7. 7
Regulatory Structure
Culture & Tourism Authority Act, 2019
Hospitality and Tourism Sector Registration, Licensing & Classification of Tourism
Projects
Special Purpose Authorities Rules
Gallyat & Kaghan Development Authorities under Act
In process
Towards Cabinet - Censorship of Motion Pictures
(Films, CDs, Videos, Stage Dramas and Shows) Rules
Introduced in Assembly – Deserving Artists Welfare Endowment Fund Act,
2021
8. Details of Total 167 Properties:
Ready to Operational /Lease /Outsource: 54 Rest Houses
28 Rest Houses advertised - process completed – (15 out of 28 properties are outsourced)
19 Rest Houses at evaluation stage – Financial proposals opened on 26-11-2021.
07 Rest Houses Transferred to Galiyat Development Authority - Outsourced.
05 Boutique Rest Houses
Chief Minister House and Governor House- Not Transferred
Karnak & Police Rest House - Outsourced on 01-06-2021
Hamala (Speaker) House at evaluation stage – Financial proposals opened on 26-11-2021
Remaining 113 Rest Houses
Details on next slide.
Progress on interventions – (1) Govt policy of outsourcing
9. Detail of 113 Properties:
Damaged/Dilapidated/Transferred Properties
82 Rest Houses (Damaged/Dilapidated)
03 Rest Houses (Transferred to KP-CTA for Tourism Police)
01 Rest House (Transferred to Rescue 1122)
Land available only
17 Rest Houses (Demolished rest houses - only land available).
Occupied Properties
06 Rest House (Occupied by Pak Army)
02 Rest Houses (Occupied by Police Department)
05 Rest Houses (Occupied by District Administration)
01 Rest House (Occupied by PEDO)
Left over Properties (two attempts)
13 Properties
Progress on interventions – (1) Govt policy of outsourcing
10. Future Action on 113 Properties:
As gotten approved from Cabinet & CM, Tourism Value Survey being
carried out
Resultantly, some properties will be returned to Departments
Others found feasible will be converted into touristic purposes
Progress on interventions – (1) Govt policy of outsourcing
11. Camping Pods
Progress on interventions – (1) Govt policy of outsourcing
The TCKP under ADP Scheme established initially five camping pod sites, in
2016-17 (Pak made-Fiber glass – 44 Pods)
Subsequently five new sites are recently established through UNDP (Imported
– Wood made – 50 Pods) with 10-years warranty.
MoU for Phase-II-A (Five Sites) is signed with UNDP to survey, import & install
camping Pods (Turn key basis) at sites approved by CM.
Five additional sites approves by CM later for Phase-II-B (Total10 sites).
Survey for Phase II-A is in progress and will be completed till end Nov 2021
12. Issues in Camping Pods Outsourcing
Progress on interventions – (1) Govt policy of outsourcing
Project is already in public private partnership (PPP) mode. The investment of private
party is their land for which they get monthly rent and job for 2/3 attendants.
The leases agreement with Governments entities or Authority expired and required
renewal after negotiation.
The life span of camping Pods (Phase-1A) was only 10 year - Only 5-2 years
remaining.
The Executing agency signed MoUs with Private Parties (on white paper) instead of
Lease agreement on stamp paper which even not registered thus made that
arrangement is legally & very weak which does not provide protection.
17. Conditionalities & Progress
Progress on interventions – (2) Taking Over PTDC Properties - 19
Rs. 250.00 Million as one time contribution to Pakistan Tourism Endowment Fund –
Transferred in 2020
Mechanism, templates, of transfer deed and assumption of lease (assignment
agreement) communicated by the Cabinet Division – Endorsement Communicated to
Cabinet Division
Contribution of 10% income from the business of transferred properties on annual
basis to Pakistan Tourism Development Endowment Fund – Commitment
communicated to Cabinet Division
Release of Rs 243.95 Million for employees – Released by Finance Dept on Friday
