Introduction of 132/11 kV Digitally Optimized Substation for Protection, Control and SCADA System in DEWA Transmission Network
8 de Dec de 2022
•
0 gostou
0 gostaram
×
Seja o primeiro a gostar disto
mostrar mais
•
13 visualizações
visualizações
×
Vistos totais
0
No Slideshare
0
De incorporações
0
Número de incorporações
0
Baixar agora
Baixar para ler offline
Denunciar
Engenharia
https://www.irjet.net/archives/V9/i11/IRJET-V9I11140.pdf
IRJET Journal
Seguir
Fast Track Publications
Anúncio
Anúncio
Anúncio
Recomendados
Modernization of Electrical Substation Automation Systems Using IEC61850
IRJET Journal
17 visualizações
•
4 slides
B5 g2 enhanced+protection+functionality+with+iec+61850+and+goose
Omeal Ahmed
260 visualizações
•
38 slides
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
iGrid T&D
710 visualizações
•
8 slides
IRJET- A Review Paper on Development of General Purpose Controller Board
IRJET Journal
3 visualizações
•
4 slides
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
Schneider Electric
1.8K visualizações
•
8 slides
Main report
mandarkatti29
533 visualizações
•
10 slides
Mais conteúdo relacionado
Similar a Introduction of 132/11 kV Digitally Optimized Substation for Protection, Control and SCADA System in DEWA Transmission Network
(20)
Modeling & Design of Dtmf Technique Based Automatic Mobile Switching & Contro...
IRJET Journal
•
38 visualizações
Induction Motor Protection Using PLC
vivatechijri
•
249 visualizações
IRJET- Iot Based Underground Cable Line Fault Detection
IRJET Journal
•
76 visualizações
Substation Automation in Smart Grid
IRJET Journal
•
8 visualizações
Green ICT
Sähköklubi
•
1K visualizações
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
IRJET Journal
•
2 visualizações
Data transmission through power line
IAEME Publication
•
449 visualizações
SOLAR POWERED WIRELESS CHARGING STATION FOR ELECTRIC CYCLE
IRJET Journal
•
35 visualizações
IRJET - Design and Implementation of RF based Wireless Home Automation System
IRJET Journal
•
32 visualizações
REAL-TIME LOCATION TRACKER FOR HEALTH PATIENT IN CRISIS
IRJET Journal
•
5 visualizações
Design & Implementation Of Fault Identification In Underground Cables Using IOT
IRJET Journal
•
79 visualizações
IRJET- CAN based Data Acquisition and Data Logging System for Vehicular Commu...
IRJET Journal
•
13 visualizações
SMART GRID(a) (3)
Prateek Diwan
•
737 visualizações
Electricity Theft: Reason and Solution
IRJET Journal
•
12 visualizações
IRJET- Design of a High Performance IoT QoS Transmission Mechanism and Middle...
IRJET Journal
•
20 visualizações
1451synopsis 599 f-good nist
riyapd10
•
292 visualizações
A remote monitoring system for a three phase 10-kva switchable distribution t...
eSAT Publishing House
•
490 visualizações
A remote monitoring system for a three phase 10-kva switchable distribution t...
eSAT Journals
•
261 visualizações
IRJET- Investigation on Delay and Power Minimization in IEEE 802.15.4 Protoco...
IRJET Journal
•
17 visualizações
STUDY AND ANALYSIS OF PROTECTION SCHEME OF DIGITAL SUBSTATION USING IEC61850-...
IAEME Publication
•
97 visualizações
Mais de IRJET Journal
(20)
AN INVESTIGATION ON THE EFFICACY OF MARBLE DUST POWDER FOR STRENGTHENING THE ...
IRJET Journal
•
29 visualizações
A Survey on Person Detection for Social Distancing and Safety Violation Alert...
