SCAFFOLDING SAFETY
21/3/2023
2
Topics to be
discussed….
21/3/2023
3
Scaffold Design Requirements
Scaffold Erection Requirements
Scaffold Alteration Requirements
Scaffold Dismantling Requirements
Safe Usage of Scaffolding
Tagging System
Scaffolding Inspection Checklist
Scaffolding Permit
What is Scaffolding?
21/3/2023
4
Scaffold is an
elevated temporary
work platform used for
supporting workers
(or) materials (or)
both.
Parts of
Scaffolding
21/3/2023
5
1. Standard
2. Ledger
3. Transom
4. Cross Bracing
5. Top Rail
6. Mid Rail
7. Toe Board
8. Brick Guard
9. Base Plate & Sole Plate
21/3/2023
6
Basic Parts of Scaffolding
21/3/2023
7
Top Rail, Mid Rail & Toe
Board
21/3/2023
8
Brick Guard
21/3/2023
9
Cross Bracing
21/3/2023
10
Base Plate
21/3/2023
11
Scaffolding
21/3/2023
12
• There are three basic types of scaffolds:
Supported scaffolds, which consist of one
or more platforms supported by rigid, load-
bearing members, such as poles, legs,
frames, outriggers, etc.
• Suspended scaffolds, which are one or
more platforms suspended by ropes or other
non-rigid, overhead support.
• Other scaffolds, principally man lifts,
personnel hoists, etc., which are sometimes
thought of as vehicles or machinery, but can
be regarded as another type of supported
21/3/2023
13
Scaffolds
21/3/2023
14
Supported scaffolds consist of one or more
platforms supported by outrigger beams, brackets,
poles, legs, posts, frames, or similar rigid support.
1. Frame (or) Fabricated Scaffold
2. Mobile Scaffold
3. Ladder Jack Scaffold
4. Pump Jack Scaffold
5. Tube & Coupler Scaffold
6. Pole Scaffold
Frame (or) Fabricated
Mobile
21/3/2023
15
Mobile Scaffold
Braced to prevent collapse.
Casters and wheels locked to
prevent movement while in a
stationary position.
Platforms must not extend beyond
the base supports of the scaffold,
unless stability is ensured.
Not allowed to ride on scaffolds
unless the surface on which
scaffold is being moved is free of
pits, holes and obstructions.
21/3/2023
16
Suspended
Scaffolds
21/3/2023
17
• Single Point
• Two Point
• Multi Point
• Catenary
• Interior Hung
• Needle Beam
• Multi Level
• Float
Single Point Two
point
21/3/2023
18
Multi Point
Catenary
21/3/2023
19
Suspended Scaffold Safety
Counterweights
secured, and not
removed until
scaffold
disassembled
Tiebacks
secured to
sound
anchorage on 21/3/2023
20
Other Scaffolds – Aerial Lift
21/3/2023
21
Aerial Lift
 Ensure proper fall
protection prior to
using
 Includes use of
guardrails
 Never exceed load
capacity
 Do not move lift truck
with workers in
basket unless
adequately designed
(upper controls –
personnel carriers) 21/3/2023
22
Scaffold Competent Person
21/3/2023
23
 Inspect scaffolding and
components prior to
each work shift
 Determine possibility of
providing fall protection
and access
 Evaluate connections to
support load
 Determine structural
soundness
 Train erectors and
dismantlers to recognize
work hazards
Scaffold Tagging System
21/3/2023
24
Red Tag….
21/3/2023
25
Indicates the
scaffold has
not been
inspected or is
not safe for
use
“DO NOT USE
SCAFFOLD”
message must
be visible
Green Tag….
21/3/2023
26
Indicates scaffold
is complete, has
been inspected,
and is safe for
use at the time of
inspection
GREEN scaffold
tag valid for a
maximum of two
weeks
2/28/02
2/14/02
A. SULAIMAN
673-2400
K. SALEH
Khaled Saleh
673-2308
431056
K. SALEH
Khaled Saleh
673-2308
431056
K. SALEH
Khaled Saleh
673-2308
431056
K. SALEH
Khaled Saleh
673-2308
431056
3/14/02 3/28/02
A. SULAIMAN
673-2400
