SlideShare a Scribd company logo
1 of 64
Cargo Tank Venting &
Inert Gas System &
Equipment
On board cargo equipment 2
Inert Gas System Introduction
On board cargo equipment 3
Introduction to Inert Gas System
 Introduction
 Flammability
 Flammable Range
 Effect of Increasing Oxygen
 Suppression of Flammability by IG
 Combustion& Explosion
 Inert Gas Prevents FIRE & EXPLOSION
On board cargo equipment 4
On board cargo equipment 5
On board cargo equipment 6
Suppression of Flammability by IG
On board cargo equipment 7
Suppression of Flammability by IG
On board cargo equipment 8
Effect of Oxygen on Flammable Range
On board cargo equipment 9
Inert Gas Definitions
On board cargo equipment 10
Inert Gas Must On Tankers
 Required Under Regulation 60 of SOLAS
 For All Petroleum Tankers more than 20,000 DWT –
Keel laid after 1-9-84
 Exception for Existing Tankers (Keel Laid prior 84)
- i) Tank Washing Machine Capacity less than 60 Cubic
Meter/Hour &
- ii) Unreasonable & Impracticable due to design determined
by Administration
- iii) For Product Tankers between 20-40,000DWT tank
washing Machine Capacity less than 60 cubic meter/Hour
 Tankers fitted with IGS to keep COT inerted at all times
On board cargo equipment 11
Inert Gas Production
On board cargo equipment 12
Inert Gas System
 Flue Gas Uptake Valves
 Scrubber
 I.G. Fans (Blowers)
 Gas Regulating Valve
 Deck Water Seal
 Non Return Valve
 Deck Isolating Valve ( Manual)
 P/ V Breaker
 Instrumentation
 Tank Atmosphere Analyzers (Oxygen
Analyzers) Fixed & Portable
On board cargo equipment 13
Inert Gas System Layout
On board cargo equipment 14
Inert Gas System Flow Sheet
On board cargo equipment 15
Inert Gas Lay Out
On board cargo equipment 16
Inert Gas Layout System
From
Flue Gas Uptake
On board cargo equipment 17
Deck Distribution of Inert Gas System
On board cargo equipment 18
I. G. S. LAYOUT
On board cargo equipment 19
Deck Water Seal Requirement
•Regulation 62 requires that Inert Gas system is
equipped with two Non return devices one of
which shall be water seal to prevent the return of
hydrocarbon to Gas safe spaces
•In addition Regulation 62 requires that
arrangement of Deck Water Seal Shall be such
that it will prevent back flow of hydrocarbon
vapours and ensure proper Functioning of Seal
Under Operating Conditions.
On board cargo equipment 20
Deck Water Seal Wet Type
On board cargo equipment 21
Deck Water Seal Semi Dry
On board cargo equipment 22
Deck Water Seal Dry Type
On board cargo equipment 23
Deck seal
 Deck seal prevent flow back
from deck pipe line to flame
area of boilers or scrubbers
 Water column works as non
returning valve
On board cargo equipment 24
Principle of IG Scrubber
On board cargo equipment 25
IG Scrubber
On board cargo equipment 26
IGS types: Inert Gas Generator (FTU) construction -Scrubber
On board cargo equipment 27
Inert Gas System Non Return Devices
 Reason for Non Return Devices
 N/R Consist of Deck Water Seal & Deck
Mechanical N/R Valve
 Deck Water Seal is a Principal Barrier
 Incase of water drop, there should be
Low Water Alarm but Seal Should not
become Ineffective
 Heating Arrangement For Deck Water
Seal
 Sight Glass & Inspection Opening
Provided
 Function of Deck Mechanical N/R V/V
 Purpose of Separate Deck Isolating Valve
On board cargo equipment 28
Deck Water Seal Wet Type
On board cargo equipment 29
Deck Water Seal Semi Dry with Heating System
On board cargo equipment 30
Pressure-Relief & vacuum protection Systems
 Principal work of
liquid filled
pressure – vacuum
deck breakers: in
case P/V v/v fails
to operate
– Over pressure by
IG or Vapour and
blow out liquid on
deck
– Suction ambient
air in gas line and
liquid in tank
On board cargo equipment 31
Liquid Filled pressure vacuum breaker
On board cargo equipment
 The Pressure-Relief and Vacuum-Protection
System gives an automatically controlled
protection against too high or too low pressure
within the cargo-handling system
 Pressure-relief piping system
 Pressure-Relief & vacuum protection System for
All Cargo Tanks, as per IMO rules.
Pressure-Relief & vacuum protection Systems
On board cargo equipment 33
P/V & High Velocity Valves
On board cargo equipment 34
Pressure-Relief & vacuum protection Systems
 P/V valves
On board cargo equipment 35
Pressure-Relief & vacuum protection Systems
 High velocity vents valve
combines the best of modulating
valves and full-lift valves.
 Valve creates "delayed" blow
down of cargo tanks. It reduces
vapor loss during low filling rates
(and due to sloshing) until venting
takes place at full rate when vapor
loss is less important.
 Valve provides active protection
from fire and explosion regardless
of pipe configuration.
 Valve operates in freezing
conditions without heating
arrangements.
On board cargo equipment 36
Pressure-Relief & vacuum protection Systems
 Common liquid P/V
On board cargo equipment 37
Pressure-Relief & vacuum protection Systems
 1,2 Pressure house; Adapter
 3,4 Pressure disc and seat
 5,6 Booster
 7,8,9 Sleeve / Weight / Stem
 10 Check lift (pressure unit)
 11,12,13 Vacuum house, disc,
seat
 14 Filter element
 15 Venting cover
 16 Check lift (vacuum unit)
