Improve the Productivity of Building Construction Project using Clash
detection Application in Building Information Modeling
Mr. Swapnesh.P.Raut1Dr.S.S.Valunjkar2
1P.G. Student, Dept of civil engineering, Government College of Engineering, Karad, Maharashtra, India.
2Professor, Dept of civil engineering, Government College of Engineering, Karad, Maharashtra, India .
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract:- In the 21st century, BIM has brought a
revolutionary concept in the Architecture, Engineering and
Construction (AEC) industry, which is allows constructing
building virtually before it is built on construction field. The
starting to implement of BIM at different levels in various
developed countries like USA, Australia and UK are
implementing BIM to a greater levelwhere inIndiaisintotal
contrast to status in developed countries. The Clash
Detection tool is one of the most useful application of BIM,
which is useful for the coordination of systems to make the
projects time efficient and economical. Inthispaperwefocus
the methodology involved conducting clash detection
analysis using building information modeling software. This
research also involves the concept of BIM, status of BIM in
India. As such, it is case study of a residential building which
consisting of an architectural, structural and Mechanical,
Electrical and Plumbing (MEP) BIM models and their
consequent clash detection. In this case study, commercial
software such as Autodesk Revit 2016, Autodesk Navisworks
Manage 2016 are used and also focuses on simplifying and
standardizing the process of BIM coordination using
Autodesk Navisworks software.
Keywords: Building InformationModeling,BIMsoftware,
AEC Industry, Clash Detection.
1. INTRODUCTION
In the last few years the construction industry, the
complexity of modern day construction projects has
increased and there will be no significant improvement in
the productivity of the construction industry has been
observed. Theproductivityoftheconstructionindustryhas
traditionally been much lower than thatofotherindustries
because the main reason for this shows to be the
incapability of new technologies. As other industries have
improved their productivity by using newmodify methods
and techniques, the construction industry is also applying
new technology such as building information modeling
(BIM) to assist better the productivity of construction
Project Management.
A building information model is consisting of the 3D
models of the project with links to all the required
information connected with the projects planning and
construction or operation.BIMisa 3Dmodelingwhichmay
involve 4th dimension as time (4D), 5thdimension of cost
(5D) and information database of the project , 6D
dimension is related to Facilities Management (FM) & 7D
dimension is related Sustainability.
The National Building Information Modeling
Standards (NBIMS) committee of US defines BIM as, “a
digital representation of physical and functional
characteristics of facility. BIM is a shared knowledge
resource for information about a facility forming are liable
basis for decisions during its life cycle i.e. from earliest
conception to demolition. A basic premise of BIM is the
collaboration by different stakeholders at different phases
of the life cycle of a facility to insert extract, update or
modify information in BIM to support and reflect the roles
of that stakeholder” .
1.1 Need of BIM
Building Information Modeling (BIM)is an integrated
the process of development and utilizes of a computer
generated model to simulate the design, planning,
construction schedule, cost information and clash
detection such as physical and functional characteristics
digitally before it is built. In Indian constructionindustryis
not applying the true potential of BIM tools. Lots of the
architectural and engineering firms inIndia still dependon
upon two-dimensional Computer-Aided Design i.e. CAD
drawings. This usage of traditional methods neither
expresses that the Indian designers are uninformed about
BIM technology and its capacity, because of unskilled BIM
users in the Indian AEC industry.
In traditional method of clash detection when BIM wasn’t
around, AEC professionals used to burn mid-night oil for
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1785
identifying mistakes in the 2D drawings. But even after
doing a lot of hard work in detection of clashes before the
starting of construction, architects and engineers used to
find out design problems of high magnitude during final
building procedure. Finding of clashes quickly used to
result in rework on jobsite which used to showquitecostly
for owners. Budget overruns are instant consequences of
rework carried out by architects and engineers during
onsite construction. Due to the failure of traditional
method it is necessary to bring about a new way of
working and thinking within the construction industry So
that it requires implanting modern technology like BIM to
improving in clash detection instead oftraditional method.
2. STATUS OF BIM IN INDIA
The Indian Architecture, Engineering and Construction
(AEC) industry is one of the vital pillars of the Indian
economy. Indian AEC has vast employment opportunity.
While, real estate sector in India was the domain area of
only handful players in the 90s, now it’s changing day by
day the growth has reached to investors, developers and
global stakeholders in the growing Architecture,
Engineering and Construction (AEC) industry in the
country. Real estate is secondlargestemploymentsector in
India, after agriculture. In contrast, the India Architecture,
Engineering and Construction (AEC) industry is not using
the true potential of BIM technology .According to a recent
McGraw-Hill Construction Report, BIM implementation in
the USA extended from 55 Percentage in 2013 to over 79
Percentage in 2015 .A Survey done by Indian RICS School
of built environment and KPMG in 2014 found that
22percentage of respondent currently use BIM,
27percentage respondent reported thattheyarecognizant
and actively considering BIM utilizationinIndia. Themajor
reason for not using BIM here is the lack of technical
expertise, the professional who has heard about this
technology but doesn’t know how to use it, and most of
them are not even aware of this technology, high cost of
software, No mandate from the government for BIM
implementation ,low demand from clients and lack of
skilled or trained employees.
3. CLASH DETECTION
Clash detection remains the primary requirement of any
