PRODUCTIVITY IMPROVEMENT THROUGH LEAN DEPLOYMENT &
WORK STUDY METHODS
Prathamesh P. Kulkarni1
, Sagar S. Kshire2
, Kailas V. Chandratre3
1, 2
Student (Final Year), 3
Associate Professor & Head of The Department, Department of Mechanical Engineering, GES’s
R.H.S. COE, Nashik, Maharashtra, India
Abstract
The objective of this paper is to present an overview on a new combined methodology for the efficient improvement in productivity
with the help of various Work Study Methods associated with Lean Manufacturing Principles & Tools. Lean manufacturing tools are
one of the most influential & most effective methodologies for eliminating wastes (MUDA), controlling quality, and improving overall
performance of any machine, system or process in any industry with the complete assurance of large annual profit margins. This
prescriptive paper proposes genuine solutions & concepts for implementing Work Study Methods and deploying associated lean
manufacturing tools in any enterprise or industry, covering the technical, engineering, and manufacturing aspects as well as the
business etiquette affairs. Lean Manufacturing together with Work Study Methods, being the most sophisticated & vast area of studies
has a huge scope for implementation & deployment of their very own concepts.
Keywords: 5S, Wastes (Muda), Time & Method Study, Setup Time Reduction (SUR), Standardized Work (SDW).
----------------------------------------------------------------------***------------------------------------------------------------------------
1. INTRODUCTION
Productivity has been generally defined as the ratio of an
extent of output to the unit of all of the resources used to
produce this output. Productivity usually deviates from
production. Production concerns with an increment in output
over a given span of time; productivity is concerned with the
ratio of output to an input. Putting in another way, improving
productivity has to do with how effectively people combine
different resources to manufacture parts and services others
dream to purchase. With the correct choices, improved
production, higher values and elevated incomes can be
accomplished for every hour worked. [1]
With rapid increase in demand of production, manufacturing
industries need to increase their potentials in production &
effectiveness to compete against their competitors. At the
same time, the production process has to be ready with the
ability to have abated costs with higher proficiency. Hence the
route to simplify the problem regarding the production is of
paramount importance. There are many ways i.e. Standardize
Work (SDW), Setup Reduction (SUR), Cycle Time
Reduction, Waste Elimination, etc. to solve the problems
concerning & governing productivity.
Considering the inclination towards a customer-focused
environment while facing fierce juxtapositions, majority of
manufacturers are implementing Work Study Methods along
with lean manufacturing tools to help eliminate wastes and
increase proficiencies rather than depending on conventional
processes and procedures [8]. According to many researchers,
using Lean Tools is the best way to improve productivity by
eliminating or reducing time consuming actions which
generally do not contribute in actual production. It is a way by
which one can reduce the cost of manufacturing & increase
productivity, which also increases annual profitability of the
industry. [2]
1.1 Role of Lean Tools in Improving Productivity
The basic definition of Lean Manufacturing can be stated as, a
perspective to manufacturing that searches for an opportunity
to reduce the operation time of processes, increase
maneuverability, and improve the corresponding attributes.
The primary concept behind Lean manufacturing is optimizing
customer significance while minimizing wastes, thereby
achieving manufacturing excellence through the creation of
more value with fewer or absolutely no capital investments.
[4]
Specific set of tools used in/for Lean Manufacturing, which
comprises together a complete methodology and which are
interdependent on each other forming a sophisticated yet
effective system are knows as Lean Tools. They play vital role
in any productivity improvement event as they have a very
high rate of success & also long lasting improved effect.
1.2 Role of Work Study in Improving Productivity
Work Study is the systematic methodology of carrying out
different yet related activities such as to improve the efficient
use of resources and to set up standards of performance &
quality for the activities to be carried out.
IJRET: International Journal of Research in Engineering and Technology
_______________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @
LEAN
TOOLS
Bottle
neck
Analysis
Wastes
(Muda)
5SStandard
Work
Setup
Reduction
In simple language, it may be defined as the analysis of a job
for the sheer purpose of finding the subsequent method of
doing it and also determining the required standard time to
perform it by the selected or given method. [9]
Work Study generally is classified in two areas: Method study
(Motion study) and Time study (Work measurement).
2. LEAN TOOLS
Lean tools have not been derived or proposed in one single
day. They have been derived from the r
people throughout the history. As they are why very complex
& interdependent on each other and one can find similarities
in one another.
Fig -1: Critical Lean Tools
Currently in practice, there are approximately 25 Lean Tools,
out of which, these five tools are considered to be the most
critical Lean Tools of all, as shown in above figure
2.1 Bottleneck Analysis
A point of concourse in a machine or system that
work load gathers at a point in the system
that specific point can hope to maintain them. The
fetched about by the bottleneck often make
longer overall cycle time. By definition, a bottleneck is a
phenomenon where the competency of a complete system or
line is restricted or limited by a single or limited number of
components or resources & analysis of such event is called as
Bottleneck Analysis.
Hence, Bottleneck Analysis is nothing but the identifica
which part/machine of the manufacturing process/line limits
the overall output and focuses on improvement the
performance of that part/machine of the process/line
International Journal of Research in Engineering and Technology eISSN: 2319
_______________________________________________________________________________________
2014, Available @ http://www.ijret.org
Wastes
(Muda)
In simple language, it may be defined as the analysis of a job
for the sheer purpose of finding the subsequent method of
doing it and also determining the required standard time to
[9]
two areas: Method study
(Motion study) and Time study (Work measurement).
Lean tools have not been derived or proposed in one single
day. They have been derived from the research of many
people throughout the history. As they are why very complex
& interdependent on each other and one can find similarities
Critical Lean Tools
Currently in practice, there are approximately 25 Lean Tools,
out of which, these five tools are considered to be the most
in above figure. [8]
A point of concourse in a machine or system that arises when
in the system more hastily than
them. The intricacies
make a queue and a
longer overall cycle time. By definition, a bottleneck is a
nomenon where the competency of a complete system or
limited by a single or limited number of
components or resources & analysis of such event is called as
Bottleneck Analysis is nothing but the identification of
which part/machine of the manufacturing process/line limits
the overall output and focuses on improvement the
performance of that part/machine of the process/line. [5]
Bottleneck Analysis is usually done along with the Time
Study Method. The system
be done is first selected. Then in the form of ‘Daily Analysis’,
‘Minute to Minute Analysis; or ‘Macro Second Study
Analysis’ the entire process is carried out along with the
guidance of Time Study Methods.
An example of Minute to Minute Bottleneck Analysis is as
shown in the figure below
Fig -2: Example of Bottleneck Analysis Sheet
2.2 Wastes (MUDA)
Anything in the manufacturing process that
to the product from the customer
Waste. In simple Language, It is nothing but any process for
which the customer does not pay the company.
There are 7 most Deadly Wastes in common
Fig -3: Seven
1.24 To 1.26 2.00
1.26 To 1.30 4.00
1.30 To 1.45
1.45 To 1.50 10.00
1.50 To 3.09
3.09 To 3.30 21.00
Down Time: 175Total Time: 510.0
Run time = 335 minutes (Total time - Down time )
Down Time (Min)
7.00 To 7.34 34.00
7.34 To 7.44 10.00
7.44 To 7.51 7.00
7.51 To 8.10 19.00
8.10 To 8.19 9.00
8.19 To 8.27
8.27 To 8.32 5.00
Time (Min)
eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
430
Bottleneck Analysis is usually done along with the Time
Study Method. The system on which the analysis is required to
done is first selected. Then in the form of ‘Daily Analysis’,
‘Minute to Minute Analysis; or ‘Macro Second Study
Analysis’ the entire process is carried out along with the
guidance of Time Study Methods.
of Minute to Minute Bottleneck Analysis is as
Example of Bottleneck Analysis Sheet
Anything in the manufacturing process that does not add value
to the product from the customer’s perspective is known as
. In simple Language, It is nothing but any process for
which the customer does not pay the company.
There are 7 most Deadly Wastes in common –
Seven Deadly Wastes
Down Time: 175
Run time = 335 minutes (Total time - Down time )
Operator Away from machine, m/c Stopped
263 no's produced
M/c Stopped, Shift Change
