22,2006 10:00:00 AM 1ALF111-1 RB(RESOURCE_01) Auto TB(TRANSDUCER_01) Auto TB(TRANSDUCER_02) Auto FB(AI_01) Auto FB(AI_02) O/S FB(AI_03) FB(PID_01) FB(SC_01) FB(IT_01) FB(IS_01) FB(AR_01) Device Tag Name: CV 4001 MANUFAC_ID: 0X00594543(Yokogawa Electric) 241 Device ID:5945430001J009185 DEV TYPE:0X001() CV 4001 Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: TE1001 Device ID:594543000550011361 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Class: BASIC Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X002() DEV_REV:0X03 242 CV 4002 Friday, September 22,2006 10:00:00 AM Device Tag Name: L 6001 MANUFAC_ID: 0X0056474B(VEGA) Device ID:56474B0770 DEV TYPE:0X0770() 243 Device Class: BASIC DEV_REV:0X03 L 6001 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: CV 4002 Device ID:5945430001J008277 Device Class: BASIC MANUFAC_ID: 0X00594543(Yokogawa Electric) 244 TE1001 Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X001() Friday, September 22,2006 10:00:00 AM DEV_REV:0X03 2009 FFIEUC-Mumbai Conference 245 © 2009 Fieldbus Foundation
28.
Device Management: Device on
FF-H1 Bus Information Basic Information Detail Information MANUFAC_ID:0X00594543(Yokogawa Electric) Device Tag Name: PT 2002 Device ID:594543000CJ000856 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 240 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 Friday, September 22,2006 10:00:00 AM 1ALF111-1 RB(RESOURCE_01) Auto TB(TRANSDUCER_01) Auto TB(TRANSDUCER_02) Auto FB(AI_01) Auto FB(AI_02) O/S FB(AI_03) FB(PID_01) FB(SC_01) FB(IT_01) FB(IS_01) FB(AR_01) Device Tag Name: CV 4001 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J009185 DEV TYPE:0X001() CV 4001 Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: TE1001 Device ID:594543000550011361 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Class: BASIC Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X002() DEV_REV:0X03 CV 4002 Friday, September 22,2006 10:00:00 AM Device Tag Name: L 6001 MANUFAC_ID: 0X0056474B(VEGA) Device ID:56474B0770 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 L 6001 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: CV 4002 Device ID:5945430001J008277 Device Class: BASIC MANUFAC_ID: 0X00594543(Yokogawa Electric) TE1001 Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X001() Friday, September 22,2006 10:00:00 AM DEV_REV:0X03 2009 FFIEUC-Mumbai Conference © 2009 Fieldbus Foundation
29.
Device Management: Device on
FF-H1 Bus Information Basic Information Detail Information MANUFAC_ID:0X00594543(Yokogawa Electric) Device Tag Name: PT 2002 Device ID:594543000CJ000856 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 240 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 Friday, September 22,2006 10:00:00 AM 1ALF111-1 Device Tag Name: CV 4001 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J009185 DEV TYPE:0X001() CV 4001 Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: TE1001 Device ID:594543000550011361 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Class: BASIC Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X002() DEV_REV:0X03 CV 4002 Friday, September 22,2006 10:00:00 AM Device Tag Name: L 6001 MANUFAC_ID: 0X0056474B(VEGA) Device ID:56474B0770 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 L 6001 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: CV 4002 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J008277 DEV TYPE:0X001() Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM TE1001 Friday, September 22,2006 10:00:00 AM 2009 FFIEUC-Mumbai Conference 29 © 2009 Fieldbus Foundation
30.
