Submit Search
Upload
Process Map(MEP)
•
Download as PPT, PDF
•
9 likes
•
6,449 views
I
irrfan
Follow
BUILDING SERVICES
Read less
Read more
Slideshow view
Report
Share
Slideshow view
Report
Share
1 of 11
Download now
Recommended
Presentation on MEP Services. Basic Details about all services inside a building & Civil MEP Coordination for a construction project
MEP- Building services
MEP- Building services
Aniket Khandelwal
Basics of Electrical Engineering in Building Services.
Building Services Electrical (MEP)
Building Services Electrical (MEP)
Manoj Mawle
BUILDING MEP SYSTEM From, Bhavik Panchal 8286401135
BUILDING MEP SYSTEM
BUILDING MEP SYSTEM
Bhavik Panchal
We provide full-spectrum solutions in the areas of Civil Construction & MEP Services i.e HVAC System, Fire Fighting, Water & Waste Water Treatment, Plumbing & Electrical Services
MEP & Construction Package
MEP & Construction Package
Charles Christian
Electrical rooms provide safe and secure spaces for the operation and maintenance of electrical equipment. While electrical equipment types and ratings can have significant impacts on electrical room requirements, distributing the electrical power to the rest of the building via wiring, busways, and raceways can also affect electrical room design. Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation, and possible future expansion. And the wiring, busways, and raceways that distribute the electrical power must be accounted for—now, and in the future. Documentation and monitoring of electrical system’s equipment and how it connects to the rest of the facility must be accurately maintained. The design of electrical rooms requires an integrated approach among disciplines. Architects and structural, mechanical, and fire protection engineers should work as a team in designing these rooms. NFPA 70: National Electrical Code (NEC) is the main source for electrical room requirements, but other codes, good practices, and recommendations should be considered. The result will be a room that is safe and secure, and provides for the functional operation and maintenance of the specific electrical equipment located within.
Electrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical rooms
ConsultingSpecifyingEngineer
Ravikant kapil is working for Manomav engineers,In this presentation he outlined the Mechanical services,Electrical services,Plumbing services and MEP coordination..
Building Services by Ravikant Kapil
Building Services by Ravikant Kapil
PriyashaShukla
Watch unique presentation for HVAC Beginers. Aclaimed and recommneded by professionals.
Hvac presentation for beginers
Hvac presentation for beginers
guestf11b52
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
Ritesh Ambadkar
Recommended
Presentation on MEP Services. Basic Details about all services inside a building & Civil MEP Coordination for a construction project
MEP- Building services
MEP- Building services
Aniket Khandelwal
Basics of Electrical Engineering in Building Services.
Building Services Electrical (MEP)
Building Services Electrical (MEP)
Manoj Mawle
BUILDING MEP SYSTEM From, Bhavik Panchal 8286401135
BUILDING MEP SYSTEM
BUILDING MEP SYSTEM
Bhavik Panchal
We provide full-spectrum solutions in the areas of Civil Construction & MEP Services i.e HVAC System, Fire Fighting, Water & Waste Water Treatment, Plumbing & Electrical Services
MEP & Construction Package
MEP & Construction Package
Charles Christian
Electrical rooms provide safe and secure spaces for the operation and maintenance of electrical equipment. While electrical equipment types and ratings can have significant impacts on electrical room requirements, distributing the electrical power to the rest of the building via wiring, busways, and raceways can also affect electrical room design. Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation, and possible future expansion. And the wiring, busways, and raceways that distribute the electrical power must be accounted for—now, and in the future. Documentation and monitoring of electrical system’s equipment and how it connects to the rest of the facility must be accurately maintained. The design of electrical rooms requires an integrated approach among disciplines. Architects and structural, mechanical, and fire protection engineers should work as a team in designing these rooms. NFPA 70: National Electrical Code (NEC) is the main source for electrical room requirements, but other codes, good practices, and recommendations should be considered. The result will be a room that is safe and secure, and provides for the functional operation and maintenance of the specific electrical equipment located within.
Electrical Systems: Designing electrical rooms
Electrical Systems: Designing electrical rooms
ConsultingSpecifyingEngineer
Ravikant kapil is working for Manomav engineers,In this presentation he outlined the Mechanical services,Electrical services,Plumbing services and MEP coordination..
Building Services by Ravikant Kapil
Building Services by Ravikant Kapil
PriyashaShukla
Watch unique presentation for HVAC Beginers. Aclaimed and recommneded by professionals.