18. High Court Case
Progress on interventions – (2) Taking Over PTDC Properties - 19
Cabinet Division submitted notification of federal cabinet approval of
transfer
PTDC submitted schedule – by 31st Dec
Teams formed but now PTDC has backed down
Secretary Tourism is focal person of Court – next hearing on 8th
RFPs for outsourcing gotten approved in advance
19. 19
Sr. # Event Date Place
1 World Tourism Day 27th Sep 2020 Khanpur Dam
2 City Tour 18th Oct 2020 Peshawar City
3 Abaseen Art Exhibition 20th Oct 2020 Nishtar Hall
4 Kashmir Day 27th Oct 2020 Nishtar Hall
5 Vintage Car Show 8th Nov 2020 Peshawar Services Club
6 Lok Mela Islamabad 6th-15th Nov 2020 Lok Virsa Islamabad
7 Survival Camp 3rd Dec 2020 Malam Jabba
8 Snow Boarding Championship 22nd-24th Jan 2021 Malam Jabba
9 Hindukush Snow Sport Festival 30th Jan-1st Feb 2021 Madaklasht Chitral
10 River Indus Jeep Rally Swabi 5th Feb 2021 Swabi Hund
11 Home Run Malam Jabba 13th Feb 2021 Malam Jabba
12 Gabin Jabba Festival 26th-28th Feb 2021 Gabin Jabba Swat
13 Womens Visit Takht Bhai 1st Mar 2021 Takht e Bhai
14 Tourism Festival 7th Mar 2021 Islamabad
15 Saidu Shareef TIC Desk 26th Mar 2021 Swat
Progress on interventions – (3) Promotion activities
20. 20
Sr. # Event Date Place
16 National Youth Conference 9th-11th July 2021 Nathiya Gali
17 Oppo V loggers Kalash Visit 15th Sep 2021 Kalash Chitral
18 Orakzai Cycle Race 1st Oct 2021 Orakzai
19 Federal Minister Usman Dar Visit 10th Oct 2021 Peshawar City Tour
20 Orphans City Tour 21th Oct 2021 Peshawar City Tour
21 A Tribute to Legend Khyber 24th Oct 2021 Peshawar Services Club
22 Kashmir Day Exhibition 27th Oct 2021 Nishtar Hall
23 Lok Mela Islamabad 1st-7th Nov 2021 Lok Virsa Islamabad
24 Diwali Sports Festival 7th Nov 2021 Col Sher Khan Stadium Peshawar
25 Federal Minister Asad Omer Visit 13th Nov 2021 Peshawar City Tour
26 Vintage Car Show 14th Nov 2021 Peshawar Services Club
27
Pakistan Blooms ( Heritage & Culture with
Flowers) Ladies
27th Nov 2021 Peshawar
Progress on interventions – (3) Promotion activities
21. 21
Progress on interventions – (4) Investment activities (Other than KITE)
Hund Water Theme Park on 400 kanal – Final feasibility expected Dec 21
PSDP + projects (5) - final feasibility expected June 22
Tourist Resort at Takht bhai Mardan
Tourist Resort at Takh e Sulaiman D.IKhan
Tourist Resort at Sheikh Badin DIKhan
Tourist Resort at Chapri Shalozan Parachinar
Tourist Resort at Garam Chashma Chitral
23. Details of Total 19 Properties:
19 Rest Houses Transferred to Galiyat Development Authority
2 Rest houses possession not given by LG
1 Rest house at Kala Pani Thandiani declared site office
Progress on Intervention (Outsourcing Policy of Government)
24. Establishment of 5-star Hotel at Nathiagali:
Leasing out of 22 Kanal land to private investor
Project awarded to Baron International
Management contract with Hilton
Work in progress
Progress on Intervention (Outsourcing Policy of Government)
25. Modernization of Ayubia Chairlift
Long term renting out of 110 Kanal
land to private investor for 40 years
Project awarded to Monal Group
Work in progress
Existing chairlift shut down
Progress on Intervention (Outsourcing Policy of Government)
26. Development of 300 Kanals land at Thandiani
Leasing out of 300 Kanals land to private investor for 99 years
Expression of interest issued
Six (6) firms applied and 4 shortlisted for RFP phase
Project expected to be awarded by February 20
Progress on Intervention (Outsourcing Policy of Government)
28. 28
Regulatory Structure
Antiquities Act, 2016
Antiquities Rules, 2020
In process
towards Cabinet – Amendments in Act to make it practical & simpler
29. 29
List of Museums in Khyber Pakhtunkhwa
Museums:
Peshawar, DI Khan, Abbottabad, Mardan, Dir Lower, Chrasadda, Swat, Khanpur,
Bannu, Hund Swabi, Gor Gathri, Chitral and Kalash Dur.