A. SULAIMAN
673-2400
A. SULAIMAN
673-2400
6
TANK 105
a
233100
Ahmed Sulaiman
233100
Ahmed Sulaiman
233100
Ahmed Sulaiman
2
233100
Ahmed Sulaiman
Insert fits
into holder
Yellow Tag….
21/3/2023
27
Indicates scaffold
has been
inspected and
may be used only
by workers
wearing a
properly anchored
personal fall
arrest system,
including a full
body harness and
lanyard
YELLOW scaffold
tag valid for two
weeks maximum
2
4/10/02
A. SULAIMAN K. SALEH
Khaled Saleh
673-2308
431056
6
TANK 105
a
233100
Ahmed Sulaiman
673-2400
Insert fits
into
holder
Displaying of Tag….
21/3/2023
28
RED scaffold tag (holder) to be
built into scaffold, near each point
of access, by scaffold craftsmen
Only qualified scaffold craftsmen
are allowed on a scaffold with a
RED scaffold tag
21/3/2023
29
If Scaffold EQUAL TO or LESS THAN 6
meters (20 feet) high:
Scaffold Supervisor signs
GREEN or YELLOW scaffold
tag(s) and prints date when next
inspection is due
Supervisor inserts the signed
GREEN or YELLOW tag(s) into
the RED holder(s)
“Date of next inspection”
must not be more than 2
weeks ahead
21/3/2023
30
If Scaffold MORE THAN 6 meters
(20 feet) tall:
Scaffold Supervisor signs tag(s)
and leaves “Date of Next
Inspection” blank
Supervisor gives the signed
GREEN or YELLOW tag(s) to a
Scaffold Inspector
• All Scaffold Inspectors and
Scaffold Supervisors MUST BE
CERTIFIED
21/3/2023
31
Scaffold Inspector inspects
scaffold
As soon as possible after Scaffold
Supervisor’s inspection
Scaffold Inspector also fills in and
signs separate “Scaffold Field
Inspection Checklist”
Inspector gives this checklist to Work
Permit Issuer’s unit, who will keep it
until scaffold is taken down
If Scaffold MORE THAN 6 meters
(20 feet) tall:
21/3/2023
32
If Scaffold Inspector agrees that
scaffold is safe to use, he will:
Fill in and sign GREEN or
YELLOW scaffold tag(s)
• Previously given to him by Scaffold
Supervisor
If Scaffold MORE THAN 6 meters
(20 feet) tall:
Scaffold Erection Requirement
21/3/2023
33
Only competent & experienced
person must be permitted to erect &
dismantle the scaffolding at site.
Guardrails, mid rails & toe boards
must be placed on all open side of
platforms more than 1.2 meters
above ground (or) floor.
Scaffold Erection Requirement
21/3/2023
34
 The top rail must be placed
approximately 1200 mm high from the
platform.
 The mid rail must be placed
approximately 600 mm high from the
platform.
 The toe board must be placed
approximately 300 mm from the
Top Rail, Mid Rail & Toe
Board
21/3/2023
35
Scaffold Erection Requirement
21/3/2023
36
 All scaffolds shall be provided with an access
ladder that extends to at least 1 meter above
the platform.
 Platforms should be 220mm wide & 25mm
thick and it should be tightened with
scaffolding to prevent movements in high
winds.
 Scaffolds should be cleaned after the
completion of work.
Scaffold Erection Requirement
21/3/2023
37
Should be on a firm foundation with
base plates.
Should be properly braced & tied
up.
Should have a properly tightened
platform.
Should have guardrails over 1.2
meters.
Should have adequate means of
Ladder Safety
Scaffold Erection Requirement
21/3/2023
39
• Must be able to
support its own
weight and 4 times
the maximum
intended load.
• Scaffolds must be
designed by a
qualified person.
Scaffold Erection Requirement
21/3/2023
40
Any scaffold damaged or
weakened from any cause
shall be immediately
repaired and shall not be
used until repairs have
been completed.
Planking
21/3/2023
41
All planking or platforms shall be