IRJET Journal
•
9 visualizações
Thermal Analysis and Design Optimization of Solar Chimney using CFD
IRJET Journal
•
7 visualizações
Common Skin Disease Diagnosis and Prediction: A Review
IRJET Journal
•
42 visualizações
A STUDY ON TWITTER SENTIMENT ANALYSIS USING DEEP LEARNING
IRJET Journal
•
22 visualizações
Band structure of metallic single-walled carbon nanotubes
IRJET Journal
•
5 visualizações
IoT Based Assistive Glove for Visually Impaired People
IRJET Journal
•
10 visualizações
A SUPERVISED MACHINE LEARNING APPROACH USING K-NEAREST NEIGHBOR ALGORITHM TO ...
IRJET Journal
•
4 visualizações
An Overview of Traffic Accident Detection System using IoT
IRJET Journal
•
6 visualizações
Artificial Neural Network: A brief study
IRJET Journal
•
4 visualizações
Review Paper on Performance Analysis of LPG Refrigerator
IRJET Journal
•
6 visualizações
WOLBACHIA PIPIENTIS AND VARROA DESTRUCTOR MITE INFESTATION RATES OF NATIVE VE...
IRJET Journal
•
5 visualizações
Survey on Automatic Kidney Lesion Detection using Deep Learning
IRJET Journal
•
8 visualizações
A Review on Safety Management System in School Bus
IRJET Journal
•
10 visualizações
Design and Validation of a Light Vehicle Tubular Space Frame Chassis
IRJET Journal
•
7 visualizações
SMART BLIND STICK USING VOICE MODULE
IRJET Journal
•
12 visualizações
AUTOMATIC HYPODERMIC INFUSION REGULATOR
IRJET Journal
•
7 visualizações
Mobile Application of Pet Adoption System
IRJET Journal
•
11 visualizações
Literature Survey on “Crowdfunding Using Blockchain”
IRJET Journal
•
8 visualizações
Pricing Optimization using Machine Learning
IRJET Journal
•
12 visualizações
Anúncio
Último
(20)
Leadership Presentation.pdf
ssuser300afd
•
0 visão
ass 1.pdf
AdityaNagare2
•
0 visão
Avro Vulcan (Owners Workshop Manual).pdf
TahirSadikovi
•
0 visão
UEC747 Lecture 21.pdf
AmanBatra31
•
0 visão
Cold Plasma.pptx
014SamriddhiChakrabo
•
0 visão
bed forms.pptx
SatyaPrakash278155
•
0 visão
PPT 4 (1).pdf
AmanBatra31
•
0 visão
Соболев Д.А. Экспериментальные самолёты России 1912-1941 (2015).pdf
TahirSadikovi
•
0 visão
Railway Signals
Umar Karimi
•
0 visão
Sikorsky S-76 Helicopter Operating Manual.pdf
TahirSadikovi
•
0 visão
Data Quality as a prerequisite for you business success: when should I start ...
Anastasija Nikiforova
•
0 visão
Chapter 3.pptx
EsubalewMulat2
•
0 visão
Sikorsky UH-3H Executive Transport Flight Manual.pdf
TahirSadikovi
•
0 visão
KUPITE PUTOVNICU,VOZAČKU DOZVOLU,OSOBNU KARTU,DIPLOMU,ROĐENI IZVOD,SCHENGENSK...
copeg413
•
0 visão
Railway Geometric Design
Umar Karimi
•
0 visão
Самолеты и вертолеты. Проектирование, конструкции и системы самолетов и верто...