Tool Change
Operator Away from machine, m/c Stopped
Tea break
Down Time (Min)
27 no's produced
Machine Stopped, Point problem
Single job produced, Lab testing for quality
Power Loss
Operator Absent, M/c stopped due to power loss
Machine Setting and Parameters Checking
Remark
Operator Absent
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 431
1. Transportation - The unnecessary movements of
operator, products or components from one place to
another result in this waste. Unnecessary transport more
commonly occurs together with product damages, lost
parts and systems, which are related with movements. [3]
2. Inventory - Inventory is the quantity of materials in
stores, which are required to manufacture a job. When
they are not used, they take up valuable storage space,
may become useless, which cannot be used for more
important goods. [3]
3. Motion - This waste comprises of all unnecessary
movements occur when operator is moving around his
work area and as a result of this; his time & efforts are
wasted. All kinds of unnecessary motion may be caused
by improper working standard practices, un-optimized
process design or work space layout. [3]
4. Waiting - If operators, machine, system or materials of
the production process are delayed by any reason,
production time is wasted, the productivity is decreased &
the cost of production will be increased.
5. Over Processing - It can also mean manufacturing the
products of a larger quality than required. This can also be
result of not checking what the customers’ real
requirements are. [3]
6. Over Production - It arises when the manufacturer is
producing more products than the customer really asks
for. This is the worst kind of waste, as it generally creates
other kinds of wastes. It increases rework factor, material
storage, processing, holding & waiting, as well as
transportation & unnecessary motion. [3]
7. Defects (Rework, Scrap) - Rework is required when
products and components are defective or damaged.
Defects are caused by bad manufacturing processes
(caused by human or machine errors). In worst case
scenario the items have to be discarded.
In these 7 wastes, ‘Over Production’ & ‘Inventory’ are
observed to be very similar to one another & hence, in modern
Lean Methodology, ‘Inventory’ is often replaced by
‘Inspection’.
Also, one more waste is being added to these 7 deadly wastes
as this waste is also observed to be of great importance, and
that is ‘Unutilized Skill’.
2.3 5S
An established methodology procreating in Japan that, when
implemented, mitigates the waste of resources and work area
in spite of increment in manufacturing & operational
proficiency. The 5S elements when translated in English are
Sort, Set-in-Order, Shine, Standardize & Sustain and are
applied in various industries to achieve lean manufacturing &
to ultimately improve productivity. [5]
Idea of 5S can be explained by following 5 Steps -
• Sort: Completely Sort out & classify that which item is
required and/or not required in the work area.
• Set in Order: Arrange items in required order that are
important so that they are ready to find & easy to use.
• Shine: Clean the work area, tools, machine &
equipments on a continuous basis in order to identify
defects& maintain standards.
• Standardize: Ensure standard & uniform procedures
and methods throughout the operation to promote
changeover.
• Sustain: Stay to the regulations to maintain the
standard & continue to improve every day. [5][6]
2.4 Standardized Work (SDW)
Standardized work is a collection and implementation of the
best practices known to that point. It includes what is
mandatory to begin the procedure and the completed state of
the same. Standard Work is the sequential method for defining
the best practices and ensuring that every operator is strictly
following them to endow the value to the customers. Because
improvements in safety, quality, productivity & profitability
will arise from time to time & the standardized work is to be
updated via work instructions document, training, and
practice. These are the methodologies that improve quality,
safety, productivity & profitability.
Basically, standardized work consists of four elements:
• Takt time, which is the rate at which the products
must be manufactured in order to meet customer
demand on time.
• The accurate work sequence in which the operator
performs tasks within takt time.
• The corresponding inventory, including jobs in
machines, required to maintain the process operation
smoothly.
• The dexterity of the operator & the maneuverability
of the machine or system.
2.4.1 Steps Involved in Standardized Work
1. Identify and define the best system that bestows a quality
result, consistently.
2. Document the steps for performing the best practice, and
make it visual using combination of pictures and text.
3. Place it at each work station where this process is being
performed by the operator.
4. Train the operators to do the tasks as defined in the
Standard Operating Procedure.
Standardized work adds regimentation to the abidance, an
element that is frequently neglected but essential for lean to
take foundation.
IJRET: International Journal of Research in Engineering and Technology
_______________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @
Select
Record
Examine
Develop
Install
Maintain
3. WORK STUDY METHODS
In order to understand the work study methods, we need to
understand the importance of method study and that of time
study. ‘Method study’ (sometimes also called Work Method
Design) is mostly used to improve the method of doing wor
When applied to existing products, method study aims to
allocate better methods of manufacturing the jobs that are safe,
effective, & economical, require mitigated human effort, and
need smaller make-ready time. The better method involves the
optimum use of best materials and appropriate manpower so
that work is performed in well-organized manner leading to
increased resource utilization, optimized quality and appeased
costs.
Fig -4: Work Study Methods
It can therefore be stated that through 'Method study' one can
have a systematic way of developing human resource
ascendancy, providing elevated machine and equipment use
and making economical use of raw materials. ‘Time study’,
however, provides the standard required time, that is the time
needed by worker to complete a job by the standard method.
By the application of method study and time study together
with Lean Tools, any industry can thus achieve greater output
at less cost and of better quality, and hence can easily achieve
higher productivity. [9]
3.1 Method Study (Work Method Design)
Fig -5: Method Study Procedure
METHOD STUDY
Scrutinizing a Product &
searching more proficient
methods to carry it.
TIME STUDY
Deciding the time required to
perform a job & its associative
precautions.
WORK
STUDY
International Journal of Research in Engineering and Technology eISSN: 2319
_______________________________________________________________________________________
2014, Available @ http://www.ijret.org
Record
Examine
In order to understand the work study methods, we need to
understand the importance of method study and that of time
study. ‘Method study’ (sometimes also called Work Method
Design) is mostly used to improve the method of doing work.
en applied to existing products, method study aims to
allocate better methods of manufacturing the jobs that are safe,
human effort, and
ready time. The better method involves the
best materials and appropriate manpower so
organized manner leading to
sed resource utilization, optimized quality and appeased
Work Study Methods
that through 'Method study' one can
have a systematic way of developing human resource
achine and equipment use,
economical use of raw materials. ‘Time study’,
time, that is the time
needed by worker to complete a job by the standard method.
By the application of method study and time study together
y can thus achieve greater output
at less cost and of better quality, and hence can easily achieve
(Work Method Design)
Method Study Procedure
As seen earlier, Method study
method of doing work, and for this reason method study is
sometimes called Work Method Design.
The following steps depict
study.
1. Select (the work to be studied).
2. Record (all relevant information
3. Examine (the recorded information).
4. Develop (an improved way of doing things).
5. Install (the new method as standard practice)
6. Maintain (the new standard proactive).
3.2 Time Study (Work Measurement)
Work measurement refers to the esti
for an activity that is the time specific for completing one job
by using the predicted method. Standard time can be defined
as the time utilized by an average experienced
for the job with provisions for delays beyond the operator’s
control.
A work has to be measured for the following reasons:
• To identify and eliminate
• To install standard times for performance
measurement.
• To measure performance against
• To set manufacturing &
Time study can be simply defined as a technique to estimate
the time to be allowed to a qualified and well
working at a normal pace to complete
specified method.
Fig -6: Time Study Procedure
TIME STUDY
Deciding the time required to
perform a job & its associative
precautions.
eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
432
s seen earlier, Method study focuses to achieve the better
method of doing work, and for this reason method study is
sometimes called Work Method Design.
pict the procedure for creating a method
(the work to be studied).
(all relevant information about that work).
