2. Agder Energi
Major hydropower producer in Norway
Annual production: 7,800 GWh 6% of total Norwegian production
1,700 MW installed capacity
47 power stations
Experience in interconnector projects:
NorGer and NorthConnect
Partner in CEDREN
(Centre for Environmental Design of Renewable Energy)
10. Norwegian Power System
30,000 MW – 96 % Hydropower
Hundreds of large reservoirs
Holds 50 % of European hydro reservoirs
1,400 MW interconnector to Norway-Germany 2018
12. Tyin
CEDREN Case Study 2030
Aurland
Potential: 20,000 MW
Hol
Sima
Nore
Mauranger/Oksla/Tysso
Tinnsjø
Shetland
Kvilldal
Jøsenf jorden
Orknøyene
Holen
Lysebotn
Tonstad
13. Flexibility to Europe within 2030?
10,000 MW new interconnector capacity
England
Scotland
Some interconnectors in combination with
pump capacity
England
Scotland
Interconnection with several countries
18. Political Channel
Norwegian White Paper – international perspectives
Economically profitable interconnectors should be built
No interconnector ownership restrictions
Offentlig
ISBN nr. 978-82-93150-12-1
FORNYBARUTBYGGING OG
MELLOMLANDSFORBINDELSER MOT
2020
Mars 2012
THEMA Rapport 2012-05
Oppdragsgivere: BKK, Lyse Energi, Agder Energi, Statkraft og Vattenfall
19. Market Channel
Market design that reveals flexibility value
Access to German balancing markets
Experience from DK4 (Norway-Denmark)
Access to German capacity markets
Primary
control
Secondary
control
Hourly
Intraday markets
reserve
Tertiary
control
30 s
5 min
15 min
TSO reserve contracts
1 hour
>1-2 hours
Activation
/ duration
Participant-to participant trading
20. Physical Channel
Two Interconnectors Norway - Germany
NORD.LINK
Interconnector and pump storage
Business models promoting
investments
Long term contracts