SlideShare a Scribd company logo
1 of 7
Download to read offline
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
357
IMPACT OF THE GLOBAL FINANCIAL CRISIS ON AUSTRALIAN
CONSTRUCTION COMPANIES: A CASE STUDY
Ram Karthikeyan THANGARAJ*, Toong Khuan CHAN**
*(Cronin & Pain, Australia)
**(Faculty of Architecture Building and Planning, University of Melbourne, Australia)
ABSTRACT
This paper reports on the in depth financial analysis of four Australian firms that were
significantly affected during the period of global financial crisis (GFC) within the building and
construction supply chain from 2005 to 2010. These four firms were chosen from a study that
involved analysis of 43 publicly listed and large private companies within the sector to understand
the sectoral impact due to GFC. Financial ratios and Altman Z Score were used for the purpose of
the analysis. All the four firms reported negative earnings for the financial years 2008 to 2010. They
all grew rapidly during the boom years either organically or through acquisitions in overseas market.
These firms either went into receivership or buyouts, or liquidated a large portion of their assets to
pay off their short or long term liabilities. Low cost of debt, coupled with easy availability of finance,
was the trigger behind these firms’ rapid expansion. Fall in revenues, decrease in asset valuation and
rising interest expenses arising out of the financial crisis were the reasons behind these firms being
unable to sustain their pre-GFC growth. Guidelines for effective financial management of firms to
withstand future financial crises were developed.
Keywords: Financial Ratios, Construction, Global Financial Crisis, Australia, Financial Distress.
I.0 INTRODUCTION
Well over a decade of mismanagement of risk, low interest rates and lack of financial
regulation have been citied to be the factors that led to the cause of GFC in the US. The collapse of
Lehman Brothers in September 2008 started a series of panic selling and caused much distress to
many other financial institutions and markets across the world. Five years after this crisis, much of
INTERNATIONAL JOURNAL OF CIVIL ENGINEERING
AND TECHNOLOGY (IJCIET)
ISSN 0976 – 6308 (Print)
ISSN 0976 – 6316(Online)
Volume 5, Issue 3, March (2014), pp. 357-363
© IAEME: www.iaeme.com/ijciet.asp
Journal Impact Factor (2014): 7.9290 (Calculated by GISI)
www.jifactor.com
IJCIET
©IAEME
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
358
the western world is slowly on the path to recovery, but many European countries are still struggling
to manage their respective economies.
As the Australian share market was very much in line with the global economies, the S&P
ASX200 index fell from a peak of 6800 in late 2007 to 3100 in early 2009. Australian banks fared
much better, as their exposure to collateralized debt obligations (CDOs) was relatively small in
comparison with other countries. The housing market was also in a strong position. In 2007, non-
conforming loans in Australia accounted for about 1% of total loans, in comparison with 13% in the
US (Debelle, 2008). The Australian Federal government mitigated the effects of the economic
slowdown with a quick reduction in interest rates and AU$42 billion stimulus package.
1.1 Objectives and Scope
These developments provided the motivation to develop a broader understanding of the
effects of this recent financial crisis on the construction supply chain thorough a case study of four
Australian companies. An analysis focused on characterizing the impact of the GFC on the financial
performance of companies within four sectors of the industry: building material suppliers, building
contractors, property developers and Australian Real Estate Investment Trusts (A-REITs) have been
published previously (Thangaraj and Chan, 2012). This paper examines the business strategy leading
up to the GFC, the financial position of these four companies during this period, and reports on the
final outcome of their positions. The key points examined are the severity of the impact by means of
ratio analysis, changes in cost structure and financial distress. The findings will inform investors,
managers and construction professionals in devising strategies for prudent financial management and
for weathering future financial crises.
2.0 METHODOLOGY
The financial investigation involved an analysis of 43 companies selected based on the
criteria that included the availability of data and their representation within the four sub-sectors of
property development, material suppliers, building construction and A-REITS. The financial
performance of all selected companies was calculated over the 2006-10 period, both years inclusive.
Despite its many drawbacks, the most precise information on these companies can only be
determined by relying on audited financial statements (Langford et al. 1993). Four companies were
selected based on news reports of their financial distress or removal from the stock market: Centro
Properties Group, Valad Property Group, Raptis Group Limited and CEC Group Limited. Centro and
Valad were both stapled securities indicating exposure to both the investment trusts and the property
development companies while Raptis was a pure property development company. CEC represented
the building construction sub-sector. There were not material supplier firms that were found to be in
distress during this period.
3.0 PERFORMANCE ANALYSIS OF COMPANIES
In terms of revenue, property developers and A-REITs exhibited significant decline in
revenues in 2008 and 2009, and in the case of developers, continuing into 2010. The building
material sector exhibited a marginal contraction of 2.8% in 2009 followed by a further reduction of
nearly 7% in 2010. On the contrary, revenues for building contractors continued to increase, albeit by
only 1.6% in 2009 and 0.8% in 2010 despite the slump in building starts in late 2008. The nature of
the building construction business is that builders are not immediately affected by a downturn due to
continuing construction projects awarded a couple of years earlier. The launch of a number of
stimulus packages; bringing forward spending on large-scale infrastructure and additional spending
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
359
on new school buildings in late 2008 and early 2009 by the Australian government mitigated the
effects of the GFC on the local construction market.
3.1 Centro Properties Group
Centro Properties Group is a public listed trust that is involved in all aspects of retail ranging
from investments, management, development of retail properties and also syndicated fund
management. First established in 1985, the firm was restructured as a stapled security consisting of
one unit of Centro Properties Trust stapled to one share in Centro Properties Limited prior to listing.
The resulting entity was listed in the market in 1997. It grew aggressively from 2000, with operations
in the US commencing in 2003 through the Centro Watt joint jenture. Centro owned 810 shopping
centres of which 682 were in the US. In April 2007, it completed a US$5 billion acquisition of New
Plan Excel Realty Trust in the US. In May 2007, it acquired Gallileo Funds Managements Limited
and purchased the remaining 50% it didn’t already own in Centro Watt. Centro also purchased the
Warnbro Fair Shopping Centre in Western Australia in July 2007. By October 2007, Centro Retail
Trust was merged with Centro Shopping America Trust.
Fig 1.1: Centro Properties Group Share Price (2002-2011)
However, in December 2007, Centro’s share price collapsed drastically (Figure 1.1) after it
announced its inability in refinancing debt obligations of AU$3.9 billion. Investigation by ASIC
revealed that Centro had classified AU$1.1 billion of debt as non-current in its 2007 Annual report,
when they were in fact current liabilities (Klan & Condon, Centro failed to disclose AU$1bn of debt,
2007). In July 2008, it announced the sale of 29 shopping malls in the US, but failed to close the
US$872 million deal by October (Hoy, 2008). In July 2011, it sold 588 US shopping centres to
Blackstone Group Limited, US for AU$9.4 billion.
After a series of profitable years, the company has reported only losses from 2008 onwards.
The initial investor confidence and subsequent loss is reflected by the 74% increase in market