30. Progress on interventions – From ADP (Select & Less KITE)
Conservation and Restoration of Peshawar Museum, Peshawar
36. Progress on interventions – From ADP (Select & Less KITE)
General Overview
Construction of Site Museum with Auditorium & Accommodation at
(1) Jaulian , Haripur (2) Takhtbhai
Conservation of Town Hall DI Khan
Conservation & restoration of (1) Dilip Kumar & (2) Raj Kapoor House
Conservation Work at Bhashali, Altars and Jestakhans at Kalash Valley
38. Progress on interventions – Priorities
Hockey, Cricket, Squash, Athletics
Female Indoor Gymnasiums
Grooming & Coaching Support
39. Progress on interventions – Hockey
Charsadda
Approved cost: 87 Million
Date of inception: 30th May, 2020
Date of Completion: 30th January, 2021
Before
Now
40. Progress on interventions – Hockey
Islamia College Peshawar
Approved cost: 91 Million
Date of inception: 30th May, 2020
Date of Completion: 30th January, 2021
Before
Now
41. Progress on interventions – Hockey
Kohat & DI Khan
Establishment of Hockey Turf at Kohat
Approved cost: 91 Million
Date of inception: 30th May, 2020
Date of Completion: 30th May, 2021
Establishment of Hockey Turf at D.I.Khan
Approved cost: 91 Million
Date of inception: 30th May, 2020
Date of Completion: 30th May, 2021
42. Approved cost: 99 Million
Date of inception: 30th May, 2020
Date of Completion: 30th Dec, 2021
Progress on interventions – Hockey
Swat Bajaur & Parachinar
Approved cost: 130 Million
Date of inception: Scheme approved
Date of Completion: 30th June, 2022
43. Approved cost: 123.75 Million
Date of inception: July, 2021
Date of Completion: April, 2022
Approved cost: 115.21 Million
Date of inception: July, 2021
Date of Completion: April, 2022
Progress on interventions – Hockey
Nowshera Abbottabad
44. Qayyum Stadium Peshawar
Mardan
Bannu
Progress on interventions – Hockey
Existing
Planned (non-ADP)
Buner
Malakand
Lower Dir
47. Approved Cost: 1944 Million
Date of Completion: June, 2022
Grey Structure: December2021
Progress: 60%
Execution: C&W Department
Seating - 14000 to 29000
3 Star Hostel
Outdoor & Indoor Academy
Swimming Pool
Arbab Niaz Cricket Stadium
Progress on interventions – Cricket (Under Process Grounds)
48. Project Details
Approved cost: 994 Million
Date of Completion: 30/06/2021
Status: 65% work done
Scope of work
1. Main Pavilion Building (ICC
Standard)
2. General Public Stand & Toilets
3. Steel fencing, Main entrances
4. Hospitality boxes
5. Digital Score Board
6. Public Health works
7. 6000 outdoor, 1000 indoor Seats
8. Parking facility
Hayatabad Cricket Ground
Progress on interventions – Cricket (Under Process Grounds)
49. Grassy Ground Swat
Approved Cost: 1145.551 Million Date of
Completion: June 24
Progress: Approved in July
Execution: C&W Department
Scope
Project Details
1. Construction of Main pavilion (International standard)
2. Construction of steps
3. Levelling & Dressing
4. Drain
5. 9 pitches
6. Lavatory block
7. External Water Supply
8. Road/footpath
9. Masjid
10. Rehabilitation of old pavilion
11. Steel fence
12. Main entrance gate
13. Public Health Work
14. Digital Score Board
15. Extra Low voltage (ELV) system
16. Electrification and Gui gas work
Grassy Ground Swat
Progress on interventions – Cricket (Under Process Grounds)
50. Approved Cost: 2467 Million
Land: 320 Kanal
Date of Completion: June 24
Progress: Approved in July
Project Details
Scope
o Construction of Pavilion
o Construction of Media Box
o Construction of Guard Room (2 No)
o Construction of Common Toilets (3
No)
o Digital Score Board
o Boundary Wall/Construction of
cricket pitch
o Main entrance gate
o Security Watch Tower
o Electrification works
o PCC Road/passages/Walk ways
o Car Parking
o Open PCC drain/storm water drain
o Over Head Water Tank
o External Water Supply & Sewerage
Works
o External Gas Supply System
o Landscaping
o External Electrification Work
o External CCTV Camera System
o Transformer 100/50 KVA
o Diesel Generator 200 KVA
High Altitude Cricket Ground Kalam
Progress on interventions – Cricket (Under Process Grounds)
51. Progress on interventions – Squash
Courts Constructed
1. GHS Neway Kali
2. GHS No.1 & Gul Bahar.
3. Islamia Collegiate
4. Benazir Women University
5. Lady Griffth Girls school
6. Frontier College for Women
7. Govt. College
8. Jinnah College for Women
52. Progress on interventions – Squash (on-Going)
FIRST 3-D Squash Court in Public Sector
Development of 3-D Squash
Court
(Hayatabad Sports Complex)
Approved cost: 100 Million
Date of inception: June, 2021
Glass being imported from
England
Civil Work completed 40%
53. Progress on interventions – General Overview ADP (Select)
Stadiums planned where non-existent - Like Karak, Lower Dir
Dedicated Female Gyms
Tehsil Level Playgrounds – 57 out of 79 completed
Adaptive Sports
Sports City at Peshawar (300 Kanal in Regi already there & feasibility
complete)
Upgradation of Sports facilities under AIP – all ex-FATA District HQs
1000 Sports facilities – landmark project [Approved 217, Completed
116, ongoing 101) - funding issues
UC Level sports facilities – just approved
Talent Identification and grooming program
54. No of Players participated: 11000
Open Trials Conducted in 127 Tehsils in 6 Games.
1. Athletics
2. Badminton
3. Football
4. Kabbadi
5. Volleyball
6. Tug of War
Progress on last 2 years activities – Under 21 Games
55. • All 04 provinces (federal, administrator Islamabad,
Gilgit Baltistan, AJK)
• Total Games = 34
• Total participants: 550
• Stokes of games (Standing disability- (lower),
(upper)- blind (mentally retarred, backbone
injured, spinal cord injured, polio hit youth).