(the recorded information).
(an improved way of doing things).
(the new method as standard practice)
(the new standard proactive).
3.2 Time Study (Work Measurement)
Work measurement refers to the estimation of standard time
for an activity that is the time specific for completing one job
method. Standard time can be defined
by an average experienced skillful operator
for the job with provisions for delays beyond the operator’s
A work has to be measured for the following reasons:
and eliminate missing or ineffective time.
standard times for performance & quality
measure performance against original expectations.
manufacturing & operating objectives.
Time study can be simply defined as a technique to estimate
the time to be allowed to a qualified and well-trained worker
working at a normal pace to complete a specified task by using
Time Study Procedure
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 433
4. SETUP TIME REDUCTION (SUR)
Setup is a set of activities to be prepared for the next part or
process, Whereas, Setup Time is the total elapsed time from
completion of the last good part from the previous setup to the
completion of the first good part from the new setup. Setup
Time Reduction or Change-over Time Reduction is defined as
the efficient reduction time to change from the last item of the
previous order to the first good item of the next order in order
to obtain increased productivity. [11]
Setup includes preparation, replacement, location and
adjustment activities. In setup reduction process, internal setup
activities require an inactive (shut down) process, meaning
that no jobs can be manufactured while the setup activity is
taking place & external setup activities may be done while the
machine is operational. By definition, all activities performed
while the machine is not producing parts are considered
internal activities. And, all the setup related activities that are
performed while the machine is producing good parts (either
the previous order or the new order) are considered external
activities. Incredible reductions in total setup time have been
realized simply by making internal activities external
activities. [10]
4.1 Need for Setup Time Reduction
Today’s manufacturing and business environments are
reaching a point that competition for survival and market share
is an obligation. Tracking the global economy will show that
being good is not sufficient, therefore every organization
really endeavor for transcendence if want to remain in the
competition.
Why Setup Reduction?
Simply -
“Equipment and the operator are occupied but
there is NO output”
Setup Time Reduction is one of the best methods to increase
efficiency of the overall plant and thereby improving the
profitability.
• Setup time reduction improves the equipment
availability, increasing the total capacity & results in:
– Better utilization of operator’s time.
– Better utilization of resources & capital cost.
– Reduced capital investment.
• Reduced setup time makes smaller batch sizes
possible, without the economic penalty, resulting in reduced:
– Overall lead times.
– Inventory & storage space needs.
– Reject rates.
Setup Reduction allows batch size reduction, which is critical
for continuous flow manufacturing & improves manufacturing
flexibility.
The following five-step approach to setup reduction may be
used to achieve efficient results –
Fig -7: Five Step Approach to SUR
5. SUMMARY
In summary, with the help of systematic study of all the
critical lean tools stated above along with efficient work study
methods, the required results of improving productivity can be
achieved in limited or very less resources in return.
In order to select target for the improvement, method study
can firstly be done to obtain accurate results about the system
which is crucial for defining the problem. After the
corresponding target has been selected, Bottleneck Analysis is
the best option to narrow down the area of problem. Once that
is done, advanced time study methods are to be implemented
to find out detailed problems present in the system.
Once the industry gets hold of the detailed problems, they can
be categorized in substantial groups in order to maintain their
integrity & so that, efficient solution on a particular problem
can easily be obtained. With Critical Lean tools stated above,
problems can be efficiently classified in corresponding area
and those tools can be applied one by one to get long lasting
results along with improved productivity as well as profit
margin.
IJRET: International Journal of Research in Engineering and Technology
_______________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @
CONCLUSIONS
From the above paper & Studies, it can be concluded that,
Critical lean tools when effectively combined with Work
Study Methods, a unique leaner system can be formed which
will be the universal solution for any type of industry having
any sort of problem regarding the productivity. If implemented
in proper order, 100% positive results are assured.
REFERENCES
[1]. Diane Galarneau and Cécile Dumas, About productivity
Spring 1993 (Vol. 5, No. 1) Article No. 5
[2]. W. Wiyaratn, and A. Watanapa, Improvement Plant
Layout Using Systematic Layout Planning (SLP) for Increased
Productivity, World Academy of Science, Engineering and
Technology, Volume - 48 (2010).
[3]. Khalil A. El-Namrouty, Mohammed S. AbuShaaban,
Seven wastes elimination targeted by lean manufacturing case
study “gaza strip manufacturing firms’’, International Journal
of Economics, Finance and Management Sciences (2013)
[4]. Ramunė Čiarnienė, Milita Vienažindien
Manufacturing: Theory and Practice,
Management (2012).
[5]. Michal Leporis and Zdenka Králová,
Approach To Production Line Bottleneck Analysis
International Conference in CYBERNETICS AND
INFORMATICS, February (2010).
[6]. Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda Erdinler,
Göksel Ulay, 5S activities and its application at a
company, African Journal of Biotechnology, ISSN 1684
© 2009 Academic Journals Vol. 8 (8), 20 April, 2009
[7]. Prof. S. B. Khedkar, Prof. R. D. Thakre, Prof. Y. V.
Mahantare, Mr. Ravi Gondne, Study of Implementing 5S
Techniques in Plastic Moulding, International Journal of
Modern Engineering Research(IJMER) Vol.2, Issue.5, Sep.
Oct. 2012,ISSN: 2249-6645.
[8]. David Mann, Creating Lean Culture, Volume I
[9]. Ralph M. Barnes, Motion and Time Study
1940.
[10]. Mr. Rahul.R.Joshi, Prof.G.R.Naik, Reduction in Setup
Time By SMED A Literature Review, International Journal of
Modern Engineering Research (IJMER) Vol.2, Issue.1, Jan
Feb 2012.
[11]. Patel Chintan Kumar, Set up Reduction
for productivity improvement of computer numerical control
(CNC) set up in manufacturing company
Mechanical Engineering Research, Vol. 5(8), November 2013.
BIOGRAPHIES
Prathamesh Pramod Kulkarni
Year in Bachelor of Mechanical Engineering
degree from GES’s R.H.S. C.O.E, Nashik,
under the affiliation of University of Pune,
Maharashtra, India.
International Journal of Research in Engineering and Technology eISSN: 2319
_______________________________________________________________________________________
2014, Available @ http://www.ijret.org
Studies, it can be concluded that,
Critical lean tools when effectively combined with Work
Study Methods, a unique leaner system can be formed which
will be the universal solution for any type of industry having
ty. If implemented
in proper order, 100% positive results are assured.
About productivity,
Improvement Plant
atic Layout Planning (SLP) for Increased
nce, Engineering and
Namrouty, Mohammed S. AbuShaaban,
Seven wastes elimination targeted by lean manufacturing case
, International Journal
of Economics, Finance and Management Sciences (2013).
, Milita Vienažindienė, Lean
, Economics And
rálová, A Simulation
Approach To Production Line Bottleneck Analysis,
International Conference in CYBERNETICS AND
Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda Erdinler,
5S activities and its application at a sample
, African Journal of Biotechnology, ISSN 1684–5315
© 2009 Academic Journals Vol. 8 (8), 20 April, 2009.
Prof. S. B. Khedkar, Prof. R. D. Thakre, Prof. Y. V.
Study of Implementing 5S
, International Journal of
Modern Engineering Research(IJMER) Vol.2, Issue.5, Sep.-
, Volume I. (Book).
Motion and Time Study, 2nd edition,
Reduction in Setup
, International Journal of
Modern Engineering Research (IJMER) Vol.2, Issue.1, Jan-
Set up Reduction – A perfect way
omputer numerical control
(CNC) set up in manufacturing company, Journal of
Mechanical Engineering Research, Vol. 5(8), November 2013.
Prathamesh Pramod Kulkarni, Pursuing Final
Year in Bachelor of Mechanical Engineering
R.H.S. C.O.E, Nashik,
under the affiliation of University of Pune,
Sagar Sunil Kshire
Bachelor of Mechanical Engineering degree
from GES’s R.H.S. C.O.E, Nashik, under the
affiliation of University of Pune, Maha
India.
Prof. Kailas V. Chandratre
Engineering from K.K.W. College of
Engineering, Nashik. (University of Pune).
M.E. in Mechanical Engineering from
Walchand College of Engineering, Sangli.
(Shivaji University) Ph.D. (Pursuing
of Pune.
eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
434
Sagar Sunil Kshire, Pursuing Final Year in
Bachelor of Mechanical Engineering degree
from GES’s R.H.S. C.O.E, Nashik, under the
affiliation of University of Pune, Maharashtra,
Prof. Kailas V. Chandratre, B.E. in Production
Engineering from K.K.W. College of
Engineering, Nashik. (University of Pune).
M.E. in Mechanical Engineering from
Walchand College of Engineering, Sangli.
Ph.D. (Pursuing) registered at University