capitalization from 2005 to 2007 and a decline of 98% from 2007 to 2010. Net profit margin in 2006
was extraordinary at 74%. Two years later, in 2008, the firm was to incur a loss of AU$2.76 for
every dollar of sales! This was due to huge rise in expenses such as impairment of goodwill,
impairment of investments in joint ventures, and property revaluation totalling AU$1.078 billion and
financing costs adding another AU$411.185 million. This decrease in profitability has also affected
the firm’s Return on Average Asset (ROAA) from 11% and 7% in 2006 and 2007 to -14% and -18%
in 2008 and 2009, indicate the firm losing its efficiency in utilizing its assets for revenue generation.
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
360
Similarly, the Return on Average Equity (ROAE) of -58% and -241% in 2008 and 2009 marks the
drastic fall in operating efficiency in generating return to shareholders.
The current ratio of 2010 is 97% less than its 2005 value. This indicates that the firm’s current
liabilities have increased by 97% for 2010 in comparison with 2005. The reason is a high expansion
cost and drop in the value of assets as a result of GFC. Moreover Centro was holding majority of its
assets in the US, which was the epicenter of the GFC. The working capital turnover turning into
negative since 2007 indicates that the firm was lacking in funds for operations. The increase in debt
to equity ratio from 0.85 to 4.79 from 2005 to 2008 indicates the firm has been aggressively
financings its growth with debt. Subsequent year values are in negative signifying cost of debt has
significantly increased relative to its earnings. The P/E ratio of 2005 stood at 22.83, indicative of
investor’s willingness to pay $22.83 for $1 of its earnings. Whereas a negative value from 2008, is a
consequential of negative earnings. The low price of the shares indicates that investors foresee an
inferior earning potential for the firm.
Centro recorded 34% higher profit in 2006 in comparison with the industry average but
subsequently fell in line with the sector average. However, from 2008 the performance fell
drastically indicating that expenses were very high in comparison. After a number of executives were
found guilty for failing to disclose billions of dollars of short-term debt, the company was in the
process of being wound up at the end of 2011.
3.2 Valad Property Group
Valad Property Group, incorporated in January 1995 was listed in the ASX in 2002 as a
stapled security. Throughout its history it has expanded through acquisitions rather than organic
growth. In mid-2004, it acquired ICA Property Group specializing in non-residential property
development and fund management. Again from 2005 to 2007, it made a string of acquisitions
ranging from retail centres, office blocks, resorts, spa and residential properties. In 2006, it raised
AU$200 million for Valad Core Plus, an open ended wholesale investment fund. Despite the
property market downturn in 2008, Valad managed to raise about AU$3 billion of equity and debt
for its fund management business.
In 2007, it gained a foothold in Europe through an investment in Crownstone European
Properties Limited. It entered the US through a joint venture with Kemco, a US based REIT.
Increasing credit crunch, interest expenses and liabilities leading up to the GFC derailed the firm’s
growth eventually hurting its profitability. Loss of investor confidence started at the beginning of
2008. In April 2011, Valad announced an AU$806 million takeover bid, including AU$500 million
of its liabilities by Blackstone Real Estate Partners, US a subsidiary of Blackstone Private Equity,
US (Carter, 2011). The deal was closed in mid-2011, and Valad was subsequently delisted from the
ASX on 30 August 2011.
At its peak in 2007, Valad stood with a staggering market capitalization of AU$25 billion.
Compared to its 2005 market value this was a 153% growth. Most of its growth was heavily funded
by debt. Financial crisis factors such as increased cost of debt, reduced revenue and fall in property
valuation eventually lead to the downfall of the company. These factors will be evidenced with ratios
in the section below. The year on year growth in profitability has played an important role in
increasing its market capitalization. Profits had increased by 130% and 160% for the year 2007 and
2006. Whereas after the crisis, Net profit margin was at its lowest in 2009 financial year at -365%.
Similar trend is visible in its ROAE value, as the increase from 2005 to 2006 was 87%. The value
reported for 2009 is -116%. The profitability ratios indicate high growth followed by even higher fall
in profitability.
Current ratio values have remained above 1.0, especially the 2008 value of 2.27 indicates that
they had $2.27 worth of assets to cover every $1 of liability. This indicates that the firm was well
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
361
positioned in short term to cover for its liabilities. The low asset turnover values help in identifying
the firm’s strategy of high profit margins. Their debt ratio stands to support the firm as well
positioned to cover for its long term liabilities. The value has remained below 1.0 from 2005 to 2010.
Throughout the six year analysis period, the operating cash flow ratio reported a negative value of -
2.81 only for 2007. The cash flow statement for that year identified operating earnings to be
AU$117 million against an expense of AU$321 million. Two possible scenarios are (i) the firm was
spending much more in its operations than its earnings, or (ii) the firm had realised profits, but the
real cash was yet to come. The reason behind the failure of the firm is well captured when analyzing
revenue and interest coverage ratio in unison. The reported revenue for year 2010 and 2009 were
significantly lower at 25% and 54% of the 2008 earnings. And the interest coverage values for 2008
to 2010 are all negative. Based on both these values it can be identified that the company failure was
due to loss in revenue and rising interest expenses.
3.3 Raptis Group Limited
Raptis Group, a property developed based in the Gold Coast was listed in the stock market in
1986. The group has but dozens of towers across the Gold Coast including the Raptis Plaza shopping
centre and the iconic Chevron Renaissance high rise apartments. In 1993, the firm was placed under
administration due to a debt of AU$70 million (Klan, 2009) but with subsequent recovery of the
property market in Queensland the group was successfully turned around.
Since 2003, the firm’s market capitalization has increased drastically triggered by the
booming property market in the Gold Coast. The reprise seems to have been short lived. This growth
was heavily funded by debt. In late 2008, Capital Finance Australia placed Limdaning, a subsidiary,
under receivership for failing to pay its subcontractors (Smart Company, 2008). The group ceased
trading in the exchange in early 2009. The last annual report filing was for 2008 financial year.
The company’s profitability grew by 80% and 36% annually between 2005 and 2007. From
2003 to 2007, revenue has also been on steady rise except for a minor dip of 8% in 2006. It has
maintained an average ROAE of 40% for the years 2003 to 2007 possibly through a high leveraged
position. ROAA fluctuated between 2 to 4% for the analysis period of 2003 to 2007.
The firm has increased its dependence on debt substantially in the years leading up to the
GFC. This is evident from the Net Gearing value. During its last year of operation in 2008, its
gearing value was at its peak of 69.69. Highly leveraged firms are considered to be very risky
especially during a downturn as the firm has to service its debt irrespective of any fall in sales.
Current ratios pre 2006 financial year place the firm in a financially healthy position. As the 2005
value of 1.65 can be interpreted as the firm having $1.65 worth of assets for every $1 of its liability.
But the values of 2006 and thereafter signify that the firms liabilities was higher than its assets. The
rise in liability is further well documented through the leverage ratio. A value of below 1 is a most
preferable situation. The debt ratio from 2004 to 2008 has remained below 1, only by a very low