Progress on last 2 years activities – 28th National Special Persons Games
56. • U-13 Talent Hunt (Squash)
Participants: 150
Sponsorship: Bank of Khyber
Stipend for winner: Rs.
20000/-
Tenue: Three Years
Date: June, 2021
Progress on last 2 years activities – Squash Talent Hunt Program
57. • Total 10 games were included.
• Total participants: 180 transgender players.
• Games:
1. Athletics
2. Cricket
3. Cycling
4. Tug of war
5. Woodball
6. Badminton
7. Table Tennis
8. Football
9. Basketball
10. Tug of war
Progress on last 2 years activities – 1st Transgender Games
58. Stokes of event:
• Open trials in 35 districts.
• 10 days camp for each discipline under qualified
coaches.
Games:
Athletes from all the 04 provinces, Gilgit Baltistan,
AJK & Islamabad participated in 04 female & 7
males games.
Progress on last 2 years activities – Under 16 National Championships
59. • First ever in Pakistan involving 07 teams from
as many regions & 01 team from merged tribal
areas
• 32 Olympians & International Hockey Players
part of the league.
• All matches Live Telecast on Geo Super.
Progress on last 2 years activities – KP Hockey League
60. Inter-Provincial Athletics Meet 2020-21
• 200 athletes (Male & Female) from 04 provinces,
Islamabad, Gilgit Baltistan, AJK participated.
• Venue: Qayyum Sports Complex Peshawar.
• KP won 2nd position by attaining 14 medals.
61. National Women Futsal Championship, 2020-21
Event held in connection with World Women Day celebration
by Government of KP.
14 Teams from 04 Provinces, Gilgit Baltistan,
Islamabad, AJK, Police, Army, International Crescent
Club, KP red & White & Diva club Islamabad.
62. International Boxing
• Flyweight Asian Gold Medalist Usman Wazir
with Directorate General Sports held International
Boxing event.
• International Boxers from Afghanistan, Pakistan
& Iran took part.
63. • A total of 510 matches will be played at 69 venues
in 35 districts across KP.
• Over 4,000 players and 276 teams will participate
in 510 30-over matches in the tournament.
• The age criterion for the selection of players in the
tournament is that players be born on or after
August 14, 2005.
PM’s Directions – Inter-School Cricket Championship 2021
64. 1. Stipend to 107 medal winners of U-16 Talent
Hunt Program @ 10000 (Gold), 8000 (Silver) &
5000 (Bronze).
2. Stipend to 1100 medal winners of KP U-21
Games @ 10000 (Gold), 8000 (Silver) & 5000
(Bronze).
3. Coaching Camps of 15 days for the winners of
KP U-21 games.
4. Distribution of International Standard Sports
equipment.
5. International Scholarship to budding and talented
youth in different games, supporting them with
airfare boarding & lodging.
Progress on last 2 years activities – Stipend Program
66. EXECUTIVE SUMMARY
Khyber Pakhtunkhwa Integrated
Tourism Project (KITE) financed
out of a credit allocated under
IDA and with counterpart funding
from Provincial ADP.
It aims to open up new tourist
destinations and areas, improve
the provincial infrastructure,
enhance tourism assets, and
strengthen institutional capacity
in support of sustainable tourism
development in province.
Approved at a total cost of PKR 17 B
(PKR 14 B IDA credit and PKR 3 B
counterpart funding) by ECNEC on
15.07.2019
Project Agreement/ Finance Agreement
signed on 26.11.2019
Components of the project:
1. Sector Enablement
2. Infrastructure Planning and Development
3. Project Management & Capacity Building
4. Contingent Emergency Response
Component
68. Integrated Tourism Zones (ITZ)
Feasibility Study & Master Planning
of 4 sites
o Ghanool, Manshera
o Mankyal, Swat
o Madaklasht, Chitral
o Thandiani, Abbottabad
Two deliverables “Inception
Report” and “Technical Analysis”
approved.
3rd deliverable Master Plan
reviewed by PMU & WB.
Next Deliverable is Management
Plan and Investment Plan.
Ghanool
Mansehra
Madaklasht
Chitral
Mankyal
Swat
Thandiyani
Abbottabad
STATUS REPORT
69. Integrated Tourism Zones (ITZ)
Land Acquisition
Section IV imposed on
o Ghanool, Manshera (480 Kanal)
o Mankyal, Swat (754 Kanal)
o Madaklasht, Chitral (540 Kanal)
Thandiani, Abbottabad owned by
GDA thus no acquisition required.
Notification as ITZ being
processed
Ghanool
Mansehra
Madaklasht
Chitral
Mankyal
Swat
Thandiyani
Abbottabad
STATUS REPORT
70. Integrated Tourism Zones (ITZ)
08 Nos new sites identified
o Sirin Valley, Manshera
o Manoor Valley, Manshera
o Jarogo Banda, Swat
o Elum Valley, Buner
o Mahabanr, Buner
o Shahi & Bin Shahi, Lower Dir
o Kalash, Lower Chitral*
Preliminary report shared with bank
Site survey to finalize the sites
WB advised that once master plan of
already 4 sites is completed than new
sites will be considered.