On board cargo equipment 38
Methods of Gas Replacement
 DILUTION
 DISPLACEMENT
 Dilution is mixing process, where velocity
of incoming Gas is High
 Displacement is a Layering Process,
where IG has Low Entry Velocity , to
enable stable horizontal interface
On board cargo equipment 39
IGS – Arrangement for Gas Replacement
On board cargo equipment 40
IGS – Arrangement for Gas Replacement
On board cargo equipment 41
IG Application
On board cargo equipment 42
On board cargo equipment 43
Requirement for I G Main
 Means for Isolating Each Tank
 Breathing Possible when Tanks Isolated from IG Main
 Blank Flanges for Slop Tanks & Isolation for OBOs
 External IG Supply Connection
 Mast Riser or High Velocity Vents Provided for
Vapour Displacement
 Purge Pipes as Far as practicable from IG inlet
 Effective Isolation between IG Main and Cargo piping
 One or More P/V Breakers
 Provision of Continuous pressure indication of IG
On board cargo equipment 44
Tanker Cycle
On board cargo equipment 45
Inert Gas Application to Various Shipboard Operations
On board cargo equipment 46
IGS types: Flue Gas System
 Flue Gas Systems cool and clean flue gas from the ship's boilers, and deliver it to
deck, typically during cargo unloading and tank washing.
 Flue gas already contains less than 5% oxygen, which is the IMO higher limit for
inert gas, no further treatment is therefore necessary.
 The main components are the scrubber unit, inert gas blowers, the deck water seal,
main non-return valve, the pressure/vacuum breaker, valves, instrumentation and
the control system.
 Surplus gas is automatically re-circulated back to the scrubber unit, and gas
production hence follows gas demand.
 The system can also, like the other variants dealt with in this presentation, be
preset to deliver fresh air for gas-freeing purposes.
On board cargo equipment 47
IGS types: Inert Gas Generator
 Inert Gas Generator Systems is used when no existing supply of
flue gas is available.
 The scrubber unit of the flue gas system is here integrated into a
generator unit consisting of a combined burner part and scrubber
part, both sea water cooled. MDO or HFO fuel is burning in the
horizontal combustion chamber to produce flue gas with an
oxygen content of typically 2-4%.
 The gas then enters the scrubber part, where it is cooled and
cleaned by sprayed sea water before being piped to the deck area.
On board cargo equipment 48
Tank Pressure & Oxygen Concentration
On board cargo equipment 49
MMC Ullaging Device
On board cargo equipment 50
Flammability Composition Diagram
On board cargo equipment 51
Isolation of Cargo Tanks from IG Deck Main
On board cargo equipment 52
Cargo tank vent system
On board cargo equipment 53
Monitoring of IG Plant
On board cargo equipment 54
Inert Gas systems
 Carbon dioxide (IG) generation system
– Burning fuel for generation carbon dioxide gas is
common procedure on gas tankers
– Take off carbon dioxide gas form boilers
 Inert Gas (IG) is sent via drier / non returning valves
and used for replacing air to prevent explosion
concentrations :
– in Cargo Tanks and
– in Ballast tanks (some times).
 IG can be supplied from the shore facilities in
emergency condition
On board cargo equipment 55
IGS types: Flue Gas System
On board cargo equipment 56
IGS types: Flue Gas System with Topping Up Generator
 This alternative consists of a flue gas system supplemented
by a separate small (500Nm3/h) inert gas generator, and is
often preferred to aboard OBO and VLCCs
 The flue gas system covers the bulk of the inerting during
cargo unloading etc., and the topping up generator tops up
tank pressures during the sea voyage.
On board cargo equipment 57
IGS types: Inert Gas Generator (FTU) construction
- Panel
- Generator
- Fan
- Scrubber
On board cargo equipment 58
IGS types: Inert Gas Generator (IGG)
Moss Inert Gas Generators for Oil/
Chemical/ Products
Moss Inert Gas Generators for
LPG/LNG
On board cargo equipment 59
IGS types: Flexinert
 Flexinert is a fuel-saving combination of a flue gas system and an
inert gas generator.
 As long as sufficient boiler flue gas is available, Flexinert works as
a flue gas system. When no basis gas is available, it works as an
inert gas generator, and when high-oxygen exhaust gas from the
main engines or diesel generators is available, it afterburns this
gas to produce inert gas with the acceptable oxygen content.
 Afterburning saves fuel since the combustion "air" already has a
reduced oxygen content.
On board cargo equipment 60
Inert Gas Generator (IGG) – output
 Oxygen: 0.5% - 1%
 Carbon Dioxide: ~ 14 %
 Nitrogen: ~ 85%
 Carbon Monoxide, oxides of
Nitrogen and Sulphur
Dioxide: ~ 0,5%
– Carbon Monoxide: Max 100
ppm
– Oxides of Nitrogen: Max 100
ppm
– Sulphur Dioxide: Max 1 ppm
 Moisture: Dew Point of -45C
Modes: Inerting
On board cargo equipment 61
Deck seal
On board cargo equipment 62
Deck seal
On board cargo equipment 63
Ballast tank inerting
 Ballast tanks are inerted in
emergency conditions
 Flexible Hose used for inerted
operation
 Pressure 250 mmWC,
On board cargo equipment 64
Pressure-Relief & vacuum protection Systems
 Vent riser