Hvac presentation for beginers
Hvac presentation for beginers
guestf11b52
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
Ritesh Ambadkar
With system-oriented work culture for precise and timely delivery, we focus on bioclimatic and environmentally sensitive design solutions.
RSP MEP Services Profile
RSP MEP Services Profile
indiarspdesign
Introduction to building services part 2
Introduction to building services part 2
Noorule Inie Osman
Bachelor of Quantity Surveying (Honours) Building Services 2 Presentation Tesco Extra at Mutiara Damansara Members: Abang Azrin Bin Abang Affandi Chua Jia Cheng Goh Jeng Jhieh Jake Sia Chyi Sern Kellyann Hiew Yau Mei Muhammad Aiman Bin Zainul Abidin Rachel Emma Betty Ernesta
Building Service 2 Presentation
Building Service 2 Presentation
Kellyann Hiew
TWO MONTH SUMMER TRAINING AT BCFSL ON FIREFIGHTING AT POWER GRID SUBSTATION BAREILLY YP TO SAVE THE WORLD IN MECHANICAL ENGINEERING FIELD
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
ASGHAR KHALIL
Integrating fire protection and fire alarm systems with building automation systems (BAS) can offer efficient and cost-effective operation. The design and installation of an integrated system must also be well-planned and coordinated, and the system must be properly maintained over its lifetime. The need for multidisciplinary coordination between the fire protection engineer and the mechanical and electrical engineers during design and construction are of key importance. Design engineers also must involve the building owner and/or operator in establishing (or at least influencing) the design criteria of the building. The owner/operator must understand that the efficiencies gained by integration will pay dividends long into the lifecycle of the building. Like a BAS, fire protection and alarm systems have also evolved into sophisticated computer-based systems, which offers more opportunities to integrate these systems to develop a more complete building response as part of overall building operations during an emergency event.
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
ConsultingSpecifyingEngineer
MEP DESIGN
Presentation- HVAC & PLUMBING DESIGN
Presentation- HVAC & PLUMBING DESIGN
MirzaHussainAhmedbai
Building services engineering, technical building services, architectural engineering, building engineering, or facilities and services planning engineering refers to the implementation of the engineering for the internal environment and environmental impact of a building.
Building Service Chapter 1
Building Service Chapter 1
Izam Lukman
Electrical services
Electrical services
Shubham Vasudev
Fire Alarm Systems fall broadly into two groups - Conventional Systems or Analogue Addressable Systems. • Conventional Fire Alarm Control System • Analogue Addressable Fire Alarm System Intelligent Addressable Fire Alarm System
Fire Alarm System, BMS
Fire Alarm System, BMS
Mohammad Azam Khan
Distribution of electricity in a large or medium
Distribution of electricity in a large or medium
Iqbal Nurfariq
13 story building with 4 basement+ ground floor+ 4 floors. HVAC,Fire Fighting,Plumbing,Medical Gases,Elevators & Conveying System
Technical Specification MEP Works
Technical Specification MEP Works
zahid qayum
Consulting engineers who specify emergency power equipment understand that installations for mission critical facilities, such as hospitals and data centers, are required to comply with NFPA 110: Standard for Emergency and Standby Power Systems, in conjunction with NFPA 70: National Electrical Code. System designers must interpret the requirements of NFPA 110, ensure their designs follow them, and educate their clients about how the standard affects their operations. NFPA 110 provides performance requirements for emergency and standby power systems that supply reliable auxiliary power to critical and essential loads when the primary power source fails. The standard covers installation, maintenance, operation, and testing requirements as they pertain to the performance of the emergency power supply system (EPSS) including power sources, transfer equipment, controls, supervisory equipment, and all related electrical and mechanical auxiliary and accessory equipment.
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
presentation and codes
Hvac systems presentation_slides
Hvac systems presentation_slides
guy ygal
This presentation includes Electrical services basic layout and basic terminologies related to electrical services and its also includes types of wiring and system of wiring....
Electrical services of bs by krt
Electrical services of bs by krt
Krunal Thanki
Fire alarm systems
Fire alarm systems
Fire alarm systems
Mahmoud Abd Elrahman
Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
Monnie Bao Jia
Design considerations of electrical installations
Design considerations of electrical installations
Design considerations of electrical installations
vishalgohel12195
This presentation are taking about the major points for the main keys of quality to control the MEP Activities, which is so important to any starting of any project.