Ghanool
Mansehra
Madaklasht
Chitral
Mankyal
Swat
Thandiyani
Abbottabad
*Notified as Local Development Authority
STATUS REPORT
71. Destination Investment Management Plans (DIMPs)
Kalam, Kumrat & Chitral
Contract Signed on 30.12.2020 with JV led by M/s Kohl & Partner (Austria).
1st Deliverable “Inception Report” approved on 6th April 2021.
Second deliverable “Situation Analysis & Technical Survey” conducted.
Draft Destination Management Plan submitted by the firm & is under
review.
Next Deliverable is Visitor Management Plan and Investment Plan.
STATUS REPORT
73. Approved by PDWP on 04.01.2021 under
available financing
Draft Evaluation Report submitted to WB on
17.05.2021
WB advised to approach 2nd lowest bidder on
20.10.2021.
Modified Bid Evaluation Report submitted to
Bank with suggestion for rebidding.
STATUS REPORT
74. Concept for Feasibility Study
approved by CM KP and later by
KITE PSC on 06.08.2020
Evaluation completed
Draft contract and combined BER
submitted to WB.
STATUS REPORT
76. Preservation/ conservation and development of
Archaeological Sites
Work on preservation/ conservation and
beautification underway
3 Mosques (Kalam, Pishmal, Odigram) District
Swat
02 Stupa (Shapula and Bhamala) District
Khyber & District Haripur)
03 Museums (Mardan, Hund Museum Swabi
and Chakdara District Lower Dir)
STATUS REPORT
77. Supply and Installation of Archaeological Sign boards
312 sign boards installed
69 directional signboards installed in District Mardan.
102 informational signboards installed at archaeological
sites in Takht Bhai, Jamal Garhi and Shahbaz Garhi.
02 boards installed at Swat Motorway
91 directional signboards installed at archaeological sites
at District Swat.
43 signboards in D.I. Khan installed
Task order for 22 archaeological boards on M-1 & N-35
and 08 in Chitral issued
STATUS REPORT
78. Task # 08_02: Buddha Corridor – Archaeological Signboards
80. Illumination of Heritage Sites
Contract awarded for Sethi House,
Peshawar Museum, Gor Gathri.
Implementation started.
Design of Jamal Garhi initiated.
Coffee Table Book
Photographic documentation of all
sites completed.
Coffee table book and booklets of
each site.
Launch in Dec 2021.
STATUS REPORT
82. Archeological Architecture & Design
o Kalash Dur Museum
o DI Khan Museum
o Peshawar Museum
o Abbottabad Museum
Next Tasks
o Showcases and other enhancements
for the Peshawar Museum
o D.I. Khan Museum and Gor Gathri
Transport Museum
STATUS REPORT
Completed
In Process
85. Supply and installation of Prefabricated toilets at
Tourism Areas
Archaeological Sites
Installed set of 03 Units at Gor Gathri Peshawar and
04 Units at Takht Bhai
Galyat
Installed 16 units at 5 sites
Kaghan Valley
Installation at 2 sites completed
Site issues (forest/ land slide)
Malakand Division (sites identified)
Site identified -- Shamozai Bridge, Kalam Tehsil Swat,
Lowari Tunnel, Lower Chitral
4 units installed at Gabeen Jabba
STATUS REPORT
91. • Kewai, Manshera
• Galyat, Abbottabad
• Thandiani, Abbottabad
• Kalash, Lower Chitral
• Kumrat, Upper Dir
• Gabeen Jabba, Swat
STATUS REPORT
10 No. 4x4 Ambulances handed
over to Rescue 1122
05 Nos 4x4 fire fighting vehicles to
be handed over after final
inspection.
Fire fighting equipment handed
over.
Installation of prefab containers at
3 sites in process.
Establishment of Rescue 1122
Stations
92. Establishment of Tourist Facilitation Hub
(TFH)
KP’s first ever Tourism 24/7 Helpline
1422 started in November 2020 (test
phase)
Fully operationalized since March 2021
Staff of Directorate of Tourist Services
trained for operations.
Handing/ taking over with KP Culture
& Tourism Authority completed.
Collaboration made with Pakistan
Meteorological Department for live
weather updates.
STATUS REPORT
93. Province Wise Calls Count
Tourists are reaching 1422 helpline from social media channels
10
28
104
809
988
994
4371
0 1000 2000 3000 4000 5000
Balochistan
AJK
Sindh
GB
Islamabad
Punjab
KP
TOURISTS DEMOGRAPHICS
CALLED @ 1422
3314
1003
693 601 558 540 450 404 397 245
TOP Queries @ TOURIST
FACILITATION HUB |1422|
17890 calls have been handled since the inception of TFH
98. Procurement for DG HS under CERC
CERC component triggered by WB on 22.03.2020 with USD 5
million reallocation
Procurement for DGHS: 1349 infusion pumps, 500
Nebulizers, 377 cardiac monitors, 35 oxygen concentrators,
25 motorized beds, 75 Syringe Pumps 16 ABG machines 65
BIPAP, 44 ECG Machines 3 Channel, 25 Portable Ultra Sound
Machines, 140 Suction Machines,300,000 KN 95 Masks.