More Related Content

What's hot

Tank atmosphere-Inert gas system
Tank atmosphere-Inert gas systemTank atmosphere-Inert gas system
Tank atmosphere-Inert gas systemnmahi96
 
Sewage treatment plant on a ship
Sewage treatment plant on a ship Sewage treatment plant on a ship
Sewage treatment plant on a ship Nejat Öztezcan
 
Marine Diesel Engine Exhaust Gas Emissions Control Technologies
Marine Diesel Engine Exhaust Gas Emissions Control TechnologiesMarine Diesel Engine Exhaust Gas Emissions Control Technologies
Marine Diesel Engine Exhaust Gas Emissions Control TechnologiesMohammud Hanif Dewan M.Phil.
 
Liferafts versus lifeboats
Liferafts versus lifeboatsLiferafts versus lifeboats
Liferafts versus lifeboatsPat Cabangis
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...Mohammud Hanif Dewan M.Phil.
 
Atot day 1 rev 1.01
Atot day 1 rev 1.01Atot day 1 rev 1.01
Atot day 1 rev 1.01glenaunzo
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
Parts of a ship1
Parts of a ship1Parts of a ship1
Parts of a ship1Ruranha
 
Energy Efficiency Definitions: EEDI, SEEMP and EEOI
Energy Efficiency Definitions: EEDI, SEEMP and EEOIEnergy Efficiency Definitions: EEDI, SEEMP and EEOI
Energy Efficiency Definitions: EEDI, SEEMP and EEOIMohammud Hanif Dewan M.Phil.
 