More Related Content

What's hot

Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptseSAT Journals
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...IRJET Journal
 
Malabar cements
Malabar cementsMalabar cements
Malabar cementssarathpkd
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organizationAswii007
 
Modelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production PlantModelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production PlantIJAEMSJORNAL
 
Organisational Productivity
Organisational ProductivityOrganisational Productivity
Organisational ProductivityDavid Alman
 
8 relationship and comparison between in jit tqm and tpm a review
8 relationship and comparison between in jit  tqm and tpm  a review8 relationship and comparison between in jit  tqm and tpm  a review
8 relationship and comparison between in jit tqm and tpm a reviewprjpublications
 
Productivity Management Through TQM
Productivity Management Through TQMProductivity Management Through TQM
Productivity Management Through TQMShailesh Desai
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Alexander Decker
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET Journal
 
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...IJERA Editor
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET Journal
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality ManagementSameer Omles
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivityMd Nazir Ansari
 
Total Productive Maintenance: Need & Framework
Total Productive Maintenance: Need & FrameworkTotal Productive Maintenance: Need & Framework
Total Productive Maintenance: Need & FrameworkCarnegie Mellon University
 

What's hot (20)

Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm conceptsEnhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the application of tqm concepts
 
I04402058062
I04402058062I04402058062
I04402058062
 
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...IRJET-  	  Ethical Climates as a Moderator on the Relationship between Lean M...
IRJET- Ethical Climates as a Moderator on the Relationship between Lean M...
 
Malabar cements
Malabar cementsMalabar cements
Malabar cements
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organization
 
Modelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production PlantModelling Production Performance of Small Scale Production Plant
Modelling Production Performance of Small Scale Production Plant
 
Organisational Productivity
Organisational ProductivityOrganisational Productivity
Organisational Productivity
 
8 relationship and comparison between in jit tqm and tpm a review
8 relationship and comparison between in jit  tqm and tpm  a review8 relationship and comparison between in jit  tqm and tpm  a review
8 relationship and comparison between in jit tqm and tpm a review
 
Productivity Management Through TQM
Productivity Management Through TQMProductivity Management Through TQM
Productivity Management Through TQM
 
Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...Work study might be the paramount methodology to improve productivity in the ...
Work study might be the paramount methodology to improve productivity in the ...
 
Productivity
ProductivityProductivity
Productivity
 
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
IRJET- Evaluating the Performance of Plant by Overall Equipment Effectiveness...
 
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
 
Wcm 5
Wcm 5Wcm 5
Wcm 5
 
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing IndustryIRJET- Application of Continuous Improvement Process in Manufacturing Industry
IRJET- Application of Continuous Improvement Process in Manufacturing Industry
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality Management
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivity
 
Quality tip 10
Quality tip 10Quality tip 10
Quality tip 10
 
Total Productive Maintenance: Need & Framework
Total Productive Maintenance: Need & FrameworkTotal Productive Maintenance: Need & Framework
Total Productive Maintenance: Need & Framework
 
Productivity
ProductivityProductivity
Productivity
 

Viewers also liked

Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...eSAT Publishing House
 
Assessment of groundwater quality for irrigation use
Assessment of groundwater quality for irrigation useAssessment of groundwater quality for irrigation use
Assessment of groundwater quality for irrigation useeSAT Publishing House
 
Igbt based on vector control of induction motor drive
Igbt based on vector control of induction motor driveIgbt based on vector control of induction motor drive
Igbt based on vector control of induction motor driveeSAT Publishing House
 
Fpga implementation of image segmentation by using edge detection based on so...
Fpga implementation of image segmentation by using edge detection based on so...Fpga implementation of image segmentation by using edge detection based on so...
Fpga implementation of image segmentation by using edge detection based on so...eSAT Publishing House
 
Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...eSAT Publishing House
 
Quality of service parameter centric resource allocation for lte advanced
Quality of service parameter centric resource allocation for lte advancedQuality of service parameter centric resource allocation for lte advanced
Quality of service parameter centric resource allocation for lte advancedeSAT Publishing House
 
Survey of analysis and performance of ofdm signals in time and frequency disp...
Survey of analysis and performance of ofdm signals in time and frequency disp...Survey of analysis and performance of ofdm signals in time and frequency disp...
Survey of analysis and performance of ofdm signals in time and frequency disp...eSAT Publishing House
 
Tools description for product development process management in food industries
Tools description for product development process management in food industriesTools description for product development process management in food industries
Tools description for product development process management in food industrieseSAT Publishing House
 
Fuzzified pso for multiobjective economic load
Fuzzified pso for multiobjective economic loadFuzzified pso for multiobjective economic load
Fuzzified pso for multiobjective economic loadeSAT Publishing House
 
Process design features of a 5 tonnesday multi – stage, intermittent drainage...
Process design features of a 5 tonnesday multi – stage, intermittent drainage...Process design features of a 5 tonnesday multi – stage, intermittent drainage...
Process design features of a 5 tonnesday multi – stage, intermittent drainage...eSAT Publishing House
 
Performance analysis of dwdm based fiber optic communication with different m...
Performance analysis of dwdm based fiber optic communication with different m...Performance analysis of dwdm based fiber optic communication with different m...
Performance analysis of dwdm based fiber optic communication with different m...eSAT Publishing House
 
Application of artificial neural network for blast performance evaluation
Application of artificial neural network for blast performance evaluationApplication of artificial neural network for blast performance evaluation
Application of artificial neural network for blast performance evaluationeSAT Publishing House
 
Survey on software remodularization techniques
Survey on software remodularization techniquesSurvey on software remodularization techniques
Survey on software remodularization techniqueseSAT Publishing House
 
Power spectrum sequence analysis of rheumatic
Power spectrum sequence analysis of rheumaticPower spectrum sequence analysis of rheumatic
Power spectrum sequence analysis of rheumaticeSAT Publishing House
 
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...Screening of antibacterial and cytotoxic activity of extracts from epidermis ...
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...eSAT Publishing House
 
A review of various technologies and transmission modes for design and develo...
A review of various technologies and transmission modes for design and develo...A review of various technologies and transmission modes for design and develo...
A review of various technologies and transmission modes for design and develo...eSAT Publishing House
 
Performance improvement of bottleneck link in red vegas over heterogeneous ne...
Performance improvement of bottleneck link in red vegas over heterogeneous ne...Performance improvement of bottleneck link in red vegas over heterogeneous ne...
Performance improvement of bottleneck link in red vegas over heterogeneous ne...eSAT Publishing House
 
Effect of naoh mercerisation on the cross linking of
Effect of naoh mercerisation on the cross linking ofEffect of naoh mercerisation on the cross linking of
Effect of naoh mercerisation on the cross linking ofeSAT Publishing House
 
New optimization scheme for cooperative spectrum sensing taking different snr...
New optimization scheme for cooperative spectrum sensing taking different snr...New optimization scheme for cooperative spectrum sensing taking different snr...
New optimization scheme for cooperative spectrum sensing taking different snr...eSAT Publishing House
 

Viewers also liked (20)

Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...
 