Procurement for GDA: Thermal Fogger Machines 3 Nos
Water Bousers 2 Nos, Protection Suits 500 Nos, Gloves 1000
Nos, Masks 1000 Nos, Googles 200 Nos, Face Shields 100
Nos.
STATUS REPORT
99. Awareness and training on SOPs for Tourism Sector – Post
Covid -19 Era:
24 Sessions w.e.f 31st May to 11 June 2021.
Target Areas: Peshawar, Abbottabad, Mansehra, Swat, Dir
Upper, Lower Chitral.
More than 800 public and private sector stakeholders
including 60 females attended.
STATUS REPORT
101. (Million Rs)
Nos Cost Allocation
KP 14 29999 8723
AIP 1 7365 1000
Total 15 37,364 9723
Progress on High Priority Projects
102. S.# Name of the Project Cost
1
Establishment of Playgrounds in Khyber
Pakhtunkhwa on need basis. (A)
/PDWP /19-11-2014
4225
• Total 88 Number Sub schemes / Tehsil level playgrounds have
been approved.
• Out of which 60 number have been completed.
• All the sites have been cleared except two grounds in Shangla
and one ground in Battagram.
• Revised PC-I is under preparation due to creation of new Sub
Tehsils in the Province.
2
Feasibility and
improvement/construction of Arbab
Niaz Cricket Stadium Peshawar. (A)
/PDWP /31-03-2021
1946.1
• Revised PC-I approved by PDWP in March, 2021.
• Work in progress.
• Series of meeting on subject project have been convened at
different level i-e Secretary Sports, Secretary C&W, ACS P&D,
Chief Secretary, Chief Minister, Khyber Pakhtunkhwa.
3
Establishment of Sports Complex in
Swat. (A) /PDWP /28-03-2018
582
• Revised PC-I approved by PDWP on 18/10/2021 due to change
of site and addition/deletion in scope of work
• Administrative Approval issued.
• Land acquisition is in process.
Progress on High Priority Projects
103. S.# Name of the Project Cost
4
Provision of Hockey Turf at D.I. Khan,
Kohat Charsadda and Islamia College
Peshawar (A) /PDWP /25-01-2021
625.03
• 4 componants i-e Islamia College, Peshawar, D.I. Khan, Kohat and
Charsadda have been completed successfully.
• The two new components (Nowshera & Abbotabad) will be
completed upto March 2022
5
F/S and Establishment of Female indoor
sports facilities at divisional
headquarters in Khyber Pakhtunkhwa
(A) /PDWP /19-02-2019
700
Progress:
• Mardan (90% completed)
• DIKhan (40% completed)
• Peshawar (50% completed)
• Swat (35% completed)
• Kohat (50% completed)
• Bannu , Contract recently awarded
• Abbottabad: Pending due to site issue. Issue will be resolved by
Speaker Provincial Assembly.
6
Up-Gradation of Hayatabad Sports
Complex Peshawar. (A) /PDWP /-
500
• The project has been assigned to National Logistic Cell (NLC) for
execution on single source basis.
• The seats for spectators have been procured through open
competition.
• The services of NESPAK have been hired on single source basis.
Cost of consultancy is Rs. 64.545 M
• Cricket Ground will be completed by 15/12/2021.
Progress on High Priority Projects
104. S.# Name of the Project Cost
7
180563 - Revival of Squash in Khyber
Pakhtunkhwa (A) /PDWP /17-09-2019
250
Total 10 number of Squash court have been approved.
The following projects will be ready for inauguration by 31-03-2022.
• Benazir Woman University,
• Jinnah College,
• Islamia College,
• GGDC Peshawar city,
• GDC Peshawar City,
• GDC Gulbahar,
• Sports Complex Kohat
Import items arrived at squash courts. Installation is in progress
Squash Court at Gul Bahar Peshawar and 2 squash courts at Kohat
Sports Complex has recently been approved.
8
200167 - Construction of Cricket
Stadium with Allied Facilities in Kalam
District Swat. (A) /PDWP /31-03-2021
2467.181
• EA consultant already hired for designing and supervision
• Work Order issued.
• The work will begin as and when land payment cleared and site
handed over to Sports Directorate
Progress on High Priority Projects
105. S.# Name of the Project Cost
9
Tourism Area Integrated
Development Project
(Establishment of Provincial
Tourism Authority). (A) /PDWP
/29-10-2020
2667.4
• 3 Components
Kalam (Approved)
Naran (Approved)
Chitral (Recently Approved on 07-07-2021
• Work stopped on Kalam & Naran approved components in 2018 due to NAB case.
• Out of 24 observations of NAB, 23 observations have been cleared. Summary for
relaxation of KPPRA rules was sent few months ago and is under process.