What's hot (20)

Ship common systems
Ship common systemsShip common systems
Ship common systems
 
Tank atmosphere-Inert gas system
Tank atmosphere-Inert gas systemTank atmosphere-Inert gas system
Tank atmosphere-Inert gas system
 
Sewage treatment plant on a ship
Sewage treatment plant on a ship Sewage treatment plant on a ship
Sewage treatment plant on a ship
 
Marine Diesel Engine Exhaust Gas Emissions Control Technologies
Marine Diesel Engine Exhaust Gas Emissions Control TechnologiesMarine Diesel Engine Exhaust Gas Emissions Control Technologies
Marine Diesel Engine Exhaust Gas Emissions Control Technologies
 
Liferafts versus lifeboats
Liferafts versus lifeboatsLiferafts versus lifeboats
Liferafts versus lifeboats
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
A Short Note on MARPOL Regulations
A Short Note on MARPOL RegulationsA Short Note on MARPOL Regulations
A Short Note on MARPOL Regulations
 
Stern Tube and Shafting Arrangements
Stern Tube and Shafting ArrangementsStern Tube and Shafting Arrangements
Stern Tube and Shafting Arrangements
 
Bilge management
Bilge managementBilge management
Bilge management
 
LNG as ship fuel
LNG as ship fuelLNG as ship fuel
LNG as ship fuel
 
Atot day 1 rev 1.01
Atot day 1 rev 1.01Atot day 1 rev 1.01
Atot day 1 rev 1.01
 
MARPOL Annex IV & Sewage Treatment Plant
MARPOL Annex IV & Sewage Treatment PlantMARPOL Annex IV & Sewage Treatment Plant
MARPOL Annex IV & Sewage Treatment Plant
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
CARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdfCARGO OIL PUMPING SYSTEM.pdf
CARGO OIL PUMPING SYSTEM.pdf
 
Parts of a ship1
Parts of a ship1Parts of a ship1
Parts of a ship1
 
Energy Efficiency Definitions: EEDI, SEEMP and EEOI
Energy Efficiency Definitions: EEDI, SEEMP and EEOIEnergy Efficiency Definitions: EEDI, SEEMP and EEOI
Energy Efficiency Definitions: EEDI, SEEMP and EEOI
 
Incinerator and MARPOL Requirements
Incinerator and MARPOL RequirementsIncinerator and MARPOL Requirements
Incinerator and MARPOL Requirements
 
MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT
 
Ship's Energy Efficiency Management
Ship's Energy Efficiency ManagementShip's Energy Efficiency Management
Ship's Energy Efficiency Management
 

Similar to Ig system & equipment oil tankers

Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...Kelvin Xu (MRINA)
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...AnupamaPanoli
 
Ship unloading systems: Mechanical Vs Pneumatic?
Ship unloading systems: Mechanical Vs Pneumatic?Ship unloading systems: Mechanical Vs Pneumatic?
Ship unloading systems: Mechanical Vs Pneumatic?Milling and Grain magazine
 
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...marketingequipment
 
Marine Nitrogen Generators from NOXERIOR
Marine Nitrogen Generators from NOXERIORMarine Nitrogen Generators from NOXERIOR
Marine Nitrogen Generators from NOXERIOROscar de Groen
 
23_AuxiliaryMarineMachinery_000.pdf
23_AuxiliaryMarineMachinery_000.pdf23_AuxiliaryMarineMachinery_000.pdf
23_AuxiliaryMarineMachinery_000.pdfKHENTV
 
Urea granulation
Urea granulationUrea granulation
Urea granulationPrem Baboo
 
Portable asphalt plant manufacturer and exporter – atlas technologies
Portable asphalt plant manufacturer and exporter – atlas technologiesPortable asphalt plant manufacturer and exporter – atlas technologies
Portable asphalt plant manufacturer and exporter – atlas technologiesAtlas Technologies
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systemskmsu
 

Similar to Ig system & equipment oil tankers (20)

temp
temptemp
temp
 
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
Portable Fuel Tank - The Application of a New Method of Bunkering for Small S...
 
Oil & Gas Engineering
Oil & Gas EngineeringOil & Gas Engineering
Oil & Gas Engineering
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
 
Ship unloading systems: Mechanical Vs Pneumatic?
Ship unloading systems: Mechanical Vs Pneumatic?Ship unloading systems: Mechanical Vs Pneumatic?
Ship unloading systems: Mechanical Vs Pneumatic?
 
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...
EQUIPMENT FOR EXTINGUISHER & CYLINDER MAINTENANCE AND TESTING / CLEAN AGENT H...
 