TahirSadikovi
•
0 visão
chap2.ppt
nasseralnemer
•
0 visão
HKC_template_2017.pptx
ECF- Nepal
•
0 visão
ECE Time Table .docx
MukulRawat40
•
0 visão
Thermogravimetric Analysis.pptx
Sohail AD
•
0 visão
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Control and SCADA System in DEWA Transmission Network
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 656 Introduction of 132/11 kV Digitally Optimized Substation for Protection, Control and SCADA System in DEWA Transmission Network Owen Raymond Glynn, Jayasingh Balakrishnan, Amod Madhukar Khirwadkar, Murali Kandakatla, Muthu Samy Veerabahu Transmission Protection Department, Dubai Electricity & Water Authority. --------------------------------------------------------------------------***-------------------------------------------------------------------------- Abstract- Dubai’s transmission power system plays a vital role in delivering optimum reliability and uninterrupted power. We therefore need to maintain the highest levels of technology, operational and cyber security best practices for all digital systems. This paper aims to provide the conceptual overview and benefits of a digitally optimized substation design. The new design includes control, protection and cyber security systems supplied from different vendors from across the globe which are engineered, configured and extensively laboratory tested to ensure perfect functionality of these highly complex and challenging digital technologies. Identifying the latest technologies available and implementing these in innovative new ways has produced new designs that enhance functionality and reliability whilst reducing large quantities of discreet components and circuitry. At station level, virtual technologies are introduced and are embedded in two servers each of which includes all SCMS, cyber security, engineering workstation and data storage with seamless redundancy similar to cloud computing server centers. Servers are configured in a cluster configuration with the remote OT data center as witness server. All applications run in a dedicated virtual machine and virtual security scans and records all traffic with artificial intelligence monitoring performed at the cyber security operations center (CSOC). At 132kV bay level, duplicate and integrated control and protection is introduced through two multifunction intelligent electronic devices (IED’s) per bay, each from a different manufacturer. All inter-bay connections are digitized through IEC61850 process bus, which are engineered to be interoperable and interchangeable between different manufacturers without the need for reconfiguration. The latest IEC61850-9-2 compliant IED’s provide enhanced digital fault recording capability which automatically transmits fault records through the IEC61850 network in the common Comtrade file format. Fault records are automatically available at the station HMI and at the central data center. Remote access to all IED’s is provided through a secure virtual desktop application. Role based access, centralized user and password management is managed by a specialist OT security team. The unique new designs were developed in house by DEWA specialists in conjunction with specialists from the original equipment manufacturers and software developers. The digitally optimized substation (DOSS) is a completely new design focused on digitization and optimization of all control, protection, data acquisition communications and cyber security systems. The digitization of thousands of components and reduction of over 100km of copper wiring delivers significant reduction in carbon footprint, reduction in building size, energy saving, cost reduction while improving the functionality and reliability of the transmission power system. This innovative initiative will ensure that DEWA will have arguably the most advanced substations both regionally and globally by introducing the latest digital technologies, optimized designs in line with the industry leading best practices. I.INTRODUCTION Dubai Electricity & Water Authority (DEWA) was established in 1992 by His Excellency Sheikh Maktoum bin Rashid Al Maktoum with the objective to provide reliable power to residents of the Emirate of Dubai. Since its inception, DEWA has continuously invested in maintaining and upgrading the power delivery infrastructure to meet the increasing demands of the growing Emirate of Dubai. Dubai Electricity & Water Authority (DEWA) Power System includes Generation, Transmission and Distribution networks. The transmission network operates at 400kV and 132kV voltage levels with over 350 transmission substations consisting of 400/132kV, 132/33kV and 132/11kV sites.