Standard Practices  of  Handling, Storage  and    Transportation of   Cl2 Tonners/Cylinders BY H. S. SEHGAL DGM (PRODUCTION)
OVERVIEW ,[object Object],[object Object],[object Object],[object Object]
Conti… ,[object Object],[object Object],[object Object]
Introduction   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Common Industrial Gases ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main Causes of Accidents ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Main Hazards ,[object Object],[object Object],[object Object],[object Object],[object Object]
Flammable Gases ,[object Object],[object Object],[object Object],[object Object],[object Object]
Non-Flammable Gases ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Poison Gases ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
NEVER trust a color of a compressed gas cylinder.  NEVER assume cylinder content ALWAYS check the label! Compressed gases Identification
Handling Liquefied Compressed Gas-Chlorine ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONT… ,[object Object],[object Object],[object Object]
DESIGN FACTORS OF TONER/CYLINDER FOR TOXIC GAS  {CHLORINE} 2 MM 2 MM CORROSION ALLOWANCE D.P. TEST SHALL BE CARRIED OUT FOR JOINT BETWEEN VALVE AND HEMISPHEREIOD. D.P. TEST SHALL BE CARRIED OUT FOR JOINT BETWEEN VALVE AND HEMISPHEREIOD. DYE PENETRATION TEST 0.95  0.95  JOINT EFFICIENCY  100% ON ALL BUTT WELDS BEARING PARTS. 100% ON ALL BUTT WELDS BEARING PARTS. RADIOGRAPHY AMBINET (65 DEG. C.) AMBINET (65 DEG. C.) DESIGN TEMP 35 KGF/CM2 (MIN) 35 KGF/CM2 (MIN) HY. TEST PRESSURE 19.9 KGF/CM2 19.9 KGF/CM2 DESIGN PRESSURE IS-7681-1975/IS-3196 IS 2825/ASME SECTION VIII DIV I /PD 5500 DESIGN CODE CYLINDER TONNER SPECIFICATION
CONT… PUNCHING DETAIL ON FOOTRING AND HEMISHERE OF TONER (VALVE SIDE) M.O.C. OF VALVES VALVE/PLUGS PAINTING LIQUID CAPACITY STRESS RELIEVING  WATER CAPACITY PNEUMETIC TEST PRESSURE SPECIFICATION SR. NO.  : T.WT.  : W.C.  : H.T.  : AL,SI, BRONZE WITH MONEL SPINDEL AS PER IS-3224 MFGD. GOLDEN YELLOW COLOR ALL OVER AFTER PRIMER PAINTING OF PRIMER IS:356. 900 KGS(MIN) YES 780 LTRS 11 KGF/CM2 (MIN) TONNER SR. NO.  : T.WT.  : W.C.  : H.T.  : AL,SI, BRONZE WITH MONEL SPINDEL AS PER IS-3224 MFGD. GOLDEN YELLOW COLOR ALL OVER AFTER PRIMER PAINTING OF PRIMER IS:356. 100 KGS(MIN) YES 88 LTRS 11 KGF/CM2 (MIN) CYLINDER
CONT… 2 MM 2 MM CORROSION ALLOWANCE CYLINDER TONNER SPECIFICATION 1.19 70 KGS 6 MM BUREAU OF INDIAN STANDARD/ LLYOD CCE-NAGPUR 1.19 620 KGS 12 MM BUREAU OF INDIAN STANDARD/ LLYOD CCE-NAGPUR FILLING RATIO TARE WEIGHT NOMINAL WALL THICKNESS INSPECTION  APPROVAL SA 516 GR 60/70 SA 516 GR 60/70 MATERIAL OF CONSTRUCTION  AS PER STANDARD DESIGN AS PER STANDARD DESIGN COVER HOOD 368 MM 316 MM 988 MM 784 MM 760 MM 2085+_ 12 MM O.D. I.D. L.
CONT… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
CONT… ,[object Object],[object Object],[object Object],[object Object],[object Object]
STORAGE PRACTICES FOR TONNERS AND CYLINDERS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
 
 
 