Keys of Quality in MEP activities
Keys of Quality in MEP activities
Walid AlSarady
A Building Management System (BMS) offers greater visibility and control of energy use. A fully integrated solution can have up to 84% of a building’s energy consuming devices directly under its control
Bms system
Bms system
BUKAR ALI KIME
BMS Automation wiring
BMS Automation wiring
BMS Automation wiring
GAUTAM KOPPALA (JORGE)
Mohd_Anwarulla
Mohd_Anwarulla
Khayoom Anwarulla
cv_eng2014
cv_eng2014
Ahmet Ozer
More Related Content
What's hot
With system-oriented work culture for precise and timely delivery, we focus on bioclimatic and environmentally sensitive design solutions.
RSP MEP Services Profile
RSP MEP Services Profile
indiarspdesign
Introduction to building services part 2
Introduction to building services part 2
Noorule Inie Osman
Bachelor of Quantity Surveying (Honours) Building Services 2 Presentation Tesco Extra at Mutiara Damansara Members: Abang Azrin Bin Abang Affandi Chua Jia Cheng Goh Jeng Jhieh Jake Sia Chyi Sern Kellyann Hiew Yau Mei Muhammad Aiman Bin Zainul Abidin Rachel Emma Betty Ernesta
Building Service 2 Presentation
Building Service 2 Presentation
Kellyann Hiew
TWO MONTH SUMMER TRAINING AT BCFSL ON FIREFIGHTING AT POWER GRID SUBSTATION BAREILLY YP TO SAVE THE WORLD IN MECHANICAL ENGINEERING FIELD
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
ASGHAR KHALIL
Integrating fire protection and fire alarm systems with building automation systems (BAS) can offer efficient and cost-effective operation. The design and installation of an integrated system must also be well-planned and coordinated, and the system must be properly maintained over its lifetime. The need for multidisciplinary coordination between the fire protection engineer and the mechanical and electrical engineers during design and construction are of key importance. Design engineers also must involve the building owner and/or operator in establishing (or at least influencing) the design criteria of the building. The owner/operator must understand that the efficiencies gained by integration will pay dividends long into the lifecycle of the building. Like a BAS, fire protection and alarm systems have also evolved into sophisticated computer-based systems, which offers more opportunities to integrate these systems to develop a more complete building response as part of overall building operations during an emergency event.
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
ConsultingSpecifyingEngineer
MEP DESIGN
Presentation- HVAC & PLUMBING DESIGN
Presentation- HVAC & PLUMBING DESIGN
MirzaHussainAhmedbai
Building services engineering, technical building services, architectural engineering, building engineering, or facilities and services planning engineering refers to the implementation of the engineering for the internal environment and environmental impact of a building.
Building Service Chapter 1
Building Service Chapter 1
Izam Lukman
Electrical services
Electrical services
Shubham Vasudev
Fire Alarm Systems fall broadly into two groups - Conventional Systems or Analogue Addressable Systems. • Conventional Fire Alarm Control System • Analogue Addressable Fire Alarm System Intelligent Addressable Fire Alarm System
Fire Alarm System, BMS
Fire Alarm System, BMS
Mohammad Azam Khan
Distribution of electricity in a large or medium
Distribution of electricity in a large or medium
Iqbal Nurfariq
13 story building with 4 basement+ ground floor+ 4 floors. HVAC,Fire Fighting,Plumbing,Medical Gases,Elevators & Conveying System
Technical Specification MEP Works
Technical Specification MEP Works
zahid qayum
Consulting engineers who specify emergency power equipment understand that installations for mission critical facilities, such as hospitals and data centers, are required to comply with NFPA 110: Standard for Emergency and Standby Power Systems, in conjunction with NFPA 70: National Electrical Code. System designers must interpret the requirements of NFPA 110, ensure their designs follow them, and educate their clients about how the standard affects their operations. NFPA 110 provides performance requirements for emergency and standby power systems that supply reliable auxiliary power to critical and essential loads when the primary power source fails. The standard covers installation, maintenance, operation, and testing requirements as they pertain to the performance of the emergency power supply system (EPSS) including power sources, transfer equipment, controls, supervisory equipment, and all related electrical and mechanical auxiliary and accessory equipment.
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
ConsultingSpecifyingEngineer
presentation and codes
Hvac systems presentation_slides
Hvac systems presentation_slides
guy ygal
This presentation includes Electrical services basic layout and basic terminologies related to electrical services and its also includes types of wiring and system of wiring....