multidisciplinary project wherein composite design needs
to be inspected for the identification of clashes. Clash
Detection is the method of inspecting and identifying the
various interferences which frequently occurs in
coordinating process of 3D models created in different
modern software’slikeRevitArchitectural ,RevitStructural
& Revit MEP .In BIM, 3D models for different types such
like Structural, Civil, and Architectural &MEP(Mechanical,
Electrical and Plumbing). When combination of all these
different types of models to create a complete BIM model
there will be chances of clash between these elements.
In clash detection test it detects the conflicts between
different elements within 3D Building Information Model
before actually construction starts, and therefore time
optimization intheconstructionschedule, reducecostsand
change orders. By using clash detection application in AEC
industry increase the productivity of design and
construction project.
There are 3 main types of clashes
1. Hard clash:
This type of clash occurs with two objects are takingupthe
same space. Such like pipes passing through walls, lower
ceiling light. This type of information is entered in the BIM
modeling objects and hard clash provides the detection
based on the geometrical as well as on semantic and rule-
based algorithms.
2. Soft Clash/Clearance Clash
Soft clash detects clashes which occur when the object
needs more positivespatial orgeometrictolerances,spaces
and buffers within their buffer zone for improved
accessibility, insulation, maintenance and safety. For
example, an air conditioning component may require
certain clearances to allow for maintenance, access or
safety that steel beam would negate.
3. 4D/Workflow Clash:
This type of clash might involve the scheduling of
contractors, the delivery of equipment i.e. cranes,
bulldozers and materials, and general timeline conflicts.
For example, work crews arriving when there is no
equipment on site[4]. Since these objects are frequently
scheduled as temporary, demolished, or other schedule so
link them for clash detection to make sure they do not
affect to project.
3.1 Need Of Clash Detection
In traditional method organizations are the prepares
activities for the execution stage as establishing contracts
with contractors, buying materials, ensuring a good
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1786
coordination and assembly order of the different systems
of a project. The most clashes are recognized when the
contractor receives the design drawings and everyone is
on-site and working. it is compare 2D designs to each
other to find conflict clashes between the specialty
designs. Because the specialty contributors i.e. structural
engineers , MEP engineers etc. develop their designs
separately, so when comparing these designs on different
drawings is a process easily overlook clashes. The
contractors require to see that the detailing of structural
elements, plumbing, electrical lines, attachment and other
component is done well. If there issomemistakeinofthese
clashes result change orders then these effects on cause
delay in project, design modifications, materials costs and
budget overruns. Using BIM and the Clash Detection
application enables potential problems to be identified
early in the design phase and resolved before construction
begins with more effective.
4. SOFTWARE USE FOR CLASH DETECTION
There are several companies who offer clash detection
software for the AEC industry. Following are some
software's which is use for clash detection in BIM
1. Revit
Revit is database structure and object definition modeling,
is a effective modeling software the preferable work
practice is of course when all the modeling is performed
internally within Revit .In order to satisfy the specific
needs of the diverse types of specialist for Revit, Autodesk
distributed the product into three types – Revit
Architecture, Revit Structure and Revit MEP. Revit
software gives clash detection abilities where objects
clashes with each other are highlighted for improvement.
This capability is however, limited in that it does not
develop reports, trace Clashes, Status Clashes ,Set Rules,
Custom Clash Test, Clearance Tests, Time Based Clashing
or track changes[5]
2. Bentley Navigator
Bentley Clash Resolution allows user to identify sets of
business or graphical elements and to detect geometrical
clashes between these object element sets. The user can
after that interactively and graphically review these
clashes, mark up particular clashes, and allocate them for
action. Clash results can be grouped, marked up and
exported to a GPS system or Excel spread sheet. [7]
3. Solibri Model Checker
Solibri Model Checker(SMC)softwarefindspotential faults
before actual work start on site . It is advanced clash
detection tool which is consisting BIM and accessibility
compliance, deficiency detection, model comparisons and
full information take off. The checking of Solibri Model
Checker is done on the basis of rules grouped into related
“rule sets”. This can be viewed as “design spell checking”.
One of most noticeable advantages of Solibri Model
Checker is to be viewed in the original BIM authoring
application, permitting them to be fixed more easily and
quickly [1]. By using Solibri Model Checker BIM
stakeholders can manage costs, delivery timings and
maintenance work.[7]
4. Autodesk Navisworks
The Autodesk Navisworks products helps architecture,
engineering, and construction teams to develop better
control over the outcome of their projects. With
Navisworks solutions, detailed design models can be
combined and reviewed by all project stakeholders,
serving users to benefit from thecompetitiveadvantagesof
building information modeling (BIM) workflows. The
Autodesk Navisworks software provides a Clash Detection
module that checks BIM model and showsanyareas where
items interfere, or “clash”, with each other. This BIM tool
allow to set up the rules, Identify clashes ,Generate
Reports, Trace Clashes, StatusClashes,ManageClashes,Set
Rules ,Custom Clash Test, Clearance Tests ,Time Based
Clashing. The Autodesk Navisworks software family offers
three products(Autodesk Navisworks Manage, Autodesk
Navisworks Simulate, Autodesk Navisworks Freedom) to
provide project stakeholders with the right tools to help
collaborate, coordinate, and communicatemore effectively.
5. METHODOLOGY
The methodology involved collecting three model
files of type “.rvt” (Autodesk Revit 2016) for the three