Tank truck-load
Tank truck-loadTank truck-load
Tank truck-load
 
Tank truck-load
Tank truck-loadTank truck-load
Tank truck-load
 
Marine Nitrogen Generators from NOXERIOR
Marine Nitrogen Generators from NOXERIORMarine Nitrogen Generators from NOXERIOR
Marine Nitrogen Generators from NOXERIOR
 
23_AuxiliaryMarineMachinery_000.pdf
23_AuxiliaryMarineMachinery_000.pdf23_AuxiliaryMarineMachinery_000.pdf
23_AuxiliaryMarineMachinery_000.pdf
 
ISO/FDIS 20519
ISO/FDIS 20519ISO/FDIS 20519
ISO/FDIS 20519
 
Urea granulation
Urea granulationUrea granulation
Urea granulation
 
OISD STD-150
OISD STD-150OISD STD-150
OISD STD-150
 
Portable asphalt plant manufacturer and exporter – atlas technologies
Portable asphalt plant manufacturer and exporter – atlas technologiesPortable asphalt plant manufacturer and exporter – atlas technologies
Portable asphalt plant manufacturer and exporter – atlas technologies
 
CArgo tank atmosphere.ppt
CArgo tank atmosphere.pptCArgo tank atmosphere.ppt
CArgo tank atmosphere.ppt
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
Smpv(u) rules 2016-18
Smpv(u) rules  2016-18Smpv(u) rules  2016-18
Smpv(u) rules 2016-18
 
HEP_Feb2013_VRT
HEP_Feb2013_VRTHEP_Feb2013_VRT
HEP_Feb2013_VRT
 
Boiler water quality requirements abma
Boiler water quality requirements abmaBoiler water quality requirements abma
Boiler water quality requirements abma
 

More from jabbar2002pk200 (20)

Marine coating assigment
Marine coating  assigmentMarine coating  assigment
Marine coating assigment
 
Garbage
GarbageGarbage
Garbage
 
Rule 2004
Rule 2004Rule 2004
Rule 2004
 
M.v i kom k case study assigment
M.v  i kom k  case study assigmentM.v  i kom k  case study assigment
M.v i kom k case study assigment
 
Meteorology presentation.pptx lates
Meteorology presentation.pptx latesMeteorology presentation.pptx lates
Meteorology presentation.pptx lates
 
Meteorology presentation
Meteorology presentationMeteorology presentation
Meteorology presentation
 
Dg impor
Dg imporDg impor
Dg impor
 
Solas assigment
Solas  assigmentSolas  assigment
Solas assigment
 
Psc
PscPsc
Psc
 
Marpol annex v
Marpol annex vMarpol annex v
Marpol annex v
 
Ship handling
Ship handlingShip handling
Ship handling
 
Classification societes. presentation
Classification societes. presentationClassification societes. presentation
Classification societes. presentation
 
Garbage
GarbageGarbage
Garbage
 
Sewage treatement plant
Sewage treatement plantSewage treatement plant
Sewage treatement plant
 
Loadline
LoadlineLoadline
Loadline
 
welding
weldingwelding
welding
 
International convention on load lines 1968 group 2
International convention on load lines 1968 group 2International convention on load lines 1968 group 2
International convention on load lines 1968 group 2
 
ship case study
ship case studyship case study
ship case study
 
Hatch ways
Hatch waysHatch ways
Hatch ways
 
Marpol annex 3& 6
Marpol annex 3& 6Marpol annex 3& 6
Marpol annex 3& 6
 

Recently uploaded

GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)Areesha Ahmad
 
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...ssuser79fe74
 
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPirithiRaju
 
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Servicenishacall1
 
Pests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPirithiRaju
 
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...Monika Rani
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)Areesha Ahmad
 
American Type Culture Collection (ATCC).pptx
American Type Culture Collection (ATCC).pptxAmerican Type Culture Collection (ATCC).pptx
American Type Culture Collection (ATCC).pptxabhishekdhamu51
 
Formation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disksFormation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disksSérgio Sacani
 
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.Nitya salvi
 
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Alandi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPirithiRaju
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learninglevieagacer
 
Presentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptxPresentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptxgindu3009
 
Botany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdfBotany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdfSumit Kumar yadav
 
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...ssifa0344
 
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...chandars293
 
Nanoparticles synthesis and characterization​ ​
Nanoparticles synthesis and characterization​  ​Nanoparticles synthesis and characterization​  ​
Nanoparticles synthesis and characterization​ ​kaibalyasahoo82800
 

Recently uploaded (20)

GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)GBSN - Biochemistry (Unit 1)
GBSN - Biochemistry (Unit 1)
 
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
Chemical Tests; flame test, positive and negative ions test Edexcel Internati...
 
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdfPests of cotton_Sucking_Pests_Dr.UPR.pdf
Pests of cotton_Sucking_Pests_Dr.UPR.pdf
 
Site Acceptance Test .
Site Acceptance Test                    .Site Acceptance Test                    .
Site Acceptance Test .
 