Electrical services of bs by krt
Electrical services of bs by krt
Krunal Thanki
Fire alarm systems
Fire alarm systems
Fire alarm systems
Mahmoud Abd Elrahman
Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
Monnie Bao Jia
Design considerations of electrical installations
Design considerations of electrical installations
Design considerations of electrical installations
vishalgohel12195
This presentation are taking about the major points for the main keys of quality to control the MEP Activities, which is so important to any starting of any project.
Keys of Quality in MEP activities
Keys of Quality in MEP activities
Walid AlSarady
A Building Management System (BMS) offers greater visibility and control of energy use. A fully integrated solution can have up to 84% of a building’s energy consuming devices directly under its control
Bms system
Bms system
BUKAR ALI KIME
BMS Automation wiring
BMS Automation wiring
BMS Automation wiring
GAUTAM KOPPALA (JORGE)
What's hot
(20)
RSP MEP Services Profile
RSP MEP Services Profile
Introduction to building services part 2
Introduction to building services part 2
Building Service 2 Presentation
Building Service 2 Presentation
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Presentation- HVAC & PLUMBING DESIGN
Presentation- HVAC & PLUMBING DESIGN
Building Service Chapter 1
Building Service Chapter 1
Electrical services
Electrical services
Fire Alarm System, BMS
Fire Alarm System, BMS
Distribution of electricity in a large or medium
Distribution of electricity in a large or medium
Technical Specification MEP Works
Technical Specification MEP Works
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Hvac systems presentation_slides
Hvac systems presentation_slides
Electrical services of bs by krt
Electrical services of bs by krt
Fire alarm systems
Fire alarm systems
BS 1- Installation of hot water supply for hotel
BS 1- Installation of hot water supply for hotel
Design considerations of electrical installations
Design considerations of electrical installations
Keys of Quality in MEP activities
Keys of Quality in MEP activities
Bms system
Bms system
BMS Automation wiring
BMS Automation wiring
Similar to Process Map(MEP)
Mohd_Anwarulla
Mohd_Anwarulla
Khayoom Anwarulla
cv_eng2014
cv_eng2014
Ahmet Ozer
MAraziR-1 (1)
MAraziR-1 (1)
M-M.Arazi Peng
Presentation about Information Technologies, Control and Monitoring Division of Eptisa and its solutions applied to transportation infrastructures
Eptisa Transportation infrastructures: Structural Health Monitoring
Eptisa Transportation infrastructures: Structural Health Monitoring
Eptisa
HOW WE CAN INTEGRATE A SENSORS SUCH AS SAFETY SENSORS WITH KUKA ROBOT.
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOT
Kirtimaan Srivastava
AutoCAD design.
Photovoltaic Permit Packet
Photovoltaic Permit Packet
CarsonBunnell
Michael W Meissners Qualifications Biography for RCDD, Structured Cabling Services for Electronic Safety and Security Systems - ESS
Michael W Meissner - RCDD ESS Qualifications
Michael W Meissner - RCDD ESS Qualifications
Michael W. Meissner, RCDD
MAJOR APPLICATIONS IN WIRELESS SENSOR NETWOKS TOPICAL IDEAS IN SENSOR NETWORKS PROJECTS TYPICAL PROCESSORS AND RADIO BOARDS IN SENSOR
Sensor Networks Projects
Sensor Networks Projects
Phdtopiccom
Sohel_CV2016]
Sohel_CV2016]
Sohel Bandri
RESUME - JAYANTHI( EST )
RESUME - JAYANTHI( EST )
Jayanthi Amirthalingam
Michael W Meissner - Cyber Security Experience and Capabilities - 02/17/2015 Michael W. Meissner is a Solutions Architect, Infrastructure Architect and Cyber Security Engineer at Ethernautics, Inc. Michael Meissner has over thirty years of relevant Information Systems and Information Technology experience. Mr. Meissner is a Cyber Security Engineer with over 20 years of Information Security practice. Mr. Meissner authored Information Security Patents.