models i.e. architectural and structural and MEP model.
Three separate clash tests were conducted:
1) Architectural Model versus Structural Model (ARVs ST),
2) Architectural Model versus MEP Model, (AR Vs MEP)
3) Structural Model versus MEP (ST Vs MEP).
The software was set to detect only hard clashes,
with a tolerance of 0.0 mm. There are many BIM software
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1787
available in market which is useful for design and
construction professionals to increase the productivity of
the project, but in this case study software used for clash
detection process is Autodesk Navisworks Manage 2016
etc. Autodesk Navisworks Manage greatest strength is
clash detection. Due to this software detecting collisions
during design, in real time, gives the BIM stakeholder a
very efficient method to improve coordination among
multiple building systems and ultimately avoid costly
remedies after drawing completion and during
Construction phase. Following are the steps for clash
detection process.
1. The first step in this case study is to import all the Revit
2016 files i.e. MEP, structural and architectural files into
Navisworks which is use in clash detection process .For
clash detection process in Navisworks, it is required to
import 3D Revit files into Navisworks or export files from
Revit to Navisworks.
2. In the next step in clash detection process converts all
the recently imported rvt files into Navisworks file format
that is .nwf file format which is shown in Figure no 1
Fig.1 Converting Revit file into NWC format
3. Once all rvt files are transformed into nwf file format we
can be simply opened in Navisworks software and then
clash tests carry out by using rvt files.
4. For performing clash tests in Navisworkssoftwarepress
the ‘Clash Detective’ tool.
5. After that we can simply click on to ‘Select’ tab that is
located within clash detective tool inNavisworkssoftware.
6. Next step is click on ‘Select’ tab then two different
columns will appear on computer screensoselectdifferent
model elements which have the chances of conflictingwith
each other which is shown in figure no 2. For example
structural element can interfere with MEP element, so in
one column we should select ‘structural element’ and in
other column we should chose ‘MEP element’ and then
simply click on ‘OK’ to run clash test.
Fig 2. Clash detection process by Navisworks
7. After the clashes between structural element and MEP
element can be easily recognized. After that for
inspection its results, we must go to Results tab.
8. Autodesk Navisworks automatically gives a status to
each clash for future use .So after that the Clash Detective
tool that keeps on updating the status of the clashes after
they are identified and are listed within Results tab which
is shown fig 3
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1788
Fig 3 Clash Detective showing the results tab
9. Further, for creating report of clash test click on
Report tab and creating report on .XML file format which
is shown in fig 4 and fig 5
Fig 4 Clash Detective showing the report tab
Fig 5 : Clash report generated by Navisworks
10. Clashes can be resolved by changing position of
particular element i.e. figure no 8 shown that clash can
be resolved by changing slope of pipe.
Fig.6 Clash between pipe (Green) and Structural
Beam (Red)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1789
Fig 7.pipe position before clash resolving
Fig 8 .Resolving clash between pipe and beam by
Changing slope of pipe
6. CONCLUSION
1. Building Information Modeling (BIM) is rapidly growing
within the AEC industry where its current implementation
shows great effects on projects in terms of performance,
time and cost.
2. In Indian construction industry is not applying the true
potential of BIM tools. Indian AEC industry is not aware
about BIM technology and its capacity and they are
unskilled BIM users.
3.Using Clash detection in this case study instead of
traditional method detects the conflictsin3DModel before
actually construction starts of building so that it is useful
for to decrease coordination errors, human errors so that
results in high level of accuracy of models. So this will be
avoiding re-work on jobsite.
4. Autodesk Navisworks makes the clashdetectionprocess
faster and easier along with completely reducing thescope
of human errors during its execution. Design clashes that
occur between building elements are successfully
identified by Navisworks andtheyaretimelysolved.Hence
complete elimination of design errors, optimize time and
cost is very important for AEC industry before actual
construction starts on jobsite.
5. Hence, implementation of clash detection tool is very
important for error-free construction project helps to
optimize time in the construction schedule and minimize
the overall cost of project at the construction stage
REFERENCES
1. W. Guangbin and Wei L, "Exploring the High-
efficiency Clash Detection between Architecture
and Structure", International Conference on
Information Management and Engineering,
Singapore,2011.
2. McGraw-Hill Construction. Smart Market Report:
The business value of BIM for construction in
Major Global markets, 2014.
3. A. Sawhney ., “State of BIM adoption and outlook
in India”, RICS school of built environment, Amity
University, May 2014.
4. G. Bhamre , A. Patil and S. Pataskar. ,“Cost and
Time Optimization for ConstructionofResidential
Building by Clash detection in Building
Information Model(BIM)”, International Research
Journal of Engineering and Technology (IRJET),
Jan 2017,Volume: 04, Issue:01, pp:550-553.
5. N.Mistry and H.Rathod, ''Softwares for Building
Information Modeling (BIM) Project Management
and Controlling'', International Journal of
Scientific Research & Development, 2014,Vol. 2,
Issue 10, ISSN : 2321-0613.
6. E. Berdeja.,"Conflict analysis in a BIM based
design”.
7. Websites: www.solibri.com,
www.vicosoftware.com, www.bentley.com
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1790
BIOGRAPHIES
Swapnesh. P. Raut received his
BE degree in civil engineering
from shivaji University
(Maharashtra) in 2015, pursuing
the M.Tech degree in
Construction Management from
Government College of
Engineering, Karad, Maharashtra.
His research interest is Building
Information Modeling.
Shriniwas Valunjkar received his
PhD degree in civil engineering in
2000, the M.Tech degree in
engineering control from
Hydraulics & Water Resources
Engineering, Housing & Town
Planning, BE degree in civil
engineering.