margin. The debt to equity ratio concretes the fact that debt funded growth was one of the major
reason for the firm to be facing receivership. The 0.92 value of debt to equity is a clear sign of a
financial trouble. For the year 2008 its total liability was about AU$900 million of which interest
bearing liability alone was close to 75%.
The difference in Raptis Group’s profitability and the developer sector is very huge. This
could arise from Raptis expenses being higher than the other firms operating in the sub sector. High
expense can be a resultant of soaring interest cost as identified above in the horizontal analysis. It is
established fact that downturn in an economy impacts revenue, which in turn lowers profitability.
Hence, Raptis maintaining lower profitability even during a booming economy has affected them to
the extent of failing on its payments to subcontractors during the crisis.
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
362
The highly leveraged nature of Raptis is evident from the difference in its debt ratio against
the sectors average. It can be summed up that debt funded growth has affected the firm significantly
during the crisis period.
3.4 CEC Group Limited
Established in 1977, CEC Group has evolved from a small civil construction company into a
vertically integrated public firm by 2008. Since its listing in 2004, the company has significantly
branched into construction and property development markets especially in and around North
Queensland. Its three main core business units were property development, construction and
materials. CEC Constructions, CEC Bitumen and Asphalt Services, CEC Property, CEC Remote
Solutions, Rapid Build, CEC Townsville and CEC Mt Isa were its subsidiary companies. These firms
undertook a multitude of works such as civil engineering contracts, property development, services
for mining and quarry operations, project management for its own group companies in remote
locations and modular building systems.
Coupled with the property development boom in Queensland and high positive sentiment in
the market, the firm had a steady rise in its share price pre-GFC. In 2008, the consolidated revenue
was AU$209 million. The aftermath of financial crisis such as credit crunch, fall in revenues, rising
interest expenses all together crippled the firm. The group announced a loss of AU$70 million, total
debts of AU$135 million and assets worth AU$93.5 million in December 2010. Following this
announcement, lenders demanded payments of its debt of about AU$63.5 million in May 2011.
Defaulting on the payment eventually placed the firm under receivership. The firm was removed
from the official list in the market with effect from the close of trading on Monday 29 August 2011.
During the 2007 market peak, the firm boosted a market capitalization of AU$141 million.
But after a series of loss reporting financial year, rising interest expenses and falling revenues had
decreased its market capitalization to a mere AU$4.7 million. The firm’s gross profitability has been
on a downscale from since 2005, sliding from 24% to -3% by 2010. This indicates that the firm was
losing money in its core operations and reason like fall in asset valuation have only added fuel in
driving the firm towards its present financial tragedy. In comparison with its ROAA, the ROAE
values are very high. This indicates that the firm was highly leveraged and will be expected to be hit
due to increased cost of debt during a downturn.
The current ratio of the firm has above 1.0 throughout the period of study indicating that the
firm was in a good position to cover for its short term liabilities. But the low quick ratio indicates
that the firm is highly depended on its inventory turnover to pay for its short term liabilities. Such a
model is faced with trouble during a downturn as there is a fall in revenue due to reduced spending.
This is evident as the revenue dropped by 50% from 2008 to 2010 financial reporting.
Very high revenue to equity of above 3.0, especially from 2008 to 2010 indicates that the firm equity
was very low and was funded largely by debt. This is further established by its high value of 4 for the
debt to equity ratio for 2009 and 2010. The firms high P/E ratio pre GFC period, indicates the
generally high investor confidence during those period. Since 2008 due to loss in profits, the P/E
ratio has turned negative. Interest coverage ratio clearly captures the firm’s inability to meet its
interest expenses, as the values after 2008 are all negative.
4.0 CONCLUSIONS
These four case studies have identified a number of factors that have led companies in the
building and construction industry to failure during the recent global financial crisis. The findings
confirm that property development companies utilized a larger proportion of debt to fund their
purchases of real estate. Financial ratio analyses have indicated that the industry was highly
International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN
0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME
363
susceptible to the effects of the GFC, especially those companies that are over-geared. All three
property development (and two with stapled real estate investment trusts) firms expanded their
operations at a very rapid pace, benefitting substantially from the availability of easy financing and
increasing property valuations in the years leading up to the GFC. The low cost of debt, coupled with
easy availability of finance led to a debt fuelled growth of many property development companies. A
fall in revenues accompanied by a decrease in asset valuation and rising interest expenses arising out
of the financial crisis were the reasons behind these firms eventual failures.
The situation with the building construction company is less dire. Most building construction
companies that were solely involved with construction work were only marginally affected by the
GFC. Companies that were distressed were those that were again highly leveraged. CEC failed due
to rising interest expense coupled with a drop in revenues leading to its inability to repay its loans.
REFERENCES
1. Altman, E. I., Financial Ratios, Discriminant Analysis and the Prediction of Corporate. The
Journal of Finance, 23(4), 589-609, 1968.
2. ABS, 4102.0 - Australian Social Trends, March 2009. Retrieved June 3, 2011, from Australian
Bureau of Statistics:
http://www.abs.gov.au/AUSSTATS/abs@.nsf/Lookup/4102.0Main+Features60March%20200
9, 2009.
3. ASX, Listed Managed Investments - Monthly Update - August. Sydney: Australian Stock
Exchange, 2007.
4. ASX, Listed Managed Investments - Monthly Update - August. Sydney: Australian Stock
Exchange, 2011.
5. Carter, B., Valad backs $806m Blackstone bid. Retrieved August 5, 2011, from The
Australian Web site:http://www.theaustralian.com.au/business-old/city-beat/valad-backs-
808mblackstone-bid/story-fn4xq4cj-1226046848904, 2011.
6. Debelle, G., Some Effects of the Global Financial Crisis on Australian Financial Markets.
Retrieved May 8, 2011, from Reserve Bank of Australia Web site:
http://www.rba.gov.au/speeches/2009/sp-ag-310309.html, 2009.
7. Hoy, G., Centro Shares Hit Record Low. Retrieved July 7, 2011, from Australian
Broadcasting Corporation:
http://www.abc.net.au/lateline/business/items/200809/s2365384.html, 2008
8. IBIS, Building Supplies Wholesaling in Australia. Melbourne: IBIS, 2011.
9. IBIS, Office Property Operators in Australia. Melbourne: IBIS, 2011.
10. Klan, A., Property tycoon Jim Raptis Empire in ruins as Raptis Group collapses. Retrieved
August 2, 2011, from News Web site: http://www.news.com.au/property-tycoons-empire-in-
ruins/story-0-1111118739310, 2009.
11. Langford, D., Iyagba, R. and Komba, D., Prediction of Solvency in Construction Companies.
Construction Management and Economics, 11 (5), 317-325, 1993.
12. Smart Company, Gold Coast property developer Raptis Group on the brink. Retrieved August
1, 2011, from Smart Company Web site: http://www.smartcompany.com.au/construction-and-
engineering/gold-coastproperty-developer-raptis-group-on-the-brink.html, 2011.
13. Thangaraj, R. K., and Chan, T.K., The effects of the global financial crisis on the Australian
building construction supply chain." Australasian Journal of Construction Economics and
Building, 12(3), 16-30, 2012.

