04/15/2011 15:00 UTC Unit  1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ  In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation  – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Increasing Stable Stable CV Pressure Drywell Increasing Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
04/14/2011 11:00 UTC Unit  5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building  Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Mais conteúdo relacionado

Mais procurados

Week 12 13 14 pe 3231
Week 12   13    14  pe  3231Week 12   13    14  pe  3231
Week 12 13 14 pe 3231Charlton Inao
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignConsultingSpecifyingEngineer
 
Hot water flow controller function description
Hot water flow controller function descriptionHot water flow controller function description
Hot water flow controller function descriptionADEWALE ADEOYE
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgearmichaeljmack
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines Karol Bielecki
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONMoiz Akhter
 
Low cost automatic water level control for domestic or industrial applicat...
Low cost  automatic water level control for domestic  or industrial  applicat...Low cost  automatic water level control for domestic  or industrial  applicat...
Low cost automatic water level control for domestic or industrial applicat...Ahasan Ullah Hasan
 
Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1Richard Peck
 
Wireless Power Transmission
Wireless Power TransmissionWireless Power Transmission
Wireless Power TransmissionYogesh Raju
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycleAslam K
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)mahmoud mosallam
 
Vapour power cycles
Vapour power cyclesVapour power cycles
Vapour power cycleskrishna khot
 
GenSync - User Guide
GenSync - User GuideGenSync - User Guide
GenSync - User GuideRichard Smith
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generatorPrasant Kumar
 

Mais procurados (20)

Week 12 13 14 pe 3231
Week 12   13    14  pe  3231Week 12   13    14  pe  3231
Week 12 13 14 pe 3231
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
ADITEC04
ADITEC04ADITEC04
ADITEC04
 
Hot water flow controller function description
Hot water flow controller function descriptionHot water flow controller function description
Hot water flow controller function description
 
Paralleling Switchgear
Paralleling SwitchgearParalleling Switchgear
Paralleling Switchgear
 
Fluke1748 - power quality measurements on overhead lines
Fluke1748 - power quality measurements  on overhead lines Fluke1748 - power quality measurements  on overhead lines
Fluke1748 - power quality measurements on overhead lines
 
NTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action PlanNTPC Ramagundam Station Blackout and Action Plan
NTPC Ramagundam Station Blackout and Action Plan
 
LETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATION
 
Low cost automatic water level control for domestic or industrial applicat...
Low cost  automatic water level control for domestic  or industrial  applicat...Low cost  automatic water level control for domestic  or industrial  applicat...
Low cost automatic water level control for domestic or industrial applicat...
 
Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1Westward Ounalashka Final Report R1
Westward Ounalashka Final Report R1
 
Wireless Power Transmission
Wireless Power TransmissionWireless Power Transmission
Wireless Power Transmission
 
Rankine Cycle
Rankine CycleRankine Cycle
Rankine Cycle
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)
 
wathiq alanbaki
wathiq alanbakiwathiq alanbaki
wathiq alanbaki
 
05 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_0509201605 ropp sandia-epri_workshop_lrov_spod_05092016
05 ropp sandia-epri_workshop_lrov_spod_05092016
 
Vapour power cycles
Vapour power cyclesVapour power cycles
Vapour power cycles
 
GenSync - User Guide
GenSync - User GuideGenSync - User Guide
GenSync - User Guide
 
BEI_FR
BEI_FRBEI_FR
BEI_FR
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generator
 

Semelhante a Fukushima Daiichi plant status report

Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:... Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...International Atomic Energy Agency
 
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)International Atomic Energy Agency
 
Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011International Atomic Energy Agency
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfGautamChattopadhyay4
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALIMahendra Magre
 
19. GM Energize.pptx
19. GM Energize.pptx19. GM Energize.pptx
19. GM Energize.pptxssuser56273f
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdfKhalidAyaz3
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
Ac supply system
Ac supply systemAc supply system
Ac supply systemankitankesh
 
Fukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationFukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationJoe Miller
 
LV 124 & LV 148 Solutions - WKS Informatik
LV 124 & LV 148 Solutions - WKS InformatikLV 124 & LV 148 Solutions - WKS Informatik
LV 124 & LV 148 Solutions - WKS InformatikAndreea Solomon
 

Semelhante a Fukushima Daiichi plant status report (20)

Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:... Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
Summary of the Status of Reactor Units in Fukushima Daiichi at 19 March, 12:...
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
IAEA Briefing on Fukushima Nuclear Emergency (22 March 2011, 15.30 UTC)
 
Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011Technical Briefing on Radiological Situation in Japan - 21 March 2011
Technical Briefing on Radiological Situation in Japan - 21 March 2011
 
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
2014 PV Distribution System Modeling Workshop: Increasing Hosting Capacity wi...
 