Recomendados

IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model por
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
11 visualizações6 slides
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr... por
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
39 visualizações4 slides
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot... por
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
59 visualizações7 slides
A Review on Challenges Involved in Implementing Building Information Modeling... por
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...IRJET Journal
102 visualizações4 slides
Application of Building Information Modelling Software’s for Planning and Sch... por
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
60 visualizações8 slides
The Information Challenge Managing Construction with BIM por
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
4.6K visualizações69 slides

Mais conteúdo relacionado

Mais procurados

A Statistical Analysis of Building Information Modeling in Project Management por
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project ManagementIRJET Journal
74 visualizações5 slides
IRJET- Digital Engineering & Project Management for AEC Industry using BIM por
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
7 visualizações6 slides
IRJET- Building Information Modeling in AEC Industry with its Implementation ... por
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET Journal
20 visualizações8 slides
BIM Report 3 por
BIM Report 3BIM Report 3
BIM Report 3KAMRAN SIDDIQUI
963 visualizações18 slides
Bim Enabled Ipd por
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipdmarybk
1.3K visualizações64 slides
Bim for construction safety design por
Bim for construction safety designBim for construction safety design
Bim for construction safety designStephen Au
1K visualizações13 slides

Mais procurados(20)

A Statistical Analysis of Building Information Modeling in Project Management por IRJET Journal
A Statistical Analysis of Building Information Modeling in Project ManagementA Statistical Analysis of Building Information Modeling in Project Management
A Statistical Analysis of Building Information Modeling in Project Management
IRJET Journal74 visualizações
IRJET- Digital Engineering & Project Management for AEC Industry using BIM por IRJET Journal
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET Journal7 visualizações
IRJET- Building Information Modeling in AEC Industry with its Implementation ... por IRJET Journal
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET Journal20 visualizações
BIM Report 3 por KAMRAN SIDDIQUI
BIM Report 3BIM Report 3
BIM Report 3
KAMRAN SIDDIQUI963 visualizações
Bim Enabled Ipd por marybk
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipd
marybk1.3K visualizações
Bim for construction safety design por Stephen Au
Bim for construction safety designBim for construction safety design
Bim for construction safety design
Stephen Au1K visualizações
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling por IRJET Journal
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET Journal40 visualizações
IRJET- 4D Simulation of MEP using Bim for Residential Building Project por IRJET Journal
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET Journal67 visualizações
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat por IRJET Journal
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET Journal20 visualizações
BIM for Building Services Engineering - HKIE seminar in 2014 por Stephen Au
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
Stephen Au1.6K visualizações
CSCM group project aug 2016 por Est
CSCM group project aug 2016CSCM group project aug 2016
CSCM group project aug 2016
Est 160 visualizações
3D and bim technology for construction safety morning section final version... por Stephen Au
3D and bim technology for construction safety   morning section final version...3D and bim technology for construction safety   morning section final version...
3D and bim technology for construction safety morning section final version...
Stephen Au816 visualizações
3D and bim technology for construction safety - track 2 por Stephen Au
3D and bim technology for construction safety  -  track 23D and bim technology for construction safety  -  track 2
3D and bim technology for construction safety - track 2
Stephen Au1K visualizações
IRJET- Rapid Prototyping – Applications in Various Field of Engineering and T... por IRJET Journal
IRJET- Rapid Prototyping – Applications in Various Field of Engineering and T...IRJET- Rapid Prototyping – Applications in Various Field of Engineering and T...
IRJET- Rapid Prototyping – Applications in Various Field of Engineering and T...
IRJET Journal32 visualizações
Application of BIM and Construction Process Simulation using 5D BIM for Resid... por IRJET Journal
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
IRJET Journal105 visualizações
Omer Syed - The Integration of BIM in Construction Organizations & its Impact... por Omer Syed
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed577 visualizações
Software presentation por Timun Loh
Software presentationSoftware presentation
Software presentation
Timun Loh2.9K visualizações
BIM Contract International Conference 2017 por Chun Keung Ng
BIM Contract International Conference 2017BIM Contract International Conference 2017
BIM Contract International Conference 2017
Chun Keung Ng879 visualizações
BIM for health and safety - Its a No-Brainer por Stefan Mordue RIBA
BIM for health and safety - Its a No-BrainerBIM for health and safety - Its a No-Brainer
BIM for health and safety - Its a No-Brainer
Stefan Mordue RIBA1.3K visualizações
Complexity of Project And Impacts on Preliminaries of Construction Project At... por Ir. Abdul Aziz Abas
Complexity of Project And Impacts on Preliminaries of Construction Project At...Complexity of Project And Impacts on Preliminaries of Construction Project At...
Complexity of Project And Impacts on Preliminaries of Construction Project At...
Ir. Abdul Aziz Abas874 visualizações

Similar a Improve the Productivity of Building Construction Project using Clash detection Application in Building Information Modeling

STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ... por
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
9 visualizações7 slides
An Execution of Building Information Modelling for Factories and Warehouse Pr... por
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
3 visualizações8 slides
Cost and Time Optimization for Construction of Residential Building by Clash ... por
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...IRJET Journal
64 visualizações4 slides
IRJET - Digital Engineering & Project Management for AEC Industry using BIM por
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
16 visualizações6 slides
Application of BIM for Scheduling and Costing of Construction Project por
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction ProjectIRJET Journal
95 visualizações4 slides
A Statistical Analysis Of Building Information Modeling In Project Management por
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project ManagementCrystal Sanchez
2 visualizações5 slides

Similar a Improve the Productivity of Building Construction Project using Clash detection Application in Building Information Modeling(20)

STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ... por IRJET Journal
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
IRJET Journal9 visualizações
An Execution of Building Information Modelling for Factories and Warehouse Pr... por IRJET Journal
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
IRJET Journal3 visualizações
Cost and Time Optimization for Construction of Residential Building by Clash ... por IRJET Journal
Cost and Time Optimization for Construction of Residential Building by Clash ...Cost and Time Optimization for Construction of Residential Building by Clash ...
Cost and Time Optimization for Construction of Residential Building by Clash ...
IRJET Journal64 visualizações
IRJET - Digital Engineering & Project Management for AEC Industry using BIM por IRJET Journal
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET Journal16 visualizações
Application of BIM for Scheduling and Costing of Construction Project por IRJET Journal
Application of BIM for Scheduling and Costing of Construction ProjectApplication of BIM for Scheduling and Costing of Construction Project
Application of BIM for Scheduling and Costing of Construction Project
IRJET Journal95 visualizações
A Statistical Analysis Of Building Information Modeling In Project Management por Crystal Sanchez
A Statistical Analysis Of Building Information Modeling In Project ManagementA Statistical Analysis Of Building Information Modeling In Project Management
A Statistical Analysis Of Building Information Modeling In Project Management
Crystal Sanchez2 visualizações
Integrating Project Management Information System and BIM for Inspecting and ... por IRJET Journal
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
IRJET Journal3 visualizações
Review on Benefits, Features, Applications and Implementation of Building Inf... por IRJET Journal
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
IRJET Journal6 visualizações
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P... por IRJET Journal
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET Journal33 visualizações
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch... por IRJET Journal
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
IRJET Journal58 visualizações
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx por yustofiachmad
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptxEFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
EFFECTIVENESS OF IMPLEMENTING 5D BIM.pptx
yustofiachmad3 visualizações
Building Information Modeling (BIM) Research Paper por abhishek chougule
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paper
abhishek chougule590 visualizações
Building Information Modelling Technology For Risk Analysis And Mitigation: A... por IRJET Journal
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
IRJET Journal5 visualizações
Recent developments in BIM in geotechnics por Rob Madill
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
Rob Madill81 visualizações
Recent developments in BIM in geotechnics por Rob Madill
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
Rob Madill79 visualizações
IS BIM ADVANTAGEOUS IN PAKISTAN? por Anees Ur Rehman
IS BIM ADVANTAGEOUS IN PAKISTAN?IS BIM ADVANTAGEOUS IN PAKISTAN?
IS BIM ADVANTAGEOUS IN PAKISTAN?
Anees Ur Rehman164 visualizações
Brochure BIM por UTHM
Brochure BIM Brochure BIM
Brochure BIM
UTHM2K visualizações
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING por IRJET Journal
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
IRJET Journal10 visualizações
bim and project controls por Omar Selim
 bim and project controls bim and project controls
bim and project controls
Omar Selim63 visualizações
Building Information Model por Manisha Shrivastava
Building Information ModelBuilding Information Model
Building Information Model
Manisha Shrivastava2.1K visualizações