 
ASSOCIATED OPERATIONAL PRACTICES ,[object Object],[object Object],[object Object],[object Object],[object Object],b. Checking/ recording of receipt tonners  ,[object Object],a. Unloading of cylinders from truck
PREPARATION OF   TONNERS/CYLINDERS ,[object Object],[object Object],[object Object],d. Internal  inspection with 12 volt supply ,[object Object],c. Checking of valves/spindle/plugs ,[object Object],b. For Cl2 gas  ,[object Object],[object Object],[object Object],[object Object],a. Physical checking
Conti… ,[object Object],[object Object],[object Object],f. Preparation for empty tonners ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],e. Hydro test for overdue tonners
FILLING OF   TONNERS/CYLINDERS  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Conti… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DESPATCH OF FILLED   TONNERS/CYLINDERS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
QUALITATIVE CHECK ,[object Object],[object Object],[object Object],[object Object]
INTENSIVE TRAINING PROGRAMME ,[object Object],[object Object],[object Object],[object Object]
EMERGENCY & EMERGENCY MANAGEMENT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Conti… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
GLOBAL MODE OF CHLORINE   TRANSPORTATION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
GLOBAL TRANSPORTATION SCENARIO Worldwide other modes of Transportation are also being used like thro’ Barges on Water for more than 6000 kms distance in Columbia, Chile & for very short distances, Pipelines 1200 Road (100%) 51 India 1000 200 Rail (67%) Road (33%) 6 Europe 600 300 Rail (30%) Road (70%) 10 Japan 4000 (Brazil) 1500 (Chile) Road Rail (75%) 66 South America 1000 Rail (90%) Road (6%) 35 North America Max. Distance Covered  (Kms) Mode of Transport Quantity of Cl2 Transported  (% of Production) Country
 
STATUS OF INDIAN CHLORINE INDUSTRY ,[object Object],[object Object],[object Object],[object Object],[object Object]
CHECK POINTS FOR TRANSPORTATION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
SAFETY PRACTICES OF TRANSPORTATION- MANUFACTURER ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SAFETY PRACTICES OF TRANSPORTATION- TRANSPORTER ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Control Measures In Case Of Chlorine Leakage During Transportation   ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
TRANSPORT  PRACTICES  IN OTHER COUNTRIES ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
BENEFITS OF BULK TRANSPOTATION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
Straps & logistic rail for securing cylinders
Load bars & logistic rail for securing cylinders
Palletizing cylinders
Ground level loading & unloading cylinders
Ton container blocking
Front bulkhead reinforcement for ton containers
C clamp on two end ton containers of truck load
Telescopic boom mounted on ton container trailer
Ton container lock-down devices
PRACTICES OF CHLORINE WITHDRAWL AT CUSTOMER END ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
Withdrawal rate of Chlorine ( Room Temp. – Threshold temp.) * withdrawal factor withdrawal factor for Tonner = 8/ Cylinder= 1   Threshold temp. is the temp. where minimum required gas pressure  is reached   Temp. Deg. C Tonner (900 Kg.) Cylinder (67 Kg.) Day Hr. Per Day Per Hr. 4 45 1.87 4.08 0.17 10 110 4.58 9.50 0.39 15 130 5.41 16.10 0.67 20 254 10.58 21.54 0.90 27 315 13.12 20.12 1.17
REGULATORY REQUIREMENTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Important precautions  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Remember   ,[object Object],[object Object],[object Object],[object Object]
Activities for which Licenses is required ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Other requirement under the Regulations: ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
Condition for no licence for filling and possession   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Examination and testing of Chlorine tonners and bullets ,[object Object],[object Object],[object Object]
[object Object],[object Object]
Important Additional Conditions of  licenses   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Notice of accidents ,[object Object],[object Object],[object Object],[object Object]
Provisions under Factories Act 1984 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Provisions under Manufacture, Storage & Import of Hazardous Chemicals Rules – 1989 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Provisions under Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996 ,[object Object],[object Object],[object Object],[object Object],[object Object]
Provisions under Central Motor Vehicle Rules 1989 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
EMERGENCY HANDLING FROM POSSIBLE LEAKAGE POINTS OF TONNER  Close the valve -      Provide O/L brass seal nut. -      Provide additional valve with  Clamp. -      Use emergency kit Sr. No. Particular Problem Action  1 Gland leakage - Gland nut loose Tighten the gland nut with suitable spanner 2 Chlorine valve passing Pitting on the spindle seat - Pitting on valve seat -  3 Chlorine valve damage - Valve broken - Use emergency kit to control leakage 4 Leakage from tonner surface - Pin hole on the surface - Use emergency kit to control leakage 5 Leakage from blind plug - Thread damaged - Use emergency kit to control leakage 6 Leakage from O/L of the Cl2 Valve - Thread damaged - Pin hole in the outlet nozzle - Gasket not properly fitted - Dosing line leakage - Close valve - Rotate Tonner to 180 deg., Use 2 nd  valve - Replace gasket   - Replace the dosing line
 