More Related Content

Viewers also liked

Behavior of concrete damaged by high temperature exposureand confined with cf...
Behavior of concrete damaged by high temperature exposureand confined with cf...Behavior of concrete damaged by high temperature exposureand confined with cf...
Behavior of concrete damaged by high temperature exposureand confined with cf...IAEME Publication
 
Rcc beam with spiral reinforcement
Rcc beam with spiral reinforcementRcc beam with spiral reinforcement
Rcc beam with spiral reinforcementIAEME Publication
 
Percentage replacement of bitumen with sugarcane waste molasses
Percentage replacement of bitumen with sugarcane waste molassesPercentage replacement of bitumen with sugarcane waste molasses
Percentage replacement of bitumen with sugarcane waste molassesIAEME Publication
 

Viewers also liked (7)

50120140507004
5012014050700450120140507004
50120140507004
 
30120140507011
3012014050701130120140507011
30120140507011
 
Behavior of concrete damaged by high temperature exposureand confined with cf...
Behavior of concrete damaged by high temperature exposureand confined with cf...Behavior of concrete damaged by high temperature exposureand confined with cf...
Behavior of concrete damaged by high temperature exposureand confined with cf...
 
40120140507006
4012014050700640120140507006
40120140507006
 
Rcc beam with spiral reinforcement
Rcc beam with spiral reinforcementRcc beam with spiral reinforcement
Rcc beam with spiral reinforcement
 
Percentage replacement of bitumen with sugarcane waste molasses
Percentage replacement of bitumen with sugarcane waste molassesPercentage replacement of bitumen with sugarcane waste molasses
Percentage replacement of bitumen with sugarcane waste molasses
 
30120140507005
3012014050700530120140507005
30120140507005
 

Similar to 20320140503041

CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIES
CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIESCONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIES
CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIESIAEME Publication
 
Financial Reporting James Hardie Group Assignment (1)
Financial Reporting James Hardie Group Assignment (1)Financial Reporting James Hardie Group Assignment (1)
Financial Reporting James Hardie Group Assignment (1)Joshua C
 
Quarterly Insurance Round Up 2q08
Quarterly Insurance Round Up 2q08Quarterly Insurance Round Up 2q08
Quarterly Insurance Round Up 2q08Jason Jones
 
WIS in Stress Testing Credit Portfolios_12 2008
WIS in Stress Testing Credit Portfolios_12 2008WIS in Stress Testing Credit Portfolios_12 2008
WIS in Stress Testing Credit Portfolios_12 2008Mark Killion, CFA
 
unisys 10308921
unisys 10308921unisys 10308921
unisys 10308921finance36
 
Innovation Policy by Fergus Harradence BIS
Innovation Policy by Fergus Harradence BISInnovation Policy by Fergus Harradence BIS
Innovation Policy by Fergus Harradence BISTal Oron
 
Asset Management White Paper
Asset Management White PaperAsset Management White Paper
Asset Management White PaperSarah Luheshi
 
Trends in public and private sector in india
Trends in public and private sector in indiaTrends in public and private sector in india
Trends in public and private sector in indiaAshutosh Gupta
 
Equity Research Report on ACE Limited
Equity Research Report on ACE LimitedEquity Research Report on ACE Limited
Equity Research Report on ACE LimitedJan Niezychowski
 
Article Strategic Insight - Sept 09
Article Strategic Insight - Sept 09Article Strategic Insight - Sept 09
Article Strategic Insight - Sept 09Damien de Chillaz
 
Investor presentation march 2018
Investor presentation march 2018Investor presentation march 2018
Investor presentation march 2018Oshkosh_Investors
 
DnB PE Report_17122008
DnB PE Report_17122008DnB PE Report_17122008
DnB PE Report_17122008poojarami25
 