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
9999266834 Call Girls In Noida Sector 22 (Delhi) Call Girl Service
 
Pests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdfPests of mustard_Identification_Management_Dr.UPR.pdf
Pests of mustard_Identification_Management_Dr.UPR.pdf
 
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...
Vip profile Call Girls In Lonavala 9748763073 For Genuine Sex Service At Just...
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)
 
American Type Culture Collection (ATCC).pptx
American Type Culture Collection (ATCC).pptxAmerican Type Culture Collection (ATCC).pptx
American Type Culture Collection (ATCC).pptx
 
Formation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disksFormation of low mass protostars and their circumstellar disks
Formation of low mass protostars and their circumstellar disks
 
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.
❤Jammu Kashmir Call Girls 8617697112 Personal Whatsapp Number 💦✅.
 
CELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdfCELL -Structural and Functional unit of life.pdf
CELL -Structural and Functional unit of life.pdf
 
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Alandi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Call Me 7737669865 Budget Friendly No Advance Booking
 
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdfPests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
Pests of cotton_Borer_Pests_Binomics_Dr.UPR.pdf
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learning
 
Presentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptxPresentation Vikram Lander by Vedansh Gupta.pptx
Presentation Vikram Lander by Vedansh Gupta.pptx
 
Botany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdfBotany 4th semester series (krishna).pdf
Botany 4th semester series (krishna).pdf
 
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
TEST BANK For Radiologic Science for Technologists, 12th Edition by Stewart C...
 
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
High Class Escorts in Hyderabad ₹7.5k Pick Up & Drop With Cash Payment 969456...
 
Nanoparticles synthesis and characterization​ ​
Nanoparticles synthesis and characterization​  ​Nanoparticles synthesis and characterization​  ​
Nanoparticles synthesis and characterization​ ​
 