Mais de IRJET Journal

SOIL STABILIZATION USING WASTE FIBER MATERIAL por
SOIL STABILIZATION USING WASTE FIBER MATERIALSOIL STABILIZATION USING WASTE FIBER MATERIAL
SOIL STABILIZATION USING WASTE FIBER MATERIALIRJET Journal
22 visualizações7 slides
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles... por
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...IRJET Journal
8 visualizações7 slides
Identification, Discrimination and Classification of Cotton Crop by Using Mul... por
Identification, Discrimination and Classification of Cotton Crop by Using Mul...Identification, Discrimination and Classification of Cotton Crop by Using Mul...
Identification, Discrimination and Classification of Cotton Crop by Using Mul...IRJET Journal
8 visualizações5 slides
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula... por
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...IRJET Journal
13 visualizações11 slides
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR... por
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...IRJET Journal
14 visualizações6 slides
Performance Analysis of Aerodynamic Design for Wind Turbine Blade por
Performance Analysis of Aerodynamic Design for Wind Turbine BladePerformance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine BladeIRJET Journal
7 visualizações5 slides

Mais de IRJET Journal(20)

SOIL STABILIZATION USING WASTE FIBER MATERIAL por IRJET Journal
SOIL STABILIZATION USING WASTE FIBER MATERIALSOIL STABILIZATION USING WASTE FIBER MATERIAL
SOIL STABILIZATION USING WASTE FIBER MATERIAL
IRJET Journal22 visualizações
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles... por IRJET Journal
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...
Sol-gel auto-combustion produced gamma irradiated Ni1-xCdxFe2O4 nanoparticles...
IRJET Journal8 visualizações
Identification, Discrimination and Classification of Cotton Crop by Using Mul... por IRJET Journal
Identification, Discrimination and Classification of Cotton Crop by Using Mul...Identification, Discrimination and Classification of Cotton Crop by Using Mul...
Identification, Discrimination and Classification of Cotton Crop by Using Mul...
IRJET Journal8 visualizações
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula... por IRJET Journal
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...
“Analysis of GDP, Unemployment and Inflation rates using mathematical formula...
IRJET Journal13 visualizações
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR... por IRJET Journal
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...
MAXIMUM POWER POINT TRACKING BASED PHOTO VOLTAIC SYSTEM FOR SMART GRID INTEGR...
IRJET Journal14 visualizações
Performance Analysis of Aerodynamic Design for Wind Turbine Blade por IRJET Journal
Performance Analysis of Aerodynamic Design for Wind Turbine BladePerformance Analysis of Aerodynamic Design for Wind Turbine Blade
Performance Analysis of Aerodynamic Design for Wind Turbine Blade
IRJET Journal7 visualizações
Heart Failure Prediction using Different Machine Learning Techniques por IRJET Journal
Heart Failure Prediction using Different Machine Learning TechniquesHeart Failure Prediction using Different Machine Learning Techniques
Heart Failure Prediction using Different Machine Learning Techniques
IRJET Journal7 visualizações
Experimental Investigation of Solar Hot Case Based on Photovoltaic Panel por IRJET Journal
Experimental Investigation of Solar Hot Case Based on Photovoltaic PanelExperimental Investigation of Solar Hot Case Based on Photovoltaic Panel
Experimental Investigation of Solar Hot Case Based on Photovoltaic Panel
IRJET Journal3 visualizações
Metro Development and Pedestrian Concerns por IRJET Journal
Metro Development and Pedestrian ConcernsMetro Development and Pedestrian Concerns
Metro Development and Pedestrian Concerns
IRJET Journal2 visualizações
Mapping the Crashworthiness Domains: Investigations Based on Scientometric An... por IRJET Journal
Mapping the Crashworthiness Domains: Investigations Based on Scientometric An...Mapping the Crashworthiness Domains: Investigations Based on Scientometric An...
Mapping the Crashworthiness Domains: Investigations Based on Scientometric An...
IRJET Journal3 visualizações
Data Analytics and Artificial Intelligence in Healthcare Industry por IRJET Journal
Data Analytics and Artificial Intelligence in Healthcare IndustryData Analytics and Artificial Intelligence in Healthcare Industry
Data Analytics and Artificial Intelligence in Healthcare Industry
IRJET Journal3 visualizações
DESIGN AND SIMULATION OF SOLAR BASED FAST CHARGING STATION FOR ELECTRIC VEHIC... por IRJET Journal
DESIGN AND SIMULATION OF SOLAR BASED FAST CHARGING STATION FOR ELECTRIC VEHIC...DESIGN AND SIMULATION OF SOLAR BASED FAST CHARGING STATION FOR ELECTRIC VEHIC...
DESIGN AND SIMULATION OF SOLAR BASED FAST CHARGING STATION FOR ELECTRIC VEHIC...
IRJET Journal53 visualizações
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur... por IRJET Journal
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
Efficient Design for Multi-story Building Using Pre-Fabricated Steel Structur...
IRJET Journal11 visualizações
Development of Effective Tomato Package for Post-Harvest Preservation por IRJET Journal
Development of Effective Tomato Package for Post-Harvest PreservationDevelopment of Effective Tomato Package for Post-Harvest Preservation
Development of Effective Tomato Package for Post-Harvest Preservation
IRJET Journal4 visualizações
“DYNAMIC ANALYSIS OF GRAVITY RETAINING WALL WITH SOIL STRUCTURE INTERACTION” por IRJET Journal
“DYNAMIC ANALYSIS OF GRAVITY RETAINING WALL WITH SOIL STRUCTURE INTERACTION”“DYNAMIC ANALYSIS OF GRAVITY RETAINING WALL WITH SOIL STRUCTURE INTERACTION”
“DYNAMIC ANALYSIS OF GRAVITY RETAINING WALL WITH SOIL STRUCTURE INTERACTION”
IRJET Journal5 visualizações
Understanding the Nature of Consciousness with AI por IRJET Journal
Understanding the Nature of Consciousness with AIUnderstanding the Nature of Consciousness with AI
Understanding the Nature of Consciousness with AI
IRJET Journal12 visualizações
Augmented Reality App for Location based Exploration at JNTUK Kakinada por IRJET Journal
Augmented Reality App for Location based Exploration at JNTUK KakinadaAugmented Reality App for Location based Exploration at JNTUK Kakinada
Augmented Reality App for Location based Exploration at JNTUK Kakinada
IRJET Journal6 visualizações
Smart Traffic Congestion Control System: Leveraging Machine Learning for Urba... por IRJET Journal
Smart Traffic Congestion Control System: Leveraging Machine Learning for Urba...Smart Traffic Congestion Control System: Leveraging Machine Learning for Urba...
Smart Traffic Congestion Control System: Leveraging Machine Learning for Urba...
IRJET Journal18 visualizações
Enhancing Real Time Communication and Efficiency With Websocket por IRJET Journal
Enhancing Real Time Communication and Efficiency With WebsocketEnhancing Real Time Communication and Efficiency With Websocket
Enhancing Real Time Communication and Efficiency With Websocket
IRJET Journal5 visualizações
Textile Industrial Wastewater Treatability Studies by Soil Aquifer Treatment ... por IRJET Journal
Textile Industrial Wastewater Treatability Studies by Soil Aquifer Treatment ...Textile Industrial Wastewater Treatability Studies by Soil Aquifer Treatment ...
Textile Industrial Wastewater Treatability Studies by Soil Aquifer Treatment ...
IRJET Journal4 visualizações