LIQUID CHLORINE SPILLAGE AND CONTROL ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
CHLORINE ABSORPTION SYSTEM ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FIRST AID FOR CHLORINE EXPOSURE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cont… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
LIQUID CHLORINE STORAGE  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SAFETY CONTROLS ON BULLETS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Containment system in case of toxic release at tank area ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Contd… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MATERIALS OF CONSTRUCTION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PIPING DESIGN/MAINTENANCE ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
REFERENCE FOR SAFE OPERATION OF CL2 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Contd… ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
LEARNING AND SHARING INCIDENT REPORT ,[object Object],[object Object],[object Object]
Incident of Chlorine Off-Site Emergency at Bhiwandi Municipal Corp on 23rd & 24th July 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Incident of Chlorine Leakage at Mumbai Port Trust (MBPT) on 14th July, 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object]
Incident of Hydrochloric Acid Leakage  due to damage of the HCL Tanker Valve ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Incident of Chlorine Gas Leakage from Tonner during Transportation On 5th September 2010 at  Village Chhattar on Rajkot-Morbi Highway (Gujarat) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
3.  Incident due to storage of incompatible material ,[object Object],[object Object]
Tank Failure in one Chlor-Alkali Plant, On June 7, 2010 In Thailand ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
Incident of Hydrochloric Acid Leakage due to product spillage ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONCLUSION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 

More Related Content

What's hot

Flammable Liquids Training
Flammable Liquids TrainingFlammable Liquids Training
Flammable Liquids Training
Dan Junkins
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting Training
Christian Escaler
 

What's hot (20)

Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Bleve
BleveBleve
Bleve
 
Coal Dust Explosion and its Safety at Thermal Power Plant
Coal Dust Explosion and its Safety at Thermal Power PlantCoal Dust Explosion and its Safety at Thermal Power Plant
Coal Dust Explosion and its Safety at Thermal Power Plant
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
Jaipur Fire
Jaipur FireJaipur Fire
Jaipur Fire
 
Piping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / HydrotestingPiping Hydrostatic Test / Hydrotesting
Piping Hydrostatic Test / Hydrotesting
 
AMMONIA storage
AMMONIA storageAMMONIA storage
AMMONIA storage
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Portable fire extinguisher
Portable fire extinguisherPortable fire extinguisher
Portable fire extinguisher
 
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
OISD-STD-117 Fire Protection Facilities for Petroleum Depots, Terminals, Pipe...
 
V 1 presentation on safety aspects of lpg handling and storage
V 1 presentation on safety aspects of lpg handling  and storageV 1 presentation on safety aspects of lpg handling  and storage
V 1 presentation on safety aspects of lpg handling and storage
 
Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)Pipeline Overview (Pipeline Operations)
Pipeline Overview (Pipeline Operations)
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
 
Flammable Liquids Training
Flammable Liquids TrainingFlammable Liquids Training
Flammable Liquids Training
 
H2 Safety
H2 SafetyH2 Safety
H2 Safety
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
HAC - Hazardous Area Classification
HAC - Hazardous Area ClassificationHAC - Hazardous Area Classification
HAC - Hazardous Area Classification
 
Cold Work Permit
Cold Work PermitCold Work Permit
Cold Work Permit
 
Basic Fire Fighting Training
Basic Fire Fighting TrainingBasic Fire Fighting Training
Basic Fire Fighting Training
 
Chemical safety
Chemical safety Chemical safety
Chemical safety
 

Viewers also liked

Safety at Wastewater Treatment plants 2013
Safety at Wastewater Treatment plants 2013Safety at Wastewater Treatment plants 2013
Safety at Wastewater Treatment plants 2013
vtsiri
 
Chemical Safety
Chemical SafetyChemical Safety
Chemical Safety
vasant oak
 
Chlorine Hazards 2009
Chlorine Hazards 2009Chlorine Hazards 2009
Chlorine Hazards 2009
vtsiri
 
Battle royale ignition (round 2)
Battle royale ignition (round 2)Battle royale ignition (round 2)
Battle royale ignition (round 2)
Anthony Lee
 

Viewers also liked (20)