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 657 The new substation designs take the latest equipment and technologies, applies them to substations in new and innovative ways that benefit the environment, DEWA and the community. II.DIGITAL SUBSTATIONS: FACTS VS MYTHS A full digital substation by definition includes low power instrument transformers (LPIT’s) also known as non- conventional instrument transformers (NCIT’s). These NCIT’s are connected to merging units, which perform analogue to digital conversion, applies a time stamp in order for the sampled values to be transmitted over an ethernet network. However, looking carefully at the concept of a digital substation, it is evident that since the NCIT’s are analogue devices that produce an analogue sinusoidal output, these systems are no more digital than conventional instrument transformers. The fact remains that substations transport power which is the product of voltage and current which are analog quantities both at primary and at secondary levels. We can therefore conclude that the term full digital substation is somewhat misleading. A. Comparison of NCIT Vs. Conventional CT In full digital substations non-conventional instrument transformers for measuring current are either a rogowski coil or optic sensor both of which are analog systems as shown in Figure1. These NCIT’s transfer analog quantities in proportion to the measured primary quantities to merging units (MU) which perform analog to digital (A to D) conversion much the same as conventional IED’s which already have built in A to D converters based on 1 amp input rating. The significant different appears at the output of the merging unit which transmits the measured data through ethernet. This is where the system becomes complex since ethernet does not have a definite or a fixed data transmission time. This is unacceptable for protection systems, which will become unstable due to measurement misalignment. The merging units therefore need to time tag each sample before transmitting. Since the IED’s are sampling at about 8kHz this amounts to a very large amount of data being transmitted for the 3phases plus neutral for currents and voltages from each merging unit. This data is transmitted through the process bus which in turn has the effect of slowing the ethernet speed. The additional cost, complexity, additional components with the obvious adverse impact on reliability would logically be implemented if there were some significant benefits. The claimed benefit is that NCIT’s produce a more linear and accurate measurement, which may be true if there was an identified reason why the conventional system was not adequate. Since protection IED’s have very advanced filtering and algorithms capable of maintaining optimum performance even with significant nonlinearity or saturation during faults – this advantage is negligible in almost all applications. For most applications it therefore becomes evident that the use of merging units is unwarranted and are an additional equipment required to be used that reduces overall reliability and availability of the power system. AnalogmA Analog1A Rogowski Coil NCIT Conventional CT Merging Unit Ethernet Switch Both systemsuseanalog measurement through an A to D converter. A to D converter isbuilt in Process Bus Fig1: Comparison of conventional CT vs Rogowski coil NCIT Non-conventional instrument transformers for all substation equipment such as bushing CT, Reactor internal CT and transformer neutral CT are not available especially for applications which are immersed in oil. This makes a full digital substation using all NCITs not possible. In DEWA a typical 132/11KV substation has 71 x 11kV bays which would result in a large number of merging units and a large amount of data on the process bus. The additional cost, complexity and the fact that OEM’s are unable to provide a consistent solution makes this option impractical considering that there is no benefit to the power system. B. Reliability of NCIT Vs. Conventional CT A quick comparison of NCIT with conventional CTs is as shown in table below. A NCITI requires a matching merging unit which needs to be considered as part of the measuring system when compared to a conventional CT which does not require additional components in order to connect to IED’s. It is evident that NCIT does have several disadvantages over conventional CTs in terms of mean time between failure (MTBF), performance, life expectancy etc. This is a separate