Assessment of groundwater quality for irrigation use
Assessment of groundwater quality for irrigation useAssessment of groundwater quality for irrigation use
Assessment of groundwater quality for irrigation use
 
Igbt based on vector control of induction motor drive
Igbt based on vector control of induction motor driveIgbt based on vector control of induction motor drive
Igbt based on vector control of induction motor drive
 
Fpga implementation of image segmentation by using edge detection based on so...
Fpga implementation of image segmentation by using edge detection based on so...Fpga implementation of image segmentation by using edge detection based on so...
Fpga implementation of image segmentation by using edge detection based on so...
 
Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...
 
Quality of service parameter centric resource allocation for lte advanced
Quality of service parameter centric resource allocation for lte advancedQuality of service parameter centric resource allocation for lte advanced
Quality of service parameter centric resource allocation for lte advanced
 
Survey of analysis and performance of ofdm signals in time and frequency disp...
Survey of analysis and performance of ofdm signals in time and frequency disp...Survey of analysis and performance of ofdm signals in time and frequency disp...
Survey of analysis and performance of ofdm signals in time and frequency disp...
 
Tools description for product development process management in food industries
Tools description for product development process management in food industriesTools description for product development process management in food industries
Tools description for product development process management in food industries
 
Fuzzified pso for multiobjective economic load
Fuzzified pso for multiobjective economic loadFuzzified pso for multiobjective economic load
Fuzzified pso for multiobjective economic load
 
Process design features of a 5 tonnesday multi – stage, intermittent drainage...
Process design features of a 5 tonnesday multi – stage, intermittent drainage...Process design features of a 5 tonnesday multi – stage, intermittent drainage...
Process design features of a 5 tonnesday multi – stage, intermittent drainage...
 
Performance analysis of dwdm based fiber optic communication with different m...
Performance analysis of dwdm based fiber optic communication with different m...Performance analysis of dwdm based fiber optic communication with different m...
Performance analysis of dwdm based fiber optic communication with different m...
 
Application of artificial neural network for blast performance evaluation
Application of artificial neural network for blast performance evaluationApplication of artificial neural network for blast performance evaluation
Application of artificial neural network for blast performance evaluation
 
Survey on software remodularization techniques
Survey on software remodularization techniquesSurvey on software remodularization techniques
Survey on software remodularization techniques
 
Joined wing uav maneuverability
Joined wing uav maneuverabilityJoined wing uav maneuverability
Joined wing uav maneuverability
 
Power spectrum sequence analysis of rheumatic
Power spectrum sequence analysis of rheumaticPower spectrum sequence analysis of rheumatic
Power spectrum sequence analysis of rheumatic
 
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...Screening of antibacterial and cytotoxic activity of extracts from epidermis ...
Screening of antibacterial and cytotoxic activity of extracts from epidermis ...
 
A review of various technologies and transmission modes for design and develo...
A review of various technologies and transmission modes for design and develo...A review of various technologies and transmission modes for design and develo...
A review of various technologies and transmission modes for design and develo...
 
Performance improvement of bottleneck link in red vegas over heterogeneous ne...
Performance improvement of bottleneck link in red vegas over heterogeneous ne...Performance improvement of bottleneck link in red vegas over heterogeneous ne...
Performance improvement of bottleneck link in red vegas over heterogeneous ne...
 
Effect of naoh mercerisation on the cross linking of
Effect of naoh mercerisation on the cross linking ofEffect of naoh mercerisation on the cross linking of
Effect of naoh mercerisation on the cross linking of
 
New optimization scheme for cooperative spectrum sensing taking different snr...
New optimization scheme for cooperative spectrum sensing taking different snr...New optimization scheme for cooperative spectrum sensing taking different snr...
New optimization scheme for cooperative spectrum sensing taking different snr...
 

Similar to Productivity improvement through lean deployment &

IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET Journal
 
Productivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniquesProductivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniqueseSAT Publishing House
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
 
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...Anna Landers
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Studyjosy2108
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyIRJET Journal
 
Productivity Improvement by Applying DILO (Time and Motion) and Lean Principles
Productivity Improvement by Applying DILO (Time and Motion) and Lean PrinciplesProductivity Improvement by Applying DILO (Time and Motion) and Lean Principles
Productivity Improvement by Applying DILO (Time and Motion) and Lean PrinciplesIJERA Editor
 
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...IAEME Publication
 
KAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing TechniqueKAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing Techniquevivatechijri
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...viveksangwan007
 
J0371055062
J0371055062J0371055062
J0371055062theijes
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...ijsrd.com
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent EngineeringBipinKumarJha1
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 

Similar to Productivity improvement through lean deployment & (20)

IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
IRJET- Improving Productivity in a Mechanical Industry using Industrial Engin...
 
Productivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniquesProductivity improvement at assembly station using work study techniques
Productivity improvement at assembly station using work study techniques
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...Application Of Lean Manufacturing Tools And Techniques  A Case Study In A Man...
Application Of Lean Manufacturing Tools And Techniques A Case Study In A Man...
 
Industrial Engineering - Method Study
Industrial Engineering - Method StudyIndustrial Engineering - Method Study
Industrial Engineering - Method Study
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
Productivity Improvement by Applying DILO (Time and Motion) and Lean Principles
Productivity Improvement by Applying DILO (Time and Motion) and Lean PrinciplesProductivity Improvement by Applying DILO (Time and Motion) and Lean Principles
Productivity Improvement by Applying DILO (Time and Motion) and Lean Principles
 
H012535263
H012535263H012535263
H012535263
 
30120140502015
3012014050201530120140502015
30120140502015
 
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
OPTIMIZING TIME WITH INCREASING PRODUCTIVITY USING LEAN MANUFACTURING AND OVE...
 
KAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing TechniqueKAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing Technique
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
J0371055062
J0371055062J0371055062
J0371055062
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
Concurrent Engineering
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
I012536474
I012536474I012536474
I012536474
 
Lean System
Lean SystemLean System
Lean System
 
IJEBEA14-419
IJEBEA14-419IJEBEA14-419
IJEBEA14-419
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Productivity improvement through lean deployment &

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 429 PRODUCTIVITY IMPROVEMENT THROUGH LEAN DEPLOYMENT & WORK STUDY METHODS Prathamesh P. Kulkarni1 , Sagar S. Kshire2 , Kailas V. Chandratre3 1, 2 Student (Final Year), 3 Associate Professor & Head of The Department, Department of Mechanical Engineering, GES’s R.H.S. COE, Nashik, Maharashtra, India Abstract The objective of this paper is to present an overview on a new combined methodology for the efficient improvement in productivity with the help of various Work Study Methods associated with Lean Manufacturing Principles & Tools. Lean manufacturing tools are one of the most influential & most effective methodologies for eliminating wastes (MUDA), controlling quality, and improving overall performance of any machine, system or process in any industry with the complete assurance of large annual profit margins. This prescriptive paper proposes genuine solutions & concepts for implementing Work Study Methods and deploying associated lean manufacturing tools in any enterprise or industry, covering the technical, engineering, and manufacturing aspects as well as the business etiquette affairs. Lean Manufacturing together with Work Study Methods, being the most sophisticated & vast area of studies has a huge scope for implementation & deployment of their very own concepts. Keywords: 5S, Wastes (Muda), Time & Method Study, Setup Time Reduction (SUR), Standardized Work (SDW). ----------------------------------------------------------------------***------------------------------------------------------------------------ 1. INTRODUCTION Productivity has been generally defined as the ratio of an extent of output to the unit of all of the resources used to produce this output. Productivity usually deviates from production. Production concerns with an increment in output over a given span of time; productivity is concerned with the ratio of output to an input. Putting in another way, improving productivity has to do with how effectively people combine different resources to manufacture parts and services others dream to purchase. With the correct choices, improved production, higher values and elevated incomes can be accomplished for every hour worked. [1] With rapid increase in demand of production, manufacturing industries need to increase their potentials in production & effectiveness to compete against their competitors. At the same time, the production process has to be ready with the ability to have abated costs with higher proficiency. Hence the route to simplify the problem regarding the production is of paramount importance. There are many ways i.e. Standardize Work (SDW), Setup Reduction (SUR), Cycle Time Reduction, Waste Elimination, etc. to solve the problems concerning & governing productivity. Considering the inclination towards a customer-focused environment while facing fierce juxtapositions, majority of manufacturers are implementing Work Study Methods along with lean manufacturing tools to help eliminate wastes and increase proficiencies rather than depending on conventional processes and procedures [8]. According to many researchers, using Lean Tools is the best way to improve productivity by eliminating or reducing time consuming actions which generally do not contribute in actual production. It is a way by which one can reduce the cost of manufacturing & increase productivity, which also increases annual profitability of the industry. [2] 1.1 Role of Lean Tools in Improving Productivity The basic definition of Lean Manufacturing can be stated as, a perspective to manufacturing that searches for an opportunity to reduce the operation time of processes, increase maneuverability, and improve the corresponding attributes. The primary concept behind Lean manufacturing is optimizing customer significance while minimizing wastes, thereby achieving manufacturing excellence through the creation of more value with fewer or absolutely no capital investments. [4] Specific set of tools used in/for Lean Manufacturing, which comprises together a complete methodology and which are interdependent on each other forming a sophisticated yet effective system are knows as Lean Tools. They play vital role in any productivity improvement event as they have a very high rate of success & also long lasting improved effect. 1.2 Role of Work Study in Improving Productivity Work Study is the systematic methodology of carrying out different yet related activities such as to improve the efficient use of resources and to set up standards of performance & quality for the activities to be carried out.
  • 2. IJRET: International Journal of Research in Engineering and Technology _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ LEAN TOOLS Bottle neck Analysis Wastes (Muda) 5SStandard Work Setup Reduction In simple language, it may be defined as the analysis of a job for the sheer purpose of finding the subsequent method of doing it and also determining the required standard time to perform it by the selected or given method. [9] Work Study generally is classified in two areas: Method study (Motion study) and Time study (Work measurement). 2. LEAN TOOLS Lean tools have not been derived or proposed in one single day. They have been derived from the r people throughout the history. As they are why very complex & interdependent on each other and one can find similarities in one another. Fig -1: Critical Lean Tools Currently in practice, there are approximately 25 Lean Tools, out of which, these five tools are considered to be the most critical Lean Tools of all, as shown in above figure 2.1 Bottleneck Analysis A point of concourse in a machine or system that work load gathers at a point in the system that specific point can hope to maintain them. The fetched about by the bottleneck often make longer overall cycle time. By definition, a bottleneck is a phenomenon where the competency of a complete system or line is restricted or limited by a single or limited number of components or resources & analysis of such event is called as Bottleneck Analysis. Hence, Bottleneck Analysis is nothing but the identifica which part/machine of the manufacturing process/line limits the overall output and focuses on improvement the performance of that part/machine of the process/line International Journal of Research in Engineering and Technology eISSN: 2319 _______________________________________________________________________________________ 2014, Available @ http://www.ijret.org Wastes (Muda) In simple language, it may be defined as the analysis of a job for the sheer purpose of finding the subsequent method of doing it and also determining the required standard time to [9] two areas: Method study (Motion study) and Time study (Work measurement). Lean tools have not been derived or proposed in one single day. They have been derived from the research of many people throughout the history. As they are why very complex & interdependent on each other and one can find similarities Critical Lean Tools Currently in practice, there are approximately 25 Lean Tools, out of which, these five tools are considered to be the most in above figure. [8] A point of concourse in a machine or system that arises when in the system more hastily than them. The intricacies make a queue and a longer overall cycle time. By definition, a bottleneck is a nomenon where the competency of a complete system or limited by a single or limited number of components or resources & analysis of such event is called as Bottleneck Analysis is nothing but the identification of which part/machine of the manufacturing process/line limits the overall output and focuses on improvement the performance of that part/machine of the process/line. [5] Bottleneck Analysis is usually done along with the Time Study Method. The system be done is first selected. Then in the form of ‘Daily Analysis’, ‘Minute to Minute Analysis; or ‘Macro Second Study Analysis’ the entire process is carried out along with the guidance of Time Study Methods. An example of Minute to Minute Bottleneck Analysis is as shown in the figure below Fig -2: Example of Bottleneck Analysis Sheet 2.2 Wastes (MUDA) Anything in the manufacturing process that to the product from the customer Waste. In simple Language, It is nothing but any process for which the customer does not pay the company. There are 7 most Deadly Wastes in common Fig -3: Seven 1.24 To 1.26 2.00 1.26 To 1.30 4.00 1.30 To 1.45 1.45 To 1.50 10.00 1.50 To 3.09 3.09 To 3.30 21.00 Down Time: 175Total Time: 510.0 Run time = 335 minutes (Total time - Down time ) Down Time (Min) 7.00 To 7.34 34.00 7.34 To 7.44 10.00 7.44 To 7.51 7.00 7.51 To 8.10 19.00 8.10 To 8.19 9.00 8.19 To 8.27 8.27 To 8.32 5.00 Time (Min) eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ 430 Bottleneck Analysis is usually done along with the Time Study Method. The system on which the analysis is required to done is first selected. Then in the form of ‘Daily Analysis’, ‘Minute to Minute Analysis; or ‘Macro Second Study Analysis’ the entire process is carried out along with the guidance of Time Study Methods. of Minute to Minute Bottleneck Analysis is as Example of Bottleneck Analysis Sheet Anything in the manufacturing process that does not add value to the product from the customer’s perspective is known as . In simple Language, It is nothing but any process for which the customer does not pay the company. There are 7 most Deadly Wastes in common – Seven Deadly Wastes Down Time: 175 Run time = 335 minutes (Total time - Down time ) Operator Away from machine, m/c Stopped 263 no's produced M/c Stopped, Shift Change Tool Change Operator Away from machine, m/c Stopped Tea break Down Time (Min) 27 no's produced Machine Stopped, Point problem Single job produced, Lab testing for quality Power Loss Operator Absent, M/c stopped due to power loss Machine Setting and Parameters Checking Remark Operator Absent