overlapped (minimum 12 inches) or
secured from movement.
Scaffold planks shall extend over
their end supports not less than 6
inches nor more than 18 inches.
Platform Construction
21/3/2023
42
No paint on wood platforms, except
edges that may be marked for
identification.
Fully planked.
No mixed components, unless
compatible and integrity maintained.
No modification of mixed components
unless approved by competent
person.
Tips
Never use
scaffolds that
do not have
proper
guardrails
installed
21/3/2023
43
Common Scaffold Safety
Tips
Must bear on
adequate
foundations
Unstable objects
will not be used
as working
platforms
21/3/2023
44
Common Scaffold Safety
Tips
Lifeline
support
must be
checked for
compatibility
prior to use.
21/3/2023
45
Life Line
21/3/2023
46
LIFE LINE
Access
Must have safe
access
Cross-braces
prohibited as
means of access
Rest platforms
required at 35 feet
intervals
Slip-resistant on all
steps and landings
21/3/2023
47
PFAS
 Workers must be
trained how to
properly use
PFAS.
 PFAS include
anchorage, lifeline
and full body
harness with
double lanyard.
 Both Active & 21/3/2023
48
Restrictions
 Don’t overloaded.
 Don’t Erect & move near power
lines .
 Repair damaged components.
 Restrict horizontal movement of
workers unless provided with
fall protection.
 Prohibit work activities during
high winds unless authorized.
 Remove whole scaffold from
service until repaired.
Note – Scaffolds must be
erected 10 feet away of the 21/3/2023
49
Over Head Power Lines
Proper clearance near overhead lines
Keep 10 foot minimum unless de-
energized,
Relocated, or installed protective covering
installed! 21/3/2023
50
Restrictions
No work on
snow, or ice
covered
platforms
No barrels,
boxes or
ladders on top
of scaffolds
21/3/2023
51
Training Required
 Employees must receive training from
qualified person that covers:
Nature of hazards, electrical, falls, and
falling items
Use of scaffold / handling
Maximum intended load and load
carrying capabilities of scaffold
Procedures for setup, dismantling or
moving the system
21/3/2023
52
 Follow the manufacturer's instructions when erecting
the scaffold.
 Do not work on scaffolds outside during stormy or
windy weather.
 Do not climb on scaffolds that wobble or lean to one
side.
 Initially inspect the scaffold prior to mounting it. Do
not use a scaffold if any pulley, block, hook or fitting
is visibly worn, cracked, rusted or otherwise
damaged.
 Do not use any scaffold tagged "Out of Service".
 Do not work on platforms or scaffolds unless they are
fully planked.
In General….
21/3/2023
53
In General….
 Do not walk or work beneath a scaffold unless a wire
mesh has been installed between the top rail and the toe
board or planking.
 Use your safety belts and lanyards when working on
scaffolding at a height.
 Attach the lanyard to a secure member of the scaffold.
 Do not climb the cross braces for access to the scaffold.
Use the ladder.
 Do not jump from, to, or between scaffolding.
 Do not move a mobile scaffold if anyone is on the
scaffold.
 Chock the wheels of the rolling scaffold, using the wheel
blocks, and also lock the wheels by using your foot to
depress the wheel-lock, before using the scaffold.21/3/2023
54
Resources
21/3/2023
55
 http://www.osha.gov/SLTC/etools/scaffolding/ind
ex.html
 http://www.osha.gov/pls/oshaweb/owadisp.show
_document?p_table=STANDARDS&p_id=9720
 http://www.hse.gov.uk/construction/safetytopics/
scaffoldinginfo.htm
 Scaffold Safety Hand book – Saudi Aramco