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 658 subject and the details are not covered in this paper; however, it is evident that use of NCIT/sensors with merging units does not offer any great advantages towards substation digitization as shown in Table-1. Table-1 Conventional CT Vs NCIT Description Conventional CT Sensor + Merging Unit (NCIT) Life expectancy > 40 years 20 years Mean time between failures (MTBF) 1,506,939 500 Replacement strategy Not required May require new GIS Consequence of failure 1 x protection out Feeder + Busbar prot. + Control out Probability of interruption Low High Performance Medium High Advantage Reliability Claim of full digital III. DIGITALLY OPTIMIZED SUBSTATION DESIGN DEWA took the initiative to review the digital substation concept and developed an innovative digitally optimized substation (DOSS) design. The new design retains the proven reliable conventional instrument transformers and utilizes the most practical and beneficial digital substation concepts of process & station bus. The DOSS design utilizes the latest smart technology available in intelligent electronic devices (IED’s) which allows customizing and optimizing the configuration of the control and protection systems in substations while reducing the number of auxiliary relays and components. This approach ultimately achieves the best- engineered solution whilst achieving higher reliability, cost reduction and lower carbon footprint. The key features of the DOSS design are: Consistent substation design irrespective of the contractors/ OEMs. More efficient design approval process for new substation projects. Reduction in time required for project design approvals, testing & commissioning. Additional benefits such as reduction of maintenance cost, ease of operation and simplification of the substation design. Using conventional instrument transformers ensures that protection and control systems can be refurbished in future without the risk of needing to replace instrument transformers or possibly switchgear. The digitally optimized substation simplified architecture is shown in Figure-2. Switches SubstationHMI Station B us Copper Hardwiring IE C61850 GOOS E IE C61850 GOOS E Bay-1 BCPU1 Bay-n BCPU1 Bay-1 BCPU2 Bay-n BCPU2 GISSwitchgear Status& Alarms Conventional CT / VT Equipment Sensor Data A. The Basis of Design Optimization Optimization of control and protection system considered the following main aspects: Protection & Control functions are integrated in single Intelligent Electronic Device (IED) Hard-wired interlocks replaced with digital signals (IEC61850 GOOSE signals over process bus). Electromechanical relays replaced with digital functions. Reduction or elimination of CTs. Integrated busbar and feeder backup protections for 11kV network. Integrated Tap Change Controller (AVR). Removal of 24 x metering units on 11kV. Elimination of external DFR devices by utilizing the inbuilt fault recorder capabilities in IEDs. Figure-2: Simplified DOSS Architecture
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 659 Each bay shall have two independent and redundant protection and control systems. Two independent auxiliary DC systems for BCPU-1 & BCPU-2, to avoid common mode failure. Protection schemes engineered to produce efficient designs with minimum number of auxiliary components. Standardization of SCADA alarm lists with reduced number of alarms to the master control station. B. Details of Design Optimization for a Typical 132kV Feeder Bay For a typical 132kV feeder bay the existing conventional SS design and new digitally optimized SS design are as shown in Figure-3. Integrated Protection,BCU, SynchCheck, VSSandDFRin bothBCPUs Digital Busbar Protectiondoes not requirea separateCT for theCheckZone. Figure-3: Feeder bay design in conventional & DOSS design The protection and control designs for a typical feeder bay in conventional and new DOSS designs are compared in Table-2. Table-2: Comparison of Feeder bay design in conventional & DOSS design Application Existing Conventional SS Design Digitally Optimized SS Design Bay Protection Main-1 Protection (M1FP) Bay Control & Protection Unit-1 (BCPU1) Main-2 Protection (M2FP) Bay Control & Protection Unit-2 (BCPU2) Bay Control Bay Control Unit (BCU) Not Applicable (Integrated to BCPU1, 2 and Respective CT core eliminated) Fault recorder DFR Busbar protection High Impedance Main-1 Protection (M1BZP) Low Impedance Main-1 Protection (M1BZP) Low Impedance Main-2 Protection (M2BZP) Low Impedance Main-2 Protection (M2BZP) DOSS designs include integrated control & protection panels (CPP) instead of separate protection and control LCC panels. A comparison of existing and new panels are as shown in Figure-4. Existing132kVFeeder ProtectionPanel Existing132kVFeeder LCCPanel Bay Controller BCPU2 BCPU1 All Protection, Bay Control, Voltage Selection Scheme, DFR& Interlocks are integrated into new BCPU’s with complete redundancy. New132kVControl& Protection Panel (CPP) Main1 Prot.Relay Main2 Prot.Relay Figure-4: Feeder bay panels between conventional and DOSS design