Ig system & equipment oil tankers

  • 1. Cargo Tank Venting & Inert Gas System & Equipment
  • 2. On board cargo equipment 2 Inert Gas System Introduction
  • 3. On board cargo equipment 3 Introduction to Inert Gas System  Introduction  Flammability  Flammable Range  Effect of Increasing Oxygen  Suppression of Flammability by IG  Combustion& Explosion  Inert Gas Prevents FIRE & EXPLOSION
  • 4. On board cargo equipment 4
  • 5. On board cargo equipment 5
  • 6. On board cargo equipment 6 Suppression of Flammability by IG
  • 7. On board cargo equipment 7 Suppression of Flammability by IG
  • 8. On board cargo equipment 8 Effect of Oxygen on Flammable Range
  • 9. On board cargo equipment 9 Inert Gas Definitions
  • 10. On board cargo equipment 10 Inert Gas Must On Tankers  Required Under Regulation 60 of SOLAS  For All Petroleum Tankers more than 20,000 DWT – Keel laid after 1-9-84  Exception for Existing Tankers (Keel Laid prior 84) - i) Tank Washing Machine Capacity less than 60 Cubic Meter/Hour & - ii) Unreasonable & Impracticable due to design determined by Administration - iii) For Product Tankers between 20-40,000DWT tank washing Machine Capacity less than 60 cubic meter/Hour  Tankers fitted with IGS to keep COT inerted at all times
  • 11. On board cargo equipment 11 Inert Gas Production
  • 12. On board cargo equipment 12 Inert Gas System  Flue Gas Uptake Valves  Scrubber  I.G. Fans (Blowers)  Gas Regulating Valve  Deck Water Seal  Non Return Valve  Deck Isolating Valve ( Manual)  P/ V Breaker  Instrumentation  Tank Atmosphere Analyzers (Oxygen Analyzers) Fixed & Portable
  • 13. On board cargo equipment 13 Inert Gas System Layout
  • 14. On board cargo equipment 14 Inert Gas System Flow Sheet
  • 15. On board cargo equipment 15 Inert Gas Lay Out
  • 16. On board cargo equipment 16 Inert Gas Layout System From Flue Gas Uptake
  • 17. On board cargo equipment 17 Deck Distribution of Inert Gas System
  • 18. On board cargo equipment 18 I. G. S. LAYOUT
  • 19. On board cargo equipment 19 Deck Water Seal Requirement •Regulation 62 requires that Inert Gas system is equipped with two Non return devices one of which shall be water seal to prevent the return of hydrocarbon to Gas safe spaces •In addition Regulation 62 requires that arrangement of Deck Water Seal Shall be such that it will prevent back flow of hydrocarbon vapours and ensure proper Functioning of Seal Under Operating Conditions.
  • 20. On board cargo equipment 20 Deck Water Seal Wet Type
  • 21. On board cargo equipment 21 Deck Water Seal Semi Dry
  • 22. On board cargo equipment 22 Deck Water Seal Dry Type
  • 23. On board cargo equipment 23 Deck seal  Deck seal prevent flow back from deck pipe line to flame area of boilers or scrubbers  Water column works as non returning valve
  • 24. On board cargo equipment 24 Principle of IG Scrubber
  • 25. On board cargo equipment 25 IG Scrubber
  • 26. On board cargo equipment 26 IGS types: Inert Gas Generator (FTU) construction -Scrubber
  • 27. On board cargo equipment 27 Inert Gas System Non Return Devices  Reason for Non Return Devices  N/R Consist of Deck Water Seal & Deck Mechanical N/R Valve  Deck Water Seal is a Principal Barrier  Incase of water drop, there should be Low Water Alarm but Seal Should not become Ineffective  Heating Arrangement For Deck Water Seal  Sight Glass & Inspection Opening Provided  Function of Deck Mechanical N/R V/V  Purpose of Separate Deck Isolating Valve
  • 28. On board cargo equipment 28 Deck Water Seal Wet Type
  • 29. On board cargo equipment 29 Deck Water Seal Semi Dry with Heating System
  • 30. On board cargo equipment 30 Pressure-Relief & vacuum protection Systems  Principal work of liquid filled pressure – vacuum deck breakers: in case P/V v/v fails to operate – Over pressure by IG or Vapour and blow out liquid on deck – Suction ambient air in gas line and liquid in tank
  • 31. On board cargo equipment 31 Liquid Filled pressure vacuum breaker
  • 32. On board cargo equipment  The Pressure-Relief and Vacuum-Protection System gives an automatically controlled protection against too high or too low pressure within the cargo-handling system  Pressure-relief piping system  Pressure-Relief & vacuum protection System for All Cargo Tanks, as per IMO rules. Pressure-Relief & vacuum protection Systems
  • 33. On board cargo equipment 33 P/V & High Velocity Valves
  • 34. On board cargo equipment 34 Pressure-Relief & vacuum protection Systems  P/V valves
  • 35. On board cargo equipment 35 Pressure-Relief & vacuum protection Systems  High velocity vents valve combines the best of modulating valves and full-lift valves.  Valve creates "delayed" blow down of cargo tanks. It reduces vapor loss during low filling rates (and due to sloshing) until venting takes place at full rate when vapor loss is less important.  Valve provides active protection from fire and explosion regardless of pipe configuration.  Valve operates in freezing conditions without heating arrangements.
  • 36. On board cargo equipment 36 Pressure-Relief & vacuum protection Systems  Common liquid P/V
  • 37. On board cargo equipment 37 Pressure-Relief & vacuum protection Systems  1,2 Pressure house; Adapter  3,4 Pressure disc and seat  5,6 Booster  7,8,9 Sleeve / Weight / Stem  10 Check lift (pressure unit)  11,12,13 Vacuum house, disc, seat  14 Filter element  15 Venting cover  16 Check lift (vacuum unit)