Último

REACTJS.pdf por
REACTJS.pdfREACTJS.pdf
REACTJS.pdfArthyR3
34 visualizações16 slides
MSA Website Slideshow (16).pdf por
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdfmsaucla
92 visualizações8 slides
Design_Discover_Develop_Campaign.pptx por
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptxShivanshSeth6
37 visualizações20 slides
Searching in Data Structure por
Searching in Data StructureSearching in Data Structure
Searching in Data Structureraghavbirla63
14 visualizações8 slides
Investor Presentation por
Investor PresentationInvestor Presentation
Investor Presentationeser sevinç
27 visualizações26 slides
Effect of deep chemical mixing columns on properties of surrounding soft clay... por
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...AltinKaradagli
10 visualizações10 slides

Último(20)

REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR334 visualizações
MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla92 visualizações
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth637 visualizações
Searching in Data Structure por raghavbirla63
Searching in Data StructureSearching in Data Structure
Searching in Data Structure
raghavbirla6314 visualizações
Investor Presentation por eser sevinç
Investor PresentationInvestor Presentation
Investor Presentation
eser sevinç27 visualizações
Effect of deep chemical mixing columns on properties of surrounding soft clay... por AltinKaradagli
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...
AltinKaradagli10 visualizações
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR345 visualizações
MK__Cert.pdf por Hassan Khan
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdf
Hassan Khan15 visualizações
Design of machine elements-UNIT 3.pptx por gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy33 visualizações
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth por Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 6 visualizações
GDSC Mikroskil Members Onboarding 2023.pdf por gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil58 visualizações
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome38 visualizações
START Newsletter 3 por Start Project
START Newsletter 3START Newsletter 3
START Newsletter 3
Start Project6 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn5 visualizações
Generative AI Models & Their Applications por SN
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their Applications
SN10 visualizações
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi8 visualizações
Ansari: Practical experiences with an LLM-based Islamic Assistant por M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous5 visualizações
DESIGN OF SPRINGS-UNIT4.pptx por gopinathcreddy
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptx
gopinathcreddy19 visualizações
LDPC_CODES.ppt por hsomashekar987
LDPC_CODES.pptLDPC_CODES.ppt
LDPC_CODES.ppt
hsomashekar98716 visualizações

Improve the Productivity of Building Construction Project using Clash detection Application in Building Information Modeling