Venture Capital Investments Q1 08 - MoneyTree Report
Venture Capital Investments Q1 08 - MoneyTree Report  Venture Capital Investments Q1 08 - MoneyTree Report
Venture Capital Investments Q1 08 - MoneyTree Report mensa25
 
A New Ranking Of The Worlds Most Innovative Countries
A New Ranking Of The Worlds Most Innovative CountriesA New Ranking Of The Worlds Most Innovative Countries
A New Ranking Of The Worlds Most Innovative CountriesJordi Planas Manzano
 
The predictability of financial, accounting-based, and industrial factors on ...
The predictability of financial, accounting-based, and industrial factors on ...The predictability of financial, accounting-based, and industrial factors on ...
The predictability of financial, accounting-based, and industrial factors on ...Marc Oliveras Villanueva
 

Similar to 20320140503041 (20)

CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIES
CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIESCONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIES
CONSEQUENCES OF ECONOMIC DOWNTURN ON CONSTRUCTION INDUSTRY AND ITS REMEDIES
 
Financial Reporting James Hardie Group Assignment (1)
Financial Reporting James Hardie Group Assignment (1)Financial Reporting James Hardie Group Assignment (1)
Financial Reporting James Hardie Group Assignment (1)
 
Quarterly Insurance Round Up 2q08
Quarterly Insurance Round Up 2q08Quarterly Insurance Round Up 2q08
Quarterly Insurance Round Up 2q08
 
Kier Group Plc: business and financial performance analysis and evaluation
Kier Group Plc: business and financial performance analysis and evaluationKier Group Plc: business and financial performance analysis and evaluation
Kier Group Plc: business and financial performance analysis and evaluation
 
WIS in Stress Testing Credit Portfolios_12 2008
WIS in Stress Testing Credit Portfolios_12 2008WIS in Stress Testing Credit Portfolios_12 2008
WIS in Stress Testing Credit Portfolios_12 2008
 
fdi inflows
fdi inflowsfdi inflows
fdi inflows
 
unisys 10308921
unisys 10308921unisys 10308921
unisys 10308921
 
DSP TIGER Fund
DSP TIGER FundDSP TIGER Fund
DSP TIGER Fund
 
Innovation Policy by Fergus Harradence BIS
Innovation Policy by Fergus Harradence BISInnovation Policy by Fergus Harradence BIS
Innovation Policy by Fergus Harradence BIS
 
Asset Management White Paper
Asset Management White PaperAsset Management White Paper
Asset Management White Paper
 
Trends in public and private sector in india
Trends in public and private sector in indiaTrends in public and private sector in india
Trends in public and private sector in india
 
Equity Research Report on ACE Limited
Equity Research Report on ACE LimitedEquity Research Report on ACE Limited
Equity Research Report on ACE Limited
 
Article Strategic Insight - Sept 09
Article Strategic Insight - Sept 09Article Strategic Insight - Sept 09
Article Strategic Insight - Sept 09
 
Investor presentation march 2018
Investor presentation march 2018Investor presentation march 2018
Investor presentation march 2018
 
TECNOLOGIA.pdf
TECNOLOGIA.pdfTECNOLOGIA.pdf
TECNOLOGIA.pdf
 
DnB PE Report_17122008
DnB PE Report_17122008DnB PE Report_17122008
DnB PE Report_17122008
 
Venture Capital Investments Q1 08 - MoneyTree Report
Venture Capital Investments Q1 08 - MoneyTree Report  Venture Capital Investments Q1 08 - MoneyTree Report
Venture Capital Investments Q1 08 - MoneyTree Report
 
A New Ranking Of The Worlds Most Innovative Countries
A New Ranking Of The Worlds Most Innovative CountriesA New Ranking Of The Worlds Most Innovative Countries
A New Ranking Of The Worlds Most Innovative Countries
 
Recent Trend of PE/VC investors in Japan
Recent Trend of PE/VC investors in JapanRecent Trend of PE/VC investors in Japan
Recent Trend of PE/VC investors in Japan
 
The predictability of financial, accounting-based, and industrial factors on ...
The predictability of financial, accounting-based, and industrial factors on ...The predictability of financial, accounting-based, and industrial factors on ...
The predictability of financial, accounting-based, and industrial factors on ...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Recently uploaded (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