  • 38. On board cargo equipment 38 Methods of Gas Replacement  DILUTION  DISPLACEMENT  Dilution is mixing process, where velocity of incoming Gas is High  Displacement is a Layering Process, where IG has Low Entry Velocity , to enable stable horizontal interface
  • 39. On board cargo equipment 39 IGS – Arrangement for Gas Replacement
  • 40. On board cargo equipment 40 IGS – Arrangement for Gas Replacement
  • 41. On board cargo equipment 41 IG Application
  • 42. On board cargo equipment 42
  • 43. On board cargo equipment 43 Requirement for I G Main  Means for Isolating Each Tank  Breathing Possible when Tanks Isolated from IG Main  Blank Flanges for Slop Tanks & Isolation for OBOs  External IG Supply Connection  Mast Riser or High Velocity Vents Provided for Vapour Displacement  Purge Pipes as Far as practicable from IG inlet  Effective Isolation between IG Main and Cargo piping  One or More P/V Breakers  Provision of Continuous pressure indication of IG
  • 44. On board cargo equipment 44 Tanker Cycle
  • 45. On board cargo equipment 45 Inert Gas Application to Various Shipboard Operations
  • 46. On board cargo equipment 46 IGS types: Flue Gas System  Flue Gas Systems cool and clean flue gas from the ship's boilers, and deliver it to deck, typically during cargo unloading and tank washing.  Flue gas already contains less than 5% oxygen, which is the IMO higher limit for inert gas, no further treatment is therefore necessary.  The main components are the scrubber unit, inert gas blowers, the deck water seal, main non-return valve, the pressure/vacuum breaker, valves, instrumentation and the control system.  Surplus gas is automatically re-circulated back to the scrubber unit, and gas production hence follows gas demand.  The system can also, like the other variants dealt with in this presentation, be preset to deliver fresh air for gas-freeing purposes.
  • 47. On board cargo equipment 47 IGS types: Inert Gas Generator  Inert Gas Generator Systems is used when no existing supply of flue gas is available.  The scrubber unit of the flue gas system is here integrated into a generator unit consisting of a combined burner part and scrubber part, both sea water cooled. MDO or HFO fuel is burning in the horizontal combustion chamber to produce flue gas with an oxygen content of typically 2-4%.  The gas then enters the scrubber part, where it is cooled and cleaned by sprayed sea water before being piped to the deck area.
  • 48. On board cargo equipment 48 Tank Pressure & Oxygen Concentration
  • 49. On board cargo equipment 49 MMC Ullaging Device
  • 50. On board cargo equipment 50 Flammability Composition Diagram
  • 51. On board cargo equipment 51 Isolation of Cargo Tanks from IG Deck Main
  • 52. On board cargo equipment 52 Cargo tank vent system
  • 53. On board cargo equipment 53 Monitoring of IG Plant
  • 54. On board cargo equipment 54 Inert Gas systems  Carbon dioxide (IG) generation system – Burning fuel for generation carbon dioxide gas is common procedure on gas tankers – Take off carbon dioxide gas form boilers  Inert Gas (IG) is sent via drier / non returning valves and used for replacing air to prevent explosion concentrations : – in Cargo Tanks and – in Ballast tanks (some times).  IG can be supplied from the shore facilities in emergency condition
  • 55. On board cargo equipment 55 IGS types: Flue Gas System
  • 56. On board cargo equipment 56 IGS types: Flue Gas System with Topping Up Generator  This alternative consists of a flue gas system supplemented by a separate small (500Nm3/h) inert gas generator, and is often preferred to aboard OBO and VLCCs  The flue gas system covers the bulk of the inerting during cargo unloading etc., and the topping up generator tops up tank pressures during the sea voyage.
  • 57. On board cargo equipment 57 IGS types: Inert Gas Generator (FTU) construction - Panel - Generator - Fan - Scrubber
  • 58. On board cargo equipment 58 IGS types: Inert Gas Generator (IGG) Moss Inert Gas Generators for Oil/ Chemical/ Products Moss Inert Gas Generators for LPG/LNG
  • 59. On board cargo equipment 59 IGS types: Flexinert  Flexinert is a fuel-saving combination of a flue gas system and an inert gas generator.  As long as sufficient boiler flue gas is available, Flexinert works as a flue gas system. When no basis gas is available, it works as an inert gas generator, and when high-oxygen exhaust gas from the main engines or diesel generators is available, it afterburns this gas to produce inert gas with the acceptable oxygen content.  Afterburning saves fuel since the combustion "air" already has a reduced oxygen content.
  • 60. On board cargo equipment 60 Inert Gas Generator (IGG) – output  Oxygen: 0.5% - 1%  Carbon Dioxide: ~ 14 %  Nitrogen: ~ 85%  Carbon Monoxide, oxides of Nitrogen and Sulphur Dioxide: ~ 0,5% – Carbon Monoxide: Max 100 ppm – Oxides of Nitrogen: Max 100 ppm – Sulphur Dioxide: Max 1 ppm  Moisture: Dew Point of -45C Modes: Inerting
  • 61. On board cargo equipment 61 Deck seal
  • 62. On board cargo equipment 62 Deck seal
  • 63. On board cargo equipment 63 Ballast tank inerting  Ballast tanks are inerted in emergency conditions  Flexible Hose used for inerted operation  Pressure 250 mmWC,
  • 64. On board cargo equipment 64 Pressure-Relief & vacuum protection Systems  Vent riser