Safety in chlorine ppt
Safety in chlorine pptSafety in chlorine ppt
Safety in chlorine ppt
 
Ankush Jindal
Ankush JindalAnkush Jindal
Ankush Jindal
 
Health & Safety For Water Treatment Plant Operators
Health & Safety For Water Treatment Plant OperatorsHealth & Safety For Water Treatment Plant Operators
Health & Safety For Water Treatment Plant Operators
 
Safety at Wastewater Treatment plants 2013
Safety at Wastewater Treatment plants 2013Safety at Wastewater Treatment plants 2013
Safety at Wastewater Treatment plants 2013
 
Chlorine
ChlorineChlorine
Chlorine
 
Medical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersMedical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylinders
 
Chemical Safety
Chemical SafetyChemical Safety
Chemical Safety
 
FAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSISFAULT & EVENT TREE ANALYSIS
FAULT & EVENT TREE ANALYSIS
 
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATIONFAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
FAULT TREE ANALYSIS (FTA) SEMINAR PRESENTATION
 
Chlorine Hazards 2009
Chlorine Hazards 2009Chlorine Hazards 2009
Chlorine Hazards 2009
 
Environment Safety Training (Hindi)- Anjali
Environment Safety Training (Hindi)- AnjaliEnvironment Safety Training (Hindi)- Anjali
Environment Safety Training (Hindi)- Anjali
 
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTHLIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
LIST OF IMPORTANT INDIAN STANDARDS ON SAFETY & HEALTH
 
Toby hardy-french riviera-on-domainsherpa
Toby hardy-french riviera-on-domainsherpaToby hardy-french riviera-on-domainsherpa
Toby hardy-french riviera-on-domainsherpa
 
inventos
inventosinventos
inventos
 
Irene foodproject
Irene foodprojectIrene foodproject
Irene foodproject
 
Montevettolini - Tuscan Olive Trees and Vineyard
Montevettolini - Tuscan Olive Trees and VineyardMontevettolini - Tuscan Olive Trees and Vineyard
Montevettolini - Tuscan Olive Trees and Vineyard
 
Michael Gilmour: 50% ROI Per Year on Domain Name Parking
Michael Gilmour: 50% ROI Per Year on Domain Name ParkingMichael Gilmour: 50% ROI Per Year on Domain Name Parking
Michael Gilmour: 50% ROI Per Year on Domain Name Parking
 
Battle royale ignition (round 2)
Battle royale ignition (round 2)Battle royale ignition (round 2)
Battle royale ignition (round 2)
 
Oess NCRM Festival
Oess NCRM FestivalOess NCRM Festival
Oess NCRM Festival
 
disability and/or mental illness for hospital dentistry
disability and/or mental illness for hospital dentistrydisability and/or mental illness for hospital dentistry
disability and/or mental illness for hospital dentistry
 

Similar to Standard practices r9

DOES CHEMICAL & PETROCHEMICAL CATALOGUE
DOES CHEMICAL & PETROCHEMICAL CATALOGUEDOES CHEMICAL & PETROCHEMICAL CATALOGUE
DOES CHEMICAL & PETROCHEMICAL CATALOGUE
Vaishakh Nair
 

Similar to Standard practices r9 (20)

Handling of Gases
Handling of GasesHandling of Gases
Handling of Gases
 
Gas-Handling-and-Safety-A-Comprehensive-Guide.pptx
Gas-Handling-and-Safety-A-Comprehensive-Guide.pptxGas-Handling-and-Safety-A-Comprehensive-Guide.pptx
Gas-Handling-and-Safety-A-Comprehensive-Guide.pptx
 
Review paper on study and implementation of steam traps
Review paper on study and implementation of steam trapsReview paper on study and implementation of steam traps
Review paper on study and implementation of steam traps
 
Safe Use of Cylinder Gases by Consultnet Limited
Safe Use of Cylinder Gases by Consultnet LimitedSafe Use of Cylinder Gases by Consultnet Limited
Safe Use of Cylinder Gases by Consultnet Limited
 
Safety in welding
Safety in weldingSafety in welding
Safety in welding
 
compressed-gas-safety.ppt
compressed-gas-safety.pptcompressed-gas-safety.ppt
compressed-gas-safety.ppt
 
compressed-gas-safety.ppt
compressed-gas-safety.pptcompressed-gas-safety.ppt
compressed-gas-safety.ppt
 