More Related Content

What's hot

Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of RiggerMajid Hussain
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
Ladder Safety in Construction
Ladder Safety in ConstructionLadder Safety in Construction
Ladder Safety in ConstructionZbut.Eu
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Syed Neyaz Ahmad
 
General Industry Fall Protection
General Industry Fall ProtectionGeneral Industry Fall Protection
General Industry Fall Protectionsepinon
 
Scaffolding awareness presentation
Scaffolding awareness presentationScaffolding awareness presentation
Scaffolding awareness presentationbobrobbo
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment Manish Yadav
 
Ladder Safety
Ladder SafetyLadder Safety
Ladder SafetyHvacmach
 
TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.pptmohammadillias
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladderbronzecs
 
Scaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptScaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptPakarabEngineering
 

What's hot (20)

Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Ladder Safety in Construction
Ladder Safety in ConstructionLadder Safety in Construction
Ladder Safety in Construction
 
Lifting Operation.ppt
Lifting Operation.pptLifting Operation.ppt
Lifting Operation.ppt
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
General Industry Fall Protection
General Industry Fall ProtectionGeneral Industry Fall Protection
General Industry Fall Protection
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Scaffolding awareness presentation
Scaffolding awareness presentationScaffolding awareness presentation
Scaffolding awareness presentation
 
Fall arrest systems
Fall arrest systemsFall arrest systems
Fall arrest systems
 
Lifting Equipment
Lifting Equipment Lifting Equipment
Lifting Equipment
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
Ladder Safety
Ladder SafetyLadder Safety
Ladder Safety
 
TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.ppt
 
Scaffold ladder
Scaffold ladderScaffold ladder
Scaffold ladder
 
Scaffold Safety Presentation.ppt
Scaffold Safety Presentation.pptScaffold Safety Presentation.ppt
Scaffold Safety Presentation.ppt
 

Similar to SCAFFOLDING SAFETY.ppt

CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptxCE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptxKyle Devon Strav
 
SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...Muhammad Saqib
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfssuseref23d3
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Repair, rehabilitation and retrofitting of structures - RRS
Repair, rehabilitation and retrofitting of structures - RRSRepair, rehabilitation and retrofitting of structures - RRS
Repair, rehabilitation and retrofitting of structures - RRSShanmugasundaram N
 
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docxKaty A. Beitia G.
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardJohn Newquist
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Crane program and sop
Crane program and sopCrane program and sop
Crane program and sopazly azmy
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Aerial Lift Safety Training by The Center to Protect Workers' Rights
Aerial Lift Safety Training by The Center to Protect Workers' RightsAerial Lift Safety Training by The Center to Protect Workers' Rights
Aerial Lift Safety Training by The Center to Protect Workers' RightsAtlantic Training, LLC.
 
Campion_Crane-Safety.pdf
Campion_Crane-Safety.pdfCampion_Crane-Safety.pdf
Campion_Crane-Safety.pdfdinesh622857
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Working at Heights
Working at Heights Working at Heights
Working at Heights FTERIESW
 
Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated commentsgulilero
 

Similar to SCAFFOLDING SAFETY.ppt (20)

CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptxCE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
CE153-COSH-SCAFFOLDING SAFETY-Engg Dept.pptx
 
SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...SCAFFOLDING SAFETY.ppt Advance Course...
SCAFFOLDING SAFETY.ppt Advance Course...
 
Failure analysis mtn526
Failure analysis mtn526Failure analysis mtn526
Failure analysis mtn526
 
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdfPMT80 Foundation Design & Installation & Commissioning & Safety.pdf
PMT80 Foundation Design & Installation & Commissioning & Safety.pdf
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Repair, rehabilitation and retrofitting of structures - RRS
Repair, rehabilitation and retrofitting of structures - RRSRepair, rehabilitation and retrofitting of structures - RRS
Repair, rehabilitation and retrofitting of structures - RRS
 