20320140503041

  • 1. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 357 IMPACT OF THE GLOBAL FINANCIAL CRISIS ON AUSTRALIAN CONSTRUCTION COMPANIES: A CASE STUDY Ram Karthikeyan THANGARAJ*, Toong Khuan CHAN** *(Cronin & Pain, Australia) **(Faculty of Architecture Building and Planning, University of Melbourne, Australia) ABSTRACT This paper reports on the in depth financial analysis of four Australian firms that were significantly affected during the period of global financial crisis (GFC) within the building and construction supply chain from 2005 to 2010. These four firms were chosen from a study that involved analysis of 43 publicly listed and large private companies within the sector to understand the sectoral impact due to GFC. Financial ratios and Altman Z Score were used for the purpose of the analysis. All the four firms reported negative earnings for the financial years 2008 to 2010. They all grew rapidly during the boom years either organically or through acquisitions in overseas market. These firms either went into receivership or buyouts, or liquidated a large portion of their assets to pay off their short or long term liabilities. Low cost of debt, coupled with easy availability of finance, was the trigger behind these firms’ rapid expansion. Fall in revenues, decrease in asset valuation and rising interest expenses arising out of the financial crisis were the reasons behind these firms being unable to sustain their pre-GFC growth. Guidelines for effective financial management of firms to withstand future financial crises were developed. Keywords: Financial Ratios, Construction, Global Financial Crisis, Australia, Financial Distress. I.0 INTRODUCTION Well over a decade of mismanagement of risk, low interest rates and lack of financial regulation have been citied to be the factors that led to the cause of GFC in the US. The collapse of Lehman Brothers in September 2008 started a series of panic selling and caused much distress to many other financial institutions and markets across the world. Five years after this crisis, much of INTERNATIONAL JOURNAL OF CIVIL ENGINEERING AND TECHNOLOGY (IJCIET) ISSN 0976 – 6308 (Print) ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME: www.iaeme.com/ijciet.asp Journal Impact Factor (2014): 7.9290 (Calculated by GISI) www.jifactor.com IJCIET ©IAEME
  • 2. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 358 the western world is slowly on the path to recovery, but many European countries are still struggling to manage their respective economies. As the Australian share market was very much in line with the global economies, the S&P ASX200 index fell from a peak of 6800 in late 2007 to 3100 in early 2009. Australian banks fared much better, as their exposure to collateralized debt obligations (CDOs) was relatively small in comparison with other countries. The housing market was also in a strong position. In 2007, non- conforming loans in Australia accounted for about 1% of total loans, in comparison with 13% in the US (Debelle, 2008). The Australian Federal government mitigated the effects of the economic slowdown with a quick reduction in interest rates and AU$42 billion stimulus package. 1.1 Objectives and Scope These developments provided the motivation to develop a broader understanding of the effects of this recent financial crisis on the construction supply chain thorough a case study of four Australian companies. An analysis focused on characterizing the impact of the GFC on the financial performance of companies within four sectors of the industry: building material suppliers, building contractors, property developers and Australian Real Estate Investment Trusts (A-REITs) have been published previously (Thangaraj and Chan, 2012). This paper examines the business strategy leading up to the GFC, the financial position of these four companies during this period, and reports on the final outcome of their positions. The key points examined are the severity of the impact by means of ratio analysis, changes in cost structure and financial distress. The findings will inform investors, managers and construction professionals in devising strategies for prudent financial management and for weathering future financial crises. 2.0 METHODOLOGY The financial investigation involved an analysis of 43 companies selected based on the criteria that included the availability of data and their representation within the four sub-sectors of property development, material suppliers, building construction and A-REITS. The financial performance of all selected companies was calculated over the 2006-10 period, both years inclusive. Despite its many drawbacks, the most precise information on these companies can only be determined by relying on audited financial statements (Langford et al. 1993). Four companies were selected based on news reports of their financial distress or removal from the stock market: Centro Properties Group, Valad Property Group, Raptis Group Limited and CEC Group Limited. Centro and Valad were both stapled securities indicating exposure to both the investment trusts and the property development companies while Raptis was a pure property development company. CEC represented the building construction sub-sector. There were not material supplier firms that were found to be in distress during this period. 3.0 PERFORMANCE ANALYSIS OF COMPANIES In terms of revenue, property developers and A-REITs exhibited significant decline in revenues in 2008 and 2009, and in the case of developers, continuing into 2010. The building material sector exhibited a marginal contraction of 2.8% in 2009 followed by a further reduction of nearly 7% in 2010. On the contrary, revenues for building contractors continued to increase, albeit by only 1.6% in 2009 and 0.8% in 2010 despite the slump in building starts in late 2008. The nature of the building construction business is that builders are not immediately affected by a downturn due to continuing construction projects awarded a couple of years earlier. The launch of a number of stimulus packages; bringing forward spending on large-scale infrastructure and additional spending
  • 3. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 359 on new school buildings in late 2008 and early 2009 by the Australian government mitigated the effects of the GFC on the local construction market. 3.1 Centro Properties Group Centro Properties Group is a public listed trust that is involved in all aspects of retail ranging from investments, management, development of retail properties and also syndicated fund management. First established in 1985, the firm was restructured as a stapled security consisting of one unit of Centro Properties Trust stapled to one share in Centro Properties Limited prior to listing. The resulting entity was listed in the market in 1997. It grew aggressively from 2000, with operations in the US commencing in 2003 through the Centro Watt joint jenture. Centro owned 810 shopping centres of which 682 were in the US. In April 2007, it completed a US$5 billion acquisition of New Plan Excel Realty Trust in the US. In May 2007, it acquired Gallileo Funds Managements Limited and purchased the remaining 50% it didn’t already own in Centro Watt. Centro also purchased the Warnbro Fair Shopping Centre in Western Australia in July 2007. By October 2007, Centro Retail Trust was merged with Centro Shopping America Trust. Fig 1.1: Centro Properties Group Share Price (2002-2011) However, in December 2007, Centro’s share price collapsed drastically (Figure 1.1) after it announced its inability in refinancing debt obligations of AU$3.9 billion. Investigation by ASIC revealed that Centro had classified AU$1.1 billion of debt as non-current in its 2007 Annual report, when they were in fact current liabilities (Klan & Condon, Centro failed to disclose AU$1bn of debt, 2007). In July 2008, it announced the sale of 29 shopping malls in the US, but failed to close the US$872 million deal by October (Hoy, 2008). In July 2011, it sold 588 US shopping centres to Blackstone Group Limited, US for AU$9.4 billion. After a series of profitable years, the company has reported only losses from 2008 onwards. The initial investor confidence and subsequent loss is reflected by the 74% increase in market capitalization from 2005 to 2007 and a decline of 98% from 2007 to 2010. Net profit margin in 2006 was extraordinary at 74%. Two years later, in 2008, the firm was to incur a loss of AU$2.76 for every dollar of sales! This was due to huge rise in expenses such as impairment of goodwill, impairment of investments in joint ventures, and property revaluation totalling AU$1.078 billion and financing costs adding another AU$411.185 million. This decrease in profitability has also affected the firm’s Return on Average Asset (ROAA) from 11% and 7% in 2006 and 2007 to -14% and -18% in 2008 and 2009, indicate the firm losing its efficiency in utilizing its assets for revenue generation.