Compressed+gas+safety
Compressed+gas+safetyCompressed+gas+safety
Compressed+gas+safety
 
Safe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSDSafe Handling of Compressed Gases by UCSD
Safe Handling of Compressed Gases by UCSD
 
OSHA's Hazardous Material Transporting Goods by Air
OSHA's Hazardous Material Transporting Goods by AirOSHA's Hazardous Material Transporting Goods by Air
OSHA's Hazardous Material Transporting Goods by Air
 
Chemical Engineering Apparatus Design lecture note
Chemical Engineering Apparatus Design lecture noteChemical Engineering Apparatus Design lecture note
Chemical Engineering Apparatus Design lecture note
 
Chemical Engineering Apparatus Design lecture note
Chemical Engineering Apparatus Design lecture noteChemical Engineering Apparatus Design lecture note
Chemical Engineering Apparatus Design lecture note
 
Chemical Engineering Apparatus Design Lecture note.pdf
Chemical Engineering  Apparatus Design Lecture note.pdfChemical Engineering  Apparatus Design Lecture note.pdf
Chemical Engineering Apparatus Design Lecture note.pdf
 
Sealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission ControlSealing the Unseen: Efficiency through Emission Control
Sealing the Unseen: Efficiency through Emission Control
 
IRJET - Minimizing Steam Loss through Steam Distribution Network using an Int...
IRJET - Minimizing Steam Loss through Steam Distribution Network using an Int...IRJET - Minimizing Steam Loss through Steam Distribution Network using an Int...
IRJET - Minimizing Steam Loss through Steam Distribution Network using an Int...
 
DOES CHEMICAL & PETROCHEMICAL CATALOGUE
DOES CHEMICAL & PETROCHEMICAL CATALOGUEDOES CHEMICAL & PETROCHEMICAL CATALOGUE
DOES CHEMICAL & PETROCHEMICAL CATALOGUE
 
Final Project work
Final Project workFinal Project work
Final Project work
 
Chemical Equipment Design - Pressure vessel 2.pptx
Chemical Equipment Design - Pressure vessel 2.pptxChemical Equipment Design - Pressure vessel 2.pptx
Chemical Equipment Design - Pressure vessel 2.pptx
 
PPT-on-false-air.ppt
PPT-on-false-air.pptPPT-on-false-air.ppt
PPT-on-false-air.ppt
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Recently uploaded (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 