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
0-GG010-MZ711-00020 Scaffolding Procedure rev.1 .docx
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standard
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Crane program and sop
Crane program and sopCrane program and sop
Crane program and sop
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Aerial Lift Safety Training by The Center to Protect Workers' Rights
Aerial Lift Safety Training by The Center to Protect Workers' RightsAerial Lift Safety Training by The Center to Protect Workers' Rights
Aerial Lift Safety Training by The Center to Protect Workers' Rights
 
Campion_Crane-Safety.pdf
Campion_Crane-Safety.pdfCampion_Crane-Safety.pdf
Campion_Crane-Safety.pdf
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Working at Heights
Working at Heights Working at Heights
Working at Heights
 
Personnel liftingad
Personnel liftingadPersonnel liftingad
Personnel liftingad
 
scaffold tags
scaffold tagsscaffold tags
scaffold tags
 
Supported Scaffold Safety
Supported Scaffold SafetySupported Scaffold Safety
Supported Scaffold Safety
 
Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated comments
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

SCAFFOLDING SAFETY.ppt

  • 1. 29 CFR 1910.28 29 CFR 1926.452 21/3/2023 1 SCAFFOLDING SAFETY
  • 3. Topics to be discussed…. 21/3/2023 3 Scaffold Design Requirements Scaffold Erection Requirements Scaffold Alteration Requirements Scaffold Dismantling Requirements Safe Usage of Scaffolding Tagging System Scaffolding Inspection Checklist Scaffolding Permit
  • 4. What is Scaffolding? 21/3/2023 4 Scaffold is an elevated temporary work platform used for supporting workers (or) materials (or) both.
  • 5. Parts of Scaffolding 21/3/2023 5 1. Standard 2. Ledger 3. Transom 4. Cross Bracing 5. Top Rail 6. Mid Rail 7. Toe Board 8. Brick Guard 9. Base Plate & Sole Plate
  • 8. Top Rail, Mid Rail & Toe Board 21/3/2023 8
  • 12. Scaffolding 21/3/2023 12 • There are three basic types of scaffolds: Supported scaffolds, which consist of one or more platforms supported by rigid, load- bearing members, such as poles, legs, frames, outriggers, etc. • Suspended scaffolds, which are one or more platforms suspended by ropes or other non-rigid, overhead support. • Other scaffolds, principally man lifts, personnel hoists, etc., which are sometimes thought of as vehicles or machinery, but can be regarded as another type of supported
  • 14. Scaffolds 21/3/2023 14 Supported scaffolds consist of one or more platforms supported by outrigger beams, brackets, poles, legs, posts, frames, or similar rigid support. 1. Frame (or) Fabricated Scaffold 2. Mobile Scaffold 3. Ladder Jack Scaffold 4. Pump Jack Scaffold 5. Tube & Coupler Scaffold 6. Pole Scaffold
  • 16. Mobile Scaffold Braced to prevent collapse. Casters and wheels locked to prevent movement while in a stationary position. Platforms must not extend beyond the base supports of the scaffold, unless stability is ensured. Not allowed to ride on scaffolds unless the surface on which scaffold is being moved is free of pits, holes and obstructions. 21/3/2023 16
  • 17. Suspended Scaffolds 21/3/2023 17 • Single Point • Two Point • Multi Point • Catenary • Interior Hung • Needle Beam • Multi Level • Float
  • 20. Suspended Scaffold Safety Counterweights secured, and not removed until scaffold disassembled Tiebacks secured to sound anchorage on 21/3/2023 20
  • 21. Other Scaffolds – Aerial Lift 21/3/2023 21
  • 22. Aerial Lift  Ensure proper fall protection prior to using  Includes use of guardrails  Never exceed load capacity  Do not move lift truck with workers in basket unless adequately designed (upper controls – personnel carriers) 21/3/2023 22
  • 23. Scaffold Competent Person 21/3/2023 23  Inspect scaffolding and components prior to each work shift  Determine possibility of providing fall protection and access  Evaluate connections to support load  Determine structural soundness  Train erectors and dismantlers to recognize work hazards