DC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdfDC Supply System, Batteries,UPS - Copy.pdf
DC Supply System, Batteries,UPS - Copy.pdf
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
 
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
Brian Cowell EDF Energy Chief Nuclear Officer (Atoms for the Future 2013)
 
19. GM Energize.pptx
19. GM Energize.pptx19. GM Energize.pptx
19. GM Energize.pptx
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
Ac supply system
Ac supply systemAc supply system
Ac supply system
 
Power plant, Power Station and types of power plant
Power plant, Power Station and types of power plantPower plant, Power Station and types of power plant
Power plant, Power Station and types of power plant
 
Fukushima Daiichi Byu Presentation
Fukushima Daiichi Byu PresentationFukushima Daiichi Byu Presentation
Fukushima Daiichi Byu Presentation
 
Nuclear fission
Nuclear fissionNuclear fission
Nuclear fission
 
LV 124 & LV 148 Solutions - WKS Informatik
LV 124 & LV 148 Solutions - WKS InformatikLV 124 & LV 148 Solutions - WKS Informatik
LV 124 & LV 148 Solutions - WKS Informatik
 
Rps plant
Rps plantRps plant
Rps plant
 
electrician
electricianelectrician
electrician
 
SLOPPY and INCORRECT MAKE WORK PROJECT & IP THEFT PLAN RE: Design 1st, Hillcr...
SLOPPY and INCORRECT MAKE WORK PROJECT & IP THEFT PLAN RE: Design 1st, Hillcr...SLOPPY and INCORRECT MAKE WORK PROJECT & IP THEFT PLAN RE: Design 1st, Hillcr...
SLOPPY and INCORRECT MAKE WORK PROJECT & IP THEFT PLAN RE: Design 1st, Hillcr...
 

Mais de International Atomic Energy Agency

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...International Atomic Energy Agency
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)International Atomic Energy Agency
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011International Atomic Energy Agency
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 

Mais de International Atomic Energy Agency (20)

IAEA Bulletin September 2011
IAEA Bulletin September 2011IAEA Bulletin September 2011
IAEA Bulletin September 2011
 
The IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear SafetyThe IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear Safety
 
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)Summary of Reactor Status (2 June 2011)
Summary of Reactor Status (2 June 2011)
 
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 4: Unit 4 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011Fukushima Marine Environment Monitoring - 5 May 2011
Fukushima Marine Environment Monitoring - 5 May 2011
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 

Fukushima Daiichi plant status report

  • 1. 04/15/2011 15:00 UTC Unit 1 2 3 4 Power (MWe /MWth) 460/1380 784/2381 784/2381 784/2381 Type of Reactor BWR-3 BWR-4 BWR-4 BWR-4 Status at time of EQ In service – auto shutdown In service – auto shutdown In service – auto shutdown Outage Core and fuel integrity Damaged Severe damage Damaged No fuel in the Reactor RPV & RCS integrity RPV temperature high but stable RPV temperature stable RPV temperature stable Not applicable due to outage plant status Containment integrity No information Damage suspected Damage suspected AC Power AC power available - power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room AC power available – power to instrumentation – Lighting to Central Control Room Building Severe damage Slight damage Severe damage Severe damage Water level of RPV Around half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant status Pressure of RPV Increasing Stable Stable CV Pressure Drywell Increasing Stable Stable Water injection to RPV Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Injection of freshwater – via mobile electric pump with off-site power Water injection to CV No information No information No information Spent Fuel Pool Status Fresh water injection by concrete pump truck Freshwater injection to the Fuel Pool Cooling Line Freshwater injection via Fuel Pool Cooling Line and Periodic spraying Fresh water injection by concrete pump truck
  • 2. 04/14/2011 11:00 UTC Unit 5 6 Power 784/2381 1100/3293 Type of Reactor BWR-4 BWR-5 Status at the EQ occurred Outage Outage Core and Fuel Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. Cold Shutdown Being maintained using off-site electrical power and existing plant equipment. RPV & RCS integrity Containment int. AC Power Building Water level of RPV Pressure of RPV Containment Pressure Water injection to RPV Water injection to CV Spent Fuel Pool Status Severe condition Concern No immediate concern

Notas do Editor

  1. 04/15/11 14:54
  2. 04/15/11 14:54