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 431 1. Transportation - The unnecessary movements of operator, products or components from one place to another result in this waste. Unnecessary transport more commonly occurs together with product damages, lost parts and systems, which are related with movements. [3] 2. Inventory - Inventory is the quantity of materials in stores, which are required to manufacture a job. When they are not used, they take up valuable storage space, may become useless, which cannot be used for more important goods. [3] 3. Motion - This waste comprises of all unnecessary movements occur when operator is moving around his work area and as a result of this; his time & efforts are wasted. All kinds of unnecessary motion may be caused by improper working standard practices, un-optimized process design or work space layout. [3] 4. Waiting - If operators, machine, system or materials of the production process are delayed by any reason, production time is wasted, the productivity is decreased & the cost of production will be increased. 5. Over Processing - It can also mean manufacturing the products of a larger quality than required. This can also be result of not checking what the customers’ real requirements are. [3] 6. Over Production - It arises when the manufacturer is producing more products than the customer really asks for. This is the worst kind of waste, as it generally creates other kinds of wastes. It increases rework factor, material storage, processing, holding & waiting, as well as transportation & unnecessary motion. [3] 7. Defects (Rework, Scrap) - Rework is required when products and components are defective or damaged. Defects are caused by bad manufacturing processes (caused by human or machine errors). In worst case scenario the items have to be discarded. In these 7 wastes, ‘Over Production’ & ‘Inventory’ are observed to be very similar to one another & hence, in modern Lean Methodology, ‘Inventory’ is often replaced by ‘Inspection’. Also, one more waste is being added to these 7 deadly wastes as this waste is also observed to be of great importance, and that is ‘Unutilized Skill’. 2.3 5S An established methodology procreating in Japan that, when implemented, mitigates the waste of resources and work area in spite of increment in manufacturing & operational proficiency. The 5S elements when translated in English are Sort, Set-in-Order, Shine, Standardize & Sustain and are applied in various industries to achieve lean manufacturing & to ultimately improve productivity. [5] Idea of 5S can be explained by following 5 Steps - • Sort: Completely Sort out & classify that which item is required and/or not required in the work area. • Set in Order: Arrange items in required order that are important so that they are ready to find & easy to use. • Shine: Clean the work area, tools, machine & equipments on a continuous basis in order to identify defects& maintain standards. • Standardize: Ensure standard & uniform procedures and methods throughout the operation to promote changeover. • Sustain: Stay to the regulations to maintain the standard & continue to improve every day. [5][6] 2.4 Standardized Work (SDW) Standardized work is a collection and implementation of the best practices known to that point. It includes what is mandatory to begin the procedure and the completed state of the same. Standard Work is the sequential method for defining the best practices and ensuring that every operator is strictly following them to endow the value to the customers. Because improvements in safety, quality, productivity & profitability will arise from time to time & the standardized work is to be updated via work instructions document, training, and practice. These are the methodologies that improve quality, safety, productivity & profitability. Basically, standardized work consists of four elements: • Takt time, which is the rate at which the products must be manufactured in order to meet customer demand on time. • The accurate work sequence in which the operator performs tasks within takt time. • The corresponding inventory, including jobs in machines, required to maintain the process operation smoothly. • The dexterity of the operator & the maneuverability of the machine or system. 2.4.1 Steps Involved in Standardized Work 1. Identify and define the best system that bestows a quality result, consistently. 2. Document the steps for performing the best practice, and make it visual using combination of pictures and text. 3. Place it at each work station where this process is being performed by the operator. 4. Train the operators to do the tasks as defined in the Standard Operating Procedure. Standardized work adds regimentation to the abidance, an element that is frequently neglected but essential for lean to take foundation.
  • 4. IJRET: International Journal of Research in Engineering and Technology _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ Select Record Examine Develop Install Maintain 3. WORK STUDY METHODS In order to understand the work study methods, we need to understand the importance of method study and that of time study. ‘Method study’ (sometimes also called Work Method Design) is mostly used to improve the method of doing wor When applied to existing products, method study aims to allocate better methods of manufacturing the jobs that are safe, effective, & economical, require mitigated human effort, and need smaller make-ready time. The better method involves the optimum use of best materials and appropriate manpower so that work is performed in well-organized manner leading to increased resource utilization, optimized quality and appeased costs. Fig -4: Work Study Methods It can therefore be stated that through 'Method study' one can have a systematic way of developing human resource ascendancy, providing elevated machine and equipment use and making economical use of raw materials. ‘Time study’, however, provides the standard required time, that is the time needed by worker to complete a job by the standard method. By the application of method study and time study together with Lean Tools, any industry can thus achieve greater output at less cost and of better quality, and hence can easily achieve higher productivity. [9] 3.1 Method Study (Work Method Design) Fig -5: Method Study Procedure METHOD STUDY Scrutinizing a Product & searching more proficient methods to carry it. TIME STUDY Deciding the time required to perform a job & its associative precautions. WORK STUDY International Journal of Research in Engineering and Technology eISSN: 2319 _______________________________________________________________________________________ 2014, Available @ http://www.ijret.org Record Examine In order to understand the work study methods, we need to understand the importance of method study and that of time study. ‘Method study’ (sometimes also called Work Method Design) is mostly used to improve the method of doing work. en applied to existing products, method study aims to allocate better methods of manufacturing the jobs that are safe, human effort, and ready time. The better method involves the best materials and appropriate manpower so organized manner leading to sed resource utilization, optimized quality and appeased Work Study Methods that through 'Method study' one can have a systematic way of developing human resource achine and equipment use, economical use of raw materials. ‘Time study’, time, that is the time needed by worker to complete a job by the standard method. By the application of method study and time study together y can thus achieve greater output at less cost and of better quality, and hence can easily achieve (Work Method Design) Method Study Procedure As seen earlier, Method study method of doing work, and for this reason method study is sometimes called Work Method Design. The following steps depict study. 1. Select (the work to be studied). 2. Record (all relevant information 3. Examine (the recorded information). 4. Develop (an improved way of doing things). 5. Install (the new method as standard practice) 6. Maintain (the new standard proactive). 3.2 Time Study (Work Measurement) Work measurement refers to the esti for an activity that is the time specific for completing one job by using the predicted method. Standard time can be defined as the time utilized by an average experienced for the job with provisions for delays beyond the operator’s control. A work has to be measured for the following reasons: • To identify and eliminate • To install standard times for performance measurement. • To measure performance against • To set manufacturing & Time study can be simply defined as a technique to estimate the time to be allowed to a qualified and well working at a normal pace to complete specified method. Fig -6: Time Study Procedure TIME STUDY Deciding the time required to perform a job & its associative precautions. eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ 432 s seen earlier, Method study focuses to achieve the better method of doing work, and for this reason method study is sometimes called Work Method Design. pict the procedure for creating a method (the work to be studied). (all relevant information about that work). (the recorded information). (an improved way of doing things). (the new method as standard practice) (the new standard proactive). 3.2 Time Study (Work Measurement) Work measurement refers to the estimation of standard time for an activity that is the time specific for completing one job method. Standard time can be defined by an average experienced skillful operator for the job with provisions for delays beyond the operator’s A work has to be measured for the following reasons: and eliminate missing or ineffective time. standard times for performance & quality measure performance against original expectations. manufacturing & operating objectives. Time study can be simply defined as a technique to estimate the time to be allowed to a qualified and well-trained worker working at a normal pace to complete a specified task by using Time Study Procedure