  • 25. Red Tag…. 21/3/2023 25 Indicates the scaffold has not been inspected or is not safe for use “DO NOT USE SCAFFOLD” message must be visible
  • 26. Green Tag…. 21/3/2023 26 Indicates scaffold is complete, has been inspected, and is safe for use at the time of inspection GREEN scaffold tag valid for a maximum of two weeks 2/28/02 2/14/02 A. SULAIMAN 673-2400 K. SALEH Khaled Saleh 673-2308 431056 K. SALEH Khaled Saleh 673-2308 431056 K. SALEH Khaled Saleh 673-2308 431056 K. SALEH Khaled Saleh 673-2308 431056 3/14/02 3/28/02 A. SULAIMAN 673-2400 A. SULAIMAN 673-2400 A. SULAIMAN 673-2400 6 TANK 105 a 233100 Ahmed Sulaiman 233100 Ahmed Sulaiman 233100 Ahmed Sulaiman 2 233100 Ahmed Sulaiman Insert fits into holder
  • 27. Yellow Tag…. 21/3/2023 27 Indicates scaffold has been inspected and may be used only by workers wearing a properly anchored personal fall arrest system, including a full body harness and lanyard YELLOW scaffold tag valid for two weeks maximum 2 4/10/02 A. SULAIMAN K. SALEH Khaled Saleh 673-2308 431056 6 TANK 105 a 233100 Ahmed Sulaiman 673-2400 Insert fits into holder
  • 28. Displaying of Tag…. 21/3/2023 28 RED scaffold tag (holder) to be built into scaffold, near each point of access, by scaffold craftsmen Only qualified scaffold craftsmen are allowed on a scaffold with a RED scaffold tag
  • 29. 21/3/2023 29 If Scaffold EQUAL TO or LESS THAN 6 meters (20 feet) high: Scaffold Supervisor signs GREEN or YELLOW scaffold tag(s) and prints date when next inspection is due Supervisor inserts the signed GREEN or YELLOW tag(s) into the RED holder(s) “Date of next inspection” must not be more than 2 weeks ahead
  • 30. 21/3/2023 30 If Scaffold MORE THAN 6 meters (20 feet) tall: Scaffold Supervisor signs tag(s) and leaves “Date of Next Inspection” blank Supervisor gives the signed GREEN or YELLOW tag(s) to a Scaffold Inspector • All Scaffold Inspectors and Scaffold Supervisors MUST BE CERTIFIED
  • 31. 21/3/2023 31 Scaffold Inspector inspects scaffold As soon as possible after Scaffold Supervisor’s inspection Scaffold Inspector also fills in and signs separate “Scaffold Field Inspection Checklist” Inspector gives this checklist to Work Permit Issuer’s unit, who will keep it until scaffold is taken down If Scaffold MORE THAN 6 meters (20 feet) tall:
  • 32. 21/3/2023 32 If Scaffold Inspector agrees that scaffold is safe to use, he will: Fill in and sign GREEN or YELLOW scaffold tag(s) • Previously given to him by Scaffold Supervisor If Scaffold MORE THAN 6 meters (20 feet) tall:
  • 33. Scaffold Erection Requirement 21/3/2023 33 Only competent & experienced person must be permitted to erect & dismantle the scaffolding at site. Guardrails, mid rails & toe boards must be placed on all open side of platforms more than 1.2 meters above ground (or) floor.
  • 34. Scaffold Erection Requirement 21/3/2023 34  The top rail must be placed approximately 1200 mm high from the platform.  The mid rail must be placed approximately 600 mm high from the platform.  The toe board must be placed approximately 300 mm from the
  • 35. Top Rail, Mid Rail & Toe Board 21/3/2023 35
  • 36. Scaffold Erection Requirement 21/3/2023 36  All scaffolds shall be provided with an access ladder that extends to at least 1 meter above the platform.  Platforms should be 220mm wide & 25mm thick and it should be tightened with scaffolding to prevent movements in high winds.  Scaffolds should be cleaned after the completion of work.
  • 37. Scaffold Erection Requirement 21/3/2023 37 Should be on a firm foundation with base plates. Should be properly braced & tied up. Should have a properly tightened platform. Should have guardrails over 1.2 meters. Should have adequate means of