  • 4. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 360 Similarly, the Return on Average Equity (ROAE) of -58% and -241% in 2008 and 2009 marks the drastic fall in operating efficiency in generating return to shareholders. The current ratio of 2010 is 97% less than its 2005 value. This indicates that the firm’s current liabilities have increased by 97% for 2010 in comparison with 2005. The reason is a high expansion cost and drop in the value of assets as a result of GFC. Moreover Centro was holding majority of its assets in the US, which was the epicenter of the GFC. The working capital turnover turning into negative since 2007 indicates that the firm was lacking in funds for operations. The increase in debt to equity ratio from 0.85 to 4.79 from 2005 to 2008 indicates the firm has been aggressively financings its growth with debt. Subsequent year values are in negative signifying cost of debt has significantly increased relative to its earnings. The P/E ratio of 2005 stood at 22.83, indicative of investor’s willingness to pay $22.83 for $1 of its earnings. Whereas a negative value from 2008, is a consequential of negative earnings. The low price of the shares indicates that investors foresee an inferior earning potential for the firm. Centro recorded 34% higher profit in 2006 in comparison with the industry average but subsequently fell in line with the sector average. However, from 2008 the performance fell drastically indicating that expenses were very high in comparison. After a number of executives were found guilty for failing to disclose billions of dollars of short-term debt, the company was in the process of being wound up at the end of 2011. 3.2 Valad Property Group Valad Property Group, incorporated in January 1995 was listed in the ASX in 2002 as a stapled security. Throughout its history it has expanded through acquisitions rather than organic growth. In mid-2004, it acquired ICA Property Group specializing in non-residential property development and fund management. Again from 2005 to 2007, it made a string of acquisitions ranging from retail centres, office blocks, resorts, spa and residential properties. In 2006, it raised AU$200 million for Valad Core Plus, an open ended wholesale investment fund. Despite the property market downturn in 2008, Valad managed to raise about AU$3 billion of equity and debt for its fund management business. In 2007, it gained a foothold in Europe through an investment in Crownstone European Properties Limited. It entered the US through a joint venture with Kemco, a US based REIT. Increasing credit crunch, interest expenses and liabilities leading up to the GFC derailed the firm’s growth eventually hurting its profitability. Loss of investor confidence started at the beginning of 2008. In April 2011, Valad announced an AU$806 million takeover bid, including AU$500 million of its liabilities by Blackstone Real Estate Partners, US a subsidiary of Blackstone Private Equity, US (Carter, 2011). The deal was closed in mid-2011, and Valad was subsequently delisted from the ASX on 30 August 2011. At its peak in 2007, Valad stood with a staggering market capitalization of AU$25 billion. Compared to its 2005 market value this was a 153% growth. Most of its growth was heavily funded by debt. Financial crisis factors such as increased cost of debt, reduced revenue and fall in property valuation eventually lead to the downfall of the company. These factors will be evidenced with ratios in the section below. The year on year growth in profitability has played an important role in increasing its market capitalization. Profits had increased by 130% and 160% for the year 2007 and 2006. Whereas after the crisis, Net profit margin was at its lowest in 2009 financial year at -365%. Similar trend is visible in its ROAE value, as the increase from 2005 to 2006 was 87%. The value reported for 2009 is -116%. The profitability ratios indicate high growth followed by even higher fall in profitability. Current ratio values have remained above 1.0, especially the 2008 value of 2.27 indicates that they had $2.27 worth of assets to cover every $1 of liability. This indicates that the firm was well
  • 5. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 361 positioned in short term to cover for its liabilities. The low asset turnover values help in identifying the firm’s strategy of high profit margins. Their debt ratio stands to support the firm as well positioned to cover for its long term liabilities. The value has remained below 1.0 from 2005 to 2010. Throughout the six year analysis period, the operating cash flow ratio reported a negative value of - 2.81 only for 2007. The cash flow statement for that year identified operating earnings to be AU$117 million against an expense of AU$321 million. Two possible scenarios are (i) the firm was spending much more in its operations than its earnings, or (ii) the firm had realised profits, but the real cash was yet to come. The reason behind the failure of the firm is well captured when analyzing revenue and interest coverage ratio in unison. The reported revenue for year 2010 and 2009 were significantly lower at 25% and 54% of the 2008 earnings. And the interest coverage values for 2008 to 2010 are all negative. Based on both these values it can be identified that the company failure was due to loss in revenue and rising interest expenses. 3.3 Raptis Group Limited Raptis Group, a property developed based in the Gold Coast was listed in the stock market in 1986. The group has but dozens of towers across the Gold Coast including the Raptis Plaza shopping centre and the iconic Chevron Renaissance high rise apartments. In 1993, the firm was placed under administration due to a debt of AU$70 million (Klan, 2009) but with subsequent recovery of the property market in Queensland the group was successfully turned around. Since 2003, the firm’s market capitalization has increased drastically triggered by the booming property market in the Gold Coast. The reprise seems to have been short lived. This growth was heavily funded by debt. In late 2008, Capital Finance Australia placed Limdaning, a subsidiary, under receivership for failing to pay its subcontractors (Smart Company, 2008). The group ceased trading in the exchange in early 2009. The last annual report filing was for 2008 financial year. The company’s profitability grew by 80% and 36% annually between 2005 and 2007. From 2003 to 2007, revenue has also been on steady rise except for a minor dip of 8% in 2006. It has maintained an average ROAE of 40% for the years 2003 to 2007 possibly through a high leveraged position. ROAA fluctuated between 2 to 4% for the analysis period of 2003 to 2007. The firm has increased its dependence on debt substantially in the years leading up to the GFC. This is evident from the Net Gearing value. During its last year of operation in 2008, its gearing value was at its peak of 69.69. Highly leveraged firms are considered to be very risky especially during a downturn as the firm has to service its debt irrespective of any fall in sales. Current ratios pre 2006 financial year place the firm in a financially healthy position. As the 2005 value of 1.65 can be interpreted as the firm having $1.65 worth of assets for every $1 of its liability. But the values of 2006 and thereafter signify that the firms liabilities was higher than its assets. The rise in liability is further well documented through the leverage ratio. A value of below 1 is a most preferable situation. The debt ratio from 2004 to 2008 has remained below 1, only by a very low margin. The debt to equity ratio concretes the fact that debt funded growth was one of the major reason for the firm to be facing receivership. The 0.92 value of debt to equity is a clear sign of a financial trouble. For the year 2008 its total liability was about AU$900 million of which interest bearing liability alone was close to 75%. The difference in Raptis Group’s profitability and the developer sector is very huge. This could arise from Raptis expenses being higher than the other firms operating in the sub sector. High expense can be a resultant of soaring interest cost as identified above in the horizontal analysis. It is established fact that downturn in an economy impacts revenue, which in turn lowers profitability. Hence, Raptis maintaining lower profitability even during a booming economy has affected them to the extent of failing on its payments to subcontractors during the crisis.
  • 6. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 362 The highly leveraged nature of Raptis is evident from the difference in its debt ratio against the sectors average. It can be summed up that debt funded growth has affected the firm significantly during the crisis period. 3.4 CEC Group Limited Established in 1977, CEC Group has evolved from a small civil construction company into a vertically integrated public firm by 2008. Since its listing in 2004, the company has significantly branched into construction and property development markets especially in and around North Queensland. Its three main core business units were property development, construction and materials. CEC Constructions, CEC Bitumen and Asphalt Services, CEC Property, CEC Remote Solutions, Rapid Build, CEC Townsville and CEC Mt Isa were its subsidiary companies. These firms undertook a multitude of works such as civil engineering contracts, property development, services for mining and quarry operations, project management for its own group companies in remote locations and modular building systems. Coupled with the property development boom in Queensland and high positive sentiment in the market, the firm had a steady rise in its share price pre-GFC. In 2008, the consolidated revenue was AU$209 million. The aftermath of financial crisis such as credit crunch, fall in revenues, rising interest expenses all together crippled the firm. The group announced a loss of AU$70 million, total debts of AU$135 million and assets worth AU$93.5 million in December 2010. Following this announcement, lenders demanded payments of its debt of about AU$63.5 million in May 2011. Defaulting on the payment eventually placed the firm under receivership. The firm was removed from the official list in the market with effect from the close of trading on Monday 29 August 2011. During the 2007 market peak, the firm boosted a market capitalization of AU$141 million. But after a series of loss reporting financial year, rising interest expenses and falling revenues had decreased its market capitalization to a mere AU$4.7 million. The firm’s gross profitability has been on a downscale from since 2005, sliding from 24% to -3% by 2010. This indicates that the firm was losing money in its core operations and reason like fall in asset valuation have only added fuel in driving the firm towards its present financial tragedy. In comparison with its ROAA, the ROAE values are very high. This indicates that the firm was highly leveraged and will be expected to be hit due to increased cost of debt during a downturn. The current ratio of the firm has above 1.0 throughout the period of study indicating that the firm was in a good position to cover for its short term liabilities. But the low quick ratio indicates that the firm is highly depended on its inventory turnover to pay for its short term liabilities. Such a model is faced with trouble during a downturn as there is a fall in revenue due to reduced spending. This is evident as the revenue dropped by 50% from 2008 to 2010 financial reporting. Very high revenue to equity of above 3.0, especially from 2008 to 2010 indicates that the firm equity was very low and was funded largely by debt. This is further established by its high value of 4 for the debt to equity ratio for 2009 and 2010. The firms high P/E ratio pre GFC period, indicates the generally high investor confidence during those period. Since 2008 due to loss in profits, the P/E ratio has turned negative. Interest coverage ratio clearly captures the firm’s inability to meet its interest expenses, as the values after 2008 are all negative. 4.0 CONCLUSIONS These four case studies have identified a number of factors that have led companies in the building and construction industry to failure during the recent global financial crisis. The findings confirm that property development companies utilized a larger proportion of debt to fund their purchases of real estate. Financial ratio analyses have indicated that the industry was highly
  • 7. International Journal of Civil Engineering and Technology (IJCIET), ISSN 0976 – 6308 (Print), ISSN 0976 – 6316(Online) Volume 5, Issue 3, March (2014), pp. 357-363 © IAEME 363 susceptible to the effects of the GFC, especially those companies that are over-geared. All three property development (and two with stapled real estate investment trusts) firms expanded their operations at a very rapid pace, benefitting substantially from the availability of easy financing and increasing property valuations in the years leading up to the GFC. The low cost of debt, coupled with easy availability of finance led to a debt fuelled growth of many property development companies. A fall in revenues accompanied by a decrease in asset valuation and rising interest expenses arising out of the financial crisis were the reasons behind these firms eventual failures. The situation with the building construction company is less dire. Most building construction companies that were solely involved with construction work were only marginally affected by the GFC. Companies that were distressed were those that were again highly leveraged. CEC failed due to rising interest expense coupled with a drop in revenues leading to its inability to repay its loans. REFERENCES 1. Altman, E. I., Financial Ratios, Discriminant Analysis and the Prediction of Corporate. The Journal of Finance, 23(4), 589-609, 1968. 2. ABS, 4102.0 - Australian Social Trends, March 2009. Retrieved June 3, 2011, from Australian Bureau of Statistics: http://www.abs.gov.au/AUSSTATS/abs@.nsf/Lookup/4102.0Main+Features60March%20200 9, 2009. 3. ASX, Listed Managed Investments - Monthly Update - August. Sydney: Australian Stock Exchange, 2007. 4. ASX, Listed Managed Investments - Monthly Update - August. Sydney: Australian Stock Exchange, 2011. 5. Carter, B., Valad backs $806m Blackstone bid. Retrieved August 5, 2011, from The Australian Web site:http://www.theaustralian.com.au/business-old/city-beat/valad-backs- 808mblackstone-bid/story-fn4xq4cj-1226046848904, 2011. 6. Debelle, G., Some Effects of the Global Financial Crisis on Australian Financial Markets. Retrieved May 8, 2011, from Reserve Bank of Australia Web site: http://www.rba.gov.au/speeches/2009/sp-ag-310309.html, 2009. 7. Hoy, G., Centro Shares Hit Record Low. Retrieved July 7, 2011, from Australian Broadcasting Corporation: http://www.abc.net.au/lateline/business/items/200809/s2365384.html, 2008 8. IBIS, Building Supplies Wholesaling in Australia. Melbourne: IBIS, 2011. 9. IBIS, Office Property Operators in Australia. Melbourne: IBIS, 2011. 10. Klan, A., Property tycoon Jim Raptis Empire in ruins as Raptis Group collapses. Retrieved August 2, 2011, from News Web site: http://www.news.com.au/property-tycoons-empire-in- ruins/story-0-1111118739310, 2009. 11. Langford, D., Iyagba, R. and Komba, D., Prediction of Solvency in Construction Companies. Construction Management and Economics, 11 (5), 317-325, 1993. 12. Smart Company, Gold Coast property developer Raptis Group on the brink. Retrieved August 1, 2011, from Smart Company Web site: http://www.smartcompany.com.au/construction-and- engineering/gold-coastproperty-developer-raptis-group-on-the-brink.html, 2011. 13. Thangaraj, R. K., and Chan, T.K., The effects of the global financial crisis on the Australian building construction supply chain." Australasian Journal of Construction Economics and Building, 12(3), 16-30, 2012.