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 433 4. SETUP TIME REDUCTION (SUR) Setup is a set of activities to be prepared for the next part or process, Whereas, Setup Time is the total elapsed time from completion of the last good part from the previous setup to the completion of the first good part from the new setup. Setup Time Reduction or Change-over Time Reduction is defined as the efficient reduction time to change from the last item of the previous order to the first good item of the next order in order to obtain increased productivity. [11] Setup includes preparation, replacement, location and adjustment activities. In setup reduction process, internal setup activities require an inactive (shut down) process, meaning that no jobs can be manufactured while the setup activity is taking place & external setup activities may be done while the machine is operational. By definition, all activities performed while the machine is not producing parts are considered internal activities. And, all the setup related activities that are performed while the machine is producing good parts (either the previous order or the new order) are considered external activities. Incredible reductions in total setup time have been realized simply by making internal activities external activities. [10] 4.1 Need for Setup Time Reduction Today’s manufacturing and business environments are reaching a point that competition for survival and market share is an obligation. Tracking the global economy will show that being good is not sufficient, therefore every organization really endeavor for transcendence if want to remain in the competition. Why Setup Reduction? Simply - “Equipment and the operator are occupied but there is NO output” Setup Time Reduction is one of the best methods to increase efficiency of the overall plant and thereby improving the profitability. • Setup time reduction improves the equipment availability, increasing the total capacity & results in: – Better utilization of operator’s time. – Better utilization of resources & capital cost. – Reduced capital investment. • Reduced setup time makes smaller batch sizes possible, without the economic penalty, resulting in reduced: – Overall lead times. – Inventory & storage space needs. – Reject rates. Setup Reduction allows batch size reduction, which is critical for continuous flow manufacturing & improves manufacturing flexibility. The following five-step approach to setup reduction may be used to achieve efficient results – Fig -7: Five Step Approach to SUR 5. SUMMARY In summary, with the help of systematic study of all the critical lean tools stated above along with efficient work study methods, the required results of improving productivity can be achieved in limited or very less resources in return. In order to select target for the improvement, method study can firstly be done to obtain accurate results about the system which is crucial for defining the problem. After the corresponding target has been selected, Bottleneck Analysis is the best option to narrow down the area of problem. Once that is done, advanced time study methods are to be implemented to find out detailed problems present in the system. Once the industry gets hold of the detailed problems, they can be categorized in substantial groups in order to maintain their integrity & so that, efficient solution on a particular problem can easily be obtained. With Critical Lean tools stated above, problems can be efficiently classified in corresponding area and those tools can be applied one by one to get long lasting results along with improved productivity as well as profit margin.
  • 6. IJRET: International Journal of Research in Engineering and Technology _______________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ CONCLUSIONS From the above paper & Studies, it can be concluded that, Critical lean tools when effectively combined with Work Study Methods, a unique leaner system can be formed which will be the universal solution for any type of industry having any sort of problem regarding the productivity. If implemented in proper order, 100% positive results are assured. REFERENCES [1]. Diane Galarneau and Cécile Dumas, About productivity Spring 1993 (Vol. 5, No. 1) Article No. 5 [2]. W. Wiyaratn, and A. Watanapa, Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity, World Academy of Science, Engineering and Technology, Volume - 48 (2010). [3]. Khalil A. El-Namrouty, Mohammed S. AbuShaaban, Seven wastes elimination targeted by lean manufacturing case study “gaza strip manufacturing firms’’, International Journal of Economics, Finance and Management Sciences (2013) [4]. Ramunė Čiarnienė, Milita Vienažindien Manufacturing: Theory and Practice, Management (2012). [5]. Michal Leporis and Zdenka Králová, Approach To Production Line Bottleneck Analysis International Conference in CYBERNETICS AND INFORMATICS, February (2010). [6]. Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda Erdinler, Göksel Ulay, 5S activities and its application at a company, African Journal of Biotechnology, ISSN 1684 © 2009 Academic Journals Vol. 8 (8), 20 April, 2009 [7]. Prof. S. B. Khedkar, Prof. R. D. Thakre, Prof. Y. V. Mahantare, Mr. Ravi Gondne, Study of Implementing 5S Techniques in Plastic Moulding, International Journal of Modern Engineering Research(IJMER) Vol.2, Issue.5, Sep. Oct. 2012,ISSN: 2249-6645. [8]. David Mann, Creating Lean Culture, Volume I [9]. Ralph M. Barnes, Motion and Time Study 1940. [10]. Mr. Rahul.R.Joshi, Prof.G.R.Naik, Reduction in Setup Time By SMED A Literature Review, International Journal of Modern Engineering Research (IJMER) Vol.2, Issue.1, Jan Feb 2012. [11]. Patel Chintan Kumar, Set up Reduction for productivity improvement of computer numerical control (CNC) set up in manufacturing company Mechanical Engineering Research, Vol. 5(8), November 2013. BIOGRAPHIES Prathamesh Pramod Kulkarni Year in Bachelor of Mechanical Engineering degree from GES’s R.H.S. C.O.E, Nashik, under the affiliation of University of Pune, Maharashtra, India. International Journal of Research in Engineering and Technology eISSN: 2319 _______________________________________________________________________________________ 2014, Available @ http://www.ijret.org Studies, it can be concluded that, Critical lean tools when effectively combined with Work Study Methods, a unique leaner system can be formed which will be the universal solution for any type of industry having ty. If implemented in proper order, 100% positive results are assured. About productivity, Improvement Plant atic Layout Planning (SLP) for Increased nce, Engineering and Namrouty, Mohammed S. AbuShaaban, Seven wastes elimination targeted by lean manufacturing case , International Journal of Economics, Finance and Management Sciences (2013). , Milita Vienažindienė, Lean , Economics And rálová, A Simulation Approach To Production Line Bottleneck Analysis, International Conference in CYBERNETICS AND Derya Sevim Korkut, Nevzat Cakıcıer, E.Seda Erdinler, 5S activities and its application at a sample , African Journal of Biotechnology, ISSN 1684–5315 © 2009 Academic Journals Vol. 8 (8), 20 April, 2009. Prof. S. B. Khedkar, Prof. R. D. Thakre, Prof. Y. V. Study of Implementing 5S , International Journal of Modern Engineering Research(IJMER) Vol.2, Issue.5, Sep.- , Volume I. (Book). Motion and Time Study, 2nd edition, Reduction in Setup , International Journal of Modern Engineering Research (IJMER) Vol.2, Issue.1, Jan- Set up Reduction – A perfect way omputer numerical control (CNC) set up in manufacturing company, Journal of Mechanical Engineering Research, Vol. 5(8), November 2013. Prathamesh Pramod Kulkarni, Pursuing Final Year in Bachelor of Mechanical Engineering R.H.S. C.O.E, Nashik, under the affiliation of University of Pune, Sagar Sunil Kshire Bachelor of Mechanical Engineering degree from GES’s R.H.S. C.O.E, Nashik, under the affiliation of University of Pune, Maha India. Prof. Kailas V. Chandratre Engineering from K.K.W. College of Engineering, Nashik. (University of Pune). M.E. in Mechanical Engineering from Walchand College of Engineering, Sangli. (Shivaji University) Ph.D. (Pursuing of Pune. eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ 434 Sagar Sunil Kshire, Pursuing Final Year in Bachelor of Mechanical Engineering degree from GES’s R.H.S. C.O.E, Nashik, under the affiliation of University of Pune, Maharashtra, Prof. Kailas V. Chandratre, B.E. in Production Engineering from K.K.W. College of Engineering, Nashik. (University of Pune). M.E. in Mechanical Engineering from Walchand College of Engineering, Sangli. Ph.D. (Pursuing) registered at University