Standard practices r9

  • 1. Standard Practices of Handling, Storage and Transportation of Cl2 Tonners/Cylinders BY H. S. SEHGAL DGM (PRODUCTION)
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. NEVER trust a color of a compressed gas cylinder. NEVER assume cylinder content ALWAYS check the label! Compressed gases Identification
  • 12.
  • 13.
  • 14. DESIGN FACTORS OF TONER/CYLINDER FOR TOXIC GAS {CHLORINE} 2 MM 2 MM CORROSION ALLOWANCE D.P. TEST SHALL BE CARRIED OUT FOR JOINT BETWEEN VALVE AND HEMISPHEREIOD. D.P. TEST SHALL BE CARRIED OUT FOR JOINT BETWEEN VALVE AND HEMISPHEREIOD. DYE PENETRATION TEST 0.95 0.95 JOINT EFFICIENCY 100% ON ALL BUTT WELDS BEARING PARTS. 100% ON ALL BUTT WELDS BEARING PARTS. RADIOGRAPHY AMBINET (65 DEG. C.) AMBINET (65 DEG. C.) DESIGN TEMP 35 KGF/CM2 (MIN) 35 KGF/CM2 (MIN) HY. TEST PRESSURE 19.9 KGF/CM2 19.9 KGF/CM2 DESIGN PRESSURE IS-7681-1975/IS-3196 IS 2825/ASME SECTION VIII DIV I /PD 5500 DESIGN CODE CYLINDER TONNER SPECIFICATION
  • 15. CONT… PUNCHING DETAIL ON FOOTRING AND HEMISHERE OF TONER (VALVE SIDE) M.O.C. OF VALVES VALVE/PLUGS PAINTING LIQUID CAPACITY STRESS RELIEVING WATER CAPACITY PNEUMETIC TEST PRESSURE SPECIFICATION SR. NO. : T.WT. : W.C. : H.T. : AL,SI, BRONZE WITH MONEL SPINDEL AS PER IS-3224 MFGD. GOLDEN YELLOW COLOR ALL OVER AFTER PRIMER PAINTING OF PRIMER IS:356. 900 KGS(MIN) YES 780 LTRS 11 KGF/CM2 (MIN) TONNER SR. NO. : T.WT. : W.C. : H.T. : AL,SI, BRONZE WITH MONEL SPINDEL AS PER IS-3224 MFGD. GOLDEN YELLOW COLOR ALL OVER AFTER PRIMER PAINTING OF PRIMER IS:356. 100 KGS(MIN) YES 88 LTRS 11 KGF/CM2 (MIN) CYLINDER
  • 16. CONT… 2 MM 2 MM CORROSION ALLOWANCE CYLINDER TONNER SPECIFICATION 1.19 70 KGS 6 MM BUREAU OF INDIAN STANDARD/ LLYOD CCE-NAGPUR 1.19 620 KGS 12 MM BUREAU OF INDIAN STANDARD/ LLYOD CCE-NAGPUR FILLING RATIO TARE WEIGHT NOMINAL WALL THICKNESS INSPECTION APPROVAL SA 516 GR 60/70 SA 516 GR 60/70 MATERIAL OF CONSTRUCTION AS PER STANDARD DESIGN AS PER STANDARD DESIGN COVER HOOD 368 MM 316 MM 988 MM 784 MM 760 MM 2085+_ 12 MM O.D. I.D. L.
  • 17.
  • 18.  
  • 19.
  • 20.
  • 21.  
  • 22.  
  • 23.  
  • 24.  
  • 25.  
  • 26.  
  • 27.  
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. GLOBAL TRANSPORTATION SCENARIO Worldwide other modes of Transportation are also being used like thro’ Barges on Water for more than 6000 kms distance in Columbia, Chile & for very short distances, Pipelines 1200 Road (100%) 51 India 1000 200 Rail (67%) Road (33%) 6 Europe 600 300 Rail (30%) Road (70%) 10 Japan 4000 (Brazil) 1500 (Chile) Road Rail (75%) 66 South America 1000 Rail (90%) Road (6%) 35 North America Max. Distance Covered (Kms) Mode of Transport Quantity of Cl2 Transported (% of Production) Country
  • 40.  
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.  
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.  
  • 56.  
  • 57.  
  • 58. Straps & logistic rail for securing cylinders
  • 59. Load bars & logistic rail for securing cylinders
  • 61. Ground level loading & unloading cylinders
  • 63. Front bulkhead reinforcement for ton containers
  • 64. C clamp on two end ton containers of truck load
  • 65. Telescopic boom mounted on ton container trailer
  • 67.
  • 68.
  • 69.  
  • 70.  
  • 71.  
  • 72. Withdrawal rate of Chlorine ( Room Temp. – Threshold temp.) * withdrawal factor withdrawal factor for Tonner = 8/ Cylinder= 1 Threshold temp. is the temp. where minimum required gas pressure is reached Temp. Deg. C Tonner (900 Kg.) Cylinder (67 Kg.) Day Hr. Per Day Per Hr. 4 45 1.87 4.08 0.17 10 110 4.58 9.50 0.39 15 130 5.41 16.10 0.67 20 254 10.58 21.54 0.90 27 315 13.12 20.12 1.17
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88. EMERGENCY HANDLING FROM POSSIBLE LEAKAGE POINTS OF TONNER Close the valve -      Provide O/L brass seal nut. -      Provide additional valve with Clamp. -      Use emergency kit Sr. No. Particular Problem Action 1 Gland leakage - Gland nut loose Tighten the gland nut with suitable spanner 2 Chlorine valve passing Pitting on the spindle seat - Pitting on valve seat -  3 Chlorine valve damage - Valve broken - Use emergency kit to control leakage 4 Leakage from tonner surface - Pin hole on the surface - Use emergency kit to control leakage 5 Leakage from blind plug - Thread damaged - Use emergency kit to control leakage 6 Leakage from O/L of the Cl2 Valve - Thread damaged - Pin hole in the outlet nozzle - Gasket not properly fitted - Dosing line leakage - Close valve - Rotate Tonner to 180 deg., Use 2 nd valve - Replace gasket   - Replace the dosing line
  • 89.  
  • 90.
  • 91.  
  • 92.  
  • 93.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104.
  • 105.
  • 106.
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 116.
  • 117.
  • 118.
  • 119.
  • 120.
  • 121.  
  • 122.  
  • 123.