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1784 Improve the Productivity of Building Construction Project using Clash detection Application in Building Information Modeling Mr. Swapnesh.P.Raut1Dr.S.S.Valunjkar2 1P.G. Student, Dept of civil engineering, Government College of Engineering, Karad, Maharashtra, India. 2Professor, Dept of civil engineering, Government College of Engineering, Karad, Maharashtra, India . ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract:- In the 21st century, BIM has brought a revolutionary concept in the Architecture, Engineering and Construction (AEC) industry, which is allows constructing building virtually before it is built on construction field. The starting to implement of BIM at different levels in various developed countries like USA, Australia and UK are implementing BIM to a greater levelwhere inIndiaisintotal contrast to status in developed countries. The Clash Detection tool is one of the most useful application of BIM, which is useful for the coordination of systems to make the projects time efficient and economical. Inthispaperwefocus the methodology involved conducting clash detection analysis using building information modeling software. This research also involves the concept of BIM, status of BIM in India. As such, it is case study of a residential building which consisting of an architectural, structural and Mechanical, Electrical and Plumbing (MEP) BIM models and their consequent clash detection. In this case study, commercial software such as Autodesk Revit 2016, Autodesk Navisworks Manage 2016 are used and also focuses on simplifying and standardizing the process of BIM coordination using Autodesk Navisworks software. Keywords: Building InformationModeling,BIMsoftware, AEC Industry, Clash Detection. 1. INTRODUCTION In the last few years the construction industry, the complexity of modern day construction projects has increased and there will be no significant improvement in the productivity of the construction industry has been observed. Theproductivityoftheconstructionindustryhas traditionally been much lower than thatofotherindustries because the main reason for this shows to be the incapability of new technologies. As other industries have improved their productivity by using newmodify methods and techniques, the construction industry is also applying new technology such as building information modeling (BIM) to assist better the productivity of construction Project Management. A building information model is consisting of the 3D models of the project with links to all the required information connected with the projects planning and construction or operation.BIMisa 3Dmodelingwhichmay involve 4th dimension as time (4D), 5thdimension of cost (5D) and information database of the project , 6D dimension is related to Facilities Management (FM) & 7D dimension is related Sustainability. The National Building Information Modeling Standards (NBIMS) committee of US defines BIM as, “a digital representation of physical and functional characteristics of facility. BIM is a shared knowledge resource for information about a facility forming are liable basis for decisions during its life cycle i.e. from earliest conception to demolition. A basic premise of BIM is the collaboration by different stakeholders at different phases of the life cycle of a facility to insert extract, update or modify information in BIM to support and reflect the roles of that stakeholder” . 1.1 Need of BIM Building Information Modeling (BIM)is an integrated the process of development and utilizes of a computer generated model to simulate the design, planning, construction schedule, cost information and clash detection such as physical and functional characteristics digitally before it is built. In Indian constructionindustryis not applying the true potential of BIM tools. Lots of the architectural and engineering firms inIndia still dependon upon two-dimensional Computer-Aided Design i.e. CAD drawings. This usage of traditional methods neither expresses that the Indian designers are uninformed about BIM technology and its capacity, because of unskilled BIM users in the Indian AEC industry. In traditional method of clash detection when BIM wasn’t around, AEC professionals used to burn mid-night oil for
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1785 identifying mistakes in the 2D drawings. But even after doing a lot of hard work in detection of clashes before the starting of construction, architects and engineers used to find out design problems of high magnitude during final building procedure. Finding of clashes quickly used to result in rework on jobsite which used to showquitecostly for owners. Budget overruns are instant consequences of rework carried out by architects and engineers during onsite construction. Due to the failure of traditional method it is necessary to bring about a new way of working and thinking within the construction industry So that it requires implanting modern technology like BIM to improving in clash detection instead oftraditional method. 2. STATUS OF BIM IN INDIA The Indian Architecture, Engineering and Construction (AEC) industry is one of the vital pillars of the Indian economy. Indian AEC has vast employment opportunity. While, real estate sector in India was the domain area of only handful players in the 90s, now it’s changing day by day the growth has reached to investors, developers and global stakeholders in the growing Architecture, Engineering and Construction (AEC) industry in the country. Real estate is secondlargestemploymentsector in India, after agriculture. In contrast, the India Architecture, Engineering and Construction (AEC) industry is not using the true potential of BIM technology .According to a recent McGraw-Hill Construction Report, BIM implementation in the USA extended from 55 Percentage in 2013 to over 79 Percentage in 2015 .A Survey done by Indian RICS School of built environment and KPMG in 2014 found that 22percentage of respondent currently use BIM, 27percentage respondent reported thattheyarecognizant and actively considering BIM utilizationinIndia. Themajor reason for not using BIM here is the lack of technical expertise, the professional who has heard about this technology but doesn’t know how to use it, and most of them are not even aware of this technology, high cost of software, No mandate from the government for BIM implementation ,low demand from clients and lack of skilled or trained employees. 3. CLASH DETECTION Clash detection remains the primary requirement of any multidisciplinary project wherein composite design needs to be inspected for the identification of clashes. Clash Detection is the method of inspecting and identifying the various interferences which frequently occurs in coordinating process of 3D models created in different modern software’slikeRevitArchitectural ,RevitStructural & Revit MEP .In BIM, 3D models for different types such like Structural, Civil, and Architectural &MEP(Mechanical, Electrical and Plumbing). When combination of all these different types of models to create a complete BIM model there will be chances of clash between these elements. In clash detection test it detects the conflicts between different elements within 3D Building Information Model before actually construction starts, and therefore time optimization intheconstructionschedule, reducecostsand change orders. By using clash detection application in AEC industry increase the productivity of design and construction project. There are 3 main types of clashes 1. Hard clash: This type of clash occurs with two objects are takingupthe same space. Such like pipes passing through walls, lower ceiling light. This type of information is entered in the BIM modeling objects and hard clash provides the detection based on the geometrical as well as on semantic and rule- based algorithms. 2. Soft Clash/Clearance Clash Soft clash detects clashes which occur when the object needs more positivespatial orgeometrictolerances,spaces and buffers within their buffer zone for improved accessibility, insulation, maintenance and safety. For example, an air conditioning component may require certain clearances to allow for maintenance, access or safety that steel beam would negate. 3. 4D/Workflow Clash: This type of clash might involve the scheduling of contractors, the delivery of equipment i.e. cranes, bulldozers and materials, and general timeline conflicts. For example, work crews arriving when there is no equipment on site[4]. Since these objects are frequently scheduled as temporary, demolished, or other schedule so link them for clash detection to make sure they do not affect to project. 3.1 Need Of Clash Detection In traditional method organizations are the prepares activities for the execution stage as establishing contracts with contractors, buying materials, ensuring a good