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 660 Accordingly, similar optimizations are done for all 132kV and 11kV bays in the new DOSS design. As per the new BCPU and BMP functionality, the protection & control IED’s are prequalified and approved after successful laboratory testing. The approved BCPU, BMP IEDs for some of the applications are as shown in below Table-3. Table-3: Prequalified BCPU, BMP IEDs for DOSS SS Voltage Level Typical Bay Application IED Make IED Type 132kV Feeder BCPU1 / BCPU2 Siemens 7SL87 SEL 411L Hitachi RED670 132kV Bus Coupler BCPU1 / BCPU2 Siemens 7SJ85 SEL 451 Hitachi REC670 132kV IDT Transformer BCPU1 / BCPU2 Siemens 7UT85 SEL 487E Hitachi RET670 11kV Feeder, Incomer & Capacitor Feeder BMP Siemens 7SJ85 SEL 451 Hitachi REC670 C. SCMS Architecture in new DOSS Design In the new DOSS design, the SCMS is completely redesigned and introduces virtual technologies. The number of SCMS components are greatly reduced whilst increasing reliability and redundancy. The SCMS architecture utilized in new DOSS design is as shown in Figure-5. Station Switch-A (Level-2) Station Switch-B (Level-2) LAN-A Field Switch Substation HMI NETWORK C02 -BCPU1 C09 -BCPU1 C04 -BCPU1 C05 -BCPU1 C06 -BCPU1 C07 -BCPU1 C08 -BCPU1 C03 -BCPU1 M1BZP-R M1BZP-Y M1BZP-B FDR RXR-1 M1RP FDR RXR-2 M1RP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 LAN-B Field Switch 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 OTS Panel-1 M2BZP-R M2BZP-Y M2BZP-B 132kV Digitally Optimized Substation – SCMS Topology C02 -BCPU2 C03 -BCPU2 C04 -BCPU2 C05 -BCPU2 C06 -BCPU2 C07 -BCPU2 C08 -BCPU2 C09 -BCPU2 FDR RXR-1 M2RP FDR RXR-2 M2RP Metering System (EMVS) Common BCU-1 OTS Panel-2 Thin Client Remote Access, Retrieval of Digital Fault Records and DataManagement System for Substation IED s (Centralized Cloud Storage & Engineering Workstation ) IT/ OT PERIMETER DEWA - IT Network Dashboard / Mobile Viewers IED Configuration / setting Users DFR Users (TPD & RTO) OTS DC-1 OTS DC-2 EMVS- 1 EMVS- 2 TCC-1 DCC-1 DCC-2 TCC-2 Notes: 1. This concept topology does not constitute a detailed design. 2. Substation Server includes Security Systems, SCMS, EWS and local storage. GPS CLOCK SCMS Panel-1 SCMS Panel-2 Substation Server & Gateway 1 (Virtual Security) (Virtual Security) 17 18 19 20 21 22 23 24 16 17 18 19 20 21 22 24 23 15 Substation Server & Gateway 2 DC 1 Charger Controller DC3 Charger Controller DC 2 Charger Controller (Future) C01 -BCPU1 (Future) C01 -BCPU2 Common BCU-2 11kV Bus 1 Loop 11kV BB CU1 11kV BB CU2 11kV BB CU3 F01-BMP F02-BMP F22-BMP F23-BMP 11kV Bus 3 Loop F48-BMP F49-BMP F70-BMP F71-BMP Busbar Protection Central Units 11kV Bus 2 Loop F24-BMP F25-BMP F46-BMP F47-BMP 11kV Switchgear Figure-5: SCMS architecture in DOSS design D. Standardization of DOSS Design Standardization in DOSS design achieved by preparing standard design documents by DEWA and including them as part of tender documents for contractor’s strict compliance. The following are the standard design documents: Control and Protection specification. SCMS technical specification. DC technical specification. Metering technical specification. Conceptual protection single line diagrams, trip logics and control & interlock logics for all the typical bays. Control and protection panel schematic and general arrangements drawings. Substation DC system single line diagrams. Substation DC chargers schematic and general arrangement drawings. Test terminal block standard terminal arrangements. Master station SCMS signal list with standard IEC61850 signal address. Standard CT & VT parameters for all bays and all applications. BCPU/ BMP IEDs specific wiring templates for each make and application. In addition to above mentioned standard design documents, pre-qualified manufacturers were also provided to the contractors to select the approved vendors.