10
Khyber Pakhtunkhwa
Integrated Tourism
Development Project (KITE)
(Cleared by CDWP 23-04-2019)
(IDA Assisted) (A) /ECNEC /15-
07-2019
3000
• 04 Integrated Tourism Zones (ITZs):
Thandinai, Mankial, Mataklash & Ghanool. Identified.
Authorities asked for imposition of Section-4.
ITZs Contract signed
Master Plan for the 4 Integrated Tourism Zones approved by the Chief Minister,
Khyber Pakhtunkhwa on 14/10/2021.
• Rehabilitation and upgrading of Thandiani Road in district Abbottabad (24 KM)
• Rehabilitation and upgrading of Mankyal Road in district Swat - 24 KM
Procurement process for Civil Contract started. World Bank has been requested
for NOL. Contract will be after receiving of NOL from World Bank.
Progress on High Priority Projects
106. S.# Name of the Project Cost
11
Development of roads to Tourist areas
in Malakand Division (A) /PDWP /
14-04-2021
4812.7
• PC-I revised on 14/04/2021.
• Scope includes:
i. Ana Kar Road, Swat, 3 KM
ii. Marghuzar Elaam Road, Swat 7 KM
iii. Dag Sar Charoona Road, Buner 7 KM
iv. Madain–Bishihram Lak Road, Swat 6 KM
v. Areena Daral Road, Swat 4 KM
vi. Gudar Lak Road Kalam, Swat 3 KM
vii. Bella beshigrami Road, Swat 4 KM
viii. Burj Banda Road, Shangla 4.5 KM
ix. Kafir Banda Road, Shangla 14 KM
x. Chail Bishigram Road – 9 Km –Swat
xi. Fazal Banda to Jarogo Waterfall – Swat – 8 Km
12
Construction of Access roads to Tourist
areas destination in Hazara Division (A)
/PDWP /14-04-2021
4655.134
• PC-I revised on 14/04/2021.
i. Manoor Valley Road, Mansehra 15 KM
ii. Ghanool Paprang Road, Mansehra 09 KM
iii. Shogran Road, Mansehra 11 KM
iv. Mundi Mali Road, Mansehra 20 KM
v. Komal Gali to Chora Seri, Haripur 07 KM Nawaz Abad to
Mundi – Mansehra – 12 Km
Progress on High Priority Projects
107. S.# Name of the Project Cost
13
Development of Tourist Spots in
Khyber Pakhtunkhwa (A) /PDWP /
18-11-2020
2200
Consultancies have been re-advertised for feasibility study/design for:
• Dubair valley road KKH to Jabba Mankiyal Swat,
• Amlook Dara BAghona to Nagrai Kacha road,
• Buner and Mooro Maali Road Kulai Palas Kohistan
• Four number tracks i.e.
Sattu Bangla Track, Abbotabad
Dak Bangla Track, Abbotabad,
Track from Shinkiari to Kund Bangla & Nadi Bangla and Shaheed
Pani Banglow, Mansehra
Track from Saiful Malood to Ansu Lake to Biari, Mansehra and
• Development of 6 number waterfalls.
Sajjikot Waterfall, Abbotabad
Umbrella Waterfall Abbotabad
Jarogoo Waterfall Swat
Noori Waterfall Haripur
Chajian Waterfall Haripur
Lamchar Waterfall Dir Upper
• NOCs from Forest Department are awaited for development of
Tracks.
Progress on High Priority Projects
108. S.# Name of the Project Cost
14
160588 - Youth Development Package.
(A) /PDWP /31-01-2018
1369
• The Jawan Marakiz will be established in each district on State
land.
• However, there is no state land available in some of the districts
at suitable locations which is causing delay in execution of this
main component.
• Identification of sites for Establishment of Jawan Markaz in
districts has been initiated as per PC-I of the Scheme.
• Process for hiring of event management firm for carrying out
National Youth Carnival was completed till the evaluation stage,
however, before the award, the process became sub-juidice
before PHC, hence the award and subsequent execution is still
pending.
15
195218 - Establishment, upgradation &
Rehabilitation of Sports Facilities (AIP)
(A) /PDWP /10-09-2020
7365
• Upgradation & Rehabilitation of 11 existing sports facilities in
different Districts have been approved by PDWP. Upgradation
work has been started at 7 sports facilities. For other 04 sports
facilities tendering is in process.
Progress on High Priority Projects
109. S.# Name of the Project Cost Status
16
Development of 1000 Playing facilities
in Khyber Pakhtunkhwa (Total Cost Rs.
5500 Mn - Phase-I Cost Rs. 2500 Mn).
(ADP)
5500
• Total 217 sub schemes have been approved at a total cost
of Rs. 1303 million.
• Out of which 116 sub schemes have been completed.
• 101 sub schemes will be completed subject to availability
of funds.