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1786 coordination and assembly order of the different systems of a project. The most clashes are recognized when the contractor receives the design drawings and everyone is on-site and working. it is compare 2D designs to each other to find conflict clashes between the specialty designs. Because the specialty contributors i.e. structural engineers , MEP engineers etc. develop their designs separately, so when comparing these designs on different drawings is a process easily overlook clashes. The contractors require to see that the detailing of structural elements, plumbing, electrical lines, attachment and other component is done well. If there issomemistakeinofthese clashes result change orders then these effects on cause delay in project, design modifications, materials costs and budget overruns. Using BIM and the Clash Detection application enables potential problems to be identified early in the design phase and resolved before construction begins with more effective. 4. SOFTWARE USE FOR CLASH DETECTION There are several companies who offer clash detection software for the AEC industry. Following are some software's which is use for clash detection in BIM 1. Revit Revit is database structure and object definition modeling, is a effective modeling software the preferable work practice is of course when all the modeling is performed internally within Revit .In order to satisfy the specific needs of the diverse types of specialist for Revit, Autodesk distributed the product into three types – Revit Architecture, Revit Structure and Revit MEP. Revit software gives clash detection abilities where objects clashes with each other are highlighted for improvement. This capability is however, limited in that it does not develop reports, trace Clashes, Status Clashes ,Set Rules, Custom Clash Test, Clearance Tests, Time Based Clashing or track changes[5] 2. Bentley Navigator Bentley Clash Resolution allows user to identify sets of business or graphical elements and to detect geometrical clashes between these object element sets. The user can after that interactively and graphically review these clashes, mark up particular clashes, and allocate them for action. Clash results can be grouped, marked up and exported to a GPS system or Excel spread sheet. [7] 3. Solibri Model Checker Solibri Model Checker(SMC)softwarefindspotential faults before actual work start on site . It is advanced clash detection tool which is consisting BIM and accessibility compliance, deficiency detection, model comparisons and full information take off. The checking of Solibri Model Checker is done on the basis of rules grouped into related “rule sets”. This can be viewed as “design spell checking”. One of most noticeable advantages of Solibri Model Checker is to be viewed in the original BIM authoring application, permitting them to be fixed more easily and quickly [1]. By using Solibri Model Checker BIM stakeholders can manage costs, delivery timings and maintenance work.[7] 4. Autodesk Navisworks The Autodesk Navisworks products helps architecture, engineering, and construction teams to develop better control over the outcome of their projects. With Navisworks solutions, detailed design models can be combined and reviewed by all project stakeholders, serving users to benefit from thecompetitiveadvantagesof building information modeling (BIM) workflows. The Autodesk Navisworks software provides a Clash Detection module that checks BIM model and showsanyareas where items interfere, or “clash”, with each other. This BIM tool allow to set up the rules, Identify clashes ,Generate Reports, Trace Clashes, StatusClashes,ManageClashes,Set Rules ,Custom Clash Test, Clearance Tests ,Time Based Clashing. The Autodesk Navisworks software family offers three products(Autodesk Navisworks Manage, Autodesk Navisworks Simulate, Autodesk Navisworks Freedom) to provide project stakeholders with the right tools to help collaborate, coordinate, and communicatemore effectively. 5. METHODOLOGY The methodology involved collecting three model files of type “.rvt” (Autodesk Revit 2016) for the three models i.e. architectural and structural and MEP model. Three separate clash tests were conducted: 1) Architectural Model versus Structural Model (ARVs ST), 2) Architectural Model versus MEP Model, (AR Vs MEP) 3) Structural Model versus MEP (ST Vs MEP). The software was set to detect only hard clashes, with a tolerance of 0.0 mm. There are many BIM software
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1787 available in market which is useful for design and construction professionals to increase the productivity of the project, but in this case study software used for clash detection process is Autodesk Navisworks Manage 2016 etc. Autodesk Navisworks Manage greatest strength is clash detection. Due to this software detecting collisions during design, in real time, gives the BIM stakeholder a very efficient method to improve coordination among multiple building systems and ultimately avoid costly remedies after drawing completion and during Construction phase. Following are the steps for clash detection process. 1. The first step in this case study is to import all the Revit 2016 files i.e. MEP, structural and architectural files into Navisworks which is use in clash detection process .For clash detection process in Navisworks, it is required to import 3D Revit files into Navisworks or export files from Revit to Navisworks. 2. In the next step in clash detection process converts all the recently imported rvt files into Navisworks file format that is .nwf file format which is shown in Figure no 1 Fig.1 Converting Revit file into NWC format 3. Once all rvt files are transformed into nwf file format we can be simply opened in Navisworks software and then clash tests carry out by using rvt files. 4. For performing clash tests in Navisworkssoftwarepress the ‘Clash Detective’ tool. 5. After that we can simply click on to ‘Select’ tab that is located within clash detective tool inNavisworkssoftware. 6. Next step is click on ‘Select’ tab then two different columns will appear on computer screensoselectdifferent model elements which have the chances of conflictingwith each other which is shown in figure no 2. For example structural element can interfere with MEP element, so in one column we should select ‘structural element’ and in other column we should chose ‘MEP element’ and then simply click on ‘OK’ to run clash test. Fig 2. Clash detection process by Navisworks 7. After the clashes between structural element and MEP element can be easily recognized. After that for inspection its results, we must go to Results tab. 8. Autodesk Navisworks automatically gives a status to each clash for future use .So after that the Clash Detective tool that keeps on updating the status of the clashes after they are identified and are listed within Results tab which is shown fig 3
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1788 Fig 3 Clash Detective showing the results tab 9. Further, for creating report of clash test click on Report tab and creating report on .XML file format which is shown in fig 4 and fig 5 Fig 4 Clash Detective showing the report tab Fig 5 : Clash report generated by Navisworks 10. Clashes can be resolved by changing position of particular element i.e. figure no 8 shown that clash can be resolved by changing slope of pipe. Fig.6 Clash between pipe (Green) and Structural Beam (Red)
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1789 Fig 7.pipe position before clash resolving Fig 8 .Resolving clash between pipe and beam by Changing slope of pipe 6. CONCLUSION 1. Building Information Modeling (BIM) is rapidly growing within the AEC industry where its current implementation shows great effects on projects in terms of performance, time and cost. 2. In Indian construction industry is not applying the true potential of BIM tools. Indian AEC industry is not aware about BIM technology and its capacity and they are unskilled BIM users. 3.Using Clash detection in this case study instead of traditional method detects the conflictsin3DModel before actually construction starts of building so that it is useful for to decrease coordination errors, human errors so that results in high level of accuracy of models. So this will be avoiding re-work on jobsite. 4. Autodesk Navisworks makes the clashdetectionprocess faster and easier along with completely reducing thescope of human errors during its execution. Design clashes that occur between building elements are successfully identified by Navisworks andtheyaretimelysolved.Hence complete elimination of design errors, optimize time and cost is very important for AEC industry before actual construction starts on jobsite. 5. Hence, implementation of clash detection tool is very important for error-free construction project helps to optimize time in the construction schedule and minimize the overall cost of project at the construction stage REFERENCES 1. W. Guangbin and Wei L, "Exploring the High- efficiency Clash Detection between Architecture and Structure", International Conference on Information Management and Engineering, Singapore,2011. 2. McGraw-Hill Construction. Smart Market Report: The business value of BIM for construction in Major Global markets, 2014. 3. A. Sawhney ., “State of BIM adoption and outlook in India”, RICS school of built environment, Amity University, May 2014. 4. G. Bhamre , A. Patil and S. Pataskar. ,“Cost and Time Optimization for ConstructionofResidential Building by Clash detection in Building Information Model(BIM)”, International Research Journal of Engineering and Technology (IRJET), Jan 2017,Volume: 04, Issue:01, pp:550-553. 5. N.Mistry and H.Rathod, ''Softwares for Building Information Modeling (BIM) Project Management and Controlling'', International Journal of Scientific Research & Development, 2014,Vol. 2, Issue 10, ISSN : 2321-0613. 6. E. Berdeja.,"Conflict analysis in a BIM based design”. 7. Websites: www.solibri.com, www.vicosoftware.com, www.bentley.com
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 03 | Mar -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1790 BIOGRAPHIES Swapnesh. P. Raut received his BE degree in civil engineering from shivaji University (Maharashtra) in 2015, pursuing the M.Tech degree in Construction Management from Government College of Engineering, Karad, Maharashtra. His research interest is Building Information Modeling. Shriniwas Valunjkar received his PhD degree in civil engineering in 2000, the M.Tech degree in engineering control from Hydraulics & Water Resources Engineering, Housing & Town Planning, BE degree in civil engineering.