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 661 Approved IEDs list. Approved protection and control component list. Approved energy meters list. Approved CT and VT manufacturers list. Approved panel manufacturers list. Approved DC system manufacturers list. E. Digitally Optimized SS Design – Benefits The new innovative digitally optimized substation design provides significant benefits to DEWA as a utility. The new design for 132/11kV substations includes the following advantages: Protection & control functions are integrated into a single IED (BCPU1/2): Reduction of 15 IEDs, redundancy in control functions and 18 x control and protection panels removed. Hard wired interlocks are replaced with peer-peer GOOSE digital signals: Over 100km of copper cabling eliminated. All electromechanical relays replaced with digital systems: Over 8000 devices removed. Reduction in the number of current transformers: Total 258 units removed. Integrated busbar and feeder backup protection for 11kV network. Integrated tap change controller (AVR) into BMP IEDs: Panel with 3 x controllers removed (digitized). Removal of 24 x metering units on 11kV. Integrated digital fault recorders (DFR’s): 3 x DFR panels removed. Optimized SCMS system: 4 x SCMS panels, 5 x computers, 2 x monitors, 20 x network switches, 196 fiber optic cables, 4 x fiber optic patch panels, 1 x GPS clock removed. Virtual security, role based remote engineering access through virtual machine is achieved. The summary of removed equipment as part of the 132/11kV design optimized SS are as shown in Table-4. Table-4: Summary of removed equipment in DOSS SS S.No. Equipment Description of Change Quantity of Removed equipment 1 132kV GIS Reduce 13 x Sets = 39 CT's 39 2 132kV Feeders Remove 3 x 132kV Protection Panels 3 3 132kV IDT's Remove 3 x 132kV Protection Panels 3 4 132kV Bus Coupler Remove 1 x 132kV Protection Panel 1 5 132kV LCC Reduce 6,707 x components (Aux relays, timers, terminals, mcb's, switches etc.) 6707 6 11kV Feeder with Metering Meters removed and CT's for metering are retained. 255 7 11kV Feeder without Metering Optimized with reduced CT's and components 672 8 11kV Cap Bank Reduced Capacitor Bank Protection relay and integrated into BMP. 102 9 11kV Incomer Check Zone relay removed, AVR function integrated into BMP. 81 10 11kV Bus Sections Reduced CT's and several components digitized 59 11 11kV Busbar Remove High Impedance scheme and implement Low Impedance BBP with integrated 11kV Feeder Backup protection. Reduce 73 x sets of CT's 3 12 LVAC Remove 34 components including High Impedance REF & CT's 34 13 SCMS SCMS panels & components 232 14 AVR Remove 1 x AVR panels and equipment’s 4 15 Digital Fault Recorder (DFR) Remove 3 x DFR panels and equipment’s 3 Total 8198
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 11 | Nov 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 662 Additionally, the new design will support DEWA’s vision and environmental goals. The reduction in carbon emissions approximately 37 tons per year for 132/11kV substation due to annual energy saving of 53MWH. Reduction in substation building size by 133m2. Savings of 7 million AED per substation due to reduced equipment. The new design utilizes, control and protection panels (CPP) developed in the UAE along with local manufacturers. IV. CONCLUSION The DOSS design selects the best technologies available, combines it with best design practices to achieve the industry leading optimized substation design. The innovative DOSS design concept can be implemented in other organizations globally, which have the same business portfolio (electricity supply), and this will positively influence our responsibility to support the sustainable development goals and protect the environment. V. REFERENCES [1] John bettler, Jesse Silva, Dan Morman, “Case Studies of IEC61850 Process Bus Systems Using GOOSE and Sample Values: Recent Installations and Research”, proceedings of the 74th Annual Georgia Tech Protective Relaying Conference, April-2021. [2] Stefan Meier, Thomas Werner, “Performance considerations in digital substation applications” white paper presented at PAC World UK 2015. [3] Greg Rzepka, Scott Wenke, Sarah Walling, “Choose Simplicity for a Better Digital Substation Design”, 70th Annual Conference for Protective Relay Engineers, Texas, April-2017. [4] Qinccui Fu, Jianyun Chen, “Design of Experiment Platform for Digital Substation Based on IEC61850”, 5th International Conference on Computer Science and Network Technology (ICCSNT)-2016 [5] Topolsky D.V., Topolskaya I.G., Topolsky N.D, “Development of an Intelligent Measuring System for Digital Substations”, International Multi conference on Industrial Engineering and Modern Technologies (FarEastCon)-2018. [6] E.V. Solomin, D.V. Topolskiy, N.D. Topolskiy, “Integration of Adaptive Digital Combined Current and Voltage Transformer into Digital Substation Ethernet Grid”, International Siberian Conference on Control and Communications (SIBCON)-2015.
Anúncio