Michael W. Meissner - Cyber Security Engineering Biography
Michael W. Meissner - Cyber Security Engineering Biography
Michael W. Meissner, RCDD
C.V 2017
C.V 2017
Abdallah Ahmed
Turnkey Solutions – the key to successful projects ---------------------------------------------------------------- EPC Solutions has all it takes to design, construct, and operate turnkey electrical substation solutions that efficiently support the reliable supply of electrical power on all voltage levels: decades of practical experience as a contractor and equipment manufacturer and a vast number of successfully completed projects all over the world, unparalleled expertise in all transmission processes, and proven excellence in project management. A distinguished tradition of innovation in power engineering, customized financing solutions, and outstanding quality standards in all production facilities worldwide round out the picture. EPCS turnkey solutions for high-voltage substations incorporate the strong performance of one of the world’s leading engineering companies and one-stop supplier of power transmission products, solutions, and services. The scope of services comprises consulting, project management, system planning, engineering, commissioning, and comprehensive after-sales support. Centers of competence and branches all over the world create local value and ensure that EPCS experts are within close reach of every project.Customers worldwide benefit from numerous advantages of high-voltage substations from EPCS: >One-stop approach comprising all technical, financial, and ecological aspects of the station’s entire life cycle >Customized solutions based on proven EPCS technologies, even for the most challenging demands >Freedom from coordination efforts and minimized financial and technical risk
EPC Solutions - All About Substation
EPC Solutions - All About Substation
EPC Solutions LLP
IJRET : International Journal of Research in Engineering and Technology is an international peer reviewed, online journal published by eSAT Publishing House for the enhancement of research in various disciplines of Engineering and Technology. The aim and scope of the journal is to provide an academic medium and an important reference for the advancement and dissemination of research results that support high-level learning, teaching and research in the fields of Engineering and Technology. We bring together Scientists, Academician, Field Engineers, Scholars and Students of related fields of Engineering and Technology
Single electron transistor technology based on chip implementation of smoke d...
Single electron transistor technology based on chip implementation of smoke d...
eSAT Publishing House
Lutche Presentation Eng
Lutche Presentation Eng
lutcheeng
it is required
IES_Syllabus_for_Electronics.pdf colour based product sorting
IES_Syllabus_for_Electronics.pdf colour based product sorting
santhoshmaha001
int caja moldeada
Tb08104003e
Tb08104003e
mrepol02
A VERY BRIEF PRESENTATION ON TELECOMMUNICATION SWITCHING NETWORK. ONLY KEY POINTS ARE MENTIONED HERE.
Switching
Switching
krishnendu17
epc proposal for supercritical unit. useful information about indian power sector. and 660mw units
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
Nikhil Kumar Rai
Energy Projects Capability Statement
Energy Projects Capability Statement
CLEMENT Guillaume
Similar to Process Map(MEP)
(20)
Mohd_Anwarulla
Mohd_Anwarulla
cv_eng2014
cv_eng2014
MAraziR-1 (1)
MAraziR-1 (1)
Eptisa Transportation infrastructures: Structural Health Monitoring
Eptisa Transportation infrastructures: Structural Health Monitoring
INTEGRATION OF SENSORS WITH KUKA ROBOT
INTEGRATION OF SENSORS WITH KUKA ROBOT
Photovoltaic Permit Packet
Photovoltaic Permit Packet
Michael W Meissner - RCDD ESS Qualifications
Michael W Meissner - RCDD ESS Qualifications
Sensor Networks Projects
Sensor Networks Projects
Sohel_CV2016]
Sohel_CV2016]
RESUME - JAYANTHI( EST )
RESUME - JAYANTHI( EST )
Michael W. Meissner - Cyber Security Engineering Biography
Michael W. Meissner - Cyber Security Engineering Biography
C.V 2017
C.V 2017
EPC Solutions - All About Substation
EPC Solutions - All About Substation
Single electron transistor technology based on chip implementation of smoke d...
Single electron transistor technology based on chip implementation of smoke d...
Lutche Presentation Eng
Lutche Presentation Eng
IES_Syllabus_for_Electronics.pdf colour based product sorting
IES_Syllabus_for_Electronics.pdf colour based product sorting
Tb08104003e
Tb08104003e
Switching
Switching
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
Energy Projects Capability Statement
Energy Projects Capability Statement
Process Map(MEP)
1.
MEP ENGINEERING MECHANICAL
ELECTRICAL PLUMBING
2.
3.
SERVICES PROVIDED 1-HV/LV
DISTRIBUTION 2 SMALL POWER 3-LIGHTING 4-FIRE DETECTION & ALARMS 5-SECURITY SYSTEMS 6-EARTHING & LIGHNING PROTECTION 7- TELECOMMUNICATION 8-BUILDING MANAGEMENT SYSTEM
4.
5.
6.
7.
8.
9.
10.
11.
Download now