Progress on High Priority Projects
111. Camping Pods
Phase-1 (A) – Local Procurement by TCKP
S.# Camping Pods Sites Land Status Lease Period
Operational Life
of Pods
1. Thandiani - Abbottabad
GDA land
(Case in Court)
Lease Period to expired Expired
2. Sharan - Mansehra
Forest Land Can’t
Lease Out
Lease extension case pending with Forest Expired
3. Bishigram - Swat Private Land
Lease Period 10 years
(13-7-2016 to 13-7-2026)
Five years Remaining
Expired
4. Yakh Tangi - Shangla Private Land
Five years
(1-10-2017 to 1-10-2022)
Two years Remaining
Expired
5. Sheikh Badin - D.I.Khan Govt. Land
Lease Period 10 years
(15-6-2016 to 15-6-2026)
Five years Remaining
Expired
112. Phase-1 (B) – International Procurement through UNDP
S.# Camping Pods Sites Land Status Lease Period Pods Status
1. Allai - Battagaram
Transferred from
TCKP
KP-CTA Property Not Handed Over
2.
Bamburait (Kalash Valley) -
Lower Chitral
Private Land
15Years
03-08-2019 to 03-08-2034
Not Handed Over
3.
Malka (Barchar) Mahband -
Buner
Private Land
20 Years
18-07-2019 to 18-07-2039
Not Handed Over
4. Shaheed-e-Sir (Buner)
Local Government
Property
Local Govt Property
initially 10 Year lease
Not Handed Over
5. Gabeen Jabba - Swat Private Land
15 Years
18-07-2017 to18-07-2032
Functional
113. Phase-2: MoU signed with UNDP For Feasibility Surveys, International Procurement,
Installation and handing taking over.
S.# Camping Pods Sites District
1. Jarogo Swat
2. Sulantarn Swat
3. Bin Shahi Lower Dir
4. Kumrat Upper Dir
5. Sor Laspur Upper Chitral
6. Broghil Upper Chitral
7. Kalam Valley Swat
8. Laram Top Dir Lower
9. Samana Top Hangu/Orakzai
10. Lilownai-Alpuri Shangla
114. List of PTDC Properties in KP (Shared by PTDC on 24th Mar, 2021)
Owned Properties:
S.No.
Name of Properties/
Location
Facilities Total Area
Covered
Area SFT
Ownership Status Remarks
1
PTDC Motel at Saidu Sharif,
Swat
23 Rooms 8K 15M 19000 PTDC Operational
Out of total 2 Kanal
5 Marla open space
for garden
2
PTDC Restaurant at
Chakdara, Malakand
Restaurant 6K 7050 PTDC Operational
3 PTDC Motel at Panakot, DIR 04 Rooms 6K 11M 7150 PTDC Operational Occupied by Army
4
PTDC Motel at Bamburait,
Chitral
07 Room 12K 13450 PTDC Operational
5
PTDC Motel at Bunni,
Chitral
04 Rooms 8K 7064 PTDC Operational
6
PTDC Motel at
Birmughlasht, Chitral
16 Rooms 32K 13450 PTDC
Not
Operational
7
PTDC Motel at Chitral,
Chitral
30 Rooms 4K 15M 24352 PTDC Operational
115. S.No.
Name of Properties/
Location
Facilities Total Area
Covered
Area SFT
Ownership Status Remarks
8
PTDC Motel at Mastuj,
Chitral
12 Rooms 13K 11050 PTDC Operational
9
PTDC Motel at Chattar
Plain, Mansehra
04 Rooms 9K 9M 3932 PTDC Operational
10
PTDC Motel at Besham,
Shangla
47 Rooms 16K 4M 34966 PTDC Operational
11
PTDC Motel at Ayubia,
Abbottabad
34 Rooms 19K 5M 15000 PTDC Operational
12
PTDC Motel at Baran Kallay
Swat (under construction)
17 Rooms 30K 25000 PTDC
Under
Construction
13
PTDC Land at Garam
Chashma, Chitral
Land 10K - PTDC Land Open Land
14 Manikal Jabba 16 Rooms 40K 25000 PTDC
Destroyed &
Disputed
List of PTDC Properties in KP (Shared by PTDC on 24th Mar, 2021)
Owned Properties:
116. S.No.
Name of Properties/
Location
Facilities Total Area
Covered
Area SFT
Ownership Status Remarks
1 PTDC Motel at Kalam, Swat 38 Rooms 40K 16238
Leased from
KPK
Operational
2
PTDC Motel at Minadam,
Swat
21 Rooms 10K 19M 13899
Leased from
KPK
Operational
3
PTDC Motel at Balakot,
Mansehra
08 Rooms 2K 7M 8500
Leased from
Distt. Council
Mansehra
Operational
4
PTDC Motel at Naran,
Mansehra
60 Rooms 160K 31292
Leased from
Forest Deptt.
KPK
Operational
5
PTDC Motel at Torkham,
Torkham (Pak - Afghan
Border)
04 Rooms 2K 6898
Long lease
period not
mentioned
Leased Out
Details not
provided
List of PTDC Properties in KP (Shared by PTDC on 24th Mar, 2021)
Leased Properties: