Panipat Textile Cluster & CDM opportunities CleanTech Conclave 24 th  April 2010
Background   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Objectives ,[object Object],[object Object]
Methodology ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Methodology (contd.) ,[object Object],[object Object],[object Object],[object Object]
Progress achieved ,[object Object],[object Object],[object Object],[object Object]
Progress achieved ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Contd..
LIST OF INDUSTRIES –  ENERGY AUDITS CONDUCTED   ,[object Object],[object Object],[object Object],[object Object],[object Object]
Energy audits conducted in the following industries ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Dyeing Units ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FINDINGS FROM CLUSTER VISITS
Potential Areas for reducing energy consumption ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Conclusions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Conclusions ,[object Object],[object Object],[object Object],[object Object]
Investment Grade Energy Audits 5 Apparel Units In  National Capital Region
Unit A - Baseline 2009 Connected Maximum Demand  (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual  Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy  + Power Bill (Rs.Lakhs) 499 536733 71784 22.67 23.69 46.36
Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Tubelights replaced by high lumen o/p LED lights 23440 0.99 1.14 14 Install voltage optimizer in lighting circuits 20258 0.85 2.66 37 Dedicated LED lighting for Sewing m/c 57658 2.43 9.47 47 Solar steam generator to supplement steam generated by diesel fired boiler 31124  (equivalent KWH of diesel) 2.9 12 50 Grand Total 132480 7.17 58.66 37
Unit B - Baseline 2009 Connected Maximum Demand  (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual  Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy  + Power Bill (Rs.Lakhs) 320 501912 246341 25.22 76.37 101.5
Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Replace existing FTL with energy efficient high lumen output FTL 30234 1.52 1.57 12 Install voltage optimizer in lighting circuits  10767 0.54 1.14 25 Provide dedicated LED lighting for production Sewing m/c 24531 1.23 4.03 39 Solar steam generator to supplement steam generated by diesel fired boiler 236678 (equivalent KWH of diesel) 10.77 35.0 39 Replace conventional regulators with electronic regulators 11333 0.57 1.2 25 Grand Total 313543 14.63 42.84 28
Unit C - Baseline 2009 Connected Maximum Demand  (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual  Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy  + Power Bill (Rs.Lakhs) 427 1065575 113411 49.2 37.4 86.6
Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Pre heat Fuel oil with boiler exhaust gases 20160 0.93 0.75 10 Replace existing tube lights with high lumens o/p lights 11385 0.53 0.55 13 solar steam generator to supplement diesel fired boiler 212619 19.5 35.0 21 Install voltage optimizer for lighting circuits 10220 0.47 1.33 34 Provide dedicated LED lighting for production Sewing m/c 12580 0.58 2.1 42 Grand Total 266964 14.63 42.84 26
Unit D - Baseline 2009 Connected Maximum Demand  (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual  Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy  + Power Bill (Rs.Lakhs) 405 460195 102255 20.9 33.74 54.64
Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Arrest waste water  2500 0.12 Nil Immediate Replace heater for hand wash by heat recovery of waste steam 1620 0.07 0.05 8 Replace the existing  life max with  True light/super life max (NG80) 16102 0.73 0.78 13 Install voltage optimizer in lighting circuits for energy saving 24318 1.11 2.8 31 Install Solar steam generator to supplement steam generated by diesel fired boiler 236677 10.77 35.0 39 Provide dedicated LED lighting for production Sewing m/c 60803 2.77 9.9 44 Grand Total 342020 15.5 48.53 27
Unit E – Baseline 2009 Connected Maximum Demand  (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual  Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy  + Power Bill (Rs.Lakhs) 405 364434 56350 16.49 18.0 34.49
Identified Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Arrest water wastage 2263 0.1 Nil Immediate Install lighting voltage optimizers 31846 1.44 0.5 4 Install dedicated LED lights for production sewing m/c 47699 2.16 7.84 44 Grand Total 81808 3.7 8.34 24
[object Object]

More Related Content

What's hot

District Heat - Powerpoint presentation
District Heat - Powerpoint presentationDistrict Heat - Powerpoint presentation
District Heat - Powerpoint presentationmontpelier
 
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...IEA-ETSAP
 
Rice husk power plant information for finance, subsidy & project related su...
Rice husk power plant information   for finance, subsidy & project related su...Rice husk power plant information   for finance, subsidy & project related su...
Rice husk power plant information for finance, subsidy & project related su...Radha Krishna Sahoo
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...IEA-ETSAP
 
INDC-Workshop-26-07-2016-Energy Sector
INDC-Workshop-26-07-2016-Energy SectorINDC-Workshop-26-07-2016-Energy Sector
INDC-Workshop-26-07-2016-Energy SectorKarim Osseiran
 
Impact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryImpact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryIEA-ETSAP
 
Accounting for changes in investment flows in a soft-linked hybrid model
Accounting for changes in investment flows in a soft-linked hybrid modelAccounting for changes in investment flows in a soft-linked hybrid model
Accounting for changes in investment flows in a soft-linked hybrid modelIEA-ETSAP
 
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013Karim Osseiran
 
Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentationsCodema
 
Impact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UKImpact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UKIEA-ETSAP
 
Zero carbon projects
Zero carbon projectsZero carbon projects
Zero carbon projectsPeter Mumford
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkPaul Kuhlman
 
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...Assessment of the long-term potential of 'power to hydrogen' in the energy sy...
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...IEA-ETSAP
 
Improving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanImproving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanIEA-ETSAP
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...IEA-ETSAP
 
Rice husk power plant project design document for finance, subsidy & projec...
Rice husk power plant project design document   for finance, subsidy & projec...Rice husk power plant project design document   for finance, subsidy & projec...
Rice husk power plant project design document for finance, subsidy & projec...Radha Krishna Sahoo
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.Paul Derwin
 
4th generation district heating
4th generation district heating4th generation district heating
4th generation district heatingShijin Raj P
 

What's hot (20)

District Heat - Powerpoint presentation
District Heat - Powerpoint presentationDistrict Heat - Powerpoint presentation
District Heat - Powerpoint presentation
 
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
 
Rice husk power plant information for finance, subsidy & project related su...
Rice husk power plant information   for finance, subsidy & project related su...Rice husk power plant information   for finance, subsidy & project related su...
Rice husk power plant information for finance, subsidy & project related su...
 
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
Hydrogen modelling in TIMES – a summary of the inputs, outputs, and best prac...
 
INDC-Workshop-26-07-2016-Energy Sector
INDC-Workshop-26-07-2016-Energy SectorINDC-Workshop-26-07-2016-Energy Sector
INDC-Workshop-26-07-2016-Energy Sector
 
Impact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industryImpact of technology availability on the transition to a net-zero industry
Impact of technology availability on the transition to a net-zero industry
 
Accounting for changes in investment flows in a soft-linked hybrid model
Accounting for changes in investment flows in a soft-linked hybrid modelAccounting for changes in investment flows in a soft-linked hybrid model
Accounting for changes in investment flows in a soft-linked hybrid model
 
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
Energy from Waste Water Sewage Sludge in Lebanon - Ecorient 2013
 
Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentations
 
Energy Efficiency Policies in Korea
Energy Efficiency Policies in Korea Energy Efficiency Policies in Korea
Energy Efficiency Policies in Korea
 
Impact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UKImpact of technology uncertainty on future low-carbon pathways in the UK
Impact of technology uncertainty on future low-carbon pathways in the UK
 
Zero carbon projects
Zero carbon projectsZero carbon projects
Zero carbon projects
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
 
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...Assessment of the long-term potential of 'power to hydrogen' in the energy sy...
Assessment of the long-term potential of 'power to hydrogen' in the energy sy...
 
Improving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanImproving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-Kazakhstan
 
Zero Carbon technology
Zero Carbon technologyZero Carbon technology
Zero Carbon technology
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
Rice husk power plant project design document for finance, subsidy & projec...
Rice husk power plant project design document   for finance, subsidy & projec...Rice husk power plant project design document   for finance, subsidy & projec...
Rice husk power plant project design document for finance, subsidy & projec...
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.
 
4th generation district heating
4th generation district heating4th generation district heating
4th generation district heating
 

Viewers also liked

Koshy Cherail - AEEE
Koshy Cherail - AEEE Koshy Cherail - AEEE
Koshy Cherail - AEEE guest17a0764
 
Death of the Search Startup
Death of the Search StartupDeath of the Search Startup
Death of the Search Startupphilosophygeek
 
Közösségi média tárlatvezetés
Közösségi média tárlatvezetésKözösségi média tárlatvezetés
Közösségi média tárlatvezetésIstvan Szecsey
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamguest17a0764
 
dotFM 2010
dotFM 2010dotFM 2010
dotFM 2010gtbundy
 
New Zealand local government website survey 2015
New Zealand local government website survey 2015New Zealand local government website survey 2015
New Zealand local government website survey 2015Jason Dawson
 
Gyűjtemények feldolgozása a KataLIN programmal
Gyűjtemények feldolgozása a KataLIN programmalGyűjtemények feldolgozása a KataLIN programmal
Gyűjtemények feldolgozása a KataLIN programmalIstvan Szecsey
 
A 16. századi egri vár 3D-s virtuális rekonstrukciója
A 16. századi egri vár 3D-s virtuális rekonstrukciójaA 16. századi egri vár 3D-s virtuális rekonstrukciója
A 16. századi egri vár 3D-s virtuális rekonstrukciójaIstvan Szecsey
 

Viewers also liked (8)

Koshy Cherail - AEEE
Koshy Cherail - AEEE Koshy Cherail - AEEE
Koshy Cherail - AEEE
 
Death of the Search Startup
Death of the Search StartupDeath of the Search Startup
Death of the Search Startup
 
Közösségi média tárlatvezetés
Közösségi média tárlatvezetésKözösségi média tárlatvezetés
Közösségi média tárlatvezetés
 
Venkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kamVenkat Rajaraman - Su-kam
Venkat Rajaraman - Su-kam
 
dotFM 2010
dotFM 2010dotFM 2010
dotFM 2010
 
New Zealand local government website survey 2015
New Zealand local government website survey 2015New Zealand local government website survey 2015
New Zealand local government website survey 2015
 
Gyűjtemények feldolgozása a KataLIN programmal
Gyűjtemények feldolgozása a KataLIN programmalGyűjtemények feldolgozása a KataLIN programmal
Gyűjtemények feldolgozása a KataLIN programmal
 
A 16. századi egri vár 3D-s virtuális rekonstrukciója
A 16. századi egri vár 3D-s virtuális rekonstrukciójaA 16. századi egri vár 3D-s virtuális rekonstrukciója
A 16. századi egri vár 3D-s virtuális rekonstrukciója
 

Similar to Samit Jain - Advit Foundation

Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfBlentBulut5
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...ESD UNU-IAS
 
Presentation Fredricton September 2009 general
Presentation Fredricton September 2009 generalPresentation Fredricton September 2009 general
Presentation Fredricton September 2009 generalAngelo Mangatal
 
CDM Potential of Renewable Energy Technologies in India
CDM Potential of Renewable Energy Technologies in IndiaCDM Potential of Renewable Energy Technologies in India
CDM Potential of Renewable Energy Technologies in IndiaPallav Purohit
 
Key Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationKey Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationZAINI ABDUL WAHAB
 
Praveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptPraveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptpraveen gautam
 
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfBest-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfprabhakarjha82
 
Biomass power plant
Biomass power plant Biomass power plant
Biomass power plant Santosh Kumar
 
Chamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy EfficiencyChamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy Efficiencyeecfncci
 
Solution Forum 5- Energy conservation in south indian tea industry undp
Solution Forum 5- Energy conservation in south indian tea industry undpSolution Forum 5- Energy conservation in south indian tea industry undp
Solution Forum 5- Energy conservation in south indian tea industry undpGlobal South-South Development Expo
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziIEEEP Karachi
 
Department of alternative energy development and efficiency (dede)
Department of alternative energy development and efficiency (dede)Department of alternative energy development and efficiency (dede)
Department of alternative energy development and efficiency (dede)PSPSolutions.net
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundaion
 

Similar to Samit Jain - Advit Foundation (20)

Dalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdfDalmia Cement Ariyalur_240314_114438.pdf
Dalmia Cement Ariyalur_240314_114438.pdf
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
 
Hindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdfHindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdf
 
ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017ESCO Contracting - CII Danfoss, Chennai Aug 2017
ESCO Contracting - CII Danfoss, Chennai Aug 2017
 
Presentation Fredricton September 2009 general
Presentation Fredricton September 2009 generalPresentation Fredricton September 2009 general
Presentation Fredricton September 2009 general
 
CDM Potential of Renewable Energy Technologies in India
CDM Potential of Renewable Energy Technologies in IndiaCDM Potential of Renewable Energy Technologies in India
CDM Potential of Renewable Energy Technologies in India
 
Group 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINALGroup 1 TenCate Presentation FINAL
Group 1 TenCate Presentation FINAL
 
CCSE Fuel Cell Commercial Workshop
CCSE Fuel Cell Commercial WorkshopCCSE Fuel Cell Commercial Workshop
CCSE Fuel Cell Commercial Workshop
 
Key Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationKey Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC Implementation
 
Praveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.pptPraveen NMEEE Environment Science.ppt
Praveen NMEEE Environment Science.ppt
 
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdfBest-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
Best-Practices-adopted-by-Ambuja-Cement-Limited-1.pdf
 
Biomass power plant
Biomass power plant Biomass power plant
Biomass power plant
 
Chamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy EfficiencyChamber of industry morang - Energy Efficiency
Chamber of industry morang - Energy Efficiency
 
energy audit
energy auditenergy audit
energy audit
 
Solution Forum 5- Energy conservation in south indian tea industry undp
Solution Forum 5- Energy conservation in south indian tea industry undpSolution Forum 5- Energy conservation in south indian tea industry undp
Solution Forum 5- Energy conservation in south indian tea industry undp
 
Concepts of economic attributes part 1
Concepts of economic attributes part 1Concepts of economic attributes part 1
Concepts of economic attributes part 1
 
Concepts of economic attributes part 1
Concepts of economic attributes part 1Concepts of economic attributes part 1
Concepts of economic attributes part 1
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz Qazi
 
Department of alternative energy development and efficiency (dede)
Department of alternative energy development and efficiency (dede)Department of alternative energy development and efficiency (dede)
Department of alternative energy development and efficiency (dede)
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 

Recently uploaded (20)

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 

Samit Jain - Advit Foundation

  • 1. Panipat Textile Cluster & CDM opportunities CleanTech Conclave 24 th April 2010
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. Investment Grade Energy Audits 5 Apparel Units In National Capital Region
  • 18. Unit A - Baseline 2009 Connected Maximum Demand (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy + Power Bill (Rs.Lakhs) 499 536733 71784 22.67 23.69 46.36
  • 19. Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Tubelights replaced by high lumen o/p LED lights 23440 0.99 1.14 14 Install voltage optimizer in lighting circuits 20258 0.85 2.66 37 Dedicated LED lighting for Sewing m/c 57658 2.43 9.47 47 Solar steam generator to supplement steam generated by diesel fired boiler 31124 (equivalent KWH of diesel) 2.9 12 50 Grand Total 132480 7.17 58.66 37
  • 20. Unit B - Baseline 2009 Connected Maximum Demand (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy + Power Bill (Rs.Lakhs) 320 501912 246341 25.22 76.37 101.5
  • 21. Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Replace existing FTL with energy efficient high lumen output FTL 30234 1.52 1.57 12 Install voltage optimizer in lighting circuits 10767 0.54 1.14 25 Provide dedicated LED lighting for production Sewing m/c 24531 1.23 4.03 39 Solar steam generator to supplement steam generated by diesel fired boiler 236678 (equivalent KWH of diesel) 10.77 35.0 39 Replace conventional regulators with electronic regulators 11333 0.57 1.2 25 Grand Total 313543 14.63 42.84 28
  • 22. Unit C - Baseline 2009 Connected Maximum Demand (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy + Power Bill (Rs.Lakhs) 427 1065575 113411 49.2 37.4 86.6
  • 23. Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Pre heat Fuel oil with boiler exhaust gases 20160 0.93 0.75 10 Replace existing tube lights with high lumens o/p lights 11385 0.53 0.55 13 solar steam generator to supplement diesel fired boiler 212619 19.5 35.0 21 Install voltage optimizer for lighting circuits 10220 0.47 1.33 34 Provide dedicated LED lighting for production Sewing m/c 12580 0.58 2.1 42 Grand Total 266964 14.63 42.84 26
  • 24. Unit D - Baseline 2009 Connected Maximum Demand (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy + Power Bill (Rs.Lakhs) 405 460195 102255 20.9 33.74 54.64
  • 25. Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Arrest waste water 2500 0.12 Nil Immediate Replace heater for hand wash by heat recovery of waste steam 1620 0.07 0.05 8 Replace the existing life max with True light/super life max (NG80) 16102 0.73 0.78 13 Install voltage optimizer in lighting circuits for energy saving 24318 1.11 2.8 31 Install Solar steam generator to supplement steam generated by diesel fired boiler 236677 10.77 35.0 39 Provide dedicated LED lighting for production Sewing m/c 60803 2.77 9.9 44 Grand Total 342020 15.5 48.53 27
  • 26. Unit E – Baseline 2009 Connected Maximum Demand (KVA) Annual Power Consumption (KWH) Annual Diesel Consumption (Ltrs.) Annual Power Bill (Rs.) Annual Energy Bill (Rs.Lakhs) Annual Energy + Power Bill (Rs.Lakhs) 405 364434 56350 16.49 18.0 34.49
  • 27. Identified Improvements & Investment payback period Energy Conservation Measures(ECM) Description / Sector Total Annual savings expected (kWh) Total Annual savings expected (Rs. In lakhs) Total Investment (Rs. in Lakhs) Simple Payback period in Months Arrest water wastage 2263 0.1 Nil Immediate Install lighting voltage optimizers 31846 1.44 0.5 4 Install dedicated LED lights for production sewing m/c 47699 2.16 7.84 44 Grand Total 81808 3.7 8.34 24
  • 28.