  • 39. Scaffold Erection Requirement 21/3/2023 39 • Must be able to support its own weight and 4 times the maximum intended load. • Scaffolds must be designed by a qualified person.
  • 40. Scaffold Erection Requirement 21/3/2023 40 Any scaffold damaged or weakened from any cause shall be immediately repaired and shall not be used until repairs have been completed.
  • 41. Planking 21/3/2023 41 All planking or platforms shall be overlapped (minimum 12 inches) or secured from movement. Scaffold planks shall extend over their end supports not less than 6 inches nor more than 18 inches.
  • 42. Platform Construction 21/3/2023 42 No paint on wood platforms, except edges that may be marked for identification. Fully planked. No mixed components, unless compatible and integrity maintained. No modification of mixed components unless approved by competent person.
  • 43. Tips Never use scaffolds that do not have proper guardrails installed 21/3/2023 43
  • 44. Common Scaffold Safety Tips Must bear on adequate foundations Unstable objects will not be used as working platforms 21/3/2023 44
  • 45. Common Scaffold Safety Tips Lifeline support must be checked for compatibility prior to use. 21/3/2023 45
  • 47. Access Must have safe access Cross-braces prohibited as means of access Rest platforms required at 35 feet intervals Slip-resistant on all steps and landings 21/3/2023 47
  • 48. PFAS  Workers must be trained how to properly use PFAS.  PFAS include anchorage, lifeline and full body harness with double lanyard.  Both Active & 21/3/2023 48
  • 49. Restrictions  Don’t overloaded.  Don’t Erect & move near power lines .  Repair damaged components.  Restrict horizontal movement of workers unless provided with fall protection.  Prohibit work activities during high winds unless authorized.  Remove whole scaffold from service until repaired. Note – Scaffolds must be erected 10 feet away of the 21/3/2023 49
  • 50. Over Head Power Lines Proper clearance near overhead lines Keep 10 foot minimum unless de- energized, Relocated, or installed protective covering installed! 21/3/2023 50
  • 51. Restrictions No work on snow, or ice covered platforms No barrels, boxes or ladders on top of scaffolds 21/3/2023 51
  • 52. Training Required  Employees must receive training from qualified person that covers: Nature of hazards, electrical, falls, and falling items Use of scaffold / handling Maximum intended load and load carrying capabilities of scaffold Procedures for setup, dismantling or moving the system 21/3/2023 52
  • 53.  Follow the manufacturer's instructions when erecting the scaffold.  Do not work on scaffolds outside during stormy or windy weather.  Do not climb on scaffolds that wobble or lean to one side.  Initially inspect the scaffold prior to mounting it. Do not use a scaffold if any pulley, block, hook or fitting is visibly worn, cracked, rusted or otherwise damaged.  Do not use any scaffold tagged "Out of Service".  Do not work on platforms or scaffolds unless they are fully planked. In General…. 21/3/2023 53
  • 54. In General….  Do not walk or work beneath a scaffold unless a wire mesh has been installed between the top rail and the toe board or planking.  Use your safety belts and lanyards when working on scaffolding at a height.  Attach the lanyard to a secure member of the scaffold.  Do not climb the cross braces for access to the scaffold. Use the ladder.  Do not jump from, to, or between scaffolding.  Do not move a mobile scaffold if anyone is on the scaffold.  Chock the wheels of the rolling scaffold, using the wheel blocks, and also lock the wheels by using your foot to depress the wheel-lock, before using the scaffold.21/3/2023 54
  • 55. Resources 21/3/2023 55  http://www.osha.gov/SLTC/etools/scaffolding/ind ex.html  http://www.osha.gov/pls/oshaweb/owadisp.show _document?p_table=STANDARDS&p_id=9720  http://www.hse.gov.uk/construction/safetytopics/ scaffoldinginfo.htm  Scaffold Safety Hand book – Saudi Aramco