Device Management: Device on
FF-H1 Bus Information Basic Information Detail Information MANUFAC_ID:0X00594543(Yokogawa Electric) Device Tag Name: PT 2002 Device ID:594543000CJ000856 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 240 Update Time: Friday, September 22,2006 10:00:00 AM PT 2002 Friday, September 22,2006 10:00:00 AM 1ALF111-1 Device Tag Name: CV 4001 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J009185 DEV TYPE:0X001() CV 4001 Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: TE1001 Device ID:594543000550011361 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device Class: BASIC Update Time: Friday, September 22,2006 10:00:00 AM DEV TYPE:0X002() DEV_REV:0X03 CV 4002 Friday, September 22,2006 10:00:00 AM Device Tag Name: L 6001 MANUFAC_ID: 0X0056474B(VEGA) Device ID:56474B0770 DEV TYPE:0X0770() Device Class: BASIC DEV_REV:0X03 L 6001 Update Time: Friday, September 22,2006 10:00:00 AM Friday, September 22,2006 10:00:00 AM Device Tag Name: CV 4002 MANUFAC_ID: 0X00594543(Yokogawa Electric) Device ID:5945430001J008277 DEV TYPE:0X001() Device Class: BASIC DEV_REV:0X03 Update Time: Friday, September 22,2006 10:00:00 AM TE1001 Friday, September 22,2006 10:00:00 AM 2009 FFIEUC-Mumbai Conference 30 © 2009 Fieldbus Foundation
31.
Support for Network
Design Network Safe and Trouble Free operation Network System Design & Layout Network Communication / Software Safety 2009 FFIEUC-Mumbai Conference 31 © 2009 Fieldbus Foundation
32.
Fundamental considerations/Fault Avoidance
Information collection and safely processing Enterprise Secure Access Network to Enterprise Network Link Aggregation Dual Homing RSTP HiPER Ring Secure Access to Plant Floor 2009 FFIEUC-Mumbai Conference 32 OCTOPUS © 2009 Fieldbus Foundation
33.
Fundamental considerations/Fault Avoidance
Design Considerations / Fault Avoidance • Industrial Ethernet Industrial Networking • Optical Fiber Interfaces Industrial Connectors • Industrial Connectors • Load Moment Indicator Electronic Control • Control Systems and Sensors and Management Systems • Graphic Control Panels and Displays 2009 FFIEUC-Mumbai Conference 33 © 2009 Fieldbus Foundation
34.
Networking at Multiple
layers Multilayer Safety Network Operating System Application FF accessories Device 2009 FFIEUC-Mumbai Conference 34 © 2009 Fieldbus Foundation
35.
Networking at Multiple
layers Design of Safety in communication systems 1. Safe communication over a bus alone does not ensure that the transferred information is safe 2. No loss / encryption of data 3. Programming Failure 4. Improper installation of networking hardware 5. Data transmission Consistency checking Confirmation of correct data transmitted & received Watch dog for external affect 6. Safe communication Risk reduction Fault avoidance Fault control 2009 FFIEUC-Mumbai Conference 35 © 2009 Fieldbus Foundation
36.
Networking at Multiple
layers Reason of Failure in networking: 1. Mis-configured Fire wall 2. Connection of infected laptop for engineering or trouble shooting 3. Infected remote support 4. Unauthorized connection with unsecured system 5. Connection with Modem, printer 6. Non proven fire wall 2009 FFIEUC-Mumbai Conference 36 © 2009 Fieldbus Foundation
37.
Networking at Multiple
layers Use of Robust and Proven Fire wall: Protection from alien control networks Protection from external networks Protection from insecure networks Protection of safety System Protection for unpatchable systems Protection of wireless systems Protection of OPC traffic … 2009 FFIEUC-Mumbai Conference 37 © 2009 Fieldbus Foundation
38.
Operational Excellence (OpX)
Asset Production Safety Excellence Excellence Excellence Performance Availability x rate x Quality rate x HSE compliance rate OPE = Cost Maintenance cost + Production cost + HSE cost Maximization of asset Maximization of production Maximization of safety excellence factor excellence factor excellence factor OPE: Overall Plant Effectiveness 2009 FFIEUC-Mumbai Conference 38 © 2009 Fieldbus Foundation
39.
Asset management:
Easy Commissioning and Easy Life 2009 FFIEUC-Mumbai Conference 39 © 2009 Fieldbus Foundation
40.
Asset management:
Easy Troubleshooting and Easy Life 2009 FFIEUC-Mumbai Conference 40 © 2009 Fieldbus Foundation
41.
2009 FFIEUC-Mumbai Conference 41
© 2009 Fieldbus